CN104616108A - Method for distributing and recovering electric power overhaul tool - Google Patents

Method for distributing and recovering electric power overhaul tool Download PDF

Info

Publication number
CN104616108A
CN104616108A CN201510057366.7A CN201510057366A CN104616108A CN 104616108 A CN104616108 A CN 104616108A CN 201510057366 A CN201510057366 A CN 201510057366A CN 104616108 A CN104616108 A CN 104616108A
Authority
CN
China
Prior art keywords
tool
electric power
instrument
task
tools
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510057366.7A
Other languages
Chinese (zh)
Inventor
王忠强
郑阳
刘富荣
杨利萍
连伟华
马磊
郑会平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN ENPAI ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN201510057366.7A priority Critical patent/CN104616108A/en
Publication of CN104616108A publication Critical patent/CN104616108A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for distributing and recovering an electric power overhaul tool. The method comprises the steps of distributing tasks to be overhauled; sending an unique task verification code to each worker; inputting the task verification code and identity information of the workers for verifying by a tool extracting system; automatically selecting the electric power tool according to the task content as requirement; distributing to related workers; recording the information of people picking the tool, the picking time and the tool information through a tool warehouse; marking that the tools are in lending state; automatically reminding the corresponding people in case that the tools are not returned timely; removing the corresponding lending state marking signal after a recovering system recognizes and examines the returned tools. With the adoption of the method, a reasonable overhaul tool list can be automatically selected according to different overhaul tasks; in addition, the tools can be quickly and reliably checked; therefore, the intensive management of the tools can be achieved; the reminding can be performed timely, and the tool recovering conditions can be verified, so that the problems such as missed carrying, carrying with wrong tools, carrying with excessive tools, and losing of the overhaul tools can be comprehensively solved, and as a result, the working efficiency and the working quality can be increased.

