CN103051065B - The distributed FA interlock method of testing of a kind of power distribution automation and system - Google Patents

The distributed FA interlock method of testing of a kind of power distribution automation and system Download PDF

Info

Publication number
CN103051065B
CN103051065B CN201210590575.4A CN201210590575A CN103051065B CN 103051065 B CN103051065 B CN 103051065B CN 201210590575 A CN201210590575 A CN 201210590575A CN 103051065 B CN103051065 B CN 103051065B
Authority
CN
China
Prior art keywords
distributed
terminal
relay protection
main website
protection tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210590575.4A
Other languages
Chinese (zh)
Other versions
CN103051065A (en
Inventor
李林
郭晋楠
汪婷婷
施维杨
张少雷
朱小丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University Of Science And Technology Intelligent Iot Technology Co ltd
Hkust Intelligent Internet Of Things Technology Co ltd
Hkust Intelligent Iot Technology Co ltd
CSG Smart Electrical Technology Co Ltd
CSG Smart Science and Technology Co Ltd
Original Assignee
KEDA INTELLIGENT TECHNOLOGY Co Ltd
KEDA INTELLIGENT ELECTRICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEDA INTELLIGENT TECHNOLOGY Co Ltd, KEDA INTELLIGENT ELECTRICAL TECHNOLOGY Co Ltd filed Critical KEDA INTELLIGENT TECHNOLOGY Co Ltd
Priority to CN201210590575.4A priority Critical patent/CN103051065B/en
Publication of CN103051065A publication Critical patent/CN103051065A/en
Application granted granted Critical
Publication of CN103051065B publication Critical patent/CN103051065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to power distribution automation distributed FA interlock method of testing, comprising: main website issues the configuration parameter of relay protection tester, relay protection tester sends voltage and current signal and gathers for it to distributed FA terminal; Start test, distributed FA terminal is judged fault, remote measure and communication value is reported to main website after collecting abnormal current change; After main website receives abnormal remote measure and communication value, control relay protection tester and send remote signal extremely for simulating the switch analogue means of on-pole switch; Switch analogue means according to after the remote signal action received, through distributed FA terminal to the information after main website feedback processing.The invention also discloses a kind of power distribution automation distributed FA interlock test macro.The present invention, without the need to line outage, provides fault simulation signal directly to FA equipment, and avoiding affects the normal operation of primary equipment safety in the debugging on electrical power distribution automatization system, and test process is more fast simple and clear.

Description

The distributed FA interlock method of testing of a kind of power distribution automation and system
Technical field
The present invention relates to power distribution network field tests, the distributed FA interlock method of testing of especially a kind of power distribution automation and system.
Background technology
In power distribution automation equipment, terminal equipment is as distributed FA(Feeder Automation-feeder automation) test be the technical assignment that most important, workload is huge.Intelligent distributed FA project is after Installation and Debugging complete, and need further to test the troubleshooting function of FA, object is the correctness in order to check configuration parameter.The current method of testing generally taked is: a line outage of loop of being powered by FA, and with protective relaying device loading simulation fault current on corresponding measurement point, during load fault electric current, the personnel of each point carry out synchronously with intercom.The advantage of this conventional method is, can direct control switchgear, more presses close to real working condition.But shortcoming is also apparent, needs line outage in test process, loading current needs to be undertaken synchronously by manually propagandaing directed to communicate, and is difficult to the success rate ensureing disposable test, does not also represent test process intuitively.
Summary of the invention
Primary and foremost purpose of the present invention is to provide a kind of without the need to line outage, provides the power distribution automation of fault simulation signal distributed FA interlock method of testing directly to FA equipment.
For achieving the above object, the utility model have employed following technical scheme: a kind of power distribution automation distributed FA interlock method of testing, and the method comprises the step of following order:
(1) main website issues the configuration parameter of relay protection tester, and relay protection tester sends voltage and current signal and gathers for it to distributed FA terminal;
(2) start test, distributed FA terminal is judged fault, remote measure and communication value is reported to main website after collecting abnormal current change;
(3), after main website receives abnormal remote measure and communication value, control relay protection tester and send remote signal extremely for simulating the switch analogue means of on-pole switch;
(4) switch analogue means is according to after the remote signal action received, through distributed FA terminal to the information after main website feedback processing.
Before the test begins, first the network topological diagram connection line in main website draws, provide the Mathematical Modeling that correspond to configuration parameter needed for relay protection tester, according to kirchhoff electric current principle, association between feeder current, load current and fault current is generated out automatically, determines the configuration parameter of relay protection tester.
Described main website provides remote signalling No. three in an orderly manner by distributed FA terminal control relay protection tester, utilizes ethernet communication Channel Exchange data, complete digital simulation work between three remote signalling number that relay protection tester produces and main website.
Described main website be provided for representing circuit ruuning situation, distributed FA terminal processing procedure and control the human-computer interaction interface of distributed FA termination function test process, user carries out confirmation process by human-computer interaction interface.
Another object of the present invention is to provide a kind of power distribution automation distributed FA interlock test macro, comprise multiple distributed FA terminal, also comprise the relay protection tester be connected with the input/output terminal of distributed FA terminal, the output of relay protection tester is connected with the input of switch analogue means, and the output of switch analogue means is connected with the input of distributed FA terminal.
Described distributed FA terminal is by Ethernet and main website communication.
The described number of distributed FA terminal and the number one_to_one corresponding of relay protection tester.
Module when also comprising for carrying out synchronous GPS couple to the time, its output is connected with the input of relay protection tester.
As shown from the above technical solution, the present invention connects relay protection tester in distributed FA terminal, by the generation of the true fault at relay protection tester simulation distribution scene, complete the reporting of fault, assign process and feedback, tested main website, communication equipment, distributed FA terminal and switch analogue means etc. are intactly carried out closed loop test, is detected the correctness of the cooperation between each equipment and the logical process after fault is occurred by this process.The present invention, without the need to line outage, provides fault simulation signal directly to FA equipment, and avoiding affects the normal operation of primary equipment safety in the debugging on electrical power distribution automatization system, and test process is more fast simple and clear.
Accompanying drawing explanation
Fig. 1 is the composition schematic diagram of distributed FA terminal and main website in the present invention;
Fig. 2 is the system configuration schematic diagram in the present invention;
Fig. 3 is equivalent topologies structural representation;
Fig. 4 is workflow diagram of the present invention.
Embodiment
A kind of power distribution automation distributed FA interlock method of testing, the method comprises the step of following order: (1) main website issues the configuration parameter of relay protection tester, and relay protection tester sends voltage and current signal and gathers for it to distributed FA terminal; (2) start test, distributed FA terminal is judged fault, remote measure and communication value is reported to main website after collecting abnormal current change; (3), after main website receives abnormal remote measure and communication value, control relay protection tester and send remote signal extremely for simulating the switch analogue means of on-pole switch; (4) switch analogue means is according to after the remote signal action received, through distributed FA terminal to the information after main website feedback processing.As shown in Figure 2,4.
As shown in Figure 4, before the test begins, first the network topological diagram connection line in main website draws, provide the Mathematical Modeling that correspond to configuration parameter needed for relay protection tester, according to kirchhoff electric current principle, association between feeder current, load current and fault current is generated out automatically, determines the configuration parameter of relay protection tester.Described main website provides remote signalling No. three in an orderly manner by distributed FA terminal control relay protection tester, utilizes ethernet communication Channel Exchange data, complete digital simulation work between three remote signalling number that relay protection tester produces and main website.Described main website be provided for representing circuit ruuning situation, distributed FA terminal processing procedure and control the human-computer interaction interface of distributed FA termination function test process, user carries out confirmation process by human-computer interaction interface.
As shown in Figure 2, native system comprises multiple distributed FA terminal, also comprise the relay protection tester be connected with the input/output terminal of distributed FA terminal, the output of relay protection tester is connected with the input of switch analogue means, and the output of switch analogue means is connected with the input of distributed FA terminal.Described distributed FA terminal is by Ethernet and main website communication.The described number of distributed FA terminal and the number one_to_one corresponding of relay protection tester.Module when also comprising for carrying out synchronous GPS couple to the time, its output is connected with the input of relay protection tester.
Be illustrated in figure 1 the system composition of distributed FA on distribution line, each distributed FA terminal gathers the ruuning situation of corresponding on-pole switch, as electric current, voltage, power and switch current location, energy storage performance etc., and above-mentioned information is sent to main website through communication network.When fault occurs, distributed FA terminal is according to the fault current information collected, decompression information and on off state, according to resident exception handles, send separating brake locking order or separating brake order by communication network to adjacent distributed FA terminal, and receive the related command of adjacent distributions formula FA terminal transmission.
Each distributed FA terminal to be out of order section according to the order independent judgment that the fault message of self and other distributed FA terminal of receiving send, send out operational order on the spot, realize fault location, isolation and restoring power supply in non-broken-down section, this process does not control by the distribution network automated control centre in any distant place, completed alone by distributed FA terminal, the communication now between the distribution network automated control centre in a distant place and distributed FA terminal is in resting state.When the operational mode adjustment of power distribution network, first calculate each setting parameter value after topological structure of electric change by artificial or Computer, then by the main website in a distant place, these parameters are handed down to distributed FA terminal, refresh original definite value.
As shown in Figure 2, in order to the ability of the fault distinguishing of test distributed distribution terminal and Fault Isolation, self-healing, need to apply fault current to the distribution terminal of each website in electric power system.Because primary fault electric current is not easily simulated, first intend at each site configuration relay protection tester, fault current is applied to distribution terminal.Because fault distinguishing, isolation and self-healing are very high to the requirement of time precision, namely at a time some relay protection testers need to export fault current simultaneously, therefore require every platform relay protection tester all GP configuring S couple time module.
Below in conjunction with Fig. 2,3,4 the present invention is further illustrated.
1, primary equipment fault simulation process
Before the test begins, first in main website, topology diagram is drawn, as shown in Figure 3, the load point in equivalent topologies structure is F1, F2, F3...FN.There is system topological figure, just can provide corresponding Mathematical Modeling, this Mathematical Modeling correspond to the parameter of the required configuration of relay protection tester, according to kirchhoff electric current principle, automatically generates out by the association between feeder current, load current and fault current.
When specifically testing, first three distant binding posts of operating for scene distributed FA terminal are directly pulled out, change the another set of terminal that relay protection tester carefully connects the wire in advance, the voltage and current signal provided with relay protection tester is replaced on-the-spot signal and is gathered to distributed FA terminal.Without the need to carrying out power failure operation to primary equipment in test process, the mode of directly changing terminal avoids the generation of the problems such as mis-wired, very safe.
2, terminal fault differentiates and message up sending process
Distributed FA terminal is judged fault, remote measure and communication value is reported to main website simultaneously after collecting abnormal current change.Main website provides remote signalling No. three in an orderly manner by distributed FA terminal control relay protection tester.
3, main website and human-computer interaction interface processing procedure
After main website receives abnormal remote measurement and remote signalling, distribution system analysis function and Intelligent treatment function produce response screen or handling process, after human-computer interaction interface, obtain the confirmation process of technical staff, control relay protection tester and send remote signal extremely for simulating the switch analogue means of on-pole switch.
Main website provides comprehensive human-computer interaction interface, the clear ruuning situation representing circuit, the processing procedure of distributed FA terminal, and controls the process of distributed FA termination function test.
4, information feed back process
Switch analogue means, according to after the remote signal action received, through distributed FA terminal to the information after main website feedback processing, forms complete event handling flow process.
In sum, the present invention connects relay protection tester in distributed FA terminal, by the generation of the true fault at relay protection tester simulation distribution scene, complete the reporting of fault, assign process and feedback, tested main website, communication equipment, distributed FA terminal and switch analogue means etc. are intactly carried out closed loop test, is detected the correctness of the cooperation between each equipment and the logical process after fault is occurred by this process.The present invention, without the need to line outage, provides fault simulation signal directly to FA equipment, and avoiding affects the normal operation of primary equipment safety in the debugging on electrical power distribution automatization system, and test process is more fast simple and clear.

