CN105738803B - A kind of method of protective relaying device remote control remote communication joint debugging - Google Patents

A kind of method of protective relaying device remote control remote communication joint debugging Download PDF

Info

Publication number
CN105738803B
CN105738803B CN201610125949.3A CN201610125949A CN105738803B CN 105738803 B CN105738803 B CN 105738803B CN 201610125949 A CN201610125949 A CN 201610125949A CN 105738803 B CN105738803 B CN 105738803B
Authority
CN
China
Prior art keywords
protective relaying
relaying device
joint debugging
remote control
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610125949.3A
Other languages
Chinese (zh)
Other versions
CN105738803A (en
Inventor
陈建洪
陈月卿
邱建斌
林海源
陈闽江
张春欣
王家兴
陈志辉
吴芳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Maintenance Branch of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610125949.3A priority Critical patent/CN105738803B/en
Publication of CN105738803A publication Critical patent/CN105738803A/en
Application granted granted Critical
Publication of CN105738803B publication Critical patent/CN105738803B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • G01R31/3278Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types

Abstract

The present invention relates to a kind of methods of protective relaying device remote control remote communication joint debugging; using running protective relaying device code table as standard base database; using protective relaying device remote control remote communication joint debugging software, remote signalling joint debugging is remotely controlled with distant place main website to substitute running protective relaying device.This method is without out of service by protective relaying device, it is not necessary that remote control remote communication joint debugging purpose can be completed in primary equipment power failure.Accuracy is up to 100%, and saving of time rate is up to 90% or more.Working efficiency is not only greatly improved, and ensures the reliable and secure operation of power grid.In addition, can also solve the problems, such as that the soft message in protective relaying device part can not carry out joint debugging.

Description

A kind of method of protective relaying device remote control remote communication joint debugging
Technical field
The present invention relates to technical field of power systems, especially a kind of method of protective relaying device remote control remote communication joint debugging.
Background technology
With the application that deepens constantly of Unattended Operation in Conventional Substation, the country has carried out to protective relaying device distant place main website (Scheduling station, monitoring backstage or fault message main website etc.)The promotion applied research of operation works.Mainly have:It throws and moves back soft pressure in a distant place Plate, distant place re-setting device, distant place modification definite value and distant place definite value cut the soft message verification in area and a distant place, referred to as " remote control remote communication joint debugging " (Similarly hereinafter).The transmission protocol of conventional substation protective relaying device is IEC60870-5-103.
Existing remote control remote communication joint debugging technical solution needs exit the protective relaying device being currently running, and are filled to relay protection It sets after carrying out security isolation, carries out dosage experiment using Special debugging instrument, generate soft message and checked with distant place main website, together When need to protective relaying device carry out throw move back soft pressing plate, re-setting device, modification definite value and definite value cut the practical remote operation such as area, To realize the purpose with the remote control remote communication joint debugging of distant place main website.
All protective relaying devices of substation are all in normal operation, and remote control remote communication joint debugging need of work is by protective relaying device Out of service, the prior art has the following disadvantages:
(1)Influence Operation of Electric Systems reliability.Since protective relaying device is out of service, for the relay of double set configurations Protection system, is left with single set configuration, and reliability reduces;For the relay protection system of single set configuration, it is also necessary to will once set It is standby to have a power failure, directly affect power equipment normal operation.
(2)Security risk is high.Protective relaying device is being run, and needs to carry out the secondary returnings such as isolation electric current, voltage, tripping Road is tested using Special debugging instrument, and security risk is quite high.
(3)Working efficiency is extremely low.Joint debugging work not only to dispatch order, operations staff carries out moving back fortune equipment operation, but also That more fatal, which is commissioning staff, to be tested using Special debugging instrument, extremely inefficient.There are about one for one 500kV substation Hundred sets of protective relaying device often covers minimum 1 day of protective relaying device remote control remote communication joint debugging time, and the joint debugging period is considerably long.
(4)The many soft messages of protective relaying device, which can not be simulated, to be sent(Such as sample exception, bad eprom error), Joint debugging work can not be completed comprehensively, and the work of these joint debuggings at present does not all carry out.
Invention content
In view of this, the purpose of the present invention is to propose to a kind of method of protective relaying device remote control remote communication joint debugging, being not necessarily to will Protective relaying device is out of service, it is not necessary that remote control remote communication joint debugging purpose can be completed in primary equipment power failure.
The present invention is realized using following scheme:A kind of method of protective relaying device remote control remote communication joint debugging, including issue remote Distant place main website, the protective relaying device of square operational order, the protective relaying device pass through intermediate equipment and the distant place main website It is connected, the intermediate equipment includes telecontrol communication machine, relay protection management machine;
The protective relaying device remote control remote communication joint debugging network structure of conventional substation is illustrated as shown in specification Fig. 1, a distant place Main website issues remote operation order, and by the equipment such as telecontrol communication machine and relay protection management machine, order is transmitted to relay protection dress It sets and is operated;Meanwhile protective relaying device also by the intermediate equipments such as telecontrol communication machine and relay protection management machine by relevant information Upload to distant place main website.Specific channel is that the 1. dotted line in Fig. 1 is connect using cable or RS485 lines depending on specific protective relaying device Depending on mouthful.
The method of the present invention specifically includes following steps:
Step S1:One portable industrial pc is provided, it is distant that protective relaying device remote control is installed on the portable industrial pc Believe joint debugging software;
Step S2:The protective relaying device is disconnected it is not necessary that protective relaying device is out of service with described The communication interface of intermediate equipment connects the communication of communication interface reconfiguration to the portable industrial pc of the protective relaying device Mouthful;
Step S3:Protective relaying device remote control remote communication joint debugging software on the portable industrial pc passes through IEC60870- 5-103 stipulations are communicated with the protective relaying device, obtain the protective relaying device codes table file;
Step S4:The protective relaying device remote control remote communication joint debugging software imports and the relay obtained in analyzing step S3 is protected Protection unit codes table file generates the basic database of software;
Step S5:The communication interface of intermediate equipment is connected with the communication interface of the portable industrial pc, the relay Protective device remote control remote communication joint debugging software is remotely controlled remote signalling joint debugging by IEC60870-5-103 stipulations and distant place main website, to It substitutes the protective relaying device and is remotely controlled remote signalling joint debugging with distant place main website.
Further, the codes table file in step S3 includes soft message, pressing plate and definite value, and codes table file format includes TXT、BAT、ini。
Further, the basic database of the software include soft pressing plate database, the area containing definite value value data library, soft Message data library, re-setting device window display data library.
Further, the software architecture of the protective relaying device remote control remote communication joint debugging software includes hardware layer, rule About layer and application layer;The cutting that different level is logically carried out according to the transmission of data uses three-layer architecture, definition Basic framework and function module.The hardware layer supports network interface and RS485 interfaces;The protocol layer uses IEC60870-5-103 stipulations are communicated, using FT12 frame formats;The application layer includes that code table obtains export module, code table Import parsing module, throwing moves back soft pressing plate module, re-setting device module, fixed value modification and cuts area's module, soft message verification module etc..
Further, the application layer further includes communication parameter setting module, communication message is shown and preserving module, information Preserve reminding module.
Particularly, the present invention exports and directly uses technology using the online of protective relaying device code table.The relay is protected The design concept of protection unit remote control remote communication joint debugging software is exactly the online export of code table and directly uses, and does not edit and does not change, with Protective relaying device in real dry run.TXT, BAT, ini format code table of mainstream producer of the software support country.In addition, The present invention proposes the new method of the protective relaying device remote control remote communication joint debugging under no cut-off condition.This motion is with running Relay protection code table carries out joint debugging as correct data, to substitute running protective device with distant place main website.This method from And can have a power failure to avoid primary equipment or relay protection is out of service that debugging can be completed, working efficiency is greatly improved, saves significantly About human and material resources, while ensuring the safety of power grid.
Compared with prior art, the present invention mainly has following advantages:
(1)Avoid that primary equipment has a power failure or relay protection is out of service that debugging can be completed, greatly improving operation of power networks can By property.
(2)Avoid the security risk of joint debugging process.This technology will not carry out the secondary returnings such as isolation electric current, voltage, tripping Road, and tested using Special debugging instrument.
(3)Greatly improve working efficiency.The accuracy of this technology is up to 100%, and saving of time rate is up to 90% or more.
(4)Solve the problems, such as that the soft message in part can not carry out joint debugging.Simulated implementation scene may be implemented using this technology The soft message that can not be simulated(Such as sample exception, bad eprom error), complete and the joint debugging of distant place main website comprehensively.
Description of the drawings
Fig. 1 is principle schematic diagram of the present invention.
Fig. 2 is the architectural schematic of protective relaying device remote control remote communication joint debugging software of the present invention.
Specific implementation mode
The present invention will be further described with reference to the accompanying drawings and embodiments.
As shown in Figure 1, present embodiments providing a kind of method of protective relaying device remote control remote communication joint debugging, including issue remote Distant place main website, the protective relaying device of square operational order, the protective relaying device pass through intermediate equipment and the distant place main website It is connected, the intermediate equipment includes telecontrol communication machine, relay protection management machine;
The protective relaying device remote control remote communication joint debugging network structure of conventional substation is illustrated as shown in specification Fig. 1, a distant place Main website issues remote operation order, and by the equipment such as telecontrol communication