Description

A kind of electric power overhaul instrument is allotted and recovery method
Technical field
The present invention relates to electric power utensil regulation technique field, particularly relate to a kind of electric power overhaul instrument and allot and recovery method.
Background technology
For meeting economy development requirement, electrical network needs safe and stable operation.When operation exception or fault appear in the associate power equipment such as transformer station, current conversion station, transmission line of electricity, electric power overhaul personnel need the moment to await orders, and make reply fast prepare for failure situations, go to the position of fault to launch maintenance.Because equipment failure situation is more, according to the difference of maintenance task, staff will carry different service kit arrival and specify station to overhaul faulty equipment.Due to the emergency of provisional, the repairing of sudden, the task of accident, usually can occur to leak the situation such as band, wrong band service kit in actual service work; Simultaneously in maintenance process, due to provisional, the complicacy of Overhaul site, the common tools such as phase meter, multimeter, breaker tester often use frequently and easily to be lost, and needs to strengthen management.
Therefore, safeguarding for realizing power equipment, overhauling integrated management, improve overhaul efficiency and work quality, need the electric power overhaul tool management method finding a kind of more optimization and science.
Summary of the invention
The problem that the present invention mainly solves is to provide a kind of electric power overhaul instrument to allot and recovery method, rational service kit list can not only be automatically selected according to the difference of maintenance task, quickly and reliably can also verify instrument, the intensive management of implementation tool, timely prompting and verification tool recovering state, solve service kit in all directions and leak the problems such as band, wrong band, multi-band and loss, improve work efficiency and work quality.
For solving the problem, the present invention adopts following technical scheme:
A kind of electric power overhaul instrument is allotted and recovery method, comprises the following steps rapid:
A, set up tool storage room, comprise maintenance task allocation unit, instrument extraction unit, instrument recovery unit;
B, maintenance task allocation unit are by Awaiting Overhaul task matching to staff, and every task and corresponding responsible person bind, and distribute task unique verification code to staff;
C, staff, to instrument extraction unit incoming task identifying code and worker's information, verify for instrument extraction unit;
D, by identity and task checking after, instrument extraction unit chooses required electric power tool according to task definition automatically;
After e, instrument are assigned to assigned work personnel, tool storage room can be recorded and gets personal information and get time and tool information accordingly, and indicates these instruments and be in the state of lending;
After the time is given back in f, appointment, if the electric power tool lent not yet is given back, tool storage room can give corresponding responsibility personnel transmission of information automatically, remind it to give back instrument;
G, staff give back corresponding electric power tool to tool storage room, and recovery system identification checks, without omitting, without after damage, disposing state of the lending beacon signal corresponding to these instruments.
Preferably, in described step b, distributing as paper-based form or note form of task identifying code.
Preferably, in described step c, the staff's identity information for the checking of instrument extraction unit has job number or fingerprint or face.
Preferably, in described step f, tool storage room has note or mail to the mode of staff's transmission of information.
Adopt technique scheme, beneficial effect of the present invention is:
The informationization of 1, overhauling task and maintainer is bound, and contributes to task coordinate and standardized management;
2, automatically choose proper implements in conjunction with task, avoid the omission owing to may cause during artificial select tool, the setup time that the task of decreasing is carried out;
3, when instrument extracts, Information Authentication is needed, safe and reliable;
4, instrument lend after record, give back remind and recycling, allow effective recovery of instrument obtain and more reasonably manage, avoid affecting follow-up use because of the not in place of recovery operation.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, content of the present invention is described further:
Fig. 1 is the schematic flow sheet of this invention institute supplying method.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with the drawings and the specific embodiments, a kind of electric power overhaul instrument allocation of the present invention and recovery method are described in further detail.Should be appreciated that embodiment described herein only in order to explain the present invention, can not limit the scope of the invention with this.
Fig. 1 illustrates the schematic flow sheet of this invention institute supplying method, a kind of electric power overhaul instrument is allotted and recovery method, comprises the following steps rapid:
Step 1, distributes Awaiting Overhaul task, distributes task unique verification code to staff;
Step 2, incoming task identifying code and worker's information, for the checking of instrument extraction unit, go to step 3 after being verified, otherwise end allotted by instrument;
Step 3, instrument extraction unit chooses required electric power tool according to task definition automatically, is distributed to related responsibility staff;
Step 4, tool storage room is recorded and is got personal information and get time and tool information accordingly, and indicates these instruments and be in the state of lending, and instrument is allotted and terminated;
Step 5, specifies after giving back the time, if the electric power tool lent not yet is given back, tool storage room can give corresponding responsibility personnel transmission of information automatically, reminds it to give back instrument; If give back at the appointed time, directly go to step 6;
Step 6, recovery system, to giving back tool identification inspection, without omission, without after damage, disposes state of the lending beacon signal corresponding to these instruments.
Wherein, in step 1, by overhauling task allocation unit by Awaiting Overhaul task matching to staff, every task and corresponding responsible person bind, and distribute task unique verification code with paper-based form or note form.
In step 2, the staff's identity information for the checking of instrument extraction unit has job number or fingerprint or face.
In step 5, specify give back the time usually than maintenance task need number of days many 1 day, tool storage room has note or mail to the mode of staff's transmission of information.
The foregoing is only better embodiment of the present invention, not in order to limit the present invention, one of ordinary skill in the art will be recognized, use the solution of the present invention can also realize many optional embodiments.All any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. electric power overhaul instrument is allotted and a recovery method, it is characterized in that, comprises the following steps:
A, set up tool storage room, comprise maintenance task allocation unit, instrument extraction unit, instrument recovery unit;
B, maintenance task allocation unit are by Awaiting Overhaul task matching to staff, and every task and corresponding responsible person bind, and distribute task unique verification code to staff;
C, staff, to instrument extraction unit incoming task identifying code and worker's information, verify for instrument extraction unit;
D, by identity and task checking after, instrument extraction unit chooses required electric power tool according to task definition automatically;
After e, instrument are assigned to assigned work personnel, tool storage room can be recorded and gets personal information and get time and tool information accordingly, and indicates these instruments and be in the state of lending;
After the time is given back in f, appointment, if the electric power tool lent not yet is given back, tool storage room can give corresponding responsibility personnel transmission of information automatically, remind it to give back instrument;
G, staff give back corresponding electric power tool to tool storage room, and recovery system identification checks, without omitting, without after damage, disposing state of the lending beacon signal corresponding to these instruments.
2. a kind of electric power overhaul instrument according to claim 1 is allotted and recovery method, it is characterized in that, in described step b, and distributing as paper-based form or note form of task identifying code.
3. a kind of electric power overhaul instrument according to claim 1 is allotted and recovery method, it is characterized in that, in described step c, the staff's identity information for the checking of instrument extraction system has job number or fingerprint or face.
4. a kind of electric power overhaul instrument according to claim 1 is allotted and recovery method, and it is characterized in that, in described step f, tool storage room system has note or mail to the mode of staff's transmission of information.
CN201510057366.7A 2015-02-04 2015-02-04 Method for distributing and recovering electric power overhaul tool Pending CN104616108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510057366.7A CN104616108A (en) 2015-02-04 2015-02-04 Method for distributing and recovering electric power overhaul tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510057366.7A CN104616108A (en) 2015-02-04 2015-02-04 Method for distributing and recovering electric power overhaul tool

Publications (1)

Publication Number Publication Date
CN104616108A true CN104616108A (en) 2015-05-13

Family

ID=53150543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510057366.7A Pending CN104616108A (en) 2015-02-04 2015-02-04 Method for distributing and recovering electric power overhaul tool

Country Status (1)

Country Link
CN (1) CN104616108A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711493A (en) * 2018-12-21 2019-05-03 上海一芯智能科技有限公司 The information processing method and system of tool management based on Radio Frequency Identification Technology
CN109767053A (en) * 2018-11-21 2019-05-17 中铁信弘远(北京)软件科技有限责任公司 Railway labor and materials intelligent management, information system
CN110288231A (en) * 2019-06-25 2019-09-27 南方电网数字电网研究院有限公司 Electric-power safe instruments distribution method, device, computer equipment and storage medium
CN111667210A (en) * 2020-04-21 2020-09-15 国网浙江省电力有限公司 Intelligent warehouse management method and device
CN112233333A (en) * 2020-09-24 2021-01-15 珠海华伟电气科技股份有限公司 Tool acceptance management method and system and tool cabinet
CN112966840A (en) * 2020-12-04 2021-06-15 中国人民解放军空军工程大学航空机务士官学校 Military aircraft regular inspection support device and method
CN113222496A (en) * 2021-04-14 2021-08-06 宁波职业技术学院 Equipment supervision method and system based on identity authentication
CN114081262A (en) * 2021-10-27 2022-02-25 中国南方电网有限责任公司超高压输电公司检修试验中心 Method for selecting tools and intelligent tool kit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101419689A (en) * 2008-12-10 2009-04-29 武汉奋进电力技术有限公司 Full lofe cycle management system of electric power tools
CN102184479A (en) * 2011-05-13 2011-09-14 石家庄供电公司 Automatic warehouse instrument management system and method
CN102968697A (en) * 2012-11-30 2013-03-13 临安市供电局 Generation device and method of tool and instrument preparation list
CN104021453A (en) * 2014-06-23 2014-09-03 海南赛龙网络科技有限公司 Aerial overhaul tool management system based on Internet of Things
CN104240137A (en) * 2013-06-06 2014-12-24 顾剑锋 Intelligent management method for electrical equipment
CN104268803A (en) * 2014-10-10 2015-01-07 国家电网公司 System and method for managing electric power overhauling tools

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101419689A (en) * 2008-12-10 2009-04-29 武汉奋进电力技术有限公司 Full lofe cycle management system of electric power tools
CN102184479A (en) * 2011-05-13 2011-09-14 石家庄供电公司 Automatic warehouse instrument management system and method
CN102968697A (en) * 2012-11-30 2013-03-13 临安市供电局 Generation device and method of tool and instrument preparation list
CN104240137A (en) * 2013-06-06 2014-12-24 顾剑锋 Intelligent management method for electrical equipment
CN104021453A (en) * 2014-06-23 2014-09-03 海南赛龙网络科技有限公司 Aerial overhaul tool management system based on Internet of Things
CN104268803A (en) * 2014-10-10 2015-01-07 国家电网公司 System and method for managing electric power overhauling tools

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109767053A (en) * 2018-11-21 2019-05-17 中铁信弘远(北京)软件科技有限责任公司 Railway labor and materials intelligent management, information system
CN109711493A (en) * 2018-12-21 2019-05-03 上海一芯智能科技有限公司 The information processing method and system of tool management based on Radio Frequency Identification Technology
CN110288231A (en) * 2019-06-25 2019-09-27 南方电网数字电网研究院有限公司 Electric-power safe instruments distribution method, device, computer equipment and storage medium
CN111667210A (en) * 2020-04-21 2020-09-15 国网浙江省电力有限公司 Intelligent warehouse management method and device
CN112233333A (en) * 2020-09-24 2021-01-15 珠海华伟电气科技股份有限公司 Tool acceptance management method and system and tool cabinet
CN112966840A (en) * 2020-12-04 2021-06-15 中国人民解放军空军工程大学航空机务士官学校 Military aircraft regular inspection support device and method
CN113222496A (en) * 2021-04-14 2021-08-06 宁波职业技术学院 Equipment supervision method and system based on identity authentication
CN114081262A (en) * 2021-10-27 2022-02-25 中国南方电网有限责任公司超高压输电公司检修试验中心 Method for selecting tools and intelligent tool kit

Similar Documents

Publication Publication Date Title
CN104616108A (en) Method for distributing and recovering electric power overhaul tool
CN104268803A (en) System and method for managing electric power overhauling tools
CN103065215B (en) Power grid dispatching method
CN104204514B (en) Method for configuring a wind energy installation, and wind energy installation
CN104669224A (en) Intelligent storage cabinet for electric power overhaul tools
CN104657820A (en) Automatic power maintenance tool management platform
CN102637027A (en) Overhaul control system and method for railway signaling device
CN104076767B (en) Railway signal equipment overhauling control system and method
CN108537471A (en) A kind of flow management and control system and its data processing method of work ticket
CN106991140B (en) Monitoring information table auditing method and system
CN103905270A (en) Smart grid android system safety base line automatic checking system and method
CN202309213U (en) Ground wire intelligent management system
CN104318300A (en) Three-card-in-one based transformer substation tool management system and method
CN106502219A (en) A kind of bearing Internet of Things intelligence fabrication line process control system
JP4170000B2 (en) Device connection management system
CN106059090B (en) A kind of working method based on dispatch automated system prompt system
CN107480855A (en) Managing and control system is rushed to repair in distribution
CN202472695U (en) Transformer station optical/electric cable identification management system based on RFID tag
CN110705721A (en) Automatic robot inspection method based on DICP system
CN106774098A (en) One kind stops power transmission safety control system
CN106557986B (en) Photovoltaic power station equipment maintenance method
JP2008299859A (en) Equipment connection management system
CN104346840A (en) Patrol information uploading apparatus and patrol information confirmation system thereof
CN105976092A (en) Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof
CN203204393U (en) A managing and controlling system of transformer substation grounding lines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Zhongqiang

Inventor after: Lu Peng

Inventor after: Liu Furong

Inventor after: Wang Zhenbang

Inventor after: Ma Lei

Inventor after: He Xi

Inventor after: Zhang Jiezheng

Inventor after: Xin Ruoming

Inventor after: Zhang Wen

Inventor after: Jin Kai

Inventor after: Yang Liping

Inventor after: Lian Weihua

Inventor before: Wang Zhongqiang

Inventor before: Zheng Yang

Inventor before: Liu Furong

Inventor before: Yang Liping

Inventor before: Lian Weihua

Inventor before: Ma Lei

Inventor before: Zheng Huiping

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170829

Address after: 450006 Huaihe West Road, Zhongyuan District, Henan, China, No. 19, No.

Applicant after: Zhengzhou electric company of State Grid Henan Power Supply Company

Applicant after: Henan Enpai Electric Power Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 450000 Huaihe West Road, Zhongyuan District, Henan, China, No. 19, No.

Applicant before: Zhengzhou electric company of State Grid Henan Power Supply Company

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150513