Claims (8)

1. a power distribution automation distributed FA interlock method of testing, the method comprises the step of following order:
(1) main website issues the configuration parameter of relay protection tester, and relay protection tester sends voltage and current signal and gathers for it to distributed FA terminal;
(2) start test, distributed FA terminal is judged fault, remote measure and communication value is reported to main website after collecting abnormal current change;
(3), after main website receives abnormal remote measure and communication value, control relay protection tester and send remote signal extremely for simulating the switch analogue means of on-pole switch;
(4) switch analogue means is according to after the remote signal action received, through distributed FA terminal to the information after main website feedback processing.
2. power distribution automation according to claim 1 distributed FA interlock method of testing, it is characterized in that: before the test begins, first the network topological diagram connection line in main website draws, provide the Mathematical Modeling that correspond to configuration parameter needed for relay protection tester, according to kirchhoff electric current principle, association between feeder current, load current and fault current is generated out automatically, determines the configuration parameter of relay protection tester.
3. power distribution automation according to claim 1 distributed FA interlock method of testing, it is characterized in that: described main website provides remote signalling No. three in an orderly manner by distributed FA terminal control relay protection tester, utilize ethernet communication Channel Exchange data between three remote signalling number that relay protection tester produces and main website, complete digital simulation work.
4. power distribution automation according to claim 1 distributed FA interlock method of testing, it is characterized in that: described main website be provided for representing circuit ruuning situation, distributed FA terminal processing procedure and control the human-computer interaction interface of distributed FA termination function test process, user carries out confirmation process by human-computer interaction interface.
5. implement the claims the system of the power distribution automation distributed FA interlock method of testing in 1 to 4 described in any one, comprise multiple distributed FA terminal, it is characterized in that: also comprise the relay protection tester be connected with the input/output terminal of distributed FA terminal, the output of relay protection tester is connected with the input of switch analogue means, and the output of switch analogue means is connected with the input of distributed FA terminal.
6. system according to claim 5, is characterized in that: described distributed FA terminal is by Ethernet and main website communication.
7. system according to claim 5, is characterized in that: the described number of distributed FA terminal and the number one_to_one corresponding of relay protection tester.
8. system according to claim 5, is characterized in that: module when also comprising for carrying out synchronous GPS couple to the time, its output is connected with the input of relay protection tester.
CN201210590575.4A 2012-12-29 2012-12-29 The distributed FA interlock method of testing of a kind of power distribution automation and system Active CN103051065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210590575.4A CN103051065B (en) 2012-12-29 2012-12-29 The distributed FA interlock method of testing of a kind of power distribution automation and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210590575.4A CN103051065B (en) 2012-12-29 2012-12-29 The distributed FA interlock method of testing of a kind of power distribution automation and system

Publications (2)

Publication Number Publication Date
CN103051065A CN103051065A (en) 2013-04-17
CN103051065B true CN103051065B (en) 2015-08-26

Family

ID=48063612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210590575.4A Active CN103051065B (en) 2012-12-29 2012-12-29 The distributed FA interlock method of testing of a kind of power distribution automation and system

Country Status (1)

Country Link
CN (1) CN103051065B (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955200B (en) * 2014-03-11 2017-01-11 广东电网公司佛山供电局 Movable mould test method for self-healing control function of power distribution network
CN203951261U (en) * 2014-03-28 2014-11-19 国网上海市电力公司 switchyard fault simulator
CN103840559A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Looped network outdoor station fault simulator and fault simulation method thereof
CN103837785A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Feeder automation detection and simulation system
CN104007366A (en) * 2014-06-12 2014-08-27 国网上海市电力公司 Feeder automation test system with automatic interference input function
CN104122474B (en) * 2014-08-06 2017-03-15 国网上海市电力公司 A kind of intelligent distribution type feeder automation logic testing system
CN104730397B (en) * 2015-04-09 2017-12-01 中国电力科学研究院 Interoperability test system and method between a kind of distribution power automation terminal
CN104953711B (en) * 2015-06-25 2017-05-17 国网天津市电力公司 Remote transmission information judging method in electric power dispatching system
CN105738803B (en) * 2016-03-07 2018-09-18 国网福建省电力有限公司 A kind of method of protective relaying device remote control remote communication joint debugging
CN106026394B (en) * 2016-06-17 2018-05-15 国网江苏省电力公司常州供电公司 Distributed feeder automation fault message exchange method
CN106655489B (en) * 2016-10-08 2023-04-07 广州霍斯通电气股份有限公司 Three-remote control device for medium-voltage load switch cabinet
CN106444709A (en) * 2016-10-13 2017-02-22 珠海许继电气有限公司 Automatic testing method and device of distribution intelligent function of power distribution terminal
CN106597144B (en) * 2016-11-18 2019-05-17 国电南瑞科技股份有限公司 The planned function detecting method of centralized FA transmitted based on simulation
CN106771760B (en) * 2016-12-30 2020-07-28 国网天津市电力公司 Distributed FA function diagnosis method based on master station simulation
CN108957160A (en) * 2017-05-19 2018-12-07 国网江苏省电力公司常州供电公司 Active power distribution network feed line automatization system test method
CN107607833A (en) * 2017-09-04 2018-01-19 国网江西省电力公司电力科学研究院 A kind of pocket intelligent distribution type feeder automation test system
CN107741543A (en) * 2017-10-20 2018-02-27 广东电网有限责任公司清远供电局 A kind of distribution power automation terminal protects Model test Method
CN107703396A (en) * 2017-11-08 2018-02-16 云南电网有限责任公司电力科学研究院 A kind of hierarchical test system based on IEC61850 distribution automations
CN108879949A (en) * 2018-06-26 2018-11-23 国网福建省电力有限公司 A kind of test method of power distribution network CPS main website and terminal
CN109116155A (en) * 2018-08-31 2019-01-01 山东建筑大学 A kind of distribution power automation terminal is tested automatically and feedback system
CN109376436B (en) * 2018-10-30 2023-06-02 湖北窗口科技有限公司 Method and device for generating strong network line topology
CN112834862A (en) * 2019-11-25 2021-05-25 南京南瑞继保电气有限公司 Testing method and tester for distributed power distribution network
CN111208382B (en) * 2020-04-23 2020-08-11 广州思泰信息技术有限公司 Electric power self-healing test method, device, system, main station and tester
CN111948478B (en) * 2020-08-14 2024-04-02 广东电网有限责任公司电力科学研究院 Power distribution terminal detection system and method under real working condition
CN114333469A (en) * 2021-12-09 2022-04-12 上海金智晟东电力科技有限公司 Power distribution terminal three-remote full-working-condition live-action simulation practical training system and method
CN115051475B (en) * 2022-08-16 2022-12-27 南方电网数字电网研究院有限公司 Multi-terminal closed-loop joint debugging system and method based on analog state device
CN115275925B (en) * 2022-09-27 2023-01-03 石家庄科林电气股份有限公司 Method and system for verifying logic of intelligent distributed FA virtual information

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101867223A (en) * 2010-04-08 2010-10-20 浙江省电力试验研究院 Automatic system fault handling method of distribution network containing a plurality of distributed power supplies
CN101997340B (en) * 2010-08-17 2012-11-14 广东电网公司电力科学研究院 Intelligent feeder line automation method in autonomous self-healing distribution network
CN102004849A (en) * 2010-11-16 2011-04-06 山东省电力学校 Offline simulation system based power system simulation test method
CN102788915B (en) * 2011-06-03 2014-05-28 广西电网公司电力科学研究院 Feeder automation online simulation method based on maintenance workstation
CN102522820B (en) * 2011-11-29 2014-07-02 陕西电力科学研究院 Testing method of synchronous coordination for primary station injection and secondary injection of distribution automation system
CN202550688U (en) * 2012-04-27 2012-11-21 天津市电力公司 Feeder automation (FA) function test simulation simulator under condition of being power-outage-free

Also Published As

Publication number Publication date
CN103051065A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN102306953B (en) Test method for secondary injection of power distribution automatization system
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN108257439A (en) A kind of distribution automation Training Methodology and analogue system for adapting to various modes
CN202159106U (en) Intelligent tester with intelligent power grid self-healing control technology
CN107255940B (en) Remote real-time simulation system of safety and stability control device
CN104133146A (en) On-site test method for feeder automation fault treatment logic
CN203069709U (en) Intelligent transformer station relay protection device detector based on DDRTS
CN108982996B (en) Outdoor scene substitution type extra-high voltage direct current protection field testing device
CN109613906B (en) Third-generation intelligent substation measurement and control submachine test system and application method thereof
CN104269090B (en) The analogue system of a kind of power information acquisition terminal wheel secondary control switch and method thereof
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN107491569A (en) Transformer substation system On-line Fault emulation mode based on IEC61850 standard GOOSE, SV technologies
CN104267283A (en) Platform and method for testing process layer to spacer layer of digital substation
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN105847076A (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN111458586A (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN110658804A (en) Test platform for inter-station stability control device wide-area joint debugging and implementation method thereof
CN104849591A (en) Power distribution automation integrated test detection device
CN102508053B (en) Area backup automatic switch testing system based on digital simulation technology
CN204065322U (en) For the failure diagnosis apparatus of ring main unit distribution terminal
CN105405334A (en) Power distribution automation system and simulation method
CN104638761A (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CSG SMART SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20150512

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 230088 No. 612-1, Mount Huangshan Road, hi tech Zone, Anhui, Hefei

Applicant after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Address before: 230088 No. 612-1, Mount Huangshan Road, hi tech Zone, Anhui, Hefei

Applicant before: ANHUI SCIENCE AND TECHNOLOGY INSTITUTE OF CHINA SMART GRID TECHNOLOGY Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ANHUI CSG SMART GRID TECHNOLOGY CO., LTD. TO: KEDA INTELLIGENT ELECTRIC TECHNOLOGY CO., LTD.

TA01 Transfer of patent application right

Effective date of registration: 20150512

Address after: 230088 No. 612-1, Mount Huangshan Road, hi tech Zone, Anhui, Hefei

Applicant after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Applicant after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 230088 No. 612-1, Mount Huangshan Road, hi tech Zone, Anhui, Hefei

Applicant before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Lin

Inventor after: Guo Jinnan

Inventor after: Wang Tingting

Inventor after: Shi Weiyang

Inventor after: Zhang Shaolei

Inventor after: Zhu Xiaoli

Inventor before: Li Lin

Inventor before: Guo Jinnan

Inventor before: Shi Weiyang

Inventor before: Zhang Shaolei

Inventor before: Zhu Xiaoli

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI LIN GUO JINNAN SHI WEIYANG ZHANG SHAOLEI ZHU XIAOLI TO: LI LIN GUO JINNAN WANG TINGTING SHI WEIYANG ZHANG SHAOLEI ZHU XIAOLI

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190529

Address after: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Co-patentee after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Co-patentee after: ANHUI CSG INTELLIGENT LOGISTICS SYSTEM CO.,LTD.

Address before: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Co-patentee before: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee after: HKUST intelligent IOT Technology Co.,Ltd.

Address before: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee before: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: Anhui University of science and technology intelligent IOT Technology Co.,Ltd.

Address after: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee after: HKUST intelligent Internet of things Technology Co.,Ltd.

Address before: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee before: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: HKUST intelligent IOT Technology Co.,Ltd.

Address after: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee after: Anhui University of science and technology intelligent IOT Technology Co.,Ltd.

Address before: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee before: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: ANHUI CSG INTELLIGENT LOGISTICS SYSTEM Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211012

Address after: No. 5111, Wangjiang West Road, Hefei, Anhui, Anhui

Patentee after: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee after: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 230088 No. 612-1 Huangshan Road, Hefei High-tech Zone, Anhui Province

Patentee before: CSG SMART ELECTRIC TECHNOLOGY Co.,Ltd.

Patentee before: CSG SMART SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: HKUST intelligent Internet of things Technology Co.,Ltd.

TR01 Transfer of patent right