CN107480855A - Managing and control system is rushed to repair in distribution - Google Patents
Managing and control system is rushed to repair in distribution Download PDFInfo
- Publication number
- CN107480855A CN107480855A CN201710546391.0A CN201710546391A CN107480855A CN 107480855 A CN107480855 A CN 107480855A CN 201710546391 A CN201710546391 A CN 201710546391A CN 107480855 A CN107480855 A CN 107480855A
- Authority
- CN
- China
- Prior art keywords
- repairing
- management
- repair
- module
- management module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000008439 repair process Effects 0.000 title claims abstract description 79
- 238000012552 review Methods 0.000 claims abstract description 21
- 238000012545 processing Methods 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 25
- 230000015556 catabolic process Effects 0.000 claims description 14
- 238000012423 maintenance Methods 0.000 claims description 10
- 238000012797 qualification Methods 0.000 claims description 5
- 230000000007 visual effect Effects 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 98
- 238000013024 troubleshooting Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 4
- 230000005611 electricity Effects 0.000 description 2
- 238000013468 resource allocation Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000002618 waking effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of distribution to rush to repair managing and control system, including arranging an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing manoeuvre management module, basic management module, central processing unit, database, the central processing unit is respectively with arranging an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing manoeuvre management module, basic management module, database are connected.Distribution of the present invention repairing management and control system combination is arranged an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing manoeuvre management module, the function of basic management module, personnel's situation on duty can be understood in time, it is easy to command centre personnel to dispatch repairing resource in time, and then effectively improves troubleshooting speed.
Description
Technical field
The present invention relates to electric power first-aid field, specifically a kind of distribution repairing managing and control system.
Technical background
Distribution repairing refers to that accident occurs for distribution electrical equipment or failure is forced emergent stopping operation, needs the short time to recover to supply
Electricity or the work fixed a breakdown.Network distributing failure emergency repair scope is the 20kV of province (area, city) Utilities Electric Co.'s investment and following voltage etc.
Level power distribution network, power distribution network scope can extend to 35kV in the power network of urban.
Distribution repairing is to rush to repair command centre as core, and repairing command centre tissue takes charge network distributing failure emergency repair work
Make, monitor distribution network failure information and accept distribution scheduling instruction and report work order, United Dispatching breakdown gang 5, breakdown van etc. for repairment and rob
Repair strength, and real-time tracking scene rush to repair situation.Breakdown gang 5 reaches the spot, searched according to the instruction of repairing command centre in limited time
Trouble point, confirm nature of trouble, isolated fault point, command centre is rushed to repair into failure situation report-back, carries out the event in the scope of business
Barrier processing work.
Existing distribution repairing managing and control system is due to designing unreasonable, meeting between command centre personnel and scene rush to repair personnel
Occur linking up phenomenon not in time, cause scheduling time long, repairing resource allocation it is unreasonable, influence troubleshooting speed, can not
Reach maximum resource utilization.
The content of the invention
The invention provides a kind of distribution to rush to repair managing and control system.
Present invention aim to address existing distribution repairing management and control system design it is unreasonable, command centre personnel rob with scene
Repair and link up not in time between personnel, cause scheduling time long, repairing resource allocation it is unreasonable, influence troubleshooting speed, can not
The problem of reaching maximum resource utilization.
The technical solution adopted for the present invention to solve the technical problems is:Managing and control system is rushed to repair in a kind of distribution, including:
Arrange an order according to class and grade and duty management module:It is managed for the on duty and duty arrangement to each staff, is easy to understand
Day part personnel placement situation;
Rush to repair management and control module:For sending repairing resource, repairing process is tracked, realizes repairing scheduling pipe
Reason, is easy to cooperating between scene rush to repair personnel and command centre personnel;
Rush to repair after-action review module:For carrying out statistical analysis to the fault message obtained during repairing;
Rush to repair manoeuvre management module:For being managed to scheme, the process of rushing to repair manoeuvre;
Basic management module:For being managed to Back ground Information;
Central processing unit:For receive arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Rush to repair manoeuvre management module, basic management module input control command, and respective handling feedback is carried out to control command;
Database:For store reception arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Rush to repair manoeuvre management module, the related data of basic management module;
The central processing unit respectively with arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Repairing manoeuvre management module, basic management module, database are connected.
Preferably, it is described arrange an order according to class and grade and duty management module include command centre handing-over management, command centre arrange an order according to class and grade management, rob
Repair team arrange an order according to class and grade management, breakdown gang 5 handing-over management, call the roll report for work management, call the roll report for work record queries, roll-call report for work historical statistics,
Zero reports management, reports for work.
Preferably, the repairing management and control module includes repairing process management, rushes to repair short message sending, fault countermeasure inquiry, protects
Electric job enquiry, repairing visual control, repairing progress billboard, interface repeating transmission, power supply station's repairing process management extremely.
Preferably, the repairing after-action review module includes fault statistics analysis, Distribution Network Failure reason Monthly Bulletin of Statistics Section, repairing
Single inquiry.
Preferably, the repairing manoeuvre management module includes the management of repairing scenario, repairing manoeuvre process management, repairing
Manoeuvre is evaluated.
Preferably, the basic management module is safeguarded including repairing stationary point, rushes to repair the conservation of resources, the maintenance of repairing qualification, mark
Quasi- chemical industry utensil configuration, goods and materials point are safeguarded, repairing expert info is safeguarded, fault countermeasure is safeguarded, the repairing stage safeguards, standard duration
Experts database analysis, the maintenance of repairing process status, duty management parameter configuration, personnel's address list are safeguarded, short message packet is safeguarded, be conventional
Short message is default, alert status are issued, repairing state is issued, document is issued, document label are read, command centre safeguards, message sound is matched somebody with somebody
Put, message template configures, repairing parameter configuration.
The beneficial effects of the invention are as follows:Distribution of the present invention repairing management and control system combination is arranged an order according to class and grade and duty management mould
Block, repairing management and control module, repairing after-action review module, repairing manoeuvre management module, the function of basic management module, can be timely
Understanding personnel situation on duty, it is easy to command centre personnel to dispatch repairing resource in time, and then effectively improves troubleshooting
Speed, repairing after-action review can be analyzed repairing data, and summing up experience, repairing manoeuvre can improve personnel and rush to repair business energy
Power, be easy to repairing everything goes well with your work expansion.
Brief description of the drawings
Fig. 1 is the system block diagram that managing and control system is rushed to repair in distribution of the present invention.
Fig. 2 is to arrange an order according to class and grade and the block diagram of duty management module.
Fig. 3 is the block diagram of repairing management and control module.
Fig. 4 is the block diagram of repairing after-action review module.
Fig. 5 is the block diagram of repairing manoeuvre management module.
The block diagram of management module based on Fig. 6.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples:
As shown in the figure, there is provided the embodiment of distribution repairing managing and control system of the present invention, it is included with lower module.
Arrange an order according to class and grade and duty management module:It is managed for the on duty and duty arrangement to each staff, is easy to understand
Day part personnel placement situation.
Rush to repair management and control module:For sending repairing resource, repairing process is tracked, realizes repairing scheduling pipe
Reason, is easy to cooperating between scene rush to repair personnel and command centre personnel.
Rush to repair after-action review module:For carrying out statistical analysis and assessment to the fault message obtained during repairing.
Rush to repair manoeuvre management module:For being managed to scheme, the process of rushing to repair manoeuvre.
Basic management module:For being managed to Back ground Information.
Central processing unit:For receive arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Rush to repair manoeuvre management module, basic management module input control command, and respective handling feedback is carried out to control command.
Database:For store reception arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Rush to repair manoeuvre management module, the related data of basic management module.
The central processing unit respectively with arrange an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module,
Repairing manoeuvre management module, basic management module, database are connected.
It is described arrange an order according to class and grade and duty management module include command centre handing-over management, command centre arrange an order according to class and grade management, breakdown gang arrange
Class's management, breakdown gang 5 join management, management, record queries, historical statistics, zero report of reporting for work of calling the roll of reporting for work of calling the roll of reporting for work of calling the roll
Manage, report for work.
Command centre's handing-over management:It is managed for the handing-over situation to command centre.
Command centre arranges an order according to class and grade management:It is managed for the duty arrangement to command centre.
Breakdown gang arranges an order according to class and grade management:It is managed for the duty arrangement to breakdown gang.
The handing-over management of breakdown gang 5:It is managed for the handing-over situation to breakdown gang.
Roll-call is reported for work management:Higher level repairing command centre personnel are provided roll-call work(is carried out to subordinate repairing command centre personnel
Energy.
Roll-call is reported for work record queries:The query function that record is reported for work in roll-call is provided.
Roll-call is reported for work historical statistics:The historical statistics function that record is reported for work in roll-call is provided.
Zero reports management:Repairing command and management center personnel can report the information such as problem state and problem description to higher level
Command centre.
Report for work:Subordinate repairing command centre personnel are provided and rush to repair higher level the work(that the roll-call of command centre personnel is reported for work
Energy.
The repairing management and control module includes repairing process management, repairing short message sending, fault countermeasure inquiry, protects electric task and look into
Ask, rush to repair visual control, repairing progress billboard, interface repeating transmission, power supply station's repairing process management extremely.
Rush to repair process management:1st, offer failure is registered, the repairing of failure process notifies, batch repairing notifies, arrival records,
Reconnoitre report, repair record, recover power transmission, the analysis of causes, the registration of other processes, receipt signal auditing, work order turn send function;2、
There is provided Trouble ticket details check, rush to repair single conjunction tear open, press, fault location function;3rd, failure is provided to study and judge, rush to repair and singly export, carry
Configuration, the outage information of waking up, which report, influences user checks and Map Switch function;The 4th, trouble point, power station, the figure of command centre are provided
Layer control and the operation of GIS figures basic function.
Rush to repair short message sending:Transmission management to rushing to repair short message is provided.
Fault countermeasure is inquired about:Searching and managing to fault countermeasure is provided.
Protect electric job enquiry:Query function to protecting electric task is provided.
Rush to repair visual control:There is provided to repairing information visuallization monitoring.
Repairing progress billboard:There is provided and repairing progress msg is checked.
Interface is retransmitted extremely:There is provided docking port abnormal repeating management.
Power supply station rushes to repair process management:The 1st, failure registration, the repairing of failure process notice are provided, reach record, reconnoitre remittance
Report, repair record, turn to send Backward Function;2nd, provide Trouble ticket details check, rush to repair single conjunction tear open, press, fault location function;3、
Offer failure is studied and judged, rushes to repair single export, reminds configuration, influence user checks and Map Switch function;The 4th, trouble point, electricity are provided
Stand, the control of the figure layer of power supply station and GIS figures basic function operate.
The repairing after-action review module includes fault statistics analysis, Distribution Network Failure reason Monthly Bulletin of Statistics Section, the single inquiry of repairing.
Fault statistics are analyzed:Function of statistic analysis to fault message is provided.
Distribution Network Failure reason Monthly Bulletin of Statistics Section:Statistical function to failure reason analysis monthly magazine is provided.
The single inquiry of repairing:Query function to failure breakdown repair list is provided.
The repairing manoeuvre management module is commented including the management of repairing scenario, repairing manoeuvre process management, repairing manoeuvre
Valency.
Rush to repair scenario management:Offer is to the newly-increased of repairing scenario, modification, inquiry, deletion and issuing function.
Rush to repair manoeuvre process management:Analog functuion to rushing to repair manoeuvre process is provided.
Rush to repair manoeuvre evaluation:Function of Evaluation to rushing to repair manoeuvre process is provided.
The basic management module is safeguarded including repairing stationary point, rushes to repair the conservation of resources, the maintenance of repairing qualification, standard chemical industry device
Tool configuration, goods and materials point are safeguarded, repairing expert info is safeguarded, fault countermeasure is safeguarded, the repairing stage safeguards, standard duration experts database minute
Analysis, the maintenance of repairing process status, duty management parameter configuration, personnel's address list are safeguarded, short message packet is safeguarded, conventional short message is pre-
If, alert status issue, repairing state issue, document issue, document label read, command centre safeguard, message sound configuration, short message
Template configuration, repairing parameter configuration.
Stationary point is rushed to repair to safeguard:Attended operation to rushing to repair stationary point is provided.
Rush to repair the conservation of resources:Attended operation to rushing to repair resource is provided.
Qualification is rushed to repair to safeguard:Attended operation to rushing to repair qualification is provided.
Standardize Work tool configuration:Attended operation to standardizing Work tool is provided.
Goods and materials point is safeguarded:Attended operation to goods and materials point is provided.
Expert info is rushed to repair to safeguard:Attended operation to rushing to repair expert info is provided.
Fault countermeasure is safeguarded:Attended operation to fault countermeasure is provided.
The repairing stage safeguards:Attended operation to rushing to repair the stage is provided.
Standard duration experts database is analyzed:There is provided and standard duration experts database is analyzed.
Process status is rushed to repair to safeguard:Maintenance to rushing to repair process status is provided.
Duty management parameter configuration:Configuration to duty management parameter is provided.
Personnel's address list is safeguarded:Maintenance function to personnel's address list is provided.
Short message packet is safeguarded:Maintenance function to the packet of personnel's address list short message is provided.
Conventional short message is preset:Maintenance function to commonly using short message is provided.
Alert status are issued:Issuing function to alert status is provided.
Repairing state is issued:Issuing function to rushing to repair state is provided.
Document is issued:Issuing function to document is provided.
Document label are read:Label wol function to document is provided.
Command centre safeguards:Maintenance function to command centre is provided.
Message sound configures:Configuration feature to message sound is provided.
Message template configures:Configuration feature to short message masterplate is provided.
Rush to repair parameter configuration:Configuration feature to rushing to repair parameter is provided.
Claims (6)
1. managing and control system is rushed to repair in a kind of distribution, it is characterised in that including:
Arrange an order according to class and grade and duty management module:It is managed for the on duty and duty arrangement to each staff, when being easy to understand each
Section personnel placement situation;
Rush to repair management and control module:For sending repairing resource, repairing process is tracked, realizes repairing management and running,
It is easy to cooperating between scene rush to repair personnel and command centre personnel;
Rush to repair after-action review module:For carrying out statistical analysis to the fault message obtained during repairing;
Rush to repair manoeuvre management module:For being managed to scheme, the process of rushing to repair manoeuvre;
Basic management module:For being managed to Back ground Information;
Central processing unit:Arranged an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing for receiving
Manoeuvre management module, basic management module input control command, and to control command carry out respective handling feedback;
Database:Arranged an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing for storing reception
The related data of manoeuvre management module, basic management module;
The central processing unit is respectively with arranging an order according to class and grade and duty management module, repairing management and control module, repairing after-action review module, repairing
Manoeuvre management module, basic management module, database are connected.
2. managing and control system is rushed to repair in distribution according to claim 1, it is characterised in that described to arrange an order according to class and grade and duty management module bag
Include command centre's handing-over management, command centre arrange an order according to class and grade management, breakdown gang arrange an order according to class and grade management, the handing-over of breakdown gang 5 is managed, roll-call is reported for work
Management, call the roll report for work record queries, call the roll report for work historical statistics, zero report management, report for work.
3. managing and control system is rushed to repair in distribution according to claim 1, it is characterised in that the repairing management and control module includes repairing
Process management, repairing short message sending, fault countermeasure inquiry, protect electric job enquiry, repairing visual control, repairing progress billboard,
Interface is retransmitted extremely, power supply station's repairing process management.
4. managing and control system is rushed to repair in distribution according to claim 1, it is characterised in that the repairing after-action review module includes
Fault statistics analysis, Distribution Network Failure reason Monthly Bulletin of Statistics Section, the single inquiry of repairing.
5. managing and control system is rushed to repair in distribution according to claim 1, it is characterised in that the repairing manoeuvre management module includes
Rush to repair scenario management, repairing manoeuvre process management, repairing manoeuvre evaluation.
6. managing and control system is rushed to repair in distribution according to claim 1, it is characterised in that the basic management module includes repairing
Stationary point maintenance, the repairing conservation of resources, repairing qualification is safeguarded, standardization Work tool is configured, goods and materials point is safeguarded, repairing expert info dimension
Shield, fault countermeasure are safeguarded, the repairing stage safeguards, standard duration experts database is analyzed, repairing process status is safeguarded, duty management parameter
Configuration, personnel's address list are safeguarded, short message is grouped and safeguards, commonly use default short message, alert status issue, rush to repair state issue, document
Issue, document label are read, command centre safeguards, message sound configures, message template configures, repairing parameter configuration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710546391.0A CN107480855A (en) | 2017-07-06 | 2017-07-06 | Managing and control system is rushed to repair in distribution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710546391.0A CN107480855A (en) | 2017-07-06 | 2017-07-06 | Managing and control system is rushed to repair in distribution |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107480855A true CN107480855A (en) | 2017-12-15 |
Family
ID=60596557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710546391.0A Pending CN107480855A (en) | 2017-07-06 | 2017-07-06 | Managing and control system is rushed to repair in distribution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107480855A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109361548A (en) * | 2018-11-20 | 2019-02-19 | 国家电网有限公司 | A kind of IMS network behavior diagnosis method for early warning and device based on active safety |
CN112446619A (en) * | 2020-11-27 | 2021-03-05 | 国网北京市电力公司 | Power distribution network emergency repair processing method and device |
CN114021754A (en) * | 2021-11-17 | 2022-02-08 | 国网山东省电力公司荣成市供电公司 | Dispatching distribution network emergency repair system |
CN117691749A (en) * | 2024-01-26 | 2024-03-12 | 国网湖北省电力有限公司 | Power grid fault response platform and using method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102346886A (en) * | 2011-09-30 | 2012-02-08 | 北京国正信安系统控制技术有限公司 | Railway emergency commanding system |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN106682826A (en) * | 2016-12-22 | 2017-05-17 | 海南电网有限责任公司 | Emergency repair command platform for distribution network |
CN106875114A (en) * | 2017-02-10 | 2017-06-20 | 国家电网公司 | The SMS platform optimization system and method for distribution repairing maneuvering platform |
-
2017
- 2017-07-06 CN CN201710546391.0A patent/CN107480855A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102346886A (en) * | 2011-09-30 | 2012-02-08 | 北京国正信安系统控制技术有限公司 | Railway emergency commanding system |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN106682826A (en) * | 2016-12-22 | 2017-05-17 | 海南电网有限责任公司 | Emergency repair command platform for distribution network |
CN106875114A (en) * | 2017-02-10 | 2017-06-20 | 国家电网公司 | The SMS platform optimization system and method for distribution repairing maneuvering platform |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109361548A (en) * | 2018-11-20 | 2019-02-19 | 国家电网有限公司 | A kind of IMS network behavior diagnosis method for early warning and device based on active safety |
CN109361548B (en) * | 2018-11-20 | 2021-09-07 | 国家电网有限公司 | IMS network behavior diagnosis early warning method and device based on active security |
CN112446619A (en) * | 2020-11-27 | 2021-03-05 | 国网北京市电力公司 | Power distribution network emergency repair processing method and device |
CN112446619B (en) * | 2020-11-27 | 2024-04-26 | 国网北京市电力公司 | Power distribution network rush-repair processing method and device |
CN114021754A (en) * | 2021-11-17 | 2022-02-08 | 国网山东省电力公司荣成市供电公司 | Dispatching distribution network emergency repair system |
CN117691749A (en) * | 2024-01-26 | 2024-03-12 | 国网湖北省电力有限公司 | Power grid fault response platform and using method thereof |
CN117691749B (en) * | 2024-01-26 | 2024-05-28 | 国网湖北省电力有限公司 | Power grid fault response platform and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107480855A (en) | Managing and control system is rushed to repair in distribution | |
CN107832354B (en) | Distribution network intelligence operation and maintenance management and control system of distributing type buffer memory | |
CN108964269A (en) | Power distribution network O&M and total management system | |
CN102646230A (en) | Information system for realizing fast power restoration management of power distribution network faults | |
CN107959589A (en) | A kind of power emergency repair dispatches system and method | |
CN104077641A (en) | Power grid operation and emergency command method and power commanding system | |
CN103439952A (en) | Experimental equipment state monitoring system | |
CN101951027A (en) | Uniform data acquisition and monitoring system of low-medium voltage power distribution network | |
CN103325019A (en) | Event-driven power grid fault information judgment method | |
CN101605065A (en) | The implementation method of security incident monitoring in the system of security centre | |
CN103065215A (en) | Power grid dispatching method | |
CN103337150A (en) | Long-distance intelligent monitoring system of grinding machines | |
CN106655523A (en) | Smart electric service system | |
CN106815373A (en) | Big data methods of exhibiting and system are rushed to repair in distribution based on BI analyses | |
CN107171438A (en) | A kind of net level matches somebody with somebody electricity consumption monitoring and management system | |
CN102255387B (en) | Monitoring system of electric equipment | |
CN108090573A (en) | A kind of preventative subway operational system and method | |
CN103366245B (en) | Electric network fault information issuing method based on OSB bus and system | |
CN107545519A (en) | A kind of power grid enterprises' fortune inspection management-control method | |
CN111667076A (en) | Tracking method for processing power failure fault | |
CN109934425A (en) | A kind of intelligent plant customization planning system and its method | |
CN201133922Y (en) | Looped network cabinet failure diagnosis device | |
CN205158452U (en) | Railway upper track operation safety control system | |
CN103400313A (en) | Overhaul data processing system used in specialized overhaul base for electrical equipment | |
CN203465826U (en) | Remote intelligent monitoring system for flour mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |