CN106329730A - Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system - Google Patents
Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system Download PDFInfo
- Publication number
- CN106329730A CN106329730A CN201610821485.XA CN201610821485A CN106329730A CN 106329730 A CN106329730 A CN 106329730A CN 201610821485 A CN201610821485 A CN 201610821485A CN 106329730 A CN106329730 A CN 106329730A
- Authority
- CN
- China
- Prior art keywords
- remote
- information
- main website
- automatic
- verification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000012795 verification Methods 0.000 claims description 53
- 230000011664 signaling Effects 0.000 claims description 44
- 238000012360 testing method Methods 0.000 claims description 44
- 238000005259 measurement Methods 0.000 claims description 39
- 238000004891 communication Methods 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 claims description 8
- 230000005540 biological transmission Effects 0.000 claims description 5
- 230000000977 initiatory effect Effects 0.000 claims description 3
- 238000002372 labelling Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 4
- 238000004088 simulation Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
Classifications
-
- H02J13/0013—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610821485.XA CN106329730A (en) | 2016-09-14 | 2016-09-14 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610821485.XA CN106329730A (en) | 2016-09-14 | 2016-09-14 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106329730A true CN106329730A (en) | 2017-01-11 |
Family
ID=57787769
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610821485.XA Pending CN106329730A (en) | 2016-09-14 | 2016-09-14 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106329730A (en) |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106961157A (en) * | 2017-04-27 | 2017-07-18 | 国家电网公司 | A kind of the reason for power system accident remote monitoring information errors resolving method |
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
CN108322348A (en) * | 2018-02-11 | 2018-07-24 | 国网江苏省电力有限公司电力科学研究院 | Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically |
CN108448721A (en) * | 2018-03-27 | 2018-08-24 | 国网山东省电力公司潍坊供电公司 | The method of electric system main station monitoring signal and standard signal Auto-matching |
CN108491254A (en) * | 2018-02-07 | 2018-09-04 | 链家网(北京)科技有限公司 | A kind of dispatching method and device of data warehouse |
CN109193928A (en) * | 2018-07-27 | 2019-01-11 | 国网浙江省电力有限公司温州供电公司 | Ground county integral system joint debugging information checking method |
CN109217470A (en) * | 2018-09-07 | 2019-01-15 | 国网江苏省电力有限公司连云港供电分公司 | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card |
CN109741003A (en) * | 2018-11-29 | 2019-05-10 | 国网浙江宁波市鄞州区供电有限公司 | The automatic Acceptance Test System of substation information table |
CN109873497A (en) * | 2019-03-18 | 2019-06-11 | 国网江苏省电力有限公司连云港供电分公司 | A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence |
CN109901492A (en) * | 2017-12-11 | 2019-06-18 | 国网新疆电力有限公司乌鲁木齐供电公司 | A kind of power scheduling monitoring system monitoring information comparison acceptance method |
CN109902102A (en) * | 2019-01-15 | 2019-06-18 | 国网辽宁省电力有限公司鞍山供电公司 | A kind of supervisory control of substation information checks and accepts the automation checking method of card |
CN110112831A (en) * | 2019-06-03 | 2019-08-09 | 国网四川省电力公司电力科学研究院 | A kind of supervisory control of substation information automation checks and accepts device and its acceptance method |
CN110212532A (en) * | 2019-07-09 | 2019-09-06 | 国家电网有限公司 | A kind of portable power network schedule automation simulation checking system |
CN110401692A (en) * | 2019-05-30 | 2019-11-01 | 国网江苏省电力有限公司徐州供电分公司 | A kind of automatic Acceptance Test System of supervisory control of substation information integral and method |
CN110535236A (en) * | 2019-07-24 | 2019-12-03 | 深圳供电局有限公司 | A kind of simulation of intelligent substation wall is from Acceptance Test System and method |
CN110571927A (en) * | 2019-08-30 | 2019-12-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110727427A (en) * | 2019-10-14 | 2020-01-24 | 国网江苏省电力有限公司镇江供电分公司 | Intelligent safety checking method for dispatching automation master station model |
CN110867963A (en) * | 2019-11-21 | 2020-03-06 | 广东电网有限责任公司 | Electric power dispatching remote control operation broadcast forecasting system and method |
CN110932401A (en) * | 2019-12-05 | 2020-03-27 | 国网辽宁省电力有限公司锦州供电公司 | Method for improving safety of remote control high-voltage switch |
CN110942159A (en) * | 2019-11-21 | 2020-03-31 | 贵州电网有限责任公司 | Maintenance and verification method for responsibility area of main network OCS (online charging System) |
CN110955808A (en) * | 2019-11-26 | 2020-04-03 | 云南电网有限责任公司 | Method for matching and associating four remote monitoring information of main plant station |
CN111105051A (en) * | 2019-12-26 | 2020-05-05 | 国网宁夏电力有限公司中卫供电公司 | Intelligent automation system lightweight master station and information checking method thereof |
CN111274355A (en) * | 2020-01-15 | 2020-06-12 | 广东电网有限责任公司 | Lucene-based main plant station remote signaling signal automatic comparison method |
CN111934433A (en) * | 2020-08-28 | 2020-11-13 | 中域高科(武汉)信息技术有限公司 | Automatic rechecking method, device, equipment and system for transformer substation monitoring background |
CN111969717A (en) * | 2020-06-30 | 2020-11-20 | 国网辽宁省电力有限公司电力科学研究院 | Remote control combined automatic acceptance method and system between main station and sub-station of electric power automation system |
CN112508404A (en) * | 2020-12-07 | 2021-03-16 | 云南电网有限责任公司普洱供电局 | Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium |
CN112579628A (en) * | 2020-12-07 | 2021-03-30 | 国网四川省电力公司天府新区供电公司 | Power monitoring information autonomous checking system and method |
CN112701790A (en) * | 2020-12-28 | 2021-04-23 | 南京圣祥电气自动化有限公司 | Transformer substation and main station intelligent joint debugging platform and joint debugging method |
CN112737120A (en) * | 2020-12-26 | 2021-04-30 | 中国南方电网有限责任公司 | Generation method and device of regional power grid control report and computer equipment |
CN112769239A (en) * | 2020-12-31 | 2021-05-07 | 南京太司德智能电气有限公司 | Automatic point-aligning acceptance robot of power dispatching system |
CN113206864A (en) * | 2021-03-25 | 2021-08-03 | 杭州博联智能科技股份有限公司 | Equipment batch adding method, device, equipment and medium |
CN114612079A (en) * | 2022-05-16 | 2022-06-10 | 国网江西省电力有限公司电力科学研究院 | Automatic checking method for monitoring information graph library of centralized control station |
CN114785681A (en) * | 2022-04-15 | 2022-07-22 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN105262220A (en) * | 2015-10-30 | 2016-01-20 | 福建奥通迈胜电力科技有限公司 | Method and system for checking telecontrol information of intelligent gateway machine of transformer station |
CN105404269A (en) * | 2015-10-23 | 2016-03-16 | 江苏省电力公司南京供电公司 | Three-remote signal acceptance system of intelligent transformer station |
-
2016
- 2016-09-14 CN CN201610821485.XA patent/CN106329730A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN105404269A (en) * | 2015-10-23 | 2016-03-16 | 江苏省电力公司南京供电公司 | Three-remote signal acceptance system of intelligent transformer station |
CN105262220A (en) * | 2015-10-30 | 2016-01-20 | 福建奥通迈胜电力科技有限公司 | Method and system for checking telecontrol information of intelligent gateway machine of transformer station |
Non-Patent Citations (1)
Title |
---|
罗俊等: ""国网江苏电力实现变电站监控信息自动验收"", 《国家电网报》 * |
Cited By (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN106971351B (en) * | 2017-03-27 | 2018-05-22 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN106961157B (en) * | 2017-04-27 | 2019-08-09 | 国家电网公司 | A kind of reason resolving method of the long-range monitoring information mistake of power system accident |
CN106961157A (en) * | 2017-04-27 | 2017-07-18 | 国家电网公司 | A kind of the reason for power system accident remote monitoring information errors resolving method |
CN107450445B (en) * | 2017-09-05 | 2020-03-27 | 国网山东省电力公司 | Multi-station unified checking and accepting method for monitoring signals of electric power system |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
CN109901492A (en) * | 2017-12-11 | 2019-06-18 | 国网新疆电力有限公司乌鲁木齐供电公司 | A kind of power scheduling monitoring system monitoring information comparison acceptance method |
CN108491254A (en) * | 2018-02-07 | 2018-09-04 | 链家网(北京)科技有限公司 | A kind of dispatching method and device of data warehouse |
CN108322348A (en) * | 2018-02-11 | 2018-07-24 | 国网江苏省电力有限公司电力科学研究院 | Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically |
CN108322348B (en) * | 2018-02-11 | 2021-01-26 | 国网江苏省电力有限公司电力科学研究院 | Transformer substation monitoring information automatic acceptance signal triggering operation subsystem and method |
CN108448721B (en) * | 2018-03-27 | 2022-12-02 | 国网山东省电力公司潍坊供电公司 | Method for automatically matching monitoring signal of main station of power system with standard signal |
CN108448721A (en) * | 2018-03-27 | 2018-08-24 | 国网山东省电力公司潍坊供电公司 | The method of electric system main station monitoring signal and standard signal Auto-matching |
CN109193928A (en) * | 2018-07-27 | 2019-01-11 | 国网浙江省电力有限公司温州供电公司 | Ground county integral system joint debugging information checking method |
CN109217470A (en) * | 2018-09-07 | 2019-01-15 | 国网江苏省电力有限公司连云港供电分公司 | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card |
CN109741003A (en) * | 2018-11-29 | 2019-05-10 | 国网浙江宁波市鄞州区供电有限公司 | The automatic Acceptance Test System of substation information table |
CN109902102A (en) * | 2019-01-15 | 2019-06-18 | 国网辽宁省电力有限公司鞍山供电公司 | A kind of supervisory control of substation information checks and accepts the automation checking method of card |
CN109902102B (en) * | 2019-01-15 | 2022-11-18 | 国网辽宁省电力有限公司鞍山供电公司 | Automatic checking method for transformer substation monitoring information check card |
CN109873497B (en) * | 2019-03-18 | 2022-06-28 | 国网江苏省电力有限公司连云港供电分公司 | Power distribution main station and terminal automatic joint debugging acceptance method based on intelligent acceptance device |
CN109873497A (en) * | 2019-03-18 | 2019-06-11 | 国网江苏省电力有限公司连云港供电分公司 | A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence |
CN110401692A (en) * | 2019-05-30 | 2019-11-01 | 国网江苏省电力有限公司徐州供电分公司 | A kind of automatic Acceptance Test System of supervisory control of substation information integral and method |
CN110401692B (en) * | 2019-05-30 | 2022-04-26 | 国网江苏省电力有限公司徐州供电分公司 | Integrated automatic checking and accepting system and method for monitoring information of transformer substation |
CN110112831A (en) * | 2019-06-03 | 2019-08-09 | 国网四川省电力公司电力科学研究院 | A kind of supervisory control of substation information automation checks and accepts device and its acceptance method |
CN110212532A (en) * | 2019-07-09 | 2019-09-06 | 国家电网有限公司 | A kind of portable power network schedule automation simulation checking system |
CN110535236A (en) * | 2019-07-24 | 2019-12-03 | 深圳供电局有限公司 | A kind of simulation of intelligent substation wall is from Acceptance Test System and method |
CN110535236B (en) * | 2019-07-24 | 2023-03-03 | 深圳供电局有限公司 | Intelligent substation bay level simulation self-acceptance system and method |
CN110571927B (en) * | 2019-08-30 | 2024-02-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110571927A (en) * | 2019-08-30 | 2019-12-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110727427A (en) * | 2019-10-14 | 2020-01-24 | 国网江苏省电力有限公司镇江供电分公司 | Intelligent safety checking method for dispatching automation master station model |
CN110942159A (en) * | 2019-11-21 | 2020-03-31 | 贵州电网有限责任公司 | Maintenance and verification method for responsibility area of main network OCS (online charging System) |
CN110942159B (en) * | 2019-11-21 | 2023-05-30 | 贵州电网有限责任公司 | Maintenance and verification method for responsibility area of master network OCS system |
CN110867963A (en) * | 2019-11-21 | 2020-03-06 | 广东电网有限责任公司 | Electric power dispatching remote control operation broadcast forecasting system and method |
CN110955808A (en) * | 2019-11-26 | 2020-04-03 | 云南电网有限责任公司 | Method for matching and associating four remote monitoring information of main plant station |
CN110955808B (en) * | 2019-11-26 | 2022-09-09 | 云南电网有限责任公司 | Method for matching and associating four remote monitoring information of main plant station |
CN110932401A (en) * | 2019-12-05 | 2020-03-27 | 国网辽宁省电力有限公司锦州供电公司 | Method for improving safety of remote control high-voltage switch |
CN111105051A (en) * | 2019-12-26 | 2020-05-05 | 国网宁夏电力有限公司中卫供电公司 | Intelligent automation system lightweight master station and information checking method thereof |
CN111274355A (en) * | 2020-01-15 | 2020-06-12 | 广东电网有限责任公司 | Lucene-based main plant station remote signaling signal automatic comparison method |
CN111969717B (en) * | 2020-06-30 | 2024-02-13 | 国网辽宁省电力有限公司电力科学研究院 | Remote control joint automatic acceptance method and system between main and sub stations of electric power automation system |
CN111969717A (en) * | 2020-06-30 | 2020-11-20 | 国网辽宁省电力有限公司电力科学研究院 | Remote control combined automatic acceptance method and system between main station and sub-station of electric power automation system |
CN111934433B (en) * | 2020-08-28 | 2021-11-02 | 中域高科(武汉)信息技术有限公司 | Automatic rechecking method, device, equipment and system for transformer substation monitoring background |
CN111934433A (en) * | 2020-08-28 | 2020-11-13 | 中域高科(武汉)信息技术有限公司 | Automatic rechecking method, device, equipment and system for transformer substation monitoring background |
CN112508404A (en) * | 2020-12-07 | 2021-03-16 | 云南电网有限责任公司普洱供电局 | Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium |
CN112579628A (en) * | 2020-12-07 | 2021-03-30 | 国网四川省电力公司天府新区供电公司 | Power monitoring information autonomous checking system and method |
CN112579628B (en) * | 2020-12-07 | 2023-05-23 | 国网四川省电力公司天府新区供电公司 | Autonomous checking system and method for power monitoring information |
CN112737120A (en) * | 2020-12-26 | 2021-04-30 | 中国南方电网有限责任公司 | Generation method and device of regional power grid control report and computer equipment |
CN112737120B (en) * | 2020-12-26 | 2024-03-22 | 中国南方电网有限责任公司 | Regional power grid control report generation method and device and computer equipment |
CN112701790A (en) * | 2020-12-28 | 2021-04-23 | 南京圣祥电气自动化有限公司 | Transformer substation and main station intelligent joint debugging platform and joint debugging method |
CN112769239A (en) * | 2020-12-31 | 2021-05-07 | 南京太司德智能电气有限公司 | Automatic point-aligning acceptance robot of power dispatching system |
CN113206864A (en) * | 2021-03-25 | 2021-08-03 | 杭州博联智能科技股份有限公司 | Equipment batch adding method, device, equipment and medium |
CN114785681A (en) * | 2022-04-15 | 2022-07-22 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation |
CN114785681B (en) * | 2022-04-15 | 2024-03-15 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and accepting system and method for monitoring information of transformer substation on-line equipment |
CN114612079A (en) * | 2022-05-16 | 2022-06-10 | 国网江西省电力有限公司电力科学研究院 | Automatic checking method for monitoring information graph library of centralized control station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106329730A (en) | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system | |
CN107346917B (en) | Secondary device based on virtual machine integrates joint debugging method | |
CN107450445A (en) | A kind of unified check of electric power supervisory control signal multistation and acceptance method | |
CN106935089B (en) | Power information acquisition terminal installation training system and method | |
CN106230903A (en) | Air conditioning unit solution lock control method and system | |
CN103941240B (en) | A kind of detection method of the extension set detecting device that communicates based on radar system | |
CN105978152A (en) | Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation | |
CN105978159A (en) | Telecontrol testing online execution-free check method for transformer station | |
CN108008209A (en) | A kind of relay protection automated closed-loop detection method | |
CN104052633A (en) | Integrated testing method for intelligent station 61850 and telecontrol 104 protocol | |
CN110401692A (en) | A kind of automatic Acceptance Test System of supervisory control of substation information integral and method | |
CN104391244A (en) | Closed loop test method of relay protection apparatus and system thereof | |
CN106329720A (en) | Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation | |
CN107907773A (en) | A kind of assembly line detecting system for site protective relaying device | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN108333547A (en) | A kind of distribution line failure indicator automatic checkout system and method | |
CN103913728B (en) | A kind of method of testing based on portable radar comprehensive tester | |
CN107257304A (en) | Telemechanical is exempted to a configuration testing system | |
CN103346497B (en) | Intelligent substation electrical virtual circuit isolation method and system | |
CN104076807A (en) | Method of debugging automation system of intelligent substation | |
CN110611312B (en) | On-line simulation system and method for panoramic data of substation bay level | |
CN109521372A (en) | A kind of distributed new and network data analysis and diagnosis system | |
CN104750095A (en) | Regulation and control center routing inspection testing system and method | |
CN108648549B (en) | Object-oriented electricity consumption information acquisition closed-loop simulation system and control method | |
CN104184215B (en) | Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170106 Address after: 222003 Lianyungang City, Jiangsu province Haizhou District Road No. 1 Applicant after: LIANYUNGANG POWER SUPPLY COMPANY OF STATE GRID JINGSU ELECTRIC POWER COMPNAY Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY Applicant after: State Power Networks Co Address before: 222003 Lianyungang City, Jiangsu province Haizhou District Road No. 1 Applicant before: LIANYUNGANG POWER SUPPLY COMPANY OF STATE GRID JINGSU ELECTRIC POWER COMPNAY Applicant before: State Power Networks Co |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Luo Jun Inventor after: Zhong Ziwei Inventor after: Wu Yi Inventor after: Liu Yi Inventor after: Fu Xiangyun Inventor after: Sun Haixia Inventor after: Xiong Hao Inventor after: Fan Qing Inventor after: Wu Haibin Inventor after: Gao Xiang Inventor before: Wu Yi Inventor before: Zhong Ziwei Inventor before: Liu Yi Inventor before: Fu Xiangyun Inventor before: Sun Haixia Inventor before: Xiong Hao Inventor before: Fan Qing Inventor before: Wu Haibin Inventor before: Luo Jun Inventor before: Gao Xiang |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |