CN106329730A - Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system - Google Patents

Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system Download PDF

Info

Publication number
CN106329730A
CN106329730A CN201610821485.XA CN201610821485A CN106329730A CN 106329730 A CN106329730 A CN 106329730A CN 201610821485 A CN201610821485 A CN 201610821485A CN 106329730 A CN106329730 A CN 106329730A
Authority
CN
China
Prior art keywords
remote
information
main website
automatic
verification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610821485.XA
Other languages
Chinese (zh)
Inventor
吴奕
刘翌
伏祥运
孙海霞
熊浩
范青
吴海斌
罗俊
高翔
仲梓维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company, State Grid Corp of China SGCC filed Critical Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
Priority to CN201610821485.XA priority Critical patent/CN106329730A/en
Publication of CN106329730A publication Critical patent/CN106329730A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0013
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a substation monitoring information automatic acceptance system based on an intelligent power grid scheduling system. The substation monitoring information automatic acceptance system is characterized in that a main station end and a plant station end are provided; the plant station end is used to trigger a virtual plant station telesignalization successive up-supply function; the main station end is used to verify whether an up-supply alarming information dot mark and up-supply information content are identical with a third party information table dot mark and an information content sequence. The substation monitoring information automatic acceptance system based on the intelligent power grid scheduling system is advantageous in that a conventional manual checking process is shortened to a minute-level, and by adopting the automatic acceptance system, acceptance working efficiency is improved, and great meaning is provided for improving a qualified acceptance result.

Description

The change station monitoring automatic Acceptance Test System of information based on intelligent grid dispatching patcher
Technical field
The invention belongs to dispatching of power netwoks field, a kind of change station monitoring information based on intelligent grid dispatching patcher is certainly Dynamic Acceptance Test System.
Background technology
At present, in Jiangsu Province, transformer station realizes unattended the most substantially, regulation and control centers at different levels be responsible for the daily of transformer station Monitoring.Along with expanding economy, the construction of electrical network is accelerated, regulation and control center in addition to daily monitoring, to be also responsible for newly-built, change, expand Build the examination verification at the monitoring information access regulation and control center of transformer station.The verification of all supervisory control of substation information is all on duty by monitoring Personnel and field adjustable personnel check one by one, and often there are thousands of remote signalling information, hundreds of telemetry intelligence (TELINT)s in a newly-built station, core Very big to workload, during especially while there is multiple station to need verification monitoring information data, need multiple monitoring operator on duty with On-the-spot cross-check information, under the present situation of monitoring personnel shortage, often results in multiple unit in charge of construction and waits in line to check and accept, delay equipment Construction period, delays the time of putting equipment in service, limits the adjustment of the method for operation, has buried hidden danger for electric power netting safe running. Occupy construction operation maintenance personnel, automation personnel and monitoring operator on duty's plenty of time and energy simultaneously, normal value class is worked Exert a certain influence.
As it is shown in figure 1, unite, artificial examination mode is initiated by plant stand, and flow of information is led to through plant stand observing and controlling, master control, approach communication Roads etc. transmit, and arrive main website preposition, with the protection node table of main website Input of Data, chopper information table, disconnecting link table, earthing Lock table, measuring point remote signalling information table, preposition remote measurement definition table, remote control relation table, preposition remote signalling definition table, remote signalling definition table, secondary Remote signalling definition table etc. is associated coupling, triggers corresponding warning information, alarm window, wiring diagram breaker in middle and disconnecting link displacement, aobvious Show corresponding interval location remote measurement numerical value.This flow of information process is long, occurs abnormal conditions frequency higher during debugging, and abnormity point It is difficult to grasp.Single information is checked and accepted by the most entirely by monitoring personnel's manual observation, verification, it is impossible to what eliminating artificially made mistakes can Can, efficiency is checked and accepted in impact.
Summary of the invention
Technical problem solved by the invention is to provide a kind of station monitoring information that becomes automatically to check and accept.
The technical solution realizing the object of the invention is:
A kind of change station monitoring automatic Acceptance Test System of information based on intelligent grid dispatching patcher, including main website end and plant stand end, factory End of standing triggers and send function, main website end to verify warning information period, the information content and the 3rd sent in virtual plant stand remote signalling successively Side information table period, information content sequence consensus.
Described main website end includes that the automatic Acceptance Test System of main website, Dispatching Control System, the automatic Acceptance Test System of main website are built in tune Degree control system;
Plant stand end includes the stand virtual front-end system of end, end of standing virtual plant stand system, data communication gateway machine, wherein scheduling controlling system System, the virtual front-end system of end of standing, end of standing virtual plant stand system, data communication gateway machine are connected by order wire;
The automatic Acceptance Test System of described main website built-in third party information table, is used for reading remote signalling/remote measurement under electrical network D5000 system/distant Control table and digital control table, it is achieved electrical network D5000 system leading information preliminary check, remote signalling associating automatic Verification, remote measurement are automatic Combine verification, remote control associating automatic Verification, remote signalling link correctness verification, remote measurement link correctness verification;
Described Dispatching Control System is for the technology platform of framework transformer station remote monitoring, and background data base stores to be checked and accepted Substation information table storehouse, provides transmission channel for the automatic joint debugging of supervisory control of substation information simultaneously;
The virtual front-end system of described station end built-in third party information table, for reading the forward table of dress under physics master control, verifies two The concordance of person, and record check results;The alarm that the virtual front-end system of end of standing receives and display station end first and second equipment sends Information, display receive message address, record associated check result.
End virtual plant stand system in described station is according to the demand of the automatic Acceptance Test System of main website, simulation master control transformer substation side monitoring letter Breath source, triggers warning information to the automatic Acceptance Test System of main website, the virtual front-end system of end of standing and Dispatching Control System monitor workstation.
The acceptance method becoming the station automatic Acceptance Test System of monitoring information based on intelligent grid dispatching patcher, it is characterised in that Comprise the following steps:
Step one, described electrical network D5000 system leading information preliminary check, the automatic Acceptance Test System of main website built-in third party information Table, reads remote signalling, remote measurement, remote control table in intelligent grid supporting system technology, verifies both concordance, and record verification As a result, electrical network D5000 system leading information preliminary check is completed.
Step 2, plant stand end virtual preposition on verify electrical substation field devices can according to third party's information table order touch Sending out corresponding signal, the remote measurement amount of the checking corresponding period of third party's information table can embody field apparatus remote measurement amount.
Step 3, remote signalling, remote measurement, Remote Control Automatic combine verification:
1. remote signalling associating automatic Verification, reset main website end is preposition, all remote signalling of plant stand end master control, and it is distant that plant stand end triggers virtual plant stand Believe and on successively, send function, in warning information period, information content and third party's information table period, information that main website end verification is sent Holding sequence consensus, main website end automatic Acceptance Test System record verifies by result, provides prompting and remarks when check results is inconsistent Error reason, the automatic Acceptance Test System of main website end generates remote signalling associating automatic Verification report;
2. verification is combined in remote measurement automatically, and in, end master control of standing preposition to main website, all remote measurement amounts are reset to 0;The virtual factory of initiating station end Send in telemetry of standing;Complete preposition parsing data and the contrast of data in third party's information table, and record difference, check results Prompting is given time inconsistent;Generate remote measurement and automatically combine acceptance report;
The most Remote Control Automatic combine verification, possess and prevent distant run switch function by mistake, including using purview certification, remote control license plant stand Differentiate, controlled by zone of responsibility and main website switch remote control anti-misoperation locking, according to remote control sequence table, switch " splitting or integrating " can be automatically performed Operation, in remote control sequence table, selects to wait to check and accept switch, determines remote control order successively, it is possible to distinguish run switch, it is ensured that do not miss Choosing, in the course of receiving, energy automatic decision remote control result, check and accept process in advance, tentative follow-up examination, it is possible to restart the distant of interruption Control is checked and accepted;
The switch failed to remote manipulation, can in remote control sequence table labelling, automatically generate remote manipulation failure sequences;
Remote control can be generated and combine automatic acceptance report.Including check and accept state after switch names, original state, control instruction, control, Failure record etc..
Step 4: described remote signalling link correctness verification, the remote signalling link correctness comparison employing single analog data of transmission, The mode of single verification, after the automatic Acceptance Test System of main website sends single change remote signalling, checks graph data.
The mode that described remote measurement link correctness verification uses Batch sending analog data, verifies one by one, main website tests automatically Receipts system is that each measuring point arranges different remote measurement values, and after Batch sending, comparison sends data, checks graph data.
Compared with prior art, its remarkable advantage is the present invention: 1) present invention change based on intelligent grid dispatching patcher station The automatic Acceptance Test System of monitoring information is in strict accordance with " electric power secondary system security protection overall plan " and " transformer station secondary system is pacified Full protection scheme " requirement, carry out security partitioning, communication boundary security protection, it is ensured that control functional safety.Automatically Acceptance Test System Mastery routine supports platform prior art specification and function based on intelligent grid dispatching technique, possesses higher technical merit;
2) present invention change based on the intelligent grid dispatching patcher station monitoring automatic Acceptance Test System of information is by Traditional Man audit process Foreshortening to a minute rank, automatic Acceptance Test System is for promoting checking and accepting efficiency, and raising is checked and accepted into qualified significant;
3) present invention change based on the intelligent grid dispatching patcher station monitoring automatic Acceptance Test System of information is simple to operate, at intelligent grid Supporting system technology can be transplanted rapidly, possess versatility, there is good promotion prospect.
Below in conjunction with the accompanying drawings the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 unites and manually checks and accepts mode structure chart.
Fig. 2 structure chart becoming the station automatic Acceptance Test System of monitoring information based on intelligent grid dispatching patcher.
Detailed description of the invention
A kind of change station monitoring automatic Acceptance Test System of information based on intelligent grid dispatching patcher, including main website end and plant stand End, plant stand end triggers and send function in virtual plant stand remote signalling successively, warning information period that main website end verification is sent, information content with Third party's information table period, information content sequence consensus, the principle of described verification is based on information table period, title describes, by One verification remote signalling title, device numbering, device type, alarm type, the result of verification is by automatic program identification record, abnormity point Can directly position to main website end or plant stand end.
Described main website end includes the automatic Acceptance Test System of main website, Dispatching Control System, the automatic Acceptance Test System of main website and scheduling control System processed is connected by order wire;
Plant stand end includes the stand virtual front-end system of end, end of standing virtual plant stand system, data communication gateway machine, wherein scheduling controlling system System, the virtual front-end system of end of standing, end of standing virtual plant stand system, data communication gateway machine are connected by order wire;
The automatic Acceptance Test System of described main website built-in third party information table, is used for reading remote signalling/remote measurement under electrical network D5000 system/distant Control table and digital control table, it is achieved electrical network D5000 system leading information preliminary check, remote signalling associating automatic Verification, remote measurement are automatic Combine verification, remote control associating automatic Verification, remote signalling link correctness verification, remote measurement link correctness verification;Main website checks and accepts automatically " remote signalling period " and " information description ", telemeter interior " remote measurement period " and " telemetry intelligence (TELINT) ", remote control table in system comparison remote signalling table Interior " remote control period " and " remote information " double keyword.
Described Dispatching Control System is for the technology platform of framework transformer station remote monitoring, and background data base stores to be tested The substation information table storehouse received, provides transmission channel for the automatic joint debugging of supervisory control of substation information simultaneously;
The virtual front-end system of described station end built-in third party information table, for reading the forward table of dress under physics master control, verifies two The concordance of person, and record check results;The alarm that the virtual front-end system of end of standing receives and display station end first and second equipment sends Information, display receive message address, record associated check result.
End virtual plant stand system in described station is according to the demand of the automatic Acceptance Test System of main website, simulation master control transformer substation side monitoring letter Breath source, triggers warning information to the automatic Acceptance Test System of main website, the virtual front-end system of end of standing and Dispatching Control System monitor workstation.
The acceptance method becoming the station automatic Acceptance Test System of monitoring information based on intelligent grid dispatching patcher, it is characterised in that Comprise the following steps:
Step one, described electrical network D5000 system leading information preliminary check, the automatic Acceptance Test System of main website built-in third party information Table, reads remote signalling, remote measurement, remote control table in intelligent grid supporting system technology, verifies both concordance, and record verification As a result, electrical network D5000 system leading information preliminary check is completed.
Step 2, plant stand end virtual preposition on verify electrical substation field devices can according to third party's information table order touch Sending out corresponding signal, the remote measurement amount of the checking corresponding period of third party's information table can embody field apparatus remote measurement amount.
Step 3, remote signalling, remote measurement, Remote Control Automatic combine verification:
1. remote signalling associating automatic Verification, reset main website end is preposition, all remote signalling of plant stand end master control, and it is distant that plant stand end triggers virtual plant stand Believe and on successively, send function, in warning information period, information content and third party's information table period, information that main website end verification is sent Holding sequence consensus, main website end automatic Acceptance Test System record verifies by result, provides prompting and remarks when check results is inconsistent Error reason, the automatic Acceptance Test System of main website end generates remote signalling associating automatic Verification report;
2. verification is combined in remote measurement automatically, and in, end master control of standing preposition to main website, all remote measurement amounts are reset to 0;The virtual factory of initiating station end Send in telemetry of standing;Complete preposition parsing data and the contrast of data in third party's information table, and record difference, check results Prompting is given time inconsistent;Generate remote measurement and automatically combine acceptance report;
The most Remote Control Automatic combine verification, possess and prevent distant run switch function by mistake, including using purview certification, remote control license plant stand Differentiate, controlled by zone of responsibility and main website switch remote control anti-misoperation locking, according to remote control sequence table, switch " splitting or integrating " can be automatically performed Operation, in remote control sequence table, selects to wait to check and accept switch, determines remote control order successively, it is possible to distinguish run switch, it is ensured that do not miss Choosing, in the course of receiving, energy automatic decision remote control result, check and accept process in advance, tentative follow-up examination, it is possible to restart the distant of interruption Control is checked and accepted;
The switch failed to remote manipulation, can in remote control sequence table labelling, automatically generate remote manipulation failure sequences;
Remote control can be generated and combine automatic acceptance report.Including check and accept state after switch names, original state, control instruction, control, Failure record etc..
Step 4: described remote signalling link correctness verification, the remote signalling link correctness comparison employing single analog data of transmission, The mode of single verification, after the automatic Acceptance Test System of main website sends single change remote signalling, checks graph data.
The mode that described remote measurement link correctness verification uses Batch sending analog data, verifies one by one, main website tests automatically Receipts system is that each measuring point arranges different remote measurement values, and after Batch sending, comparison sends data, checks graph data.

Claims (2)

1. the change station monitoring automatic Acceptance Test System of information based on intelligent grid dispatching patcher, it is characterised in that include main website End and plant stand end, plant stand end triggers and send function, main website end to verify warning information period, the letter sent in virtual plant stand remote signalling successively Breath content and third party's information table period, information content sequence consensus;
Described main website end includes the automatic Acceptance Test System of main website, Dispatching Control System, the automatic Acceptance Test System of main website and scheduling controlling system System is connected by order wire;
Plant stand end includes the stand virtual front-end system of end, end of standing virtual plant stand system, data communication gateway machine, wherein scheduling controlling system System, the virtual front-end system of end of standing, end of standing virtual plant stand system, data communication gateway machine are connected by order wire;
The automatic Acceptance Test System of described main website built-in third party information table, is used for reading remote signalling/remote measurement under electrical network D5000 system/distant Control table and digital control table, it is achieved electrical network D5000 system leading information preliminary check, remote signalling associating automatic Verification, remote measurement are automatic Combine verification, remote control associating automatic Verification, remote signalling link correctness verification, remote measurement link correctness verification;
Described Dispatching Control System is for the technology platform of framework transformer station remote monitoring, and background data base stores to be checked and accepted Substation information table storehouse, provides transmission channel for the automatic joint debugging of supervisory control of substation information simultaneously;
The virtual front-end system of described station end built-in third party information table, for reading the forward table of dress under physics master control, verifies two The concordance of person, and record check results;The alarm that the virtual front-end system of end of standing receives and display station end first and second equipment sends Information, display receive message address, record associated check result;
End virtual plant stand system in described station, according to the demand of the automatic Acceptance Test System of main website, simulates master control transformer substation side monitoring information Source, triggers warning information and supervises to the automatic Acceptance Test System of main website, the virtual front-end system of end of standing and scheduling controlling master control transformer substation side Stand.
2. one kind becomes testing of the station automatic Acceptance Test System of monitoring information based on based on intelligent grid dispatching patcher described in claim 1 Receiving method, it is characterised in that comprise the following steps:
Step one, described electrical network D5000 system database preliminary check, the automatic Acceptance Test System of main website built-in third party information table, Read remote signalling, remote measurement, remote control table in intelligent grid supporting system technology, verify both concordance, and record verification knot Really, electrical network D5000 system leading information preliminary check is completed;
Step 2, plant stand end virtual preposition on read total control database downloading information, checking electrical substation field devices can be by According to third party's information table sequence trigger switch corresponding signal, the remote measurement amount of the checking corresponding period of third party's information table can set at the scene of embodying Standby remote measurement amount;
Step 3, remote signalling, remote measurement, Remote Control Automatic combine verification:
1. remote signalling associating automatic Verification, reset main website end is preposition, all remote signalling of plant stand end master control, and it is distant that plant stand end triggers virtual plant stand Believe and on successively, send function, in warning information period, information content and third party's information table period, information that main website end verification is sent Holding sequence consensus, main website end automatic Acceptance Test System record verifies by result, provides prompting and remarks when check results is inconsistent Error reason, the automatic Acceptance Test System of main website end generates remote signalling associating automatic Verification report;
2. verification is combined in remote measurement automatically, and in, end master control of standing preposition to main website, all remote measurement amounts are reset to 0;The virtual factory of initiating station end Send in telemetry of standing;Complete preposition parsing data and the contrast of data in third party's information table, and record difference, check results Prompting is given time inconsistent;Generate remote measurement and automatically combine acceptance report;
The most Remote Control Automatic combine verification, possess and prevent distant run switch function by mistake, including using purview certification, remote control license plant stand Differentiate, controlled by zone of responsibility and main website switch remote control anti-misoperation locking, according to remote control sequence table, switch " splitting or integrating " can be automatically performed Operation, in remote control sequence table, selects to wait to check and accept switch, determines remote control order successively, it is possible to distinguish run switch, it is ensured that do not miss Choosing, in the course of receiving, energy automatic decision remote control result, check and accept process in advance, tentative follow-up examination, it is possible to restart the distant of interruption Control is checked and accepted;
The switch failed to remote manipulation, can in remote control sequence table labelling, automatically generate remote manipulation failure sequences;
Remote control can be generated and combine automatic acceptance report, including check and accept state after switch names, original state, control instruction, control, Failure record etc.;
Step 4: described remote signalling link correctness verification, remote signalling link correctness comparison uses and sends single analog data, single The mode of verification, after the automatic Acceptance Test System of main website sends single change remote signalling, checks graph data;
The mode that described remote measurement link correctness verification uses Batch sending analog data, verifies one by one, main website checks and accepts system automatically System arranges different remote measurement values for each measuring point, and after Batch sending, comparison sends data, checks graph data.
CN201610821485.XA 2016-09-14 2016-09-14 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system Pending CN106329730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610821485.XA CN106329730A (en) 2016-09-14 2016-09-14 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610821485.XA CN106329730A (en) 2016-09-14 2016-09-14 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system

Publications (1)

Publication Number Publication Date
CN106329730A true CN106329730A (en) 2017-01-11

Family

ID=57787769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610821485.XA Pending CN106329730A (en) 2016-09-14 2016-09-14 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system

Country Status (1)

Country Link
CN (1) CN106329730A (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106961157A (en) * 2017-04-27 2017-07-18 国家电网公司 A kind of the reason for power system accident remote monitoring information errors resolving method
CN106971351A (en) * 2017-03-27 2017-07-21 国网江苏省电力公司电力科学研究院 The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN107450445A (en) * 2017-09-05 2017-12-08 国网山东省电力公司 A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN108322348A (en) * 2018-02-11 2018-07-24 国网江苏省电力有限公司电力科学研究院 Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN108491254A (en) * 2018-02-07 2018-09-04 链家网(北京)科技有限公司 A kind of dispatching method and device of data warehouse
CN109193928A (en) * 2018-07-27 2019-01-11 国网浙江省电力有限公司温州供电公司 Ground county integral system joint debugging information checking method
CN109217470A (en) * 2018-09-07 2019-01-15 国网江苏省电力有限公司连云港供电分公司 It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card
CN109741003A (en) * 2018-11-29 2019-05-10 国网浙江宁波市鄞州区供电有限公司 The automatic Acceptance Test System of substation information table
CN109873497A (en) * 2019-03-18 2019-06-11 国网江苏省电力有限公司连云港供电分公司 A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence
CN109901492A (en) * 2017-12-11 2019-06-18 国网新疆电力有限公司乌鲁木齐供电公司 A kind of power scheduling monitoring system monitoring information comparison acceptance method
CN109902102A (en) * 2019-01-15 2019-06-18 国网辽宁省电力有限公司鞍山供电公司 A kind of supervisory control of substation information checks and accepts the automation checking method of card
CN110112831A (en) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN110212532A (en) * 2019-07-09 2019-09-06 国家电网有限公司 A kind of portable power network schedule automation simulation checking system
CN110401692A (en) * 2019-05-30 2019-11-01 国网江苏省电力有限公司徐州供电分公司 A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN110535236A (en) * 2019-07-24 2019-12-03 深圳供电局有限公司 A kind of simulation of intelligent substation wall is from Acceptance Test System and method
CN110571927A (en) * 2019-08-30 2019-12-13 深圳供电局有限公司 Four-remote signal parameter checking method
CN110727427A (en) * 2019-10-14 2020-01-24 国网江苏省电力有限公司镇江供电分公司 Intelligent safety checking method for dispatching automation master station model
CN110867963A (en) * 2019-11-21 2020-03-06 广东电网有限责任公司 Electric power dispatching remote control operation broadcast forecasting system and method
CN110932401A (en) * 2019-12-05 2020-03-27 国网辽宁省电力有限公司锦州供电公司 Method for improving safety of remote control high-voltage switch
CN110942159A (en) * 2019-11-21 2020-03-31 贵州电网有限责任公司 Maintenance and verification method for responsibility area of main network OCS (online charging System)
CN110955808A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司 Method for matching and associating four remote monitoring information of main plant station
CN111105051A (en) * 2019-12-26 2020-05-05 国网宁夏电力有限公司中卫供电公司 Intelligent automation system lightweight master station and information checking method thereof
CN111274355A (en) * 2020-01-15 2020-06-12 广东电网有限责任公司 Lucene-based main plant station remote signaling signal automatic comparison method
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN111969717A (en) * 2020-06-30 2020-11-20 国网辽宁省电力有限公司电力科学研究院 Remote control combined automatic acceptance method and system between main station and sub-station of electric power automation system
CN112508404A (en) * 2020-12-07 2021-03-16 云南电网有限责任公司普洱供电局 Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium
CN112579628A (en) * 2020-12-07 2021-03-30 国网四川省电力公司天府新区供电公司 Power monitoring information autonomous checking system and method
CN112701790A (en) * 2020-12-28 2021-04-23 南京圣祥电气自动化有限公司 Transformer substation and main station intelligent joint debugging platform and joint debugging method
CN112737120A (en) * 2020-12-26 2021-04-30 中国南方电网有限责任公司 Generation method and device of regional power grid control report and computer equipment
CN112769239A (en) * 2020-12-31 2021-05-07 南京太司德智能电气有限公司 Automatic point-aligning acceptance robot of power dispatching system
CN113206864A (en) * 2021-03-25 2021-08-03 杭州博联智能科技股份有限公司 Equipment batch adding method, device, equipment and medium
CN114612079A (en) * 2022-05-16 2022-06-10 国网江西省电力有限公司电力科学研究院 Automatic checking method for monitoring information graph library of centralized control station
CN114785681A (en) * 2022-04-15 2022-07-22 国网江苏省电力有限公司徐州供电分公司 Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098988A (en) * 2015-08-26 2015-11-25 国家电网公司 Regulation information acceptance check method based on replacing service
CN105262220A (en) * 2015-10-30 2016-01-20 福建奥通迈胜电力科技有限公司 Method and system for checking telecontrol information of intelligent gateway machine of transformer station
CN105404269A (en) * 2015-10-23 2016-03-16 江苏省电力公司南京供电公司 Three-remote signal acceptance system of intelligent transformer station

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098988A (en) * 2015-08-26 2015-11-25 国家电网公司 Regulation information acceptance check method based on replacing service
CN105404269A (en) * 2015-10-23 2016-03-16 江苏省电力公司南京供电公司 Three-remote signal acceptance system of intelligent transformer station
CN105262220A (en) * 2015-10-30 2016-01-20 福建奥通迈胜电力科技有限公司 Method and system for checking telecontrol information of intelligent gateway machine of transformer station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗俊等: ""国网江苏电力实现变电站监控信息自动验收"", 《国家电网报》 *

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106971351A (en) * 2017-03-27 2017-07-21 国网江苏省电力公司电力科学研究院 The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN106971351B (en) * 2017-03-27 2018-05-22 国网江苏省电力公司电力科学研究院 The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN106961157A (en) * 2017-04-27 2017-07-18 国家电网公司 A kind of the reason for power system accident remote monitoring information errors resolving method
CN106961157B (en) * 2017-04-27 2019-08-09 国家电网公司 A kind of reason resolving method of the long-range monitoring information mistake of power system accident
CN107450445B (en) * 2017-09-05 2020-03-27 国网山东省电力公司 Multi-station unified checking and accepting method for monitoring signals of electric power system
CN107450445A (en) * 2017-09-05 2017-12-08 国网山东省电力公司 A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN109901492A (en) * 2017-12-11 2019-06-18 国网新疆电力有限公司乌鲁木齐供电公司 A kind of power scheduling monitoring system monitoring information comparison acceptance method
CN108491254A (en) * 2018-02-07 2018-09-04 链家网(北京)科技有限公司 A kind of dispatching method and device of data warehouse
CN108322348B (en) * 2018-02-11 2021-01-26 国网江苏省电力有限公司电力科学研究院 Transformer substation monitoring information automatic acceptance signal triggering operation subsystem and method
CN108322348A (en) * 2018-02-11 2018-07-24 国网江苏省电力有限公司电力科学研究院 Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically
CN108448721B (en) * 2018-03-27 2022-12-02 国网山东省电力公司潍坊供电公司 Method for automatically matching monitoring signal of main station of power system with standard signal
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN109193928A (en) * 2018-07-27 2019-01-11 国网浙江省电力有限公司温州供电公司 Ground county integral system joint debugging information checking method
CN109217470A (en) * 2018-09-07 2019-01-15 国网江苏省电力有限公司连云港供电分公司 It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card
CN109741003A (en) * 2018-11-29 2019-05-10 国网浙江宁波市鄞州区供电有限公司 The automatic Acceptance Test System of substation information table
CN109902102A (en) * 2019-01-15 2019-06-18 国网辽宁省电力有限公司鞍山供电公司 A kind of supervisory control of substation information checks and accepts the automation checking method of card
CN109902102B (en) * 2019-01-15 2022-11-18 国网辽宁省电力有限公司鞍山供电公司 Automatic checking method for transformer substation monitoring information check card
CN109873497A (en) * 2019-03-18 2019-06-11 国网江苏省电力有限公司连云港供电分公司 A kind of distribution main website and the automatic joint debugging acceptance method of terminal checking and accepting device based on intelligence
CN109873497B (en) * 2019-03-18 2022-06-28 国网江苏省电力有限公司连云港供电分公司 Power distribution main station and terminal automatic joint debugging acceptance method based on intelligent acceptance device
CN110401692A (en) * 2019-05-30 2019-11-01 国网江苏省电力有限公司徐州供电分公司 A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN110401692B (en) * 2019-05-30 2022-04-26 国网江苏省电力有限公司徐州供电分公司 Integrated automatic checking and accepting system and method for monitoring information of transformer substation
CN110112831A (en) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN110212532A (en) * 2019-07-09 2019-09-06 国家电网有限公司 A kind of portable power network schedule automation simulation checking system
CN110535236B (en) * 2019-07-24 2023-03-03 深圳供电局有限公司 Intelligent substation bay level simulation self-acceptance system and method
CN110535236A (en) * 2019-07-24 2019-12-03 深圳供电局有限公司 A kind of simulation of intelligent substation wall is from Acceptance Test System and method
CN110571927B (en) * 2019-08-30 2024-02-13 深圳供电局有限公司 Four-remote signal parameter checking method
CN110571927A (en) * 2019-08-30 2019-12-13 深圳供电局有限公司 Four-remote signal parameter checking method
CN110727427A (en) * 2019-10-14 2020-01-24 国网江苏省电力有限公司镇江供电分公司 Intelligent safety checking method for dispatching automation master station model
CN110942159A (en) * 2019-11-21 2020-03-31 贵州电网有限责任公司 Maintenance and verification method for responsibility area of main network OCS (online charging System)
CN110867963A (en) * 2019-11-21 2020-03-06 广东电网有限责任公司 Electric power dispatching remote control operation broadcast forecasting system and method
CN110942159B (en) * 2019-11-21 2023-05-30 贵州电网有限责任公司 Maintenance and verification method for responsibility area of master network OCS system
CN110955808A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司 Method for matching and associating four remote monitoring information of main plant station
CN110955808B (en) * 2019-11-26 2022-09-09 云南电网有限责任公司 Method for matching and associating four remote monitoring information of main plant station
CN110932401A (en) * 2019-12-05 2020-03-27 国网辽宁省电力有限公司锦州供电公司 Method for improving safety of remote control high-voltage switch
CN111105051A (en) * 2019-12-26 2020-05-05 国网宁夏电力有限公司中卫供电公司 Intelligent automation system lightweight master station and information checking method thereof
CN111274355A (en) * 2020-01-15 2020-06-12 广东电网有限责任公司 Lucene-based main plant station remote signaling signal automatic comparison method
CN111969717B (en) * 2020-06-30 2024-02-13 国网辽宁省电力有限公司电力科学研究院 Remote control joint automatic acceptance method and system between main and sub stations of electric power automation system
CN111969717A (en) * 2020-06-30 2020-11-20 国网辽宁省电力有限公司电力科学研究院 Remote control combined automatic acceptance method and system between main station and sub-station of electric power automation system
CN111934433B (en) * 2020-08-28 2021-11-02 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN112508404A (en) * 2020-12-07 2021-03-16 云南电网有限责任公司普洱供电局 Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium
CN112579628A (en) * 2020-12-07 2021-03-30 国网四川省电力公司天府新区供电公司 Power monitoring information autonomous checking system and method
CN112579628B (en) * 2020-12-07 2023-05-23 国网四川省电力公司天府新区供电公司 Autonomous checking system and method for power monitoring information
CN112737120A (en) * 2020-12-26 2021-04-30 中国南方电网有限责任公司 Generation method and device of regional power grid control report and computer equipment
CN112737120B (en) * 2020-12-26 2024-03-22 中国南方电网有限责任公司 Regional power grid control report generation method and device and computer equipment
CN112701790A (en) * 2020-12-28 2021-04-23 南京圣祥电气自动化有限公司 Transformer substation and main station intelligent joint debugging platform and joint debugging method
CN112769239A (en) * 2020-12-31 2021-05-07 南京太司德智能电气有限公司 Automatic point-aligning acceptance robot of power dispatching system
CN113206864A (en) * 2021-03-25 2021-08-03 杭州博联智能科技股份有限公司 Equipment batch adding method, device, equipment and medium
CN114785681A (en) * 2022-04-15 2022-07-22 国网江苏省电力有限公司徐州供电分公司 Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation
CN114785681B (en) * 2022-04-15 2024-03-15 国网江苏省电力有限公司徐州供电分公司 Automatic checking and accepting system and method for monitoring information of transformer substation on-line equipment
CN114612079A (en) * 2022-05-16 2022-06-10 国网江西省电力有限公司电力科学研究院 Automatic checking method for monitoring information graph library of centralized control station

Similar Documents

Publication Publication Date Title
CN106329730A (en) Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system
CN107346917B (en) Secondary device based on virtual machine integrates joint debugging method
CN107450445A (en) A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN106935089B (en) Power information acquisition terminal installation training system and method
CN106230903A (en) Air conditioning unit solution lock control method and system
CN103941240B (en) A kind of detection method of the extension set detecting device that communicates based on radar system
CN105978152A (en) Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN104052633A (en) Integrated testing method for intelligent station 61850 and telecontrol 104 protocol
CN110401692A (en) A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN108446197A (en) A kind of control protection board automatic checkout system and method
CN104391244A (en) Closed loop test method of relay protection apparatus and system thereof
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN107907773A (en) A kind of assembly line detecting system for site protective relaying device
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN103913728B (en) A kind of method of testing based on portable radar comprehensive tester
CN107257304A (en) Telemechanical is exempted to a configuration testing system
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
CN104076807A (en) Method of debugging automation system of intelligent substation
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN109521372A (en) A kind of distributed new and network data analysis and diagnosis system
CN104750095A (en) Regulation and control center routing inspection testing system and method
CN108648549B (en) Object-oriented electricity consumption information acquisition closed-loop simulation system and control method
CN104184215B (en) Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
CN106909615B (en) Method and device for verifying data information consistency between master station and substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170106

Address after: 222003 Lianyungang City, Jiangsu province Haizhou District Road No. 1

Applicant after: LIANYUNGANG POWER SUPPLY COMPANY OF STATE GRID JINGSU ELECTRIC POWER COMPNAY

Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Applicant after: State Power Networks Co

Address before: 222003 Lianyungang City, Jiangsu province Haizhou District Road No. 1

Applicant before: LIANYUNGANG POWER SUPPLY COMPANY OF STATE GRID JINGSU ELECTRIC POWER COMPNAY

Applicant before: State Power Networks Co

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Luo Jun

Inventor after: Zhong Ziwei

Inventor after: Wu Yi

Inventor after: Liu Yi

Inventor after: Fu Xiangyun

Inventor after: Sun Haixia

Inventor after: Xiong Hao

Inventor after: Fan Qing

Inventor after: Wu Haibin

Inventor after: Gao Xiang

Inventor before: Wu Yi

Inventor before: Zhong Ziwei

Inventor before: Liu Yi

Inventor before: Fu Xiangyun

Inventor before: Sun Haixia

Inventor before: Xiong Hao

Inventor before: Fan Qing

Inventor before: Wu Haibin

Inventor before: Luo Jun

Inventor before: Gao Xiang

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111