CN105262220B CN201510724346.0A CN201510724346A CN105262220B CN 105262220 B CN105262220 B CN 105262220B CN 201510724346 A CN201510724346 A CN 201510724346A CN 105262220 B CN105262220 B CN 105262220B
Authority
CN
China
Prior art keywords
information
substation
intelligence
telecontrol
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510724346.0A
Other languages
Chinese (zh)
Other versions
CN105262220A (en
Inventor
许为松
李怡然
黄晨奕
赵晖
吴孝彬
汪逸帆
李敏昱
徐士华
李明辉
许为钤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201510724346.0A priority Critical patent/CN105262220B/en
Publication of CN105262220A publication Critical patent/CN105262220A/en
Application granted granted Critical
Publication of CN105262220B publication Critical patent/CN105262220B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides a kind of substation's gateway machine telecontrol information check method, this method comprises: importing the information check list of any one substation's gateway machine to verification server from scheduling station server;By the telecontrol information mirror image of substation's gateway machine to verifying server;The telecontrol information of mirror image is led into data form, and whether the data for verifying the information check list and data form are consistent, if it is not, the information that export is inconsistent, the telecontrol information that substation's gateway machine is modified according to inconsistent information updates the telecontrol information of substation's gateway machine;If so, verification server is according to the polling period automatic detecting of setting substation's gateway machine.The invention has the advantages that the automatic Verification and automatic detecting of telecontrol information in substation's gateway machine may be implemented safe, reliable and effectively, it is ensured that each substation's gateway machine is run, and the quality and efficiency of entire grid dispatching management can be improved.

Description

Substation's intelligence shutdown telecontrol information check method and system
Technical field
The present invention relates to electrical equipment, in particular to a kind of substation's intelligence shutdown telecontrol information check method and it is System.
Background technique
Currently, intelligent substation and conventional comprehensive substation have all realized unattendedization, because of each substation Electric substation automation system is had, it is that the measurement of collection power grid, control, protection, economical operation, an operation index etc. are various Integrated system.Intelligent intelligence shutdown plays a crucial role naturally as the important component of electric substation automation system, In specific works, intelligent intelligence shutdown is the equipment directly communicated with dispatching of power netwoks, its working condition will directly affect To the quality and efficiency of entire grid dispatching management, and then influence the economic benefit of entire electric power enterprise.And how safety, can It leans on, effectively carry out the automatic management shut down to intelligent intelligence and control, be at present still one in automatic management An emphasis problem in weak link and automatic management.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of substation's intelligence shutdown telecontrol information check method, Automatic Verification and the inspection of substation's intelligence shutdown telecontrol information are realized by this method.
The present invention is realized in one of technical problem: substation's intelligence shutdown telecontrol information check method, this method need The verification server that one scheduling station server is provided and is connect with the scheduling station server, the scheduling station server And verification server shuts down with each substation's intelligence and connects;This method comprises the following steps:
Step 1 is serviced from information check list to the verification that scheduling station server imports any one substation's intelligence shutdown Device;
Step 2, by the telecontrol information mirror image of substation's intelligence shutdown to verifying server;
The telecontrol information of mirror image is led into data form, and verifies the number of the information check list and data form by step 3 According to whether unanimously, if it is not, then entering step 4;If so, entering step 5;
The inconsistent information of step 4, export, the telecontrol information of substation's intelligence shutdown is modified according to inconsistent information, Update the telecontrol information of substation's intelligence shutdown, and return step 2;
Step 5, verification server shut down according to the polling period automatic detecting of setting substation's intelligence.
Further, before the step 1, further includes:
Step 11, scheduling station server shut down according to telemechanical four remote control function information configuration substation's intelligence of electric system Telecontrol information, and create the initial information point table of substation's intelligence shutdown;
The telecontrol information of configuration is inserted initial information point table by step 12, and using the initial information point table as information school Core list is stored in scheduling station server.
Further, the step 3 specifically: the telecontrol information of mirror image is led into data form by verification server, and is adopted Whether the data for verifying the information check list and data form with Nakatsu algorithm are consistent, if it is not, then finding out inconsistent letter Breath, enters step 4 later;If so, the telecontrol information file that mirror image substation's intelligence is shut down current, and store to verification and service Device enters step 5 later.
Further, the step 5 specifically: setting verification server the automatic detecting period, verification server according to The polling period of setting obtains the generation time of the telecontrol information file of substation's intelligence shutdown, and verifies the generation time with before Whether the generation time of mirror image to the telecontrol information file for verifying server is consistent, if time consistency, illustrates the change Telecontrol information in the shutdown of power station intelligence does not change, without any processing at this time;If Time Inconsistency, illustrate substation's intelligence Telecontrol information in shutdown has variation, at this time return step 2.
The second technical problem to be solved by the present invention is to provide a kind of substation's intelligence shutdown telecontrol information nucleus correcting system, Automatic Verification and the inspection of substation's intelligence shutdown telecontrol information are realized by the system.
The present invention is realized in the twos' of technical problem: substation's intelligence shutdown telecontrol information nucleus correcting system, the system need The verification server that one scheduling station server is provided and is connect with the scheduling station server, the scheduling station server And verification server shuts down with each substation's intelligence and connects;The system includes: import modul, is used for from scheduling station server The information check list of any one substation's intelligence shutdown is imported to verifying server;
Mirror module, telecontrol information mirror image for substation's intelligence to be shut down is to verifying server;
Module is checked, for the telecontrol information of mirror image to be led into data form, and verifies the information check list and data Whether the data of list are consistent, if it is not, then entering information changes module;If so, into automatic detecting module;
Information changes module, for exporting inconsistent information, modifies substation's intelligence shutdown according to inconsistent information Telecontrol information, update the telecontrol information of substation's intelligence shutdown, and return to mirror module;
Automatic detecting module is shut down for verifying server according to the polling period automatic detecting of setting substation's intelligence.
Further, before the import modul, further includes:
Information collocation module, for scheduling station server according to the telemechanical four remote control function information configuration power transformation of electric system The telecontrol information of intelligence of standing shutdown, and create the initial information point table of substation's intelligence shutdown;
List fills in module, and telecontrol information for that will configure inserts initial information point table, and by the initial information point table Scheduling station server is stored in as information check list.
Further, the check module specifically: the telecontrol information of mirror image is led into data form by verification server, and Whether the data for verifying the information check list and data form using Nakatsu algorithm are consistent, if it is not, then finding out inconsistent Information enters information later and changes module;If so, the telecontrol information file that mirror image substation's intelligence is shut down current, and store To verification server, enter automatic detecting module later.
Further, the automatic detecting module specifically: the automatic detecting period of setting verification server, verification service Device obtains the generation time of the telecontrol information file of substation's intelligence shutdown according to the polling period of setting, and when verifying the generation Between with previous secondary mirror image to verification server the telecontrol information file the generation time it is whether consistent, if time consistency, say Telecontrol information in bright substation's intelligence shutdown does not change, without any processing at this time;If Time Inconsistency, illustrate the change Telecontrol information in the shutdown of power station intelligence has variation, returns to mirror module at this time.
The present invention has the advantage that the automatic Verification of telecontrol information in the shutdown of substation's intelligence may be implemented and patrol automatically Inspection, it is ensured that each substation's intelligence shutdown is run safe, reliable and effectively, this helps that entire grid dispatching management can be improved Quality and efficiency, and improve the economic benefit of entire electric power enterprise, economic loss caused by reducing because of failure.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the execution flow chart of substation's intelligence of the present invention shutdown telecontrol information check method.
Specific embodiment
It please refers to shown in Fig. 1, the preferred embodiment of substation's intelligence shutdown telecontrol information check method, this method need to provide one Scheduling station server and the verification server being connect with the scheduling station server, the scheduling station server and school Server is tested to connect with the shutdown of each substation's intelligence;This method comprises the following steps:
Step S11, scheduling station server shuts down according to telemechanical four remote control function information configuration substation's intelligence of electric system Telecontrol information, and create substation's intelligence shutdown initial information point table, creation when, IEC60870 international standard can be referred to To create initial information point table;Wherein, telemechanical four remote control function is i.e.:
Telemetering (telemetry intelligence (TELINT)): long-range measurement;For acquiring and transmit operating parameter, including various electrical quantity are (on route The magnitudes such as voltage, electric current, power) and load uncertainty etc.;
Remote signalling (remote signalling information): remote signal;For acquiring and transmitting various protections and switching value information.
It is remotely controlled (remote information): long-range control;For receiving and performing remote control command, long-range some switch controls are set It is standby remotely to be controlled.
Remote regulating (remote regulating information): remote adjustment;For receiving and performing remote regulating order, long-range control amount equipment is carried out Remote debugging, such as regulator generator output power.
Step S12, the telecontrol information of configuration is inserted into initial information point table, and using the initial information point table as information school Core list is stored in scheduling station server.
Above-mentioned steps S11, step S12 are only executed when creating new substation or replacement substation's intelligence shutdown.
Step S2, information check list to the verification that any one substation's intelligence is shut down is imported from scheduling station server to service Device;
Step S3, by the telecontrol information mirror image of substation's intelligence shutdown to verifying server;In the specific implementation, it can adopt Automatic duplicating of data is carried out with teletransmission specification and is uploaded.
Step S4, the telecontrol information of mirror image is led into data form by verification server, and should using the verification of Nakatsu algorithm Whether the data of information check list and data form are consistent, if it is not, then finding out inconsistent information, enter step S5 later; If so, the telecontrol information file that mirror image substation's intelligence is shut down current, and store to verification server, for making when automatic detecting With entering step S6 later.
Step S5, exporting inconsistent information in the specific implementation can be by being pushed to system for inconsistent information Alarm window, to remind the timely handling failure of maintenance personnel;The remote of substation's intelligence shutdown is modified according to inconsistent information Dynamic information updates the telecontrol information of substation's intelligence shutdown, and return step S3;
Step S6, verification server shuts down according to the polling period automatic detecting of setting substation's intelligence;Step S6 tool Body are as follows: setting verification server the automatic detecting period, for example, it can be set to every 2 week automatic detecting it is primary;Verification clothes Business device obtains the generation time of the telecontrol information file of substation's intelligence shutdown according to the polling period of setting, and verifies the generation Whether the time is consistent with the generation time of the telecontrol information file of previous secondary mirror image to verification server, if time consistency, Illustrate that the telecontrol information in substation's intelligence shutdown does not change, it is without any processing at this time;If Time Inconsistency illustrates this Telecontrol information in the shutdown of substation's intelligence has variation, at this time return step S3.Certainly, relevant staff can also be according to reality Use demand manually selects the substation for wanting inspection, and to the generation time of the telecontrol information file in substation's intelligence shutdown into Row automatic detecting.
The preferred embodiment of substation's intelligence shutdown telecontrol information nucleus correcting system, the system need to provide a scheduling station server And the verification server being connect with the scheduling station server, the scheduling station server and verification server are and respectively The shutdown connection of substation's intelligence;The system includes: that information collocation module, list fill in module, import modul, mirror module, check Module, information change module and automatic detecting module;
The information collocation module, for scheduling station server according to the telemechanical four remote control function information configuration of electric system The telecontrol information of substation's intelligence shutdown, and the initial information point table of substation's intelligence shutdown is created, in creation, can refer to IEC60870 international standard creates initial information point table;Wherein, telemechanical four remote control function is i.e.:
Telemetering (telemetry intelligence (TELINT)): long-range measurement;For acquiring and transmit operating parameter, including various electrical quantity are (on route The magnitudes such as voltage, electric current, power) and load uncertainty etc.;
Remote signalling (remote signalling information): remote signal;For acquiring and transmitting various protections and switching value information.
It is remotely controlled (remote information): long-range control;For receiving and performing remote control command, long-range some switch controls are set It is standby remotely to be controlled.
Remote regulating (remote regulating information): remote adjustment;For receiving and performing remote regulating order, long-range control amount equipment is carried out Remote debugging, such as regulator generator output power.
The list fills in module, and telecontrol information for that will configure inserts initial information point table, and by the initial information Point table is stored in scheduling station server as information check list.
The information collocation module, list are filled in module and are only held when creating new substation or replacement substation's intelligence shutdown Row.
The import modul, for importing the information check list that any one substation's intelligence is shut down from scheduling station server To verification server;
The mirror module, telecontrol information mirror image for substation's intelligence to be shut down is to verifying server;Specific real Shi Shi can carry out automatic duplicating of data and be uploaded using teletransmission specification.
The telecontrol information of mirror image is led into data form for verifying server, and uses Nakatsu by the check module Algorithm verifies the information check list and whether the data of data form consistent, if it is not, then find out inconsistent information, it is laggard Enter the information change module;If so, the telecontrol information file that mirror image substation's intelligence is shut down current, and store to verification and take Business device enters the automatic detecting module for using when automatic detecting later.
The information changes module, in the specific implementation, can be by will be inconsistent for exporting inconsistent information Information is pushed to the alarm window of system, to remind the timely handling failure of maintenance personnel;The change is modified according to inconsistent information The telecontrol information of power station intelligence shutdown, updates the telecontrol information of substation's intelligence shutdown, and returns to the mirror module;
The automatic detecting module is closed for verifying server according to the polling period automatic detecting of setting substation's intelligence Machine;The automatic detecting module specifically: the automatic detecting period of setting verification server, for example, it can be set to every 2 week Automatic detecting is primary;Verification server obtains the life of the telecontrol information file of substation's intelligence shutdown according to the polling period of setting At the time, and verify generation time and previous secondary mirror image to verification server the telecontrol information file the generation time whether Unanimously, if time consistency, illustrate that the telecontrol information in substation's intelligence shutdown does not change, it is without any processing at this time;If Time Inconsistency then illustrates that the telecontrol information in substation's intelligence shutdown has variation, returns to the mirror module at this time.Certainly, Relevant staff can also manually select the substation for wanting inspection according to actual use demand, and in substation's intelligence shutdown Telecontrol information file the generation time carry out automatic detecting.
In conclusion the invention has the following beneficial effects: may be implemented substation's intelligence shutdown in telecontrol information it is automatic Verification and automatic detecting, it is ensured that each substation's intelligence shutdown is run safe, reliable and effectively, this helps can be improved entire The quality and efficiency of grid dispatching management, and the economic benefit of entire electric power enterprise is improved, economic damage caused by reducing because of failure It loses.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (4)

  1. The telecontrol information check method 1. a kind of substation's intelligence is shut down, it is characterised in that: this method need to provide a scheduling station service Device and the verification server being connect with the scheduling station server, the scheduling station server and verification server with Each substation's intelligence shutdown connection;This method comprises the following steps:
    Step 1 imports information check list that any one substation's intelligence is shut down from scheduling station server to verification server;
    Step 2, by the telecontrol information mirror image of substation's intelligence shutdown to verifying server;
    The telecontrol information of mirror image is led into data form by step 3, and the data for verifying the information check list and data form are It is no consistent, if it is not, then entering step 4;If so, entering step 5;
    The inconsistent information of step 4, export, the telecontrol information of substation's intelligence shutdown is modified according to inconsistent information, is updated The telecontrol information of substation's intelligence shutdown, and return step 2;
    Step 5, verification server shut down according to the polling period automatic detecting of setting substation's intelligence;
    The step 5 specifically: in the automatic detecting period of setting verification server, verify server according to the polling period of setting The generation time of the telecontrol information file of substation's intelligence shutdown is obtained, and verifies generation time and previous secondary mirror image to verification Whether the generation time of the telecontrol information file of server is consistent, if time consistency, illustrates in substation's intelligence shutdown Telecontrol information does not change, without any processing at this time;If Time Inconsistency, illustrate the telemechanical letter in substation's intelligence shutdown Breath has variation, at this time return step 2;
    Before the step 1, further includes:
    The telemechanical that step 11, scheduling station server shut down according to telemechanical four remote control function information configuration substation's intelligence of electric system Information, and create the initial information point table of substation's intelligence shutdown;
    The telecontrol information of configuration is inserted initial information point table by step 12, and using the initial information point table as information check table Singly it is stored in scheduling station server.
  2. The telecontrol information check method 2. substation's intelligence according to claim 1 is shut down, it is characterised in that: step 3 tool Body are as follows: the telecontrol information of mirror image is led into data form by verification server, and verifies the information check table using Nakatsu algorithm It is single whether consistent with the data of data form, if it is not, then finding out inconsistent information, 4 are entered step later;If so, mirror image The telecontrol information file that substation's intelligence is shut down current, and store to verification server, 5 are entered step later.
  3. The telecontrol information nucleus correcting system 3. a kind of substation's intelligence is shut down, it is characterised in that: the system need to provide a scheduling station service Device and the verification server being connect with the scheduling station server, the scheduling station server and verification server with Each substation's intelligence shutdown connection;The system includes:
    Import modul takes for importing information check list to the verification that any one substation's intelligence is shut down from scheduling station server Business device;
    Mirror module, telecontrol information mirror image for substation's intelligence to be shut down is to verifying server;
    Module is checked, for the telecontrol information of mirror image to be led into data form, and verifies the information check list and data form Data it is whether consistent, if it is not, then enter information change module;If so, into automatic detecting module;
    Information changes module, for exporting inconsistent information, modifies the remote of substation's intelligence shutdown according to inconsistent information Dynamic information, updates the telecontrol information of substation's intelligence shutdown, and returns to mirror module;
    Automatic detecting module is shut down for verifying server according to the polling period automatic detecting of setting substation's intelligence;
    The automatic detecting module specifically: in the automatic detecting period of setting verification server, verify server according to setting Polling period obtains the generation time of the telecontrol information file of substation's intelligence shutdown, and verifies generation time and previous secondary mirror Whether the generation time of picture to the telecontrol information file for verifying server is consistent, if time consistency, illustrates substation's intelligence Telecontrol information in shutdown does not change, without any processing at this time;If Time Inconsistency, illustrate in substation's intelligence shutdown Telecontrol information have variation, return to mirror module at this time;
    Before the import modul, further includes:
    Information collocation module, for scheduling station server according to the telemechanical four remote control function information configuration substation intelligence of electric system The telecontrol information of shutdown, and create the initial information point table of substation's intelligence shutdown;
    List fills in module, and telecontrol information for that will configure inserts initial information point table, and using the initial information point table as Information check list is stored in scheduling station server.
  4. The telecontrol information nucleus correcting system 4. substation's intelligence according to claim 3 is shut down, it is characterised in that: the check module Specifically: the telecontrol information of mirror image is led into data form by verification server, and verifies the information check using Nakatsu algorithm Whether the data of list and data form are consistent, if it is not, then finding out inconsistent information, enter information later and change module;If It is the telecontrol information file that then mirror image substation's intelligence is shut down current, and stores to verification server, enters automatic detecting later Module.
CN201510724346.0A 2015-10-30 2015-10-30 Substation's intelligence shutdown telecontrol information check method and system Active CN105262220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510724346.0A CN105262220B (en) 2015-10-30 2015-10-30 Substation's intelligence shutdown telecontrol information check method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510724346.0A CN105262220B (en) 2015-10-30 2015-10-30 Substation's intelligence shutdown telecontrol information check method and system

Publications (2)

Publication Number Publication Date
CN105262220A CN105262220A (en) 2016-01-20
CN105262220B true CN105262220B (en) 2019-01-22

Family

ID=55101772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510724346.0A Active CN105262220B (en) 2015-10-30 2015-10-30 Substation's intelligence shutdown telecontrol information check method and system

Country Status (1)

Country Link
CN (1) CN105262220B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105912566A (en) * 2016-03-25 2016-08-31 北京用尚科技股份有限公司 Method of automatically checking and comparing telecontrol information of master station and slave station of power system
CN106329730A (en) * 2016-09-14 2017-01-11 国网江苏省电力公司连云港供电公司 Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system
CN107067161B (en) * 2017-03-20 2021-05-14 国网福建省电力有限公司 Automatic checking implementation system and method for information point table in smart power grid
CN107612998B (en) * 2017-09-19 2019-08-23 国电南瑞科技股份有限公司 A kind of substation's telemechanical forwarding remote data nucleus correcting system and method
CN108712306A (en) * 2018-05-10 2018-10-26 国网宁夏电力有限公司信息通信公司 A kind of information system automation inspection platform and method for inspecting
CN110119417A (en) * 2019-06-11 2019-08-13 广东电网有限责任公司 A kind of substation's remote action data intelligence check analysis system and check analysis method
CN111307489A (en) * 2020-03-24 2020-06-19 云南电网有限责任公司电力科学研究院 Intelligent telecontrol machine closed-loop automatic test system
CN112910086B (en) * 2021-01-18 2024-05-31 国网山东省电力公司青岛供电公司 Intelligent substation data verification method and system
CN112910093B (en) * 2021-03-04 2023-05-30 广西电网有限责任公司钦州供电局 Efficient method for checking telecontrol signal of scheduling master station

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355056B (en) * 2011-09-13 2013-06-05 浙江大学 Method for improving closing reliability of remote-terminal-unit-architecture-based substation
CN103390028B (en) * 2013-06-26 2016-09-14 广东电网公司电力科学研究院 A kind of protection definite value check method for novel telecontrol machine
CN103676669B (en) * 2013-12-09 2016-08-03 国家电网公司 The check method of a kind of telecontrol information and nucleus correcting system

Also Published As

Publication number Publication date
CN105262220A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105262220B (en) Substation's intelligence shutdown telecontrol information check method and system
CN106712300B (en) The multistage anti-error locking system in intelligent substation boss station
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN102005736B (en) On-line monitoring method of state of relay protection equipment
CN109217472B (en) Automatic closed-loop joint debugging method for monitoring information checking
CN109193945B (en) Automatic closed-loop checking method for telecontrol data configuration of intelligent substation
CN107317399B (en) Visual automatic point aligning method for intelligent transformer substation
CN105978159B (en) A kind of substation's remote control test is online to exempt to execute checking method
CN105576831A (en) Automatic verification method for security control of master station and sub station
CN103050931A (en) Power system hierarchical data matching and relay protection setting merging method
CN106296467B (en) A method of generating operation order
CN204291050U (en) A kind of dispatching and monitoring information check system
CN103823199A (en) Automatic detection system and detection method for intelligent substation relay protection testing device
CN107069961A (en) A kind of transformer station's telemechanical apparatus and the method for regulating and controlling main website remote signalling automated closed-loop joint debugging
CN207883176U (en) Power network schedule automation integration training system
CN102709894A (en) On-line checking method and system for relay protection setting value
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN106532955A (en) Implementation method for remote measurement identification function of centralized monitoring transformer station
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN106941281A (en) A kind of telemechanical apparatus based on supervisory control of substation backstage and the method for regulating and controlling main website remote measurement automated closed-loop joint debugging
CN105955159A (en) Regulation operation anti-misoperation checking method based on anti-misoperation rule source side maintenance
CN104076807A (en) Method of debugging automation system of intelligent substation
CN108599370A (en) Power distribution automation main station apparatus and system
CN103676669B (en) The check method of a kind of telecontrol information and nucleus correcting system
CN110365114A (en) The energy-accumulating power station total management system and information interacting method integrated based on multimode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Weisong

Inventor after: Xu Weihan

Inventor after: Li Yiran

Inventor after: Huang Chenyi

Inventor after: Zhao Hui

Inventor after: Wu Xiaobin

Inventor after: Wang Yifan

Inventor after: Li Minyu

Inventor after: Xu Shihua

Inventor after: Li Minghui

Inventor before: Xu Weisong

Inventor before: Li Minghui

Inventor before: Zhao Hui

Inventor before: Liang Antao

Inventor before: Wu Xiaobin

Inventor before: Weng Changjin

Inventor before: Ni Guijiang

Inventor before: Wang Junfeng

Inventor before: Xu Shihua

Inventor before: Sun Zhenye

GR01 Patent grant
GR01 Patent grant