CN105978152A - Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation - Google Patents

Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation Download PDF

Info

Publication number
CN105978152A
CN105978152A CN201610448002.6A CN201610448002A CN105978152A CN 105978152 A CN105978152 A CN 105978152A CN 201610448002 A CN201610448002 A CN 201610448002A CN 105978152 A CN105978152 A CN 105978152A
Authority
CN
China
Prior art keywords
joint debugging
regulation
main website
control main
loop joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610448002.6A
Other languages
Chinese (zh)
Other versions
CN105978152B (en
Inventor
陈建洪
陈月卿
邱建斌
陈闽江
陈志辉
王成庆
齐孝辉
甘磊
侯晨
吴芳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Maintenance Branch of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610448002.6A priority Critical patent/CN105978152B/en
Publication of CN105978152A publication Critical patent/CN105978152A/en
Application granted granted Critical
Publication of CN105978152B publication Critical patent/CN105978152B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0013
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention relates to an automatic closed loop joint debugging method for telecontrol equipment and a regulation and control main station of an intelligent substation. According to the automatic closed loop joint debugging method, The correctly-debugged SCD configuration files from the monitoring background of the substation and the EXCEL model files issued by the regulation and control main station are taken as the standard basis data source; data source simulation generation software based on the existing IEC61850 protocol is adopted for simulating the operations of sending the telemetry and telecontrol data of the substation to the telecontrol equipment, obtaining messages which are sent to the regulation and control center from the telecontrol equipment, performing analyzing, comparing and the like on the messages, and realizing telemetry and telecontrol automatic closed loop joint debugging; and meanwhile, the software automatically simulates the operations of sending down the telecontrol instruction from the regulation and control center to the telecontrol equipment, obtaining the telecontrol data which is sent down to the substation from the telecontrol equipment, performing analyzing, comparing and the like on the messages, and realizing telecontrol automatic closed loop joint debugging. According to the automatic closed loop joint debugging method, the purpose of joint debugging of the telecontrol equipment and the regulation and control main station can be fulfilled without requiring power failure of primary and secondary equipment; the accuracy can achieve 100%; the time saving rate can reach greater than 95%; and therefore, the working efficiency is greatly improved, and the reliable and safe operation of the power grid can be ensured.

Description

A kind of intelligent substation telemechanical apparatus and the method regulating and controlling main website automated closed-loop joint debugging
Technical field
The present invention relates to power system automation technology field, the method especially relating to a kind of intelligent substation telemechanical apparatus based on IEC61850 stipulations and the automated closed-loop joint debugging of regulation and control main website.
Background technology
Along with the Premium Features of the unattended strengthened research of intelligent substation and regulation and control main website promote, regulation and control main website be not simply responsible for the supervision task of traditional switch tool position and Line Flow, but has undertaken the monitor task such as the supervision of all secondary equipment health state of transformer station, a secondary device remote control operation.The telemechanical apparatus of transformer station plays, in regulation and control main website, the transfer effect formed a connecting link, it is that station equipment regulates and controls, with a distant place, the bridge that main website is connected, the interior remote measure and communication data that see off on telemechanical apparatus are handed to an on-the-spot secondary device carry out practical operation to regulation and control main website, the guidance command data that the main website of reception regulation and control simultaneously is assigned.
Existing intelligent substation telemechanical apparatus and regulation and control main website joint debugging technical scheme are carried out after supervisory control of substation backstage is correct with on-the-spot one or two equipment joint debuggings, and content includes remote measurement, remote signalling, remote control (being called for short " three is distant ", lower same) joint debugging.Telemechanical apparatus with the remote measure and communication joint debugging process of regulation and control main website is: utilize special test equipment that substation secondary device is carried out dosage test, monitoring backstage can receive corresponding remote measure and communication data, these data will also pass through and deliver on telemechanical apparatus and regulate and control main website simultaneously, if monitoring backstage and regulation and control main website data consistent, test result is correct, all tests correct then joint debugging when all remote measure and communication data and terminates.Telemechanical apparatus with the remote measure and communication joint debugging process of regulation and control main website is: distant place regulation and control main website issues the remote manipulation order of on-the-spot one or two equipment, through telemechanical apparatus forward command, remote field secondary device or primary equipment, if the regulation and control remotely-controlled object that issues of main website and remote control content is actual with scene is consistent, then think that remote control is correct, terminate when all remote controls perform the most correct then joint debugging.
The major defect that prior art exists has:
1) work efficiency is extremely low.Transformer station's telemechanical apparatus and the joint debugging of regulation and control main website are still manual method, both number of devices many (telemechanical apparatus 2, regulation and control main website at least 4), repeat joint debugging (at least 4 times) often, internal information amount of standing huge (1 500kV intelligent substation there are about 10,000 a plurality of information), manually utilizing Special debugging instrument dosage test speed slow, work efficiency joint debugging accuracy extremely inefficient, artificial is the highest.
2) Operation of Electric Systems reliability is affected.Owing to artificial joint debugging accuracy is the highest, often result in the matters of aggravation sending mistake on remote measure and communication, also have the major accident causing a distant place to control by mistake or refusing to control transforming plant primary equipment.
3) security risk is high.Using traditional Special debugging instrument that manually utilizes to carry out dosage test method, need to carry out isolating the secondary circuits such as electric current, voltage, tripping operation, power supply, in process of the test, security risk is high.
4) grid power blackout is directly contributed.Remote control united test uses a secondary device method in direct remote control station, causes transformer station one secondary device to have a power failure.
Summary of the invention
A kind of method that it is an object of the invention to provide intelligent substation telemechanical apparatus and the automated closed-loop joint debugging of regulation and control main website, the method can complete telemechanical apparatus and regulation and control main website joint debugging purpose without being had a power failure by a secondary device, accuracy is up to 100%, and saving of time rate reaches more than 95%.Work efficiency is not only greatly improved, and guarantees the reliable and secure operation of electrical network.
For achieving the above object, a kind of method that the technical scheme is that intelligent substation telemechanical apparatus and the automated closed-loop joint debugging of regulation and control main website, comprise the steps,
S1: transformer station's automated closed-loop joint debugging system is provided, described transformer station automated closed-loop joint debugging system is connected to telemechanical apparatus station level end, and ensureing that telemechanical apparatus disconnects with A/B net in station, described transformer station automated closed-loop joint debugging system is also through switch and telemechanical apparatus and regulation and control main website common network;
S2: transformer station's automated closed-loop joint debugging system introducing regulation and control main website EXCEL model file and monitoring system of electric substation SCD file, with in the EXCEL three distant entitled guiding of remote signalling, carry out closed loop joint debugging one by one;
S3: according to one of them the remote signalling title in EXCEL, the remote signalling entry corresponding to transformer station's automated closed-loop joint debugging system Automatic-searching SCD file;
S4: generated software by data sources based on IEC61850 stipulations simulation and import SCD file, trigger and send on the digital simulation of this remote signalling entry;
S5: the remote signalling entry data sent in simulation is forwarded to main website through telemechanical apparatus period and numerical value thereof;
S6: regulation and control main website receives telemechanical apparatus period and numerical value thereof, triggers the visual change information title of regulation and control person and numerical value thereof;
S7: regulation and control main website exploitation information returns program, and name of the information and the numerical value thereof of change are returned to transformer station's automated closed-loop joint debugging system;
S8: transformer station's automated closed-loop joint debugging system is according to the remote signalling title of triggered SCD file and numerical value thereof, contrast regulates and controls name of the information and the numerical value thereof that main website is returned, if title is consistent and numerical value is consistent, then it is assumed that remote signalling verification is correct, and re-start next remote signalling audit process;Otherwise, screen this mistake remote signalling, after checking that amendment telemechanical apparatus or regulation and control main website configure, carry out automated closed-loop joint debugging again to checking incorrect remote signalling, until complete check is correct;
S9: complete telemechanical apparatus and the correct verification of regulation and control main website configuration.
In an embodiment of the present invention, also including three distant middle remote measurements are carried out joint debugging, its joint debugging method is identical with the joint debugging method of step S2 to S8 remote signalling.
In an embodiment of the present invention, also include three distant middle remote controls are carried out joint debugging, its joint debugging method is identical with the joint debugging method of step S2 to S8 remote signalling, difference is that the joint debugging of remote control is in regulation and control main website end closed loop, guidance command is sent by the simulation of regulation and control main website, after transformer station's automated closed-loop joint debugging system receives order, return guidance command object and command context.
Compared to prior art, the method have the advantages that
(1) it is greatly improved work efficiency.The accuracy of this technology is up to 100%, and saving of time rate reaches more than 95%;Thus ensured power grid security reliability service;(2) avoid primary equipment to have a power failure or out of service can the completing of relay protection is debugged, be greatly improved operation of power networks reliability;(3) security risk of joint debugging process is avoided;This technology to carry out isolating the secondary circuits such as electric current, voltage, tripping operation, and utilizes Special debugging instrument to test.
Accompanying drawing explanation
Fig. 1 is telemechanical apparatus and the regulation and control main website closed loop joint debugging network structure block diagram of the intelligent substation that the present invention uses.
Fig. 2 is transformer station of the present invention automated closed-loop remote signalling joint debugging main flow chart.
Detailed description of the invention
Below in conjunction with the accompanying drawings, technical scheme is specifically described.
A kind of intelligent substation telemechanical apparatus of the present invention and the method for regulation and control main website automated closed-loop joint debugging, comprise the steps,
S1: transformer station's automated closed-loop joint debugging system is provided, described transformer station automated closed-loop joint debugging system is connected to telemechanical apparatus station level end, and ensureing that telemechanical apparatus disconnects with A/B net in station, described transformer station automated closed-loop joint debugging system is also through switch and telemechanical apparatus and regulation and control main website common network;
S2: transformer station's automated closed-loop joint debugging system introducing regulation and control main website EXCEL model file and monitoring system of electric substation SCD file, with in the EXCEL three distant entitled guiding of remote signalling, carry out closed loop joint debugging one by one;
S3: according to one of them the remote signalling title in EXCEL, the remote signalling entry corresponding to transformer station's automated closed-loop joint debugging system Automatic-searching SCD file;
S4: generated software by data sources based on IEC61850 stipulations simulation and import SCD file, trigger and send on the digital simulation of this remote signalling entry;
S5: the remote signalling entry data sent in simulation is forwarded to main website through telemechanical apparatus period and numerical value thereof;
S6: regulation and control main website receives telemechanical apparatus period and numerical value thereof, triggers the visual change information title of regulation and control person and numerical value thereof;
S7: regulation and control main website exploitation information returns program, and name of the information and the numerical value thereof of change are returned to transformer station's automated closed-loop joint debugging system;
S8: transformer station's automated closed-loop joint debugging system is according to the remote signalling title of triggered SCD file and numerical value thereof, contrast regulates and controls name of the information and the numerical value thereof that main website is returned, if title is consistent and numerical value is consistent, then it is assumed that remote signalling verification is correct, and re-start next remote signalling audit process;Otherwise, screen this mistake remote signalling, after checking that amendment telemechanical apparatus or regulation and control main website configure, carry out automated closed-loop joint debugging again to checking incorrect remote signalling, until complete check is correct;
S9: complete telemechanical apparatus and the correct verification of regulation and control main website configuration.
Also including three distant middle remote measurements are carried out joint debugging, its joint debugging method is identical with the joint debugging method of remote signalling.
Also include three distant middle remote controls are carried out joint debugging, its joint debugging method is identical with the joint debugging method of remote signalling, difference is that the joint debugging of remote control is in regulation and control main website end closed loop, guidance command is sent by the simulation of regulation and control main website, after transformer station's automated closed-loop joint debugging system receives order, return guidance command object and command context.
Below for the present invention implement process.
The telemechanical apparatus of the intelligent substation of the present invention is illustrated as shown in Figure 1 with regulating and controlling main website closed loop joint debugging network structure.It is connected to station level A/B net in telemechanical apparatus station, outside telemechanical apparatus station, is connected to main website through dispatch data net.This project automated closed-loop joint debugging system server side is connected to telemechanical apparatus station level end (needing telemechanical apparatus to disconnect) with A/B net in station, and the other end is through switch and telemechanical apparatus and regulation and control main website common network.
The precondition of the present invention is that supervisory control of substation backstage is carried out after on-the-spot one or two equipment joint debuggings correctly, and the supervisory control of substation backstage SCD configuration file that joint debugging is correct the most is just data source.The present invention utilizes the simulation of existing data sources based on IEC61850 stipulations to generate software, import the SCD file of transformer station, according to the data entries that the screening of " three is distant " title is to be checked, carried out and station level communication by network, simulated field one secondary device IED packet sending and receiving, reaches station level telemechanical apparatus, distant place regulation and control main website etc. are carried out " three is distant " debugging purpose.Data sources based on IEC61850 stipulations simulation generation software achieves and substitutes operating substation field one or two facility information in the way of software, for checking transformer station's telemechanical apparatus and " three is distant " information of regulation and control main website.
The present invention is according to the developing thought of " model, Uniform Name ", it is achieved monitoring system of electric substation is different with regulation and control main website two to be run in system model in concordance nominally.In the EXCEL model file of regulation and control main website, title is directly derived by " three is distant " title in monitoring system of electric substation SCD file and is extracted, the title of regulation and control main website is sent on screening is required, this title does not makes any changes, and in SCD file, " three is distant " title is just the same.The telemechanical point table of telemechanical apparatus is that its most crucial content has period, " three is distant " title and numerical value thereof for the form with regulation and control main website agreement " three is distant " information content.From the point of view of artificial joint debugging method, the content that joint debugging is checked is " three is distant " title and numerical value thereof, and period is internal agreement between telemechanical apparatus and regulation and control main website, can verify whether period configures correctly by automated closed-loop joint debugging.Then, institute of the present invention joint debugging to be actual " three the is distant " title of substation field and numerical value thereof the most consistent with " three the is distant " title represented after regulation and control main website reception and numerical value thereof.
Such as Fig. 2, intelligent substation telemechanical apparatus proposed by the invention is embodied as technological means as follows (as a example by remote signalling joint debugging) with regulating and controlling main website automated closed-loop joint debugging:
(1) transformer station's automated closed-loop joint debugging system introducing regulation and control main website EXCEL model file, with the entitled guiding of remote signalling of " three is distant " in EXCEL, carries out closed loop joint debugging one by one.
(2) the remote signalling entry according to some the remote signalling title in EXCEL, corresponding to automated closed-loop joint debugging system Automatic-searching SCD file.
(3) generated software by data sources based on IEC61850 stipulations simulation and import SCD file, trigger and send on the digital simulation of this remote signalling entry.
(4) the remote signalling entry data sent in simulation is forwarded to main website through telemechanical apparatus period and numerical value thereof.
(5) regulation and control main website receives telemechanical apparatus period and numerical value thereof, triggers the visual change information title of regulation and control person and numerical value thereof.
(6) regulation and control main website exploitation information returns program, and name of the information and the numerical value thereof of change are returned to transformer station's automated closed-loop joint debugging system.
(7) transformer station's automated closed-loop joint debugging system is according to triggered SCD file this remote signalling title and numerical value thereof, contrast regulates and controls name of the information and the numerical value thereof that main website is returned, if title is consistent and numerical value is consistent, then think that remote signalling verification is correct, thus verify that telemechanical apparatus and the configuration of regulation and control main website are correct.
(8) so circulating, the remote signalling complete check " three is distant " is complete one by one.
(9) if there being some remote signalling verification incorrect, then unification screens inconsistent remote signalling, after checking that amendment telemechanical apparatus or regulation and control main website configure, these incorrect remote signalling of verification is carried out automated closed-loop joint debugging again, until complete check is correct.
The joint debugging method of remote measurement is the same with remote signalling, except for the difference that remote signalling can only assignment 0 or 1, and remote measurement can be with one floating number of assignment.
The joint debugging of remote control, in regulation and control main website end closed loop, is sent guidance command by the simulation of regulation and control main website, after transformer station's automated closed-loop joint debugging system receives order, returns guidance command object and command context.Whole joint debugging method is the same with remote signalling, does not repeats.
It is above presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, when produced function is without departing from the scope of technical solution of the present invention, belong to protection scope of the present invention.

Claims (3)

1. an intelligent substation telemechanical apparatus and the method regulating and controlling main website automated closed-loop joint debugging, it is characterised in that: comprise the steps,
S1: transformer station's automated closed-loop joint debugging system is provided, described transformer station automated closed-loop joint debugging system is connected to telemechanical apparatus station level end, and ensureing that telemechanical apparatus disconnects with A/B net in station, described transformer station automated closed-loop joint debugging system is also through switch and telemechanical apparatus and regulation and control main website common network;
S2: transformer station's automated closed-loop joint debugging system introducing regulation and control main website EXCEL model file and monitoring system of electric substation SCD file, with in the EXCEL three distant entitled guiding of remote signalling, carry out closed loop joint debugging one by one;
S3: according to one of them the remote signalling title in EXCEL, the remote signalling entry corresponding to transformer station's automated closed-loop joint debugging system Automatic-searching SCD file;
S4: generated software by data sources based on IEC61850 stipulations simulation and import SCD file, trigger and send on the digital simulation of this remote signalling entry;
S5: the remote signalling entry data sent in simulation is forwarded to main website through telemechanical apparatus period and numerical value thereof;
S6: regulation and control main website receives telemechanical apparatus period and numerical value thereof, triggers the visual change information title of regulation and control person and numerical value thereof;
S7: regulation and control main website exploitation information returns program, and name of the information and the numerical value thereof of change are returned to transformer station's automated closed-loop joint debugging system;
S8: transformer station's automated closed-loop joint debugging system is according to the remote signalling title of triggered SCD file and numerical value thereof, contrast regulates and controls name of the information and the numerical value thereof that main website is returned, if title is consistent and numerical value is consistent, then it is assumed that remote signalling verification is correct, and re-start next remote signalling audit process;Otherwise, screen this mistake remote signalling, after checking that amendment telemechanical apparatus or regulation and control main website configure, carry out automated closed-loop joint debugging again to checking incorrect remote signalling, until complete check is correct;
S9: complete telemechanical apparatus and the correct verification of regulation and control main website configuration.
A kind of intelligent substation telemechanical apparatus the most according to claim 1 and the method regulating and controlling main website automated closed-loop joint debugging, it is characterised in that: also including three distant middle remote measurements are carried out joint debugging, its joint debugging method is identical with the joint debugging method of step S2 to S8 remote signalling.
A kind of intelligent substation telemechanical apparatus the most according to claim 1 and the method regulating and controlling main website automated closed-loop joint debugging, it is characterized in that: also include three distant middle remote controls are carried out joint debugging, its joint debugging method is identical with the joint debugging method of step S2 to S8 remote signalling, difference is that the joint debugging of remote control is in regulation and control main website end closed loop, guidance command is sent by the simulation of regulation and control main website, after transformer station's automated closed-loop joint debugging system receives order, return guidance command object and command context.
CN201610448002.6A 2016-06-21 2016-06-21 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging Active CN105978152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610448002.6A CN105978152B (en) 2016-06-21 2016-06-21 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610448002.6A CN105978152B (en) 2016-06-21 2016-06-21 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging

Publications (2)

Publication Number Publication Date
CN105978152A true CN105978152A (en) 2016-09-28
CN105978152B CN105978152B (en) 2018-05-04

Family

ID=57021474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610448002.6A Active CN105978152B (en) 2016-06-21 2016-06-21 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging

Country Status (1)

Country Link
CN (1) CN105978152B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106941281A (en) * 2017-04-12 2017-07-11 国网福建省电力有限公司 A kind of telemechanical apparatus based on supervisory control of substation backstage and the method for regulating and controlling main website remote measurement automated closed-loop joint debugging
CN106953407A (en) * 2017-04-11 2017-07-14 国网福建省电力有限公司 A kind of telemechanical apparatus based on supervisory control of substation backstage real-time database and the method for regulating and controlling the Remote Control Automatic closed loop joint debugging of main website
CN107069961A (en) * 2017-04-12 2017-08-18 国网福建省电力有限公司 A kind of transformer station's telemechanical apparatus and the method for regulating and controlling main website remote signalling automated closed-loop joint debugging
CN107133275A (en) * 2017-04-11 2017-09-05 国网福建省电力有限公司 The method that a kind of regulation and control main website telemechanical point table is audited automatically
CN109150636A (en) * 2018-10-31 2019-01-04 国网四川省电力公司电力科学研究院 A kind of intelligent substation of full link information stream is assisted to experimental tests method and system
CN109167432A (en) * 2018-08-20 2019-01-08 国网福建省电力有限公司 A kind of substation's regulation remote control object online recognition method
CN109361563A (en) * 2018-10-31 2019-02-19 广东电网有限责任公司 A kind of substation DNP specification adjustment method
CN109508945A (en) * 2018-06-22 2019-03-22 广东电网有限责任公司 A kind of method of dispatching automation information point automatic checking
CN110021995A (en) * 2019-01-30 2019-07-16 国网浙江宁波市鄞州区供电有限公司 A kind of distribution network automated information joint debugging emulation test system
CN110445685A (en) * 2019-08-09 2019-11-12 云南电网有限责任公司电力科学研究院 Remote motion signal all-round property testing method and system
CN111030301A (en) * 2019-12-18 2020-04-17 广东电网有限责任公司 Method for checking correlation of scheduling automation information points
CN111668938A (en) * 2020-06-17 2020-09-15 南京太司德智能电气有限公司 Method for realizing simulation remote control of electric power measurement and control device
CN112134351A (en) * 2020-08-21 2020-12-25 国网山东省电力公司 Remote telemetry acceptance system and method based on transformer substation distribution network
CN112165444A (en) * 2020-08-10 2021-01-01 国网安徽省电力有限公司 Automatic comparison and verification system and method for remote signaling and remote measuring quantity of telecontrol machine of intelligent substation
CN113131620A (en) * 2021-05-25 2021-07-16 国网河南省电力公司平顶山供电公司 Telecontrol information joint debugging method for transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104184215A (en) * 2014-09-12 2014-12-03 国网浙江宁波市鄞州区供电公司 Substation dispatching automation joint debugging method and device and system using same
CN104578407A (en) * 2014-12-15 2015-04-29 国电南瑞科技股份有限公司 Method for exporting full-substation virtual terminal connection of intelligent substation by devices without repetition
CN105511294A (en) * 2015-11-24 2016-04-20 积成电子股份有限公司 Simulated-IED-device-based simulated telecontrol virtual debugging method
CN105549418A (en) * 2015-12-07 2016-05-04 国网安徽省电力公司蚌埠供电公司 SCD communication debugging system for intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104184215A (en) * 2014-09-12 2014-12-03 国网浙江宁波市鄞州区供电公司 Substation dispatching automation joint debugging method and device and system using same
CN104578407A (en) * 2014-12-15 2015-04-29 国电南瑞科技股份有限公司 Method for exporting full-substation virtual terminal connection of intelligent substation by devices without repetition
CN105511294A (en) * 2015-11-24 2016-04-20 积成电子股份有限公司 Simulated-IED-device-based simulated telecontrol virtual debugging method
CN105549418A (en) * 2015-12-07 2016-05-04 国网安徽省电力公司蚌埠供电公司 SCD communication debugging system for intelligent substation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋康等: "数字化智能变电站远动双测控实现方法", 《电力自动化设备》 *
彭志强等: "电力远动装置闭环测试方法实现及应用", 《电气应用》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106953407A (en) * 2017-04-11 2017-07-14 国网福建省电力有限公司 A kind of telemechanical apparatus based on supervisory control of substation backstage real-time database and the method for regulating and controlling the Remote Control Automatic closed loop joint debugging of main website
CN107133275A (en) * 2017-04-11 2017-09-05 国网福建省电力有限公司 The method that a kind of regulation and control main website telemechanical point table is audited automatically
CN107069961A (en) * 2017-04-12 2017-08-18 国网福建省电力有限公司 A kind of transformer station's telemechanical apparatus and the method for regulating and controlling main website remote signalling automated closed-loop joint debugging
CN107069961B (en) * 2017-04-12 2019-04-26 国网福建省电力有限公司 A kind of method of substation's telemechanical apparatus and regulation main website remote signalling automated closed-loop joint debugging
CN106941281B (en) * 2017-04-12 2019-04-26 国网福建省电力有限公司 A method of telemechanical apparatus and regulation main website telemetering automated closed-loop joint debugging based on supervisory control of substation backstage
CN106941281A (en) * 2017-04-12 2017-07-11 国网福建省电力有限公司 A kind of telemechanical apparatus based on supervisory control of substation backstage and the method for regulating and controlling main website remote measurement automated closed-loop joint debugging
CN109508945A (en) * 2018-06-22 2019-03-22 广东电网有限责任公司 A kind of method of dispatching automation information point automatic checking
CN109167432B (en) * 2018-08-20 2021-10-29 国网福建省电力有限公司 Online identification method for remote control object regulated and controlled by transformer substation
CN109167432A (en) * 2018-08-20 2019-01-08 国网福建省电力有限公司 A kind of substation's regulation remote control object online recognition method
CN109150636A (en) * 2018-10-31 2019-01-04 国网四川省电力公司电力科学研究院 A kind of intelligent substation of full link information stream is assisted to experimental tests method and system
CN109361563A (en) * 2018-10-31 2019-02-19 广东电网有限责任公司 A kind of substation DNP specification adjustment method
CN109150636B (en) * 2018-10-31 2023-08-22 国网四川省电力公司电力科学研究院 Intelligent substation auxiliary point-to-point test method and system for full-link information flow
CN110021995A (en) * 2019-01-30 2019-07-16 国网浙江宁波市鄞州区供电有限公司 A kind of distribution network automated information joint debugging emulation test system
CN110445685A (en) * 2019-08-09 2019-11-12 云南电网有限责任公司电力科学研究院 Remote motion signal all-round property testing method and system
CN111030301B (en) * 2019-12-18 2020-09-25 广东电网有限责任公司 Method for checking correlation of scheduling automation information points
CN111030301A (en) * 2019-12-18 2020-04-17 广东电网有限责任公司 Method for checking correlation of scheduling automation information points
CN111668938A (en) * 2020-06-17 2020-09-15 南京太司德智能电气有限公司 Method for realizing simulation remote control of electric power measurement and control device
CN111668938B (en) * 2020-06-17 2023-08-04 南京太司德智能电气有限公司 Method for realizing analog remote control of electric power measurement and control device
CN112165444A (en) * 2020-08-10 2021-01-01 国网安徽省电力有限公司 Automatic comparison and verification system and method for remote signaling and remote measuring quantity of telecontrol machine of intelligent substation
CN112134351A (en) * 2020-08-21 2020-12-25 国网山东省电力公司 Remote telemetry acceptance system and method based on transformer substation distribution network
CN113131620A (en) * 2021-05-25 2021-07-16 国网河南省电力公司平顶山供电公司 Telecontrol information joint debugging method for transformer substation

Also Published As

Publication number Publication date
CN105978152B (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN105978152A (en) Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation
CN107069961B (en) A kind of method of substation's telemechanical apparatus and regulation main website remote signalling automated closed-loop joint debugging
CN105302121A (en) Sequential control operation order automatic anti-error check method based on simulation IED device
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN104460346B (en) Feeder automation action logic test method based on power distribution terminal service verification
CN104090194B (en) Intelligent substation relay protection non-intrusion type test system and method
CN105511294B (en) Simulation telemechanical Virtual Debugging method based on emulation IED devices
CN106329730A (en) Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system
CN106941281B (en) A method of telemechanical apparatus and regulation main website telemetering automated closed-loop joint debugging based on supervisory control of substation backstage
CN105978159B (en) A kind of substation's remote control test is online to exempt to execute checking method
CN105262220B (en) Substation's intelligence shutdown telecontrol information check method and system
CN104820635A (en) Method of testing robustness of closed loop protocol based on semantic analysis of dynamic script
CN108983006A (en) Type feeder automation switch terminal scene does not have a power failure full-automatic testing method on the spot
CN105548742B (en) System is tested in a distant place for relay protection
CN204291050U (en) A kind of dispatching and monitoring information check system
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN109217472B (en) Automatic closed-loop joint debugging method for monitoring information checking
CN102788915A (en) Feeder automation online simulation method based on maintenance workstation
CN104076807B (en) The adjustment method of the automated system of intelligent substation
CN104269090B (en) The analogue system of a kind of power information acquisition terminal wheel secondary control switch and method thereof
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN104184215B (en) Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
CN205389138U (en) Intelligent substation simulation main website integrated test system
CN103544104B (en) Testing method for power distribution terminal remote control functional software module
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 350003 No. 54 road 54 Fuzhou, Fujian

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Address before: 350003 No. 54 road 54 Fuzhou, Fujian

Co-patentee before: State Grid Corporation of China

Patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181206

Address after: 350003 No. 54 road 54 Fuzhou, Fujian

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Co-patentee after: STATE GRID FUJIAN ECONOMIC Research Institute

Address before: 350003 No. 54 road 54 Fuzhou, Fujian

Co-patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.