CN108537471A CN201810611921.XA CN201810611921A CN108537471A CN 108537471 A CN108537471 A CN 108537471A CN 201810611921 A CN201810611921 A CN 201810611921A CN 108537471 A CN108537471 A CN 108537471A
Authority
CN
China
Prior art keywords
information
work
equipment
field communication
board information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810611921.XA
Other languages
Chinese (zh)
Inventor
郭洪远
李瑞东
苏永健
李云峰
徐义巍
邓万平
杨致富
陈文�
李鹏竹
贺学军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Jing Nengningdong Power Generation Corp Ltd
Original Assignee
Ningxia Jing Nengningdong Power Generation Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Jing Nengningdong Power Generation Corp Ltd filed Critical Ningxia Jing Nengningdong Power Generation Corp Ltd
Priority to CN201810611921.XA priority Critical patent/CN108537471A/en
Publication of CN108537471A publication Critical patent/CN108537471A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of flow management and control system of work ticket and its data processing methods, are related to power system security administrative skill field.Hand-held terminal device in system is acquired the radio frequency identification mark code of equipment on the spot, shoots one or more operations of the image information of relevant staff and the voice messaging by recording device acquisition relevant staff by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, by near-field communication identification chip collector's identity board information, by the photographic device under one or more working stage of electric industry trouble free service;The radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board information, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and the background server equipment is uploaded to by network.

Description

A kind of flow management and control system and its data processing method of work ticket
Technical field
The present invention relates to the flow management and control system of power system security administrative skill field more particularly to a kind of work ticket and Its data processing method.
Background technology
In power system security administrative skill field, work ticket permits working on electrical equipment and system software Writ, and execute the written foundation for ensureing technical safety measures.The flow management and control mode for being currently based on work ticket is general It also rests in the artificial and way to manage of papery, process is generally:
First, after work approval, safety measure arranges that executor according to the requirement of work ticket safety measure, carries out safety and arranges Arrangement is applied, before service work starts, work permit people can arrive scene control work ticket jointly with work responsible person and check item by item, really Recognize listed safety measure to improve and correctly execute.Which equipment live work permit people is described in detail to work responsible person, has pressure Power, high temperature, explosion and Danger Electric shock risk etc., the cosignatory completion work ticket of both sides permit formality.Forbid to run after going into operation or examine It repaiies personnel and unilaterally changes safety measure.Workplace faulted-stage section:When work interruption, shift member should withdraw from from scene, listed Safety measure remains stationary as, and work ticket is still held by the responsible person that works and deposited.Before working on after interruption, work responsible person should recognize again The true requirement for checking safety measure and should meeting work ticket, can work.When being led without work responsible person, staff must not be into Enter job site.The equipment test run stage:Equipment after maintenance should carry out test run.Repair apparatus test run work should be by the responsible person that works File an application, work ticket agreed to and withdrawn through work permit people, job crew class member withdraws job site, by operations staff into The relevant work of row test run.Forbid not withdraw work ticket, contacts test run equipment by parole.It still to work after test run When, after work permit people should fulfil work permit formality again with work responsible person by " safety measure " execution column, it can restore Work.It such as needs to change former work ticket safety measure, work ticket should be signed and issued again.Work finishing steps:After work, work Responsible person should check and cleaning housekeeping scene is organized to lead staff to withdraw scene after confirming no problem comprehensively.Work Licensor and work responsible person arrive onsite acceptance jointly, check status of equipment, whether there is or not leave object, if then cleaning etc. exists It is filled on work ticket knocking-off time, both sides' signature, come to an end knot for work side.Work ticket completes the stage:Operator is torn open Except temporary fence, nameplate is removed, restores safety measure, report value grows (squad leader, machine group leader).To unrecovered safety measure, Report value is grown (squad leader, machine group leader) and is made a record, and is capped " executed " chapter in the work ticket upper right corner, come to an end knot for work ticket side.
As it can be seen that the flow management and control mode based on work ticket also rests on artificial and papery way to manage in the prior art On, can not to work ticket safety measure arrangement, safety measure recovery, work permit, work termination etc. the stages whether according to《Electric industry Safety work regulation》Carry out management and control, it is difficult to which whether the flow in electric power monitoring system work performs effectively.
Invention content
The embodiment of the present invention provides a kind of flow management and control system and its data processing method of work ticket, existing to solve The flow management and control mode based on work ticket also rests in the artificial and way to manage of papery in technology, can not be to work ticket safety Measure arrangement, safety measure recovery, work permit, work termination etc. the stages whether according to《Electric industry safety work regulation》Carry out pipe Control, it is difficult to the problem of whether flow in electric power monitoring system work performs effectively.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:
A kind of flow management and control system of work ticket, including:Background server equipment, is provided with radio frequency at hand-held terminal device The equipment on the spot of identification marking code, the live earthing or grounding means for being respectively arranged with near-field communication identification chip, live sign board and people Member's identity board;The hand-held terminal device is connect by network with the background server equipment;The handheld terminal is set It is standby to be provided with photographic device and recording device;
The hand-held terminal device is used under one or more working stage of electric industry trouble free service, is acquired and is set on the spot Standby radio frequency identification identifies code, is identified by near-field communication identification chip collection site earthing or grounding means information, by near-field communication Chip collection site sign board information is taken the photograph by near-field communication identification chip collector's identity board information, by described The image information of relevant staff is shot as device and the voice messaging of relevant staff is acquired by the recording device One or more operations;By the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, scene mark Board information, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and by network Reach the background server equipment.
Further, the hand-held terminal device is additionally provided with central processing element circuit, radio communication circuit, radio frequency and knows Other circuit and near-field communication identification circuit;The central processing element circuit and the radio communication circuit, rfid circuit It is separately connected with near-field communication identification circuit;
Circuit is connected to network to the hand-held terminal device by radio communication, to connect with the background server equipment It connects;
The hand-held terminal device is by the way that the radio frequency identification of equipment identifies code on the spot described in rfid circuit acquisition;
The hand-held terminal device senses each near-field communication identification chip by the near-field communication identification circuit, and acquisition is existing Field earthing or grounding means information, live sign board information and personnel identity Sign Board information.
Specifically, the photographic device and recording device are connect with the central processing element circuit.
Specifically, the hand-held terminal device is additionally provided with liquid crystal touch display screen, speaker circuit and power circuit, institute Liquid crystal touch display screen, speaker circuit and power circuit is stated to connect with the central processing element circuit respectively.
Further, the flow management and control system of the work ticket further includes that backstage shows that equipment, the backstage show equipment It is communicated to connect with the background server equipment, to show the data information of background server equipment.
A kind of data processing method of the flow management and control system of work ticket is applied to the flow management and control system of above-mentioned work ticket System, the method includes:
Obtain the work ticket information of the electric industry trouble free service of background server equipment;
Under one or more working stage of electric industry trouble free service, be acquired equipment on the spot radio frequency identification mark code, Believe by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board Breath shoots related work people by near-field communication identification chip collector's identity board information, by the photographic device Member image information and by the recording device acquire relevant staff voice messaging one or more operations;
By the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment.
Specifically, it is described under one or more working stage of electric industry trouble free service, it is acquired the radio frequency of equipment on the spot Identification marking code is acquired by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip Live sign board information is clapped by near-field communication identification chip collector's identity board information, by the photographic device Take the photograph relevant staff image information and by the recording device acquire relevant staff voice messaging one kind or A variety of operations, including:
Arrangement stage is arranged in the peace of electric industry trouble free service, arranges the figure of arrangement operational staff by photographic device shooting peace As information, pacifies the voice messaging arranged and arrange operational staff by recording device acquisition, adopted by near-field communication identification chip The live sign board information of collection, passes through near-field communication identification chip collection site earthing or grounding means information;
It is described to believe the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment, including:
The voice messaging for arranging the image information of arrangement operational staff, peace to arrange arrangement operational staff will be pacified, live sign board is believed Breath and live earthing or grounding means information carry out registration record, and are uploaded to the background server equipment by network;
It is to pacify execution state of arranging by the corresponding status modifier of the work ticket.
Specifically, it is described under one or more working stage of electric industry trouble free service, it is acquired the radio frequency of equipment on the spot Identification marking code is acquired by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip Live sign board information is clapped by near-field communication identification chip collector's identity board information, by the photographic device Take the photograph relevant staff image information and by the recording device acquire relevant staff voice messaging one kind or A variety of operations further include:
In the work permit stage of electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identifies code, passes through the record Mixer acquires the voice messaging for the danger source on the spot that licensor states to work responsible person, is adopted by near-field communication identification chip Collect the identity board information of licensor and the responsible person that works, and licensor and work responsible person are shot by the photographic device The image information of group photo;
It is described to believe the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment, including:
The radio frequency identification of equipment on the spot is identified into code, the on the spot voice messaging of danger source, licensor and works responsible person's The image information of identity board information and licensor and work responsible person's group photo carries out registration record, and is uploaded by network To the background server equipment;
It is work permit state by the corresponding status modifier of the work ticket.
Specifically, it is described under one or more working stage of electric industry trouble free service, it is acquired the radio frequency of equipment on the spot Identification marking code is acquired by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip Live sign board information is clapped by near-field communication identification chip collector's identity board information, by the photographic device Take the photograph relevant staff image information and by the recording device acquire relevant staff voice messaging one kind or A variety of operations further include:
Safety after the work permit of electric industry trouble free service and before starting to work is told somebody what one's real intentions are the stage, and the camera shooting is passed through Device shoot pre-set work ticket Preventive Control of Dangerous Spot analysis information, by the recording device collecting work responsible person to The voice messaging of the Preventive Control of Dangerous Spot analysis information of teams and groups staff statement, it is negative by near-field communication identification chip collecting work The identity board information of people and teams and groups staff are blamed, and work responsible person and teams and groups' work are shot by the photographic device The image information of personnel's group photo;
In the course of work of electric industry trouble free service, the danger of pre-set work ticket is shot by the photographic device Point pre-control analyzes information, and the work ticket Preventive Control of Dangerous Spot executive condition voice of teams and groups staff is acquired by the recording device Information shoots the image information of the work ticket Preventive Control of Dangerous Spot executive condition of teams and groups staff by the photographic device, leads to Cross the identity board information of near-field communication identification chip acquisition teams and groups staff;The work ticket Preventive Control of Dangerous Spot executes feelings Condition includes seatbelt wearing situation, Work tool service condition and labor protection articles for use service condition;
It is described to believe the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment, including:
The Preventive Control of Dangerous Spot analysis information of work ticket, Preventive Control of Dangerous Spot are analyzed into the voice messaging of information, work responsible person It is carried out with the image information of the identity board information of teams and groups staff and work responsible person and teams and groups staff group photo Registration record, and the background server equipment is uploaded to by network;
By the Preventive Control of Dangerous Spot analysis information of work ticket, work ticket Preventive Control of Dangerous Spot executive condition voice messaging, work ticket The image information of Preventive Control of Dangerous Spot executive condition and the identity board information of teams and groups staff carry out registration record, and pass through Network is uploaded to the background server equipment.
Specifically, it is described under one or more working stage of electric industry trouble free service, it is acquired the radio frequency of equipment on the spot Identification marking code is acquired by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip Live sign board information is clapped by near-field communication identification chip collector's identity board information, by the photographic device Take the photograph relevant staff image information and by the recording device acquire relevant staff voice messaging one kind or A variety of operations further include:
In the work finishing steps of electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identifies code, logical by near field Believe the identity board information of identification chip collecting work licensor and the responsible person that works, and class is shot by the photographic device The image information of group staff's group photo;
It is described to believe the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment, including:
By the radio frequency identification of equipment on the spot mark code, work permit people and the identity board information for the responsible person that works and The image information of personnel's group photo carries out registration record, and is uploaded to the background server equipment by network;
It is work final state by the corresponding status modifier of the work ticket.
Specifically, it is described under one or more working stage of electric industry trouble free service, it is acquired the radio frequency of equipment on the spot Identification marking code is acquired by near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip Live sign board information is clapped by near-field communication identification chip collector's identity board information, by the photographic device Take the photograph relevant staff image information and by the recording device acquire relevant staff voice messaging one kind or A variety of operations further include:
The stage is completed in the work ticket of electric industry trouble free service, is believed by near-field communication identification chip collection site sign board Breath acquires the identity board information that safety measure restores people and guardian by near-field communication identification chip, logical by near field Believe identification chip collection site earthing or grounding means information, acquiring safety measure by the recording device restores people and guardian's progress Restore the voice messaging that peace is arranged;
It is described to believe the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment, including:
Live sign board information, safety measure are restored into the identity board information of people and guardian, live earthing or grounding means Information and safety measure restore people and guardian carries out restoring the voice messaging progress registration record that peace is arranged, and by network Reach the background server equipment;
It is work ticket completion status by the corresponding status modifier of the work ticket;
The method further includes:
Prompt message should not be extractd according to the sign board that live sign board information is sent by receiving the background server equipment, And it is shown.
Specifically, the work ticket information includes the expired moment of work ticket;
The method further includes:
In one preset duration of residue of expired moment apart from work ticket, the work ticket that background server equipment is sent is received Reminder message.
Specifically, the radio frequency identification mark of the equipment on the spot for being uploaded to the background server equipment by network The one of code, live earthing or grounding means information, live sign board information, personnel identity Sign Board information, image information and voice messaging Kind is a variety of by according to work ticket information progress statistical query, forms work ticket relative recording content;The work ticket packet Include work draft bank;
The method further includes:
Receive work draft bank to be checked, on the spot the radio frequency identification mark code of equipment, live earthing or grounding means information, scene mark Will board information or personnel identity Sign Board information, and the background server equipment is sent to by network;
Receive the background server equipment according to work draft bank to be checked, on the spot equipment radio frequency identification mark code, The work ticket relative recording content of live earthing or grounding means information, live sign board information or personnel identity Sign Board information feedback.
The flow management and control system and its data processing method of a kind of work ticket provided in an embodiment of the present invention, hand in the system Hold terminal device and can be acquired the radio frequency identification of equipment on the spot under one or more working stage of electric industry trouble free service Identification code, by near-field communication identification chip collection site earthing or grounding means information, pass through near-field communication identification chip collection site Sign board information shoots phase by near-field communication identification chip collector's identity board information, by the photographic device It closes the image information of staff and acquires the one or more of the voice messaging of relevant staff by the recording device Operation;So as to which the radio frequency identification of collected equipment on the spot is identified code, live earthing or grounding means information, live sign board letter Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment.In this way, under each working stage of electric industry trouble free service, work ticket relevant information may be implemented Acquisition, record and upload, can monitoring work personnel whether executed according to regulatory requirements, can be improved personnel safety consciousness.Solution Certainly the flow management and control mode based on work ticket also rests in the artificial and way to manage of papery in the prior art, can not be to work Ticket safety measure is arranged and the progress management and control such as recovery situation, it is difficult to which whether the flow in electric power monitoring system work performs effectively The problem of.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without having to pay creative labor, may be used also for those of ordinary skill in the art With obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of structural schematic diagram one of the flow management and control system of work ticket provided in an embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram two of the flow management and control system of work ticket provided in an embodiment of the present invention;
Fig. 3 is a kind of flow chart of the data processing method of the flow management and control system of work ticket provided in an embodiment of the present invention One;
Fig. 4 is a kind of flow chart of the data processing method of the flow management and control system of work ticket provided in an embodiment of the present invention Two.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It should be noted that since the flow management and control mode in the prior art based on work ticket also rests on artificial and papery Way to manage on, therefore there are problems, such as:
1., can not to work ticket safety measure arrange and recovery situation carry out management and control.
Service work ticket safety measure is that service work is smoothed out most important security perimeter, due to production scene people Member's professional standards are irregular, working attitude is full differs, if safety measure arrangement is not in place, service personnel may be made injured Or equipment damage can influence unit safety production if safety measure cannot be restored comprehensively;It simultaneously also can not be to overhauling people " maintenance is taken care of oneself " safety measure executive condition of member carries out management and control.
2., can not to live nameplate carry out management and control.
When unit maintenance, since overhauling project is more, numerous maintenance safety measures can be overlapped, thus can cause one switch or Multiple nameplates are hung at person's valve, and management and control can not be carried out either with or without the new nameplate of suspension when rearranging safety measure, When restoring safety measure, management and control can not be also carried out either with or without nameplate is extractd, more, miscellaneous so as to cause production scene nameplate, Disorderly, some nameplates even arbitrarily abandon, and keep Overhaul site nameplate chaotic.
3., " work permit ", the flows such as " work termination " whether according to《Electrical safe working order》It executes, Wu Faguan Control.
《Electrical safe working order》It is required that:Before service work starts, work permit people can jointly arrive with work responsible person Scene control work ticket checks that the listed safety measure of confirmation is improved and correct execution item by item.Work permit people to work responsible person Which equipment live is described in detail, has pressure, high temperature, explosion and Danger Electric shock risk etc., the cosignatory completion work ticket license of both sides Formality.
《Electrical safe working order》It is required that:After work, work responsible person should check and organize to clean and arrange comprehensively Working site leads staff to withdraw scene after confirming no problem.Work permit people and work responsible person test to scene jointly It receives, checks status of equipment, whether there is or not leave object, if then cleaning etc. is filled in knocking-off time on work ticket, both sides' label Name, come to an end knot for work side.
" work permit " " work termination " is all to carry out on computers at present, work permit people/responsible person whether according to《Electricity Industry safety work order》It is required that execute, it can not management and control.
4., management and control can not be carried out to work ticket " Analysis about Dangerous Point control single " executive condition.
If crewmember is unclear to content listed by " Analysis about Dangerous Point controls single ", it may result in crewmember and go to the wrong way Maintenance interval cannot use qualified Work tool, not know about the problems such as service area danger source, cause personal injury or equipment Damage, and the responsible person that works before starting the work at present carries out " Analysis about Dangerous Point controls single " executive condition to crewmember and has no way of Verification, only personnel, which are signed, to be confirmed, and can random allograph.
5., whether service personnel carries out in real earnest according to content listed by " Analysis about Dangerous Point controls single " in maintenance process, can not Management and control.
For " Analysis about Dangerous Point control is single " executive condition during service work, no detection methods, for example overhaul In the process whether using qualified Work tool, the low use of the whether high extension of safety belt etc., service personnel can be caused to loosen safe meaning for a long time Know, off one's guard, there are security risks.
6., cannot achieve to full factory ground wire, grounding switch data management and control.
Earthing or grounding means registration at present is manually to register, but use demolition, installation feelings to site examining and repairing demand and earthing or grounding means Condition can not fully understand, be susceptible to artificial accidentally registration, while there is also the risk of accidentally division earthing or grounding means, it is hidden to there is safety Suffer from.
In order to overcome above-mentioned many defects, as shown in Figure 1, the embodiment of the present invention provides a kind of flow management and control system of work ticket System 10, including:Background server equipment 11, hand-held terminal device 12 are provided with radio frequency identification (Radio Frequency Identification, abbreviation RFID) identification code 131 equipment on the spot 13, be respectively arranged with near-field communication (Near Field Communication, abbreviation NFC) identification chip live earthing or grounding means 14, live sign board 15 and personnel identity Sign Board 16;The hand-held terminal device 12 is connect by network with the background server equipment 11;The hand-held terminal device 12 is set It is equipped with photographic device 121 and recording device 122.The hand-held terminal device 12 can be that smart mobile phone, tablet computer etc. are portable Movable equipment, but be not only limited to this.More hand-held terminal devices 12 can be set in the embodiment of the present invention, passed through respectively Network is communicated to connect with background server equipment 11.
In addition, the scene sign board 15 is for the various sign boards in operating position to be arranged, number can be arranged thereon, And the information recorded in near-field communication identification chip is identical as the information indicated by each sign board.For example, live sign board 15 can To have " No switching on, someone's work, number:348 ", it " works, numbers herein:159 ", " quiescing, someone's work, number: 050 " etc., but it is not only limited to this.
Personnel's identity board 16 can be lanyard, and above-noted has employee's photo, name, department and post etc. Information, the information recorded in the near-field communication identification chip include at least the information that 16 surface of personnel identity Sign Board is recorded.
The hand-held terminal device 12 can under one or more working stage of electric industry trouble free service (such as peace arrange arrangement rank Section, work permit stage, safe stage of telling somebody what one's real intentions are, work finishing steps and work ticket completion stage etc.), it is acquired and sets on the spot Standby 13 radio frequency identification mark code 131 leads to by 14 information of near-field communication identification chip collection site earthing or grounding means, by near field Believe 15 information of identification chip collection site sign board, by 16 information of near-field communication identification chip collector's identity board, The image information that relevant staff is shot by the photographic device 121 acquires related work to by the recording device 122 Make one or more operations of the voice messaging of personnel;By the radio frequency identification mark code of collected equipment on the spot, scene ground connection One or more progress of device information, live sign board information, personnel identity Sign Board information, image information and voice messaging Record, and the background server equipment 11 is uploaded to by network.
Further, as shown in Fig. 2, the hand-held terminal device 12 is additionally provided with central processing element circuit 123, wireless Telecommunication circuit 124, rfid circuit 125 and near-field communication identification circuit 126;The central processing element circuit 123 and institute Radio communication circuit 124, rfid circuit 125 and near-field communication identification circuit 126 is stated to be separately connected.
Circuit 124 is connected to network to the hand-held terminal device 12 by radio communication, with the background server equipment 11 connections.
The hand-held terminal device 12 acquires the radio frequency identification marking of the equipment 13 on the spot by the rfid circuit 125 Know code 131.
It is (right that the hand-held terminal device 12 by the near-field communication identification circuit 126 senses each near-field communication identification chip It is respectively near-field communication identification chip 141,151 that live earthing or grounding means 14, live sign board 15 and personnel identity mark 16, which should be arrived, With 161), collection site earthing or grounding means information, live sign board information and personnel identity Sign Board information.
Specifically, as shown in Fig. 2, the photographic device 121 and recording device 122 and the central processing element circuit 123 connections.
Specifically, as shown in Fig. 2, the hand-held terminal device 12 is additionally provided with liquid crystal touch display screen 127, loud speaker electricity Road 128 and power circuit 129, the liquid crystal touch display screen 127, speaker circuit 128 and power circuit 129 respectively with it is described Central processing element circuit connects.The hand-held terminal device 12 can be controlled and operated by liquid crystal touch display screen 127, also may be used Show the data information in hand-held terminal device 12.Can be that hand-held terminal device 12 makes a sound by speaker circuit 128. Can be that hand-held terminal device 12 is powered by power circuit 129.
Further, as shown in Fig. 2, the flow management and control system 10 of the work ticket, which further includes backstage, shows equipment 17, institute It states backstage and shows that equipment 17 is communicated to connect with the background server equipment 11, to show that the data of background server equipment 11 are believed Breath.
A kind of flow management and control system of work ticket provided in an embodiment of the present invention, the terminal device of holding of hand can be in the system Under one or more working stage of electric industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, passes through near field Communication identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, pass through Near-field communication identification chip collector's identity board information, the image that relevant staff is shot by the photographic device Information and by the recording device acquire relevant staff voice messaging one or more operations;So as to adopt Radio frequency identification mark code, live earthing or grounding means information, live sign board information, the personnel identity Sign Board of the equipment on the spot collected Information, image information and the one or more of voice messaging are recorded, and are uploaded to the background server by network and are set It is standby.In this way, under each working stage of electric industry trouble free service, acquisition, record and the upload of work ticket relevant information may be implemented, Can monitoring work personnel whether executed according to regulatory requirements, can be improved personnel safety consciousness.Solution is based in the prior art The flow management and control mode of work ticket also rests in the artificial and way to manage of papery, can not to work ticket safety measure arrangement with And recovery situation etc. carries out management and control, it is difficult to the problem of whether flow in electric power monitoring system work performs effectively.
In addition, as shown in figure 3, the embodiment of the present invention also provides a kind of data processing side of the flow management and control system of work ticket Method is applied to the flow management and control system of the corresponding work tickets of above-mentioned Fig. 1 and Fig. 2, the method includes:
The work ticket information of the electric industry trouble free service of step 201, acquisition background server equipment.
The work ticket information may come from ERP system (Enterprise Resource Planning, corporate resources meter The system of drawing), which can run on background server equipment.
Step 202, under one or more working stage of electric industry trouble free service, be acquired the radio frequency identification of equipment on the spot Identification code, by near-field communication identification chip collection site earthing or grounding means information, pass through near-field communication identification chip collection site Sign board information shoots phase by near-field communication identification chip collector's identity board information, by the photographic device It closes the image information of staff and acquires the one or more of the voice messaging of relevant staff by the recording device Operation.
Step 203 indicates the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, scene Board information, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and by network Reach the background server equipment.
As it can be seen that a kind of data processing method of the flow management and control system of work ticket provided in an embodiment of the present invention, Ke Yi Under each working stage of electric industry trouble free service, acquisition, record and the upload of work ticket relevant information are realized, it can monitoring work personnel Whether executed according to regulatory requirements, personnel safety consciousness can be improved.Solve the flow pipe based on work ticket in the prior art Prosecutor formula also rests in the artificial and way to manage of papery, can not to work ticket safety measure arrangement and recovery situation etc. into Row management and control, it is difficult to the problem of whether flow in electric power monitoring system work performs effectively.
In order to make those skilled in the art be better understood by the present invention, a specific application example is set forth below, such as Shown in Fig. 4, the embodiment of the present invention provides a kind of data processing method of the flow management and control system of work ticket, including:
The work ticket information of the electric industry trouble free service of step 301, acquisition background server equipment.
Step 302 arranges arrangement stage in the peace of electric industry trouble free service, arranges arrangement to execute by photographic device shooting peace The image information of personnel is pacified the voice messaging arranged and arrange operational staff by recording device acquisition, is known by near-field communication Other chip collection site sign board information passes through near-field communication identification chip collection site earthing or grounding means information.
Arrange arrangement stage, peace that arrangement operational staff is arranged to need to arrange content to arrange that peace is arranged one by one according to work ticket peace in peace.
Peace is arranged and arranges the image information of operational staff, pacifies the voice messaging for arranging operational staff, the scene of arranging by step 303 Sign board information and live earthing or grounding means information carry out registration record, and are uploaded to the background server equipment by network, And by the corresponding status modifier of the work ticket it is that peace arranges execution state.
In this way, can check that the peace for carrying out registration record arranges the relevant information of arrangement in background server equipment.It can be with Including corresponding safety measure, executive condition, executor, execution date, execute the contents such as time.
Step 304, the work permit stage in electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identify code, lead to The voice messaging that the recording device acquires the danger source on the spot that licensor states to work responsible person is crossed, is known by near-field communication The identity board information of other chip acquisition licensor and the responsible person that works, and licensor and work are shot by the photographic device Make the image information of responsible person's group photo.
In the work permit stage, licensor needs to state danger source on the spot to work responsible person, and checks arranged Safety measure whether meet service requirements, it is therefore desirable to voice and Image Acquisition are carried out, to record the progress of this process.
The radio frequency identification of equipment on the spot is identified code, the on the spot voice messaging of danger source, licensor and work by step 305 The image information of the identity board information of responsible person and licensor and work responsible person's group photo carries out registration record, and passes through Network is uploaded to the background server equipment, and is work permit state by the corresponding status modifier of work ticket.
Step 306, the safety after the work permit of electric industry trouble free service and before starting to work are told somebody what one's real intentions are the stage, are passed through The photographic device shoots the Preventive Control of Dangerous Spot analysis information of pre-set work ticket, passes through the recording device collecting work The voice messaging for the Preventive Control of Dangerous Spot analysis information that responsible person states to teams and groups staff, is adopted by near-field communication identification chip Collect work responsible person and teams and groups staff identity board information, and by the photographic device shoot work responsible person and The image information of teams and groups staff group photo.In the course of work of electric industry trouble free service, shot by the photographic device pre- The Preventive Control of Dangerous Spot for the work ticket being first arranged analyzes information, and the work ticket that teams and groups staff is acquired by the recording device is endangered Danger point pre-control executive condition voice messaging, the work ticket Preventive Control of Dangerous Spot that teams and groups staff is shot by the photographic device are held The image information of market condition acquires the identity board information of teams and groups staff by near-field communication identification chip;The work It includes that seatbelt wearing situation, Work tool service condition and labor protection articles for use use feelings to make ticket Preventive Control of Dangerous Spot executive condition Condition.
The Preventive Control of Dangerous Spot analysis information of work ticket, Preventive Control of Dangerous Spot are analyzed the voice messaging of information, work by step 307 Make the identity board information of responsible person and teams and groups staff and the image of work responsible person and teams and groups staff group photo Information carries out registration record, and is uploaded to the background server equipment by network.The Preventive Control of Dangerous Spot of work ticket is analyzed Information, work ticket Preventive Control of Dangerous Spot executive condition voice messaging, the image information of work ticket Preventive Control of Dangerous Spot executive condition and class The identity board information of group staff carries out registration record, and is uploaded to the background server equipment by network.
Step 308, the work finishing steps in electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identify code, lead to The identity board information of near-field communication identification chip acquisition teams and groups staff is crossed, and teams and groups are shot by the photographic device The image information of staff's group photo.
The radio frequency identification of equipment on the spot is identified code, the identity board information of teams and groups staff and class by step 309 The image information of group staff's group photo carries out registration record, and is uploaded to the background server equipment by network, and will The corresponding status modifier of the work ticket is work final state.
Step 310, the work ticket completion stage in electric industry trouble free service, pass through near-field communication identification chip collection site mark Will board information acquires the identity board information that safety measure restores people and guardian by near-field communication identification chip, passes through Near-field communication identification chip collection site earthing or grounding means information acquires safety measure by the recording device and restores people and monitoring People carries out restoring the voice messaging that peace is arranged.
Live sign board information, safety measure are restored people and the identity board information of guardian, scene by step 311 Earthing or grounding means information and safety measure restore people and guardian carries out restoring the voice messaging progress registration record that peace is arranged, and lead to It crosses network and is uploaded to the background server equipment, and be work ticket completion status by the corresponding status modifier of the work ticket.
In addition, the work ticket in electric industry trouble free service completes the stage, pass through near-field communication identification chip collection site mark After board information, if there is also other work at live sign board, it should not extract, the background server will be received at this time and set The standby sign board sent according to live sign board information should not extract prompt message, and be shown.
In addition, the work ticket information includes the expired moment of work ticket;In electric industry trouble free service, apart from work ticket A remaining preset duration (such as 2 hours) of expired moment when, receive the work ticket reminder message that background server equipment is sent, It becomes invalid after the specified date to avoid work ticket.
Specifically, the radio frequency identification mark of the equipment on the spot for being uploaded to the background server equipment by network The one of code, live earthing or grounding means information, live sign board information, personnel identity Sign Board information, image information and voice messaging Kind is a variety of by according to work ticket information progress statistical query, forms work ticket relative recording content;The work ticket packet Include work draft bank.
In this way, this method can also receive, work draft bank to be checked, the radio frequency identification mark code of equipment, scene connect on the spot Ground device information, live sign board information or personnel identity Sign Board information, and the background server is sent to by network Equipment;
Later, radio frequency identification marking of the background server equipment according to work draft bank to be checked, equipment on the spot is received The work ticket relative recording of knowledge code, live earthing or grounding means information, live sign board information or personnel identity Sign Board information feedback Content.So as to realize the express query of work ticket relative recording content.
A kind of data processing method of the flow management and control system of work ticket provided in an embodiment of the present invention, hand in the system The radio frequency identification marking of equipment on the spot can be acquired under one or more working stage of electric industry trouble free service by holding terminal device Know code, by near-field communication identification chip collection site earthing or grounding means information, pass through near-field communication identification chip collection site mark Will board information shoots correlation by near-field communication identification chip collector's identity board information, by the photographic device The image information of staff and by the recording device acquire relevant staff voice messaging one or more behaviour Make;So as to which the radio frequency identification of collected equipment on the spot is identified code, live earthing or grounding means information, live sign board letter Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment.In this way, under each working stage of electric industry trouble free service, work ticket relevant information may be implemented Acquisition, record and upload, can monitoring work personnel whether executed according to regulatory requirements, can be improved personnel safety consciousness.Solution Certainly the flow management and control mode based on work ticket also rests in the artificial and way to manage of papery in the prior art, can not be to work Ticket safety measure is arranged and the progress management and control such as recovery situation, it is difficult to which whether the flow in electric power monitoring system work performs effectively The problem of.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, the present invention can be used in one or more wherein include computer usable program code computer The computer program production implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
Specific embodiment is applied in the present invention, and principle and implementation of the present invention are described, above example Explanation be merely used to help understand the present invention method and its core concept;Meanwhile for those of ordinary skill in the art, According to the thought of the present invention, there will be changes in the specific implementation manner and application range, in conclusion in this specification Appearance should not be construed as limiting the invention.

Claims (13)

1. a kind of flow management and control system of work ticket, which is characterized in that including:Background server equipment, is set hand-held terminal device The equipment on the spot for being equipped with radio frequency identification mark code, the live earthing or grounding means for being respectively arranged with near-field communication identification chip, scene mark Will board and personnel identity Sign Board;The hand-held terminal device is connect by network with the background server equipment;The hand It holds terminal device and is provided with photographic device and recording device;
The hand-held terminal device is used under one or more working stage of electric industry trouble free service, is acquired equipment on the spot Radio frequency identification mark code, by near-field communication identification chip collection site earthing or grounding means information, pass through near-field communication identification chip Collection site sign board information is filled by near-field communication identification chip collector's identity board information, by the camera shooting Set the one of the image information of shooting relevant staff and the voice messaging by recording device acquisition relevant staff Kind or a variety of operations;By the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board letter Breath, personnel identity Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network The background server equipment.
2. the flow management and control system of work ticket according to claim 1, which is characterized in that the hand-held terminal device is also set It is equipped with central processing element circuit, radio communication circuit, rfid circuit and near-field communication identification circuit;The central processing Chip circuit is separately connected with the radio communication circuit, rfid circuit and near-field communication identification circuit;
Circuit is connected to network to the hand-held terminal device by radio communication, to be connect with the background server equipment;
The hand-held terminal device is by the way that the radio frequency identification of equipment identifies code on the spot described in rfid circuit acquisition;
The hand-held terminal device senses each near-field communication identification chip by the near-field communication identification circuit, and collection site connects Ground device information, live sign board information and personnel identity Sign Board information.
3. the flow management and control system of work ticket according to claim 2, which is characterized in that the photographic device and recording dress It sets and is connect with the central processing element circuit.
4. the flow management and control system of work ticket according to claim 3, which is characterized in that the hand-held terminal device is also set It is equipped with liquid crystal touch display screen, speaker circuit and power circuit, the liquid crystal touch display screen, speaker circuit and power supply electricity Road is connect with the central processing element circuit respectively.
5. the flow management and control system of work ticket according to claim 1, which is characterized in that the flow management and control of the work ticket System further includes that backstage shows equipment, and the backstage shows that equipment is communicated to connect with the background server equipment, after display The data information of platform server apparatus.
6. a kind of data processing method of the flow management and control system of work ticket, which is characterized in that be applied to claim 1 to 5 times The flow management and control system of work ticket described in one, the method includes:
Obtain the work ticket information of the electric industry trouble free service of background server equipment;
Under one or more working stage of electric industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, passes through Near-field communication identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, Shoot relevant staff's by near-field communication identification chip collector's identity board information, by the photographic device Image information and by the recording device acquire relevant staff voice messaging one or more operations;
By the radio frequency identification mark code of collected equipment on the spot, live earthing or grounding means information, live sign board information, Ren Yuanshen Part Sign Board information, image information and the one or more of voice messaging are recorded, and are uploaded to the backstage by network Server apparatus.
7. the data processing method of the flow management and control system of work ticket according to claim 6, which is characterized in that described in electricity Under one or more working stage of industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, passes through near-field communication Identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, pass through near field Communication identification chip collector's identity board information, the image information that relevant staff is shot by the photographic device With by the recording device acquire relevant staff voice messaging one or more operations, including:
Arrangement stage is arranged in the peace of electric industry trouble free service, arranges the image of arrangement operational staff to believe by photographic device shooting peace Breath is pacified the voice messaging arranged and arrange operational staff by recording device acquisition, is acquired by near-field communication identification chip existing Field mark board information passes through near-field communication identification chip collection site earthing or grounding means information;
The radio frequency identification by collected equipment on the spot identifies code, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment, including:
Will peace arrange the image information of arrangement operational staff, peace arrange the voice messaging of arrangement operational staff, live sign board information and Live earthing or grounding means information carries out registration record, and is uploaded to the background server equipment by network;
It is to pacify execution state of arranging by the corresponding status modifier of the work ticket.
8. the data processing method of the flow management and control system of work ticket according to claim 7, which is characterized in that described in electricity Under one or more working stage of industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, passes through near-field communication Identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, pass through near field Communication identification chip collector's identity board information, the image information that relevant staff is shot by the photographic device With the one or more operations for the voice messaging for acquiring relevant staff by the recording device, further include:
In the work permit stage of electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identifies code, passes through the recording and fills The voice messaging for setting the danger source on the spot that acquisition licensor states to work responsible person is permitted by the acquisition of near-field communication identification chip Can people and work responsible person identity board information, and pass through the photographic device shoot licensor and work responsible person group photo Image information;
The radio frequency identification by collected equipment on the spot identifies code, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment, including:
By the radio frequency identification of equipment on the spot mark code, on the spot the voice messaging of danger source, licensor and the responsible person that works identity The image information of Sign Board information and licensor and work responsible person's group photo carries out registration record, and is uploaded to institute by network State background server equipment;
It is work permit state by the corresponding status modifier of the work ticket.
9. the data processing method of the flow management and control system of work ticket according to claim 8, which is characterized in that described in electricity Under one or more working stage of industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, passes through near-field communication Identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, pass through near field Communication identification chip collector's identity board information, the image information that relevant staff is shot by the photographic device With the one or more operations for the voice messaging for acquiring relevant staff by the recording device, further include:
Safety after the work permit of electric industry trouble free service and before starting to work is told somebody what one's real intentions are the stage, and the photographic device is passed through The Preventive Control of Dangerous Spot analysis information for shooting pre-set work ticket, by the recording device collecting work responsible person to teams and groups The voice messaging of the Preventive Control of Dangerous Spot analysis information of staff's statement, passes through near-field communication identification chip collecting work responsible person With the identity board information of teams and groups staff, and passes through the photographic device and shoot work responsible person and teams and groups staff The image information of group photo;
In the course of work of electric industry trouble free service, the dangerous point that pre-set work ticket is shot by the photographic device is pre- Control analysis information, the work ticket Preventive Control of Dangerous Spot executive condition voice that teams and groups staff is acquired by the recording device are believed Breath is shot the image information of the work ticket Preventive Control of Dangerous Spot executive condition of teams and groups staff by the photographic device, passed through Near-field communication identification chip acquires the identity board information of teams and groups staff;The work ticket Preventive Control of Dangerous Spot executive condition Including seatbelt wearing situation, Work tool service condition and labor protection articles for use service condition;
The radio frequency identification by collected equipment on the spot identifies code, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment, including:
The Preventive Control of Dangerous Spot analysis information of work ticket, Preventive Control of Dangerous Spot are analyzed to voice messaging, work responsible person and the Ban of information The image information of the identity board information of group staff and work responsible person and teams and groups staff group photo is registered Record, and the background server equipment is uploaded to by network;
The Preventive Control of Dangerous Spot analysis information of work ticket, work ticket Preventive Control of Dangerous Spot executive condition voice messaging, work ticket is dangerous The image information of point pre-control executive condition and the identity board information of teams and groups staff carry out registration record, and pass through network It is uploaded to the background server equipment.
10. the data processing method of the flow management and control system of work ticket according to claim 9, which is characterized in that it is described Under one or more working stage of electric industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, led to by near field Believe identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, by close Field communication identification chip collector's identity board information passes through the image letter that the photographic device shoots relevant staff Breath and by the recording device acquire relevant staff voice messaging one or more operations, further include:
In the work finishing steps of electric industry trouble free service, the radio frequency identification for acquiring equipment on the spot identifies code, is known by near-field communication The identity board information of other chip collecting work licensor and work responsible person, and teams and groups' work is shot by the photographic device Make the image information of personnel's group photo;
The radio frequency identification by collected equipment on the spot identifies code, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment, including:
Radio frequency identification mark code, work permit people and the work responsible person's identity board information of equipment on the spot and personnel are closed The image information of shadow carries out registration record, and is uploaded to the background server equipment by network;
It is work final state by the corresponding status modifier of the work ticket.
11. the data processing method of the flow management and control system of work ticket according to claim 10, which is characterized in that it is described Under one or more working stage of electric industry trouble free service, it is acquired the radio frequency identification mark code of equipment on the spot, led to by near field Believe identification chip collection site earthing or grounding means information, by near-field communication identification chip collection site sign board information, by close Field communication identification chip collector's identity board information passes through the image letter that the photographic device shoots relevant staff Breath and by the recording device acquire relevant staff voice messaging one or more operations, further include:
The stage is completed in the work ticket of electric industry trouble free service, by near-field communication identification chip collection site sign board information, is led to The identity board information that near-field communication identification chip acquisition safety measure restores people and guardian is crossed, is identified by near-field communication Chip collection site earthing or grounding means information acquires safety measure recovery people by the recording device and guardian carries out recovery peace The voice messaging arranged;
The radio frequency identification by collected equipment on the spot identifies code, live earthing or grounding means information, live sign board information, people Member's identity board information, image information and the one or more of voice messaging are recorded, and are uploaded to by network described Background server equipment, including:
Live sign board information, safety measure are restored into the identity board information of people and guardian, live earthing or grounding means information And safety measure restores people and guardian carries out restoring the voice messaging progress registration record that peace is arranged, and be uploaded to by network The background server equipment;
It is work ticket completion status by the corresponding status modifier of the work ticket;
The method further includes:
Prompt message should not be extractd according to the sign board that live sign board information is sent by receiving the background server equipment, be gone forward side by side Row display.
12. the data processing method of the flow management and control system of work ticket according to claim 6, which is characterized in that the work Make the expired moment that ticket information includes work ticket;
The method further includes:
In one preset duration of residue of expired moment apart from work ticket, receives the work ticket that background server equipment is sent and remind Message.
13. the data processing method of the flow management and control system of work ticket according to claim 6, which is characterized in that described logical The radio frequency identification for crossing the equipment on the spot that network is uploaded to the background server equipment identifies code, live earthing or grounding means information, shows Field mark board information, personnel identity Sign Board information, image information and the one or more of voice messaging are believed according to work ticket Breath carries out statistical query, forms work ticket relative recording content;The work ticket information includes work ticket number;
The method further includes:
Receive work draft bank to be checked, on the spot the radio frequency identification mark code of equipment, live earthing or grounding means information, live sign board Information or personnel identity Sign Board information, and the background server equipment is sent to by network;
The background server equipment is received according to work draft bank to be checked, on the spot the radio frequency identification mark code of equipment, scene The work ticket relative recording content of earthing or grounding means information, live sign board information or personnel identity Sign Board information feedback.
CN201810611921.XA 2018-06-14 2018-06-14 A kind of flow management and control system and its data processing method of work ticket Pending CN108537471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810611921.XA CN108537471A (en) 2018-06-14 2018-06-14 A kind of flow management and control system and its data processing method of work ticket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810611921.XA CN108537471A (en) 2018-06-14 2018-06-14 A kind of flow management and control system and its data processing method of work ticket

Publications (1)

Publication Number Publication Date
CN108537471A true CN108537471A (en) 2018-09-14

Family

ID=63470843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810611921.XA Pending CN108537471A (en) 2018-06-14 2018-06-14 A kind of flow management and control system and its data processing method of work ticket

Country Status (1)

Country Link
CN (1) CN108537471A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886654A (en) * 2019-02-25 2019-06-14 邱彩英 A kind of integrated office control system
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN110769042A (en) * 2019-10-11 2020-02-07 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN112651313A (en) * 2020-12-17 2021-04-13 国网上海市电力公司 Equipment nameplate double-intelligent identification method, storage medium and terminal
CN113114746A (en) * 2021-03-31 2021-07-13 内蒙古科电数据服务有限公司 Intelligent aid decision-making method for work ticket finishing link
CN113114747A (en) * 2021-03-31 2021-07-13 内蒙古科电数据服务有限公司 Intelligent auxiliary decision-making method for work ticket permission link
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113746888A (en) * 2021-03-31 2021-12-03 内蒙古科电数据服务有限公司 Intelligent auxiliary decision-making method for work ticket monitoring link
CN113780805A (en) * 2021-09-09 2021-12-10 广东电网有限责任公司 Method, device, equipment and storage medium for transformer substation operation management
CN114548337A (en) * 2022-02-25 2022-05-27 西安热工研究院有限公司 Work ticket mobile application system and work method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968689A (en) * 2012-11-16 2013-03-13 江苏省电力公司徐州供电公司 Intelligent monitoring method for remote control of power transformation overhaul work
CN103034918A (en) * 2011-09-30 2013-04-10 华东电网有限公司富春江水力发电厂 Electric power safe production management system operating method
US20130159039A1 (en) * 2011-12-15 2013-06-20 International Business Machines Corporation Data center infrastructure management system for maintenance
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN106651104A (en) * 2016-10-19 2017-05-10 国网山东省电力公司烟台供电公司 RFID-based electric power operation field intelligent warning device
CN208538175U (en) * 2018-06-14 2019-02-22 宁夏京能宁东发电有限责任公司 A kind of flow management and control system of work ticket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103034918A (en) * 2011-09-30 2013-04-10 华东电网有限公司富春江水力发电厂 Electric power safe production management system operating method
US20130159039A1 (en) * 2011-12-15 2013-06-20 International Business Machines Corporation Data center infrastructure management system for maintenance
CN102968689A (en) * 2012-11-16 2013-03-13 江苏省电力公司徐州供电公司 Intelligent monitoring method for remote control of power transformation overhaul work
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN106651104A (en) * 2016-10-19 2017-05-10 国网山东省电力公司烟台供电公司 RFID-based electric power operation field intelligent warning device
CN208538175U (en) * 2018-06-14 2019-02-22 宁夏京能宁东发电有限责任公司 A kind of flow management and control system of work ticket

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886654A (en) * 2019-02-25 2019-06-14 邱彩英 A kind of integrated office control system
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN110769042A (en) * 2019-10-11 2020-02-07 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN110769042B (en) * 2019-10-11 2022-12-09 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN112651313A (en) * 2020-12-17 2021-04-13 国网上海市电力公司 Equipment nameplate double-intelligent identification method, storage medium and terminal
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113114747A (en) * 2021-03-31 2021-07-13 内蒙古科电数据服务有限公司 Intelligent auxiliary decision-making method for work ticket permission link
CN113746888A (en) * 2021-03-31 2021-12-03 内蒙古科电数据服务有限公司 Intelligent auxiliary decision-making method for work ticket monitoring link
CN113114747B (en) * 2021-03-31 2022-04-05 内蒙古科电数据服务有限公司 Intelligent auxiliary decision-making method for work ticket permission link
CN113191591B (en) * 2021-03-31 2022-06-28 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113114746A (en) * 2021-03-31 2021-07-13 内蒙古科电数据服务有限公司 Intelligent aid decision-making method for work ticket finishing link
CN113780805A (en) * 2021-09-09 2021-12-10 广东电网有限责任公司 Method, device, equipment and storage medium for transformer substation operation management
CN114548337A (en) * 2022-02-25 2022-05-27 西安热工研究院有限公司 Work ticket mobile application system and work method thereof

Similar Documents

Publication Publication Date Title
CN108537471A (en) A kind of flow management and control system and its data processing method of work ticket
CN113191591B (en) On-site monitoring method for electric power operating personnel
CN105809355A (en) Personnel information identification method based on working field remote monitoring system
CN105825329A (en) Safety and quality inspection method based on remote working site monitoring system
CN208538175U (en) A kind of flow management and control system of work ticket
CN103544739A (en) B/S (Browser/Server) architecture-based polling method of visual subway equipment polling management system
CN106845647A (en) The tour repair method of charging station, apparatus and system
CN110246249B (en) Self-service handling method and device for transformer substation services
CN104808516B (en) Electrical equipment operation control method and device
CN101458502A (en) Electrical power system standardized work intelligent control method and special equipment
CN111063144A (en) Abnormal behavior monitoring method, device, equipment and computer readable storage medium
CN104616108A (en) Method for distributing and recovering electric power overhaul tool
CN104076767A (en) Railway signal equipment overhauling control system and method
CN107977718A (en) Substation equipment maintaining method and system based on BIM models
CN105894237A (en) Intelligent distributing and recycling management method with functions of voice guide and face recognition
CN114386780A (en) Intelligent work ticket operation ticket system
CN113114746B (en) Intelligent aid decision-making method for work ticket finishing link
CN113114747B (en) Intelligent auxiliary decision-making method for work ticket permission link
CN106059090A (en) Prompt system based on scheduling automation system and work method thereof
CN109658574A (en) A kind of electrical equipment anti-misoperation system and its operating method
CN110808040B (en) System and method for controlling flow of interlocking work tickets and operation tickets based on voice
CN109103985A (en) The method and apparatus for controlling the execution of operation order
CN208361617U (en) A kind of authorization device of building hoist
CN113194120B (en) Intelligent auxiliary decision-making method for work ticket bottom-of-delivery link
CN113746888B (en) Intelligent assistant decision-making method for work ticket monitoring link

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination