CN102968697A - Generation device and method of tool and instrument preparation list - Google Patents
Generation device and method of tool and instrument preparation list Download PDFInfo
- Publication number
- CN102968697A CN102968697A CN201210510647XA CN201210510647A CN102968697A CN 102968697 A CN102968697 A CN 102968697A CN 201210510647X A CN201210510647X A CN 201210510647XA CN 201210510647 A CN201210510647 A CN 201210510647A CN 102968697 A CN102968697 A CN 102968697A
- Authority
- CN
- China
- Prior art keywords
- work tool
- bar code
- operation task
- typical operation
- listings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a generation device and method of a tool and instrument preparation list, belonging to the field of power asset management. The device comprises a bar code scanner, a computer and a printing device. The method comprises such steps as standardizing site data, completing data in a database, printing and sticking bar codes, scanning in the bar codes, and outputting the tool and instrument preparation list. Firstly, relative data of each power substation is standardized, and then the data in the database of the computer is completed, so that the correctness of the tool and instrument preparation list is not affected because of great difference among the power stations and complex items and types of the tools. The device can also automatically generate a plurality of tool and instrument preparation lists at the same time, and the whole process is precisely controlled by the computer and not interfered by other human factors, so that tools and instruments are 100% prepared at a time and are not missed or taken by mistakes again.
Description
Technical field
The present invention relates to a kind of Work tool and prepare single generating device and generation method thereof, belong to the electric power asset management domain.
Background technology
Electrical equipment is divided into operation, (cold standby and stand-by heat) for subsequent use, three kinds of states of maintenance, is that the process of another kind of state is back brake with equipment by a kind of state-transition.By operating breaker, disconnector and minute, splice grafting ground plug-in strip or extension, dismounting ground wire be converted to electrical equipment another kind of state or make system change the method for operation from a kind of state, grid switching operation just is in this operation.In electric system, grid switching operation is one of topmost work of operations staff, grid switching operation must executable operations ticket system be made with the work monitoring, operation order is specializing of operation task, operation intention and operation scheme, being the basic and crucial of correct executable operations, is the foundation that the person on duty carries out grid switching operation.
The grid switching operation flow process is at present: accept preliminary command, fill in operation order, and---the review operations ticket is correct, and------accepting scheduling is just making, and------the pin operation order is signed in practical operation---operation is reported---to Preventive Control of Dangerous Spot in the checking apparatus name.In the aforesaid operations flow process, when receiving after scheduling just making, before the formal operation of beginning, the person on duty should be with Work tool and the key that need use in this grid switching operation, such as safety helmet, multimeter, control lever, ground wire, key etc. are disposable ready, i.e. so-called beam worker utensil.
At present in the grid switching operation process, Work tool is that the operations staff accepts to dispatch and just making before the rear formal operation according to operation task operation order content and interim the preparation.Larger difference, Work tool type and key project are various, some operation task operation order is many but because each electric substation exists, and lack the program of reaffirming, and other human factors, be difficult to guarantee that Work tool 100% disposable preparation is correct, leak to take by mistake by Work tool to occur repeatedly.Consider the actual conditions of Lou taking by mistake by Work tool, some Utilities Electric Co.s have released and have used Work tool to prepare list.After the review operations ticket was correct, the person on duty counted Work tool and the key that this action need is used according to operation task operation order content and personal experience, gathered to be filled up to Work tool and to prepare single upper and audit and pass through.When the operations staff accepts scheduling when just making rear beam worker utensil, directly prepare single listed Work tool according to Work tool and the key inventory is prepared.Although at present by this organiztion measure, the correctness that Work tool is prepared increases, leakage is taken by mistake by Work tool and still is difficult to avoid.
Leakage is taken by mistake and has been prolonged artificially equipment by Work tool and stop the labour time, has increased electrical network in improper mode working time, so that power supply reliability descends, economy reduces, and power grid risk strengthens.Simultaneously, leakage is taken by mistake by Work tool and also may be caused pernicious misoperation fault.
In view of this, the inventor studies this, develops specially a kind of Work tool and prepares single generating device and generation method thereof, and this case produces thus.
Summary of the invention
One of purpose of the present invention provide a kind of can avoid leak taking by mistake by Work tool and Work tool simple in structure, simple operation prepare single generating device.
A kind of Work tool is prepared single generating device, comprises the barcode scanner for the bar code input, and is connected a computing machine for storage/executive routine that is connected with barcode scanner, and the printing device that links to each other with computing machine.
Described printing device comprises 1 universal printer at least.
As preferably, described printing device also comprises 1 bar code printer.
Two of purpose of the present invention provides a kind of single Work tool of Work tool preparation that can generate rapidly and accurately and prepares single generation method.
A kind of Work tool is prepared single generation method, comprises the steps:
1) at first Work tool type and all keys of each transformer station are added up, set up Work tool set of listings and key set of listings, put Work tool corresponding to each typical operation task in order and prepare list, set up each transformer station's typical operation task Work tool and prepare single collection;
The database of the data input computing machine in 2) preparing the data in the above-mentioned Work tool set of listings, the data in the key set of listings, each typical operation task Work tool singly;
3) with step 2) in every typical operation task Work tool prepare singly to generate corresponding bar code, and print by printing device, stick in the typical mission operation order;
4) when the operations staff carries out a certain typical operation task, scan this typical operation task Work tool with barcode scanner and prepare single bar code, obtain the bar code key assignments, and automatic entering computer database, computing machine extracts corresponding operation task Work tool according to the bar code key assignments and prepares single from database;
5) at last the operation task Work tool that generates in the step 4) is prepared single-pass and cross the printing device printout, the operations staff prepares single postorder operation of carrying out according to the Work tool of output.
Above-mentioned steps 2) in, the data owner in the described Work tool set of listings will comprise the typonym of all operations Work tool and managing security tools and instruments in the transformer station; Data owner in the described key set of listings will comprise the key titles such as equipment all in the transformer station, anti-error, door; The data owner that described each typical operation task Work tool is prepared in the list will comprise Work tool typonym and the key title that each typical operation required by task will be used.
Above-mentioned steps 4) in, when the operations staff carries out multinomial typical operation task, can scan simultaneously the bar code of multinomial typical operation task with barcode scanner, obtain a plurality of different bar code key assignments, and automatic entering computer database, computing machine extracts corresponding operation task Work tool according to different bar code key assignments and prepares list from database, and automatically is aggregated into the Work tool preparation list of a total multioperation task.
Adopt above-mentioned Work tool to prepare single generating device and production method, prepare singly to fill in to compare with traditional Work tool, has following advantage: first the related data of each electric substation is carried out standardization, and then the data in the Computer Database are carried out perfect, can there be larger difference because of each electric substation, Work tool type project is various and affect Work tool and prepare single correctness; Described device can also automatically generate the Work tool of multi-mode operation task simultaneously and prepare single, and whole process is accurately controlled by computing machine, can not be subjected to other interference from human factor, guarantee that Work tool 100% disposable preparation is correct, can not occur again to leak and take by mistake by the Work tool event, reduce to 0 thereby will take the pernicious misoperation fault risk that may cause by Work tool by mistake because of leakage.
Below in conjunction with drawings and the specific embodiments the present invention is done and to describe in further detail.
Description of drawings
Fig. 1 is that the Work tool of present embodiment is prepared the single generating device structural representation;
Fig. 2 is that the Work tool of present embodiment is prepared single method flow diagram that generates.
Embodiment
As shown in Figure 1, a kind of Work tool is prepared single generating device, comprise the barcode scanner 1 for a bar code input, with is connected a computing machine 2 that is used for storage/executive routine that is connected with barcode scanner 1, and the printing device that links to each other with computing machine 2, wherein, printing device comprises the public and affairs universal printer 3 of a Taiwan Affairs Office, and a bar code printer 4.In the present embodiment, office and affairs universal printer 3 are used for marker's utensil and prepare list or alternative document, bar code printer 4 is mainly used in generating the bar code printing that Work tool is prepared single early stage, after the single corresponding bar code printing of all typical operation task Work tools preparations is good, can remove bar code printer 4.Sometimes, for saving resource, printing device also can include only the public and affairs universal printer 3 of a Taiwan Affairs Office, namely is used for printing bar code, is used for again Work tool and prepares singles' seal.
As shown in Figure 2, the Work tool that adopts above-mentioned Work tool to prepare the single generating device generation is prepared single generation method, take hilllock jurisdiction 110kV Shiquan transformer station of sun O﹠M class as example, comprises the steps:
1) field data standardization: at first Work tool type and all keys of 110kV Shiquan transformer station are added up, set up Work tool set of listings and the key set of listings of 110kV Shiquan transformer station, the Work tool corresponding to each typical operation task of arrangement 110kV Shiquan transformer station prepared single, sets up hilllock jurisdiction 110kV Shiquan transformer station of sun O﹠M class typical operation task Work tool and prepares single collection;
2) database data is perfect: with the data in the above-mentioned Work tool set of listings: the typonym that mainly comprises all operations Work tool and managing security tools and instruments in the transformer station; Data in the key set of listings: mainly comprise the key titles such as equipment all in the transformer station, anti-error, door; Each typical operation task Work tool is prepared the data in single: mainly comprise Work tool typonym that each typical operation required by task will be used and the database of key title input computing machine 2;
3) print, paste bar code: with step 2) in every typical operation task Work tool prepare single bar code that generates unique correspondence, and print 4 out by bar code printer, stick in the corresponding typical mission operation order;
4) sweep bar code: when the operations staff carries out 1 operation task and becomes 1# main transformer 10kV side and change cold standby into by operation such as: 110kV Shiquan, with the bar code of barcode scanner 1 this operation task of scanning in the preparation of typical operation task Work tool is single, obtain the bar code key assignments, and automatically input computing machine 2 databases, computing machine 2 extracts corresponding operation task Work tool according to the bar code key assignments and prepares single from database;
5) the output Work tool is prepared single: at last the 110kV Shiquan who generates in the step 4) is become 1# main transformer 10kV side and cross office and 3 printouts of affairs universal printer by the Work tool preparation single-pass that operation changes cold standby into, the operations staff prepares single postorder of carrying out again according to the Work tool of output and operates.
Above-mentioned steps 4) in, when the operations staff carries out more than 1 typical operation task, can scan simultaneously the bar code of multinomial typical operation task with barcode scanner 2, obtain a plurality of different bar code key assignments, and automatic entering computer database, computing machine extracts corresponding operation task Work tool according to different bar code key assignments and prepares list from database, and automatically is aggregated into the Work tool preparation list of a total multioperation task.
Above-described embodiment and graphic and non-limiting product form of the present invention and style, any person of an ordinary skill in the technical field all should be considered as not breaking away from patent category of the present invention to its suitable variation or modification of doing.
Claims (6)
1. a Work tool is prepared single generating device, it is characterized in that: comprise the barcode scanner for the bar code input, and is connected a computing machine for storage/executive routine that is connected with barcode scanner, and the printing device that links to each other with computing machine.
2. a kind of Work tool as claimed in claim 1 is prepared single generating device, and it is characterized in that: described printing device comprises 1 universal printer at least.
3. a kind of Work tool as claimed in claim 1 is prepared single generating device, and it is characterized in that: described printing device also comprises 1 bar code printer.
4. a Work tool is prepared single generation method, it is characterized in that comprising the steps:
1) at first Work tool type and all keys of each transformer station are added up, set up Work tool set of listings and key set of listings, put Work tool corresponding to each typical operation task in order and prepare list, set up each transformer station's typical operation task Work tool and prepare single collection;
The database of the data input computing machine in 2) preparing the data in the above-mentioned Work tool set of listings, the data in the key set of listings, each typical operation task Work tool singly;
3) with step 2) in every typical operation task Work tool prepare singly to generate corresponding bar code, and print by printing device, stick in the typical mission operation order;
4) when the operations staff carries out a certain typical operation task, scan this typical operation task Work tool with barcode scanner and prepare single bar code, obtain the bar code key assignments, and automatic entering computer database, computing machine extracts corresponding operation task Work tool according to the bar code key assignments and prepares single from database;
5) at last the operation task Work tool that generates in the step 4) is prepared single-pass and cross the printing device printout, the operations staff prepares single postorder operation of carrying out according to the Work tool of output.
5. a kind of Work tool as claimed in claim 4 is prepared single generation method, it is characterized in that above-mentioned steps 2) in, the data owner in the described Work tool set of listings will comprise the typonym of all operations Work tool and managing security tools and instruments in the transformer station; Data owner in the described key set of listings will comprise the key titles such as equipment all in the transformer station, anti-error, door; The data owner that described each typical operation task Work tool is prepared in the list will comprise Work tool typonym and the key title that each typical operation required by task will be used.
6. a kind of Work tool as claimed in claim 4 is prepared single generation method, it is characterized in that above-mentioned steps 4) in, when the operations staff carries out multinomial typical operation task, can scan simultaneously the bar code of multinomial typical operation task with barcode scanner, obtain a plurality of different bar code key assignments, entering computer database, computing machine extracts corresponding operation task Work tool according to different bar code key assignments and prepares list from database, and automatically is aggregated into the Work tool preparation list of a total multioperation task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210510647XA CN102968697A (en) | 2012-11-30 | 2012-11-30 | Generation device and method of tool and instrument preparation list |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210510647XA CN102968697A (en) | 2012-11-30 | 2012-11-30 | Generation device and method of tool and instrument preparation list |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102968697A true CN102968697A (en) | 2013-03-13 |
Family
ID=47798827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210510647XA Pending CN102968697A (en) | 2012-11-30 | 2012-11-30 | Generation device and method of tool and instrument preparation list |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102968697A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103473649A (en) * | 2013-09-17 | 2013-12-25 | 国家电网公司 | Intelligent tool selection device based on single-chip microcomputer and method thereof |
CN104616108A (en) * | 2015-02-04 | 2015-05-13 | 国网河南省电力公司郑州供电公司 | Method for distributing and recovering electric power overhaul tool |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1408185A (en) * | 1999-06-30 | 2003-04-02 | 诺基亚公司 | Identification object |
US20050119786A1 (en) * | 2003-04-22 | 2005-06-02 | United Parcel Service Of America, Inc. | System, method and computer program product for containerized shipping of mail pieces |
CN102609812A (en) * | 2012-01-19 | 2012-07-25 | 中国广东核电集团有限公司 | System and method for object replacement procession of nuclear power station |
CN102723243A (en) * | 2012-06-12 | 2012-10-10 | 上海交通大学 | Misassembly preventive system for electrical product assembly |
-
2012
- 2012-11-30 CN CN201210510647XA patent/CN102968697A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1408185A (en) * | 1999-06-30 | 2003-04-02 | 诺基亚公司 | Identification object |
US20050119786A1 (en) * | 2003-04-22 | 2005-06-02 | United Parcel Service Of America, Inc. | System, method and computer program product for containerized shipping of mail pieces |
CN102609812A (en) * | 2012-01-19 | 2012-07-25 | 中国广东核电集团有限公司 | System and method for object replacement procession of nuclear power station |
CN102723243A (en) * | 2012-06-12 | 2012-10-10 | 上海交通大学 | Misassembly preventive system for electrical product assembly |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103473649A (en) * | 2013-09-17 | 2013-12-25 | 国家电网公司 | Intelligent tool selection device based on single-chip microcomputer and method thereof |
CN104616108A (en) * | 2015-02-04 | 2015-05-13 | 国网河南省电力公司郑州供电公司 | Method for distributing and recovering electric power overhaul tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106157167B (en) | Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket | |
CN107045663B (en) | Visual online checking system and method for secondary safety measure operation ticket | |
CN110829595B (en) | Intelligent power station relay protection equipment overhaul safety isolation measure execution method and system | |
CN107167704B (en) | Power distribution network fault diagnosis system and method based on CIM model | |
CN112910089A (en) | Transformer substation secondary equipment fault logic visualization method and system | |
CN104678960B (en) | It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method | |
CN106815373B (en) | Distribution network first-aid repair big data display method and system based on BI analysis | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN106329730A (en) | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system | |
CN109685352A (en) | A kind of device maintenance method and system of intelligence control linkage | |
CN103761624A (en) | Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system | |
CN105427039A (en) | Efficient processing method of distribution network repair work orders based on responsibility areas | |
CN101592953A (en) | Based on integrated monitoring intelligent simulation error-preventing operation bill system and method thereof | |
CN102591223B (en) | Intelligentized diagnostic system of substation-operation operation tickets | |
CN103441570A (en) | One-button type sequential control operation control method based on integrated information platform | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN108233536A (en) | A kind of intelligent program remote handling system | |
CN103066700B (en) | Power grid fault information processing method and system | |
CN104091243A (en) | Intelligent switching operation ticket mechanism designing and achieving method | |
CN110674282A (en) | Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method | |
CN106651198A (en) | Power grid accident auxiliary processing method and system | |
CN104360835A (en) | Automatic sequential control operation ticket generation method based on topologic mode | |
CN105186686B (en) | A kind of dispatching of power netwoks intelligent error preventing policy system based on full mesh topology | |
CN113300765A (en) | Intelligent identification and diagnosis method for power digital link | |
CN110704700B (en) | One-key sequence control equipment state intelligent simulation method based on expert knowledge rule base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130313 |