CN106961157A - A kind of the reason for power system accident remote monitoring information errors resolving method - Google Patents

A kind of the reason for power system accident remote monitoring information errors resolving method Download PDF

Info

Publication number
CN106961157A
CN106961157A CN201710287525.1A CN201710287525A CN106961157A CN 106961157 A CN106961157 A CN 106961157A CN 201710287525 A CN201710287525 A CN 201710287525A CN 106961157 A CN106961157 A CN 106961157A
Authority
CN
China
Prior art keywords
accident
signal
remote monitoring
sub
reason
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710287525.1A
Other languages
Chinese (zh)
Other versions
CN106961157B (en
Inventor
吴晋波
刘海峰
陈宏�
熊尚峰
洪权
郭思源
李理
蔡昱华
朱维钧
李振文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710287525.1A priority Critical patent/CN106961157B/en
Publication of CN106961157A publication Critical patent/CN106961157A/en
Application granted granted Critical
Publication of CN106961157B publication Critical patent/CN106961157B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0006

Abstract

The invention discloses resolving method the reason for a kind of power system accident remote monitoring information errors, the implementation steps of method include receiving the power system accident actual conditions that transformer station's operation maintenance personnel is reported and submitted, accident sub-gate signal is checked one by one for power system accident actual conditions, if accident sub-gate signal and power system accident actual conditions are inconsistent, power system accident remote monitoring information errors reason is carried out to differentiate, hair and by mistake hair different situations are leaked by accident sub-gate signal, it is examined in the substation accident resultant signal at corresponding moment, protection act exports signal, whether a switch point position signal lacks, and telemetry, successively differentiate determination cause the accident remote monitoring information errors the reason for.The present invention can differentiate the equipment or information link for positioning the sub-gate signal mistake that causes the accident only in accordance with the remote monitoring signal of scheduling station, be that follow-up defect elimination points the direction, and improve monitoring information rectification efficiency, ensure the promptness of remote monitoring maintenance of information.

Description

A kind of the reason for power system accident remote monitoring information errors resolving method
Technical field
The present invention relates to power dispatching automation technology, and in particular to a kind of power system accident remote monitoring information errors The reason for resolving method.
Background technology
With power network popularization, Automation of Electric Systems, intelligence degree are increasingly deepened, most of in current power network to become Power station realized it is unattended, to operation of power networks state, the particularly abnormal, monitoring of failure situation and disposal in time, increasingly Rely on operations staff's remote monitoring.The relevant monitoring information of power remote monitoring system information, particularly accident it is accurate and complete Whole property, the timely discovery to accident is disposed, or even power system safety and stability operation is significant.In order to more directly perceived, accurate anti- Power system accident situation is reflected, New Generation of Intelligent power grid regulation technology support system (scheduling station) always believes substation accident Number (exporting signal by all protection acts to synthesize) and corresponding switch sub-gate signal logic synthesis accident sub-gate signal, and push away Deliver to operations staff's monitoring interface.Accident sub-gate signal is offered convenience to Operation of Electric Systems personnel's remote monitoring, and raising is got over Therefore the efficiency of processing is found, reduce the labor intensity of monitoring personnel.There are some omissions and send out by mistake in current accident sub-gate signal Situation, have impact on its effect in operation monitoring.It is more due to being related to equipment and information link, accident sub-gate signal mistake The reason for (omit, send out) differentiates more difficult by mistake, the difficulty to defect elimination band, is unfavorable for the promptness of monitoring information maintenance.
Therefore, at present in the urgent need to a kind of accident sub-gate signal using quick analysis identification error reason as target is wrong The method for analyzing reason by mistake, to improve the efficiency of monitoring information defect elimination, ensures the promptness of remote monitoring maintenance of information.It is existing to relate to And the method for remote monitoring signal alarm is many, but safeguard to be target for remote monitoring signal error, in order to signal defect elimination The reason for resolving method almost do not have.A kind of power train as disclosed in Application No. 201310114561.X Chinese patent literature Grid operation state of uniting and analysis system and monitoring and analysis method, for grid operation state, analysis and early warning System, but the technical scheme is not directed to analyze the equipment or method of power system accident remote monitoring information errors reason.Such as A kind of electric power supervisory control alarm information processing method disclosed in the Chinese patent literature of Application No. 201510075099.6 and System, though the technical scheme recognizes whether alarm event occurs by warning information, improves power system warning information Analysis efficiency, but the reason for do not analyze fault alarm information, it is impossible to the efficiency of information defect elimination is improved, is unfavorable for safeguarding monitoring in time The correct and integrality of information.
The content of the invention
The technical problem to be solved in the present invention:For prior art above mentioned problem there is provided one kind only in accordance with scheduling station Remote monitoring signal can differentiate positioning and cause the accident the equipment or information link of sub-gate signal mistake, be that follow-up defect elimination is indicated Direction, improves monitoring information rectification efficiency, ensures the power system accident remote monitoring of the promptness of remote monitoring maintenance of information The reason for information errors resolving method.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
A kind of the reason for power system accident remote monitoring information errors resolving method, implementation steps include:
1) the power system accident actual conditions that transformer station's operation maintenance personnel is reported and submitted are received, for the actual feelings of power system accident Condition checks accident sub-gate signal one by one, for each accident sub-gate signal, if accident sub-gate signal is real with power system accident Border situation is inconsistent, then redirects execution step 2) resolution of power system accident remote monitoring information errors reason is carried out, otherwise, jump Turn to perform step 19);
If 2) accident actual conditions have occurred, and do not have accident moment, the accident sub-gate signal of location of accident, then redirect and hold Row step 3), otherwise, redirect execution step 14);
3) it is determined as accident sub-gate signal leakage hair, the accident resultant signal of transformer station occurs for verification accident moment, accident, if Accident resultant signal is lacked, then redirects execution step 4), otherwise, redirect execution step 11);
4) verification accident moment, the protection act outlet signal of location of accident, protection act outlet signal is power transformation The outlet signal of trip protection in standing, and not comprising protection alarm action or enabling signal;If protection act exports signal deletion, Then redirect execution step 5);Otherwise, execution step 10 is redirected);
5) verification accident moment, the switch point position signal of location of accident, the accident moment is in the leakage of accident sub-gate signal The moment occurs for actual accidents during hair;If switch point position signal deletion, execution step 6 is redirected);Otherwise, execution step 9 is redirected);
6) whether normally other interval remote measurements of transformer station, remote signals occur for verification accident moment, accident, if the station is distant Survey, remote signals do not refresh, then redirect execution step 7);Otherwise, execution step 8 is redirected);
7) judge occur transformer station and scheduling station communication failure by accident the reason for accident remote monitoring information errors, Exit;
8) the reason for judging accident remote monitoring information errors is controlled as the measure and control device faults itself of location of accident or with station Layer network communication failure, the location of accident is that the position of the switch of tripping occurs for actual accidents when accident sub-gate signal leaks and sent out; Exit;
9) protection device and station level network service of the reason for the judging accident remote monitoring information errors as location of accident Failure, is exited;
10) judge occur substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors It is wrong, corresponding protection act outlet signal is not included into accident resultant signal, exited;
11) verification accident moment, the switch point position signal of location of accident, if switch point position signal deletion, redirects execution Step 12);Otherwise, execution step 13 is redirected);
12) the reason for judging accident remote monitoring information errors as accident correspondence position position of the switch relay failure, Exit;
13) the reason for judging accident remote monitoring information errors exists as scheduling station accident sub-gate signal combinator to be leaked Hole, accident resultant signal fails to be effectively matched with a switch point position signal, exits;
14) it is judged as accident sub-gate signal hair by mistake, there is accident sub-gate signal, correspondence time, the accident reality of abort situation Situation does not occur, checking signal moment, the protection act outlet signal of signal location, and the signal moment is in accident separating brake letter The moment occurs for the signified accident of accident sub-gate signal when number sending out by mistake, and the signal location is the accident point when accident sub-gate signal leaks and sent out The position of the switch of lock signal meaning accident tripping;If protection act exports signal deletion, execution step 15 is redirected);Otherwise, jump Turn to perform step 16);
15) judge occur substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors It is wrong, non-protected action outlet signal is defined as protection act outlet signal by mistake, and accident resultant signal is included, exit;
16) signal moment, the telemetry of signal location are verified, if telemetry is signal in the specified time send out by mistake before Zero or fixed numbers, then redirect execution step 17);Otherwise, execution step 18 is redirected);
17) the reason for judging accident remote monitoring information errors as corresponding protection test during main website non-shield test reactor letter Number, exit;
18) the reason for judging accident remote monitoring information errors cause as telemechanical apparatus faults itself monitoring information by mistake hair or Main website does not shield initializing signal when telemechanical apparatus is restarted, and exits.
Preferably, step 1) in accident sub-gate signal for substation accident resultant signal with switch sub-gate signal logic close Into signal;
Preferably, the expression formula of the logic composite signal is Sfxy=SfxS&Qxy, wherein SfxySwitched for x transformer stations y Accident sub-gate signal, SfxSFor x substation accident resultant signals, QxyFor x transformer stations y switch point position signals.
Preferably, step 3) in the accident resultant signal of transformer station be transformer station's all protection signal logics synthesis letter Number;
Preferably, the expression formula of the accident resultant signal isWherein SfxSFor x substation accident resultant signals, PxiFor x transformer stations i set protection acts outlet signal.
The reason for power system accident remote monitoring information errors of the present invention resolving method have the advantages that it is following:The present invention By receiving the power system accident actual conditions that transformer station's operation maintenance personnel is reported and submitted, for power system accident actual conditions one by one Verification accident sub-gate signal, if accident sub-gate signal and power system accident actual conditions are inconsistent, carries out power system accident Remote monitoring information errors reason is differentiated, and is leaked by accident sub-gate signal and is sent out and send out different situations by mistake, is examined in the corresponding moment Whether substation accident resultant signal, protection act outlet signal, a switch point position signal lack, and telemetry, successively differentiate It is determined that cause the accident remote monitoring information errors the reason for.The present invention can be differentiated only in accordance with the remote monitoring signal of scheduling station The equipment or information link for the sub-gate signal mistake that causes the accident are positioned, is that follow-up defect elimination points the direction, monitoring information rectification is improved Efficiency, ensures the promptness of remote monitoring maintenance of information.
Brief description of the drawings
Fig. 1 is the basic procedure schematic diagram of present invention method.
Embodiment
As shown in figure 1, the implementation of resolving method is walked the reason for the present embodiment power system accident remote monitoring information errors Suddenly include:
1) the power system accident actual conditions that transformer station's operation maintenance personnel is reported and submitted are received, for the actual feelings of power system accident Condition checks accident sub-gate signal one by one, for each accident sub-gate signal, if accident sub-gate signal is real with power system accident Border situation is inconsistent, then redirects execution step 2) resolution of power system accident remote monitoring information errors reason is carried out, otherwise, jump Turn to perform step 19);
If 2) accident actual conditions have occurred, and do not have accident moment, the accident sub-gate signal of location of accident, then redirect and hold Row step 3), otherwise, redirect execution step 14);
3) it is determined as accident sub-gate signal leakage hair, the accident resultant signal of transformer station occurs for verification accident moment, accident, if Accident resultant signal is lacked, then redirects execution step 4), otherwise, redirect execution step 11);
4) verification accident moment, the protection act outlet signal of location of accident, protection act outlet signal is power transformation The outlet signal of trip protection in standing, and not comprising protection alarm action or enabling signal;If protection act exports signal deletion, Then redirect execution step 5);Otherwise, execution step 10 is redirected);
In the present embodiment, on March 2 16 is checked:34:15th, the switch point position signal of 512 switches, it is found that the switch point position is believed Number do not lack;
5) verification accident moment, the switch point position signal of location of accident, the accident moment is in the leakage of accident sub-gate signal The moment occurs for actual accidents during hair;If switch point position signal deletion, execution step 6 is redirected);Otherwise, execution step 9 is redirected);
6) whether normally other interval remote measurements of transformer station, remote signals occur for verification accident moment, accident, if the station is distant Survey, remote signals do not refresh, then redirect execution step 7);Otherwise, execution step 8 is redirected);
7) judge occur transformer station and scheduling station communication failure by accident the reason for accident remote monitoring information errors, Exit;
8) the reason for judging accident remote monitoring information errors is controlled as the measure and control device faults itself of location of accident or with station Layer network communication failure, the location of accident is that the position of the switch of tripping occurs for actual accidents when accident sub-gate signal leaks and sent out; Exit;
9) protection device and station level network service of the reason for the judging accident remote monitoring information errors as location of accident Failure, is exited;
10) judge occur substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors It is wrong, corresponding protection act outlet signal is not included into accident resultant signal, exited;
11) verification accident moment, the switch point position signal of location of accident, if switch point position signal deletion, redirects execution Step 12);Otherwise, execution step 13 is redirected);
12) the reason for judging accident remote monitoring information errors as accident correspondence position position of the switch relay failure, Exit;
13) the reason for judging accident remote monitoring information errors exists as scheduling station accident sub-gate signal combinator to be leaked Hole, accident resultant signal fails to be effectively matched with a switch point position signal, exits;
14) it is judged as accident sub-gate signal hair by mistake, there is accident sub-gate signal, correspondence time, the accident reality of abort situation Situation does not occur, checking signal moment, the protection act outlet signal of signal location, and the signal moment is in accident separating brake letter The moment occurs for the signified accident of accident sub-gate signal when number sending out by mistake, and the signal location is the accident point when accident sub-gate signal leaks and sent out The position of the switch of lock signal meaning accident tripping;If protection act exports signal deletion, execution step 15 is redirected);Otherwise, jump Turn to perform step 16);
15) judge occur substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors It is wrong, by non-protected action outlet signal (such as switch control circuit broken string, switch on the spot, spring unstored energy) be defined as by mistake protection Action outlet signal, and accident resultant signal is included, exit;
16) signal moment, the telemetry of signal location are verified, if telemetry is signal in the specified time send out by mistake before Zero or fixed numbers, then redirect execution step 17);Otherwise, execution step 18 is redirected);
17) the reason for judging accident remote monitoring information errors as corresponding protection test during main website non-shield test reactor letter Number, exit;
18) the reason for judging accident remote monitoring information errors cause as telemechanical apparatus faults itself monitoring information by mistake hair or Main website does not shield initializing signal when telemechanical apparatus is restarted, and exits.
In the present embodiment, step 1) in accident sub-gate signal be substation accident resultant signal with switching patrolling for sub-gate signal Collect composite signal.In the present embodiment, the expression formula of logic composite signal is Sfxy=SfxS&Qxy, wherein SfxySwitched for x transformer stations y Accident sub-gate signal, SfxSFor x substation accident resultant signals, QxyFor x transformer stations y switch point position signals, i.e. certain switch failure Sub-gate signal is that the station accident resultant signal and the switch divide position signal and signal.
In the present embodiment, step 3) in the accident resultant signal of transformer station closed for all protection signal logics of transformer station Into signal.In the present embodiment, the expression formula of accident resultant signal isWherein SfxSFor x substation accident resultant signals, Pxi It is that all protection acts of certain transformer station go out message for the outlet of x transformer stations i set protection acts signal, i.e. certain substation accident resultant signal Number or signal.
Table 1 is certain 220kV transformer stations accident in March remote monitoring information, and table 2 is the power transformation after being examined through live operation maintenance personnel Stand the accident actual conditions of same period.Hereafter will be using Tables 1 and 2 as input data, to the present embodiment power system thing Therefore resolving method is illustrated the reason for remote monitoring information errors:
Table 1:Certain 220kV substation accident remote monitoring information.
Alarm signal title Time
512 switch point positions On March 2 16:34:15 0330
512 route protections action outlet On March 2 16:34:15 0370
Accident resultant signal On March 2 16:34:15 0370
601 switch control circuits break On March 14 08:10:25 0800
Accident resultant signal On March 14 08:10:25 0800
601 switch point positions On March 14 08:10:25 0810
601 accident separating brakes On March 14 08:10:25 0810
Table 2:Certain 220kV substation accident actual conditions after verified.
The present embodiment perform step 1) when verification accident sub-gate signal when, find March 2 accident sub-gate signal and accident Actual conditions are inconsistent, and this needs redirects execution step 2) carry out the resolution of power system accident remote monitoring information errors reason. Performing step 2) when, find on March 2 16:34:15th, 512 switch failure actual conditions have occurred, and on non-March 2 16:34: 15th, the accident sub-gate signal of 512 switches, therefore redirect execution step 3).Performing step 3) when, it is judged as that accident sub-gate signal leaks Hair, checks on March 2 16:34:15th, the accident resultant signal of the 220kV transformer stations, it is found that the accident resultant signal is not lacked;Therefore jump Turn to perform step 11).Performing step 11) when, because a switch point position signal is not lacked, redirect execution step 13).Performing step 13) when, recognize the reason for judging to cause the accident remote monitoring information errors and deposited as scheduling station accident sub-gate signal combinator In leak, accident resultant signal fails to be effectively matched with a switch point position signal.
In the processing of another accident sub-gate signal, perform step 1) when verification accident sub-gate signal when, find March 14 Accident sub-gate signal and accident actual conditions it is inconsistent, redirect execution step 2) carry out power system accident remote monitoring information Error reason is differentiated;Perform step 2) when, find on March 14 08:10:25th, 601 switch failure actual conditions do not occur, and have 3 On the moon 14 08:10:25th, the accident sub-gate signal of 601 switches, therefore redirect execution step 14);Perform step 14) when, it is judged as Accident sub-gate signal is sent out by mistake, checks on March 14 08:10:25th, the protection act outlet signal of 601 switches, does not find that the protection is moved Signal, therefore redirect execution step 15 for export);Perform step 15) when, identification judgement causes the accident remote monitoring information errors The reason for by accident to occur substation accident resultant signal combinator wrong, non-protected action outlet signal is defined as protecting by mistake Shield action outlet signal, and include accident resultant signal.
Finally, terminate epicycle accident remote monitoring information errors reason to differentiate.
By resolving method the reason for carried power system accident remote monitoring information errors, on March 2 16 is recognized:34:15、 The information of 512 switches leaks hair for accident sub-gate signal, and it is scheduling station to recognize the reason for causing the accident remote monitoring information errors There is leak in accident sub-gate signal combinator, accident resultant signal fails to be effectively matched with a switch point position signal;It is true by examining It is that scheduling station fails matching accident resultant signal with switching point position signal.By carried power system accident remote monitoring information The reason for mistake resolving method, recognize on March 14 08:10:25th, the information of 601 switches is sent out by mistake for accident sub-gate signal, and identification is made It is wrong into occurring substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors, by non-protected Action outlet signal is defined as protection act outlet signal by mistake, and includes accident resultant signal;It is strictly that will switch control by verification Circuit breaking signal is defined as protection act outlet signal by mistake, and includes accident resultant signal.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (5)

1. the reason for a kind of power system accident remote monitoring information errors resolving method, it is characterised in that implementation steps include:
1) the power system accident actual conditions that transformer station operation maintenance personnel is reported and submitted are received, for power system accident actual conditions by Individual verification accident sub-gate signal, for each accident sub-gate signal, if accident sub-gate signal and the actual feelings of power system accident Condition is inconsistent, then redirects execution step 2) resolution of power system accident remote monitoring information errors reason is carried out, otherwise, redirect and hold Row step 19);
If 2) accident actual conditions have occurred, and do not have accident moment, the accident sub-gate signal of location of accident, then redirect and perform step It is rapid 3), otherwise, redirect execution step 14);
3) it is determined as accident sub-gate signal leakage hair, the accident resultant signal of transformer station occurs for verification accident moment, accident, if accident Resultant signal is lacked, then redirects execution step 4), otherwise, redirect execution step 11);
4) verification accident moment, the protection act outlet signal of location of accident, protection act outlet signal is in transformer station The outlet signal of trip protection, and not comprising protection alarm action or enabling signal;If protection act exports signal deletion, jump Turn to perform step 5);Otherwise, execution step 10 is redirected);
5) verification accident moment, the switch point position signal of location of accident, the accident moment are when accident sub-gate signal leaks and sent out Moment occurs for actual accidents;If switch point position signal deletion, execution step 6 is redirected);Otherwise, execution step 9 is redirected);
6) whether normally other interval remote measurements of transformer station, remote signals occur for verification accident moment, accident, if the station remote measurement, Remote signals do not refresh, then redirect execution step 7);Otherwise, execution step 8 is redirected);
7) judge occur transformer station and scheduling station communication failure by accident the reason for accident remote monitoring information errors, move back Go out;
8) the reason for judging accident remote monitoring information errors as location of accident measure and control device faults itself or with station level net Network communication failure, the location of accident is that the position of the switch of tripping occurs for actual accidents when accident sub-gate signal leaks and sent out;Exit;
9) the reason for judging accident remote monitoring information errors as location of accident protection device and station level network communication failure, Exit;
10) judge that occurring substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors has By mistake, corresponding protection act outlet signal is not included into accident resultant signal, exited;
11) verification accident moment, the switch point position signal of location of accident, if switch point position signal deletion, redirects execution step 12);Otherwise, execution step 13 is redirected);
12) the reason for judging accident remote monitoring information errors exits as the position of the switch relay failure of accident correspondence position;
13) there is leak as scheduling station accident sub-gate signal combinator in the reason for judging accident remote monitoring information errors, Accident resultant signal fails to be effectively matched with a switch point position signal, exits;
14) it is judged as accident sub-gate signal hair by mistake, there is accident sub-gate signal, correspondence time, the accident actual conditions of abort situation Do not occur, checking signal moment, the protection act outlet signal of signal location, the signal moment is missed in accident sub-gate signal The moment occurs for accident sub-gate signal meaning accident during hair, and the signal location is the accident separating brake letter when accident sub-gate signal leaks and sent out The position of the switch of number signified accident tripping;If protection act exports signal deletion, execution step 15 is redirected);Otherwise, redirect and hold Row step 16);
15) judge that occurring substation accident resultant signal combinator by accident the reason for accident remote monitoring information errors has By mistake, non-protected action outlet signal is defined as protection act outlet signal by mistake, and includes accident resultant signal, exited;
16) signal moment, the telemetry of signal location are verified, if signal send out by mistake before in the specified time telemetry be zero or Fixed numbers, then redirect execution step 17);Otherwise, execution step 18 is redirected);
17) the reason for judging accident remote monitoring information errors as corresponding protection test during the non-shield test reactor signal of main website, move back Go out;
18) the reason for judging accident remote monitoring information errors causes monitoring information hair or telemechanical by mistake as telemechanical apparatus faults itself Main website does not shield initializing signal when device is restarted, and exits.
2. resolving method the reason for power system accident remote monitoring information errors according to claim 1, it is characterised in that Step 1) in accident sub-gate signal for substation accident resultant signal with switch sub-gate signal logic composite signal.
3. resolving method the reason for power system accident remote monitoring information errors according to claim 1, it is characterised in that The expression formula of the logic composite signal is Sfxy=SfxS&Qxy, wherein SfxyThe accident sub-gate signal switched for x transformer stations y, SfxS For x substation accident resultant signals, QxyFor x transformer stations y switch point position signals.
4. resolving method the reason for power system accident remote monitoring information errors according to claim 1, it is characterised in that Step 3) in transformer station accident resultant signal be all protection signal logic composite signals of transformer station.
5. resolving method the reason for power system accident remote monitoring information errors according to claim 4, it is characterised in that The expression formula of the accident resultant signal isWherein SfxSFor x substation accident resultant signals, PxiCover and protect for x transformer stations i Shield action outlet signal.
CN201710287525.1A 2017-04-27 2017-04-27 A kind of reason resolving method of the long-range monitoring information mistake of power system accident Active CN106961157B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710287525.1A CN106961157B (en) 2017-04-27 2017-04-27 A kind of reason resolving method of the long-range monitoring information mistake of power system accident

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710287525.1A CN106961157B (en) 2017-04-27 2017-04-27 A kind of reason resolving method of the long-range monitoring information mistake of power system accident

Publications (2)

Publication Number Publication Date
CN106961157A true CN106961157A (en) 2017-07-18
CN106961157B CN106961157B (en) 2019-08-09

Family

ID=59483876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710287525.1A Active CN106961157B (en) 2017-04-27 2017-04-27 A kind of reason resolving method of the long-range monitoring information mistake of power system accident

Country Status (1)

Country Link
CN (1) CN106961157B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN109583028A (en) * 2018-10-31 2019-04-05 国网湖南省电力有限公司 A kind of scheduling power plant accident resultant signal synthetic method and system
CN113097981A (en) * 2021-03-15 2021-07-09 国网江苏省电力有限公司南通供电分公司 Method for judging missing of monitoring alarm signal of transformer substation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
JP2015078937A (en) * 2013-10-18 2015-04-23 ゼネラル・エレクトリック・カンパニイ Correcting accumulated power in utility meters
CN106329730A (en) * 2016-09-14 2017-01-11 国网江苏省电力公司连云港供电公司 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
JP2015078937A (en) * 2013-10-18 2015-04-23 ゼネラル・エレクトリック・カンパニイ Correcting accumulated power in utility meters
CN106329730A (en) * 2016-09-14 2017-01-11 国网江苏省电力公司连云港供电公司 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN108448721B (en) * 2018-03-27 2022-12-02 国网山东省电力公司潍坊供电公司 Method for automatically matching monitoring signal of main station of power system with standard signal
CN109583028A (en) * 2018-10-31 2019-04-05 国网湖南省电力有限公司 A kind of scheduling power plant accident resultant signal synthetic method and system
CN109583028B (en) * 2018-10-31 2023-04-18 国网湖南省电力有限公司 Scheduling power plant accident total signal synthesis method and system
CN113097981A (en) * 2021-03-15 2021-07-09 国网江苏省电力有限公司南通供电分公司 Method for judging missing of monitoring alarm signal of transformer substation
CN113097981B (en) * 2021-03-15 2022-03-25 国网江苏省电力有限公司南通供电分公司 Method for judging missing of monitoring alarm signal of transformer substation

Also Published As

Publication number Publication date
CN106961157B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN103606910B (en) The fault self-recovery method in a kind of outlet of the distribution feeder based on Wide-area Measurement Information dead band
KR100843130B1 (en) Apparatus and method for diagnosing ied abnormal state on-line in substation automation system based on iec61850
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN107749667B (en) Real-time monitoring method for information and state of intelligent substation protection pressing plate
CN103326467B (en) A kind of protection act report implementation method based on Prudential Master device wave-record chart
CN106961157B (en) A kind of reason resolving method of the long-range monitoring information mistake of power system accident
CN110110856A (en) A kind of electric network failure diagnosis method and system based on multi-source information depth reasoning
CN105305365A (en) Power grid relay protection emergency management system
CN104852469A (en) Equipment real-time status-based smart substation soft strap remote anti-misoperation method
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN105573283A (en) Transformer station equipment function association database establishing method and event association information group filtering method
CN106899084B (en) Distributor track website switch state analysis method and system based on video intelligent identification
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN107104414A (en) A kind of relay protection maintenance aid decision-making method based on online data
CN106849367A (en) A kind of transformer station's remote online monitoring and state evaluating method
CN106529824A (en) Method for analyzing functional damage degrees of secondary equipment and secondary system of intelligent substation
CN102005819A (en) Fault isolation method of electric distribution network
CN206235698U (en) A kind of electric network single-phase earth fault differentiates, isolates and resultant fault anticipation device
CN104795804A (en) Auxiliary relay protection monitoring processing system and processing method thereof
CN109708687A (en) A kind of monitoring system of on-pole switch
CN108963841A (en) It is associated with the secondary device sequence method and system of primary equipment operating status
CN108493906B (en) Decentralized bus protection handset repair method and decentralized bus protection system
CN103997126B (en) A kind of fault diagnosis stage division based on on-off state and system
CN102738892A (en) Realization method of intelligent anti-error system of transformer substation based on IEC61850
CN108279360A (en) Singlephase earth fault circuit monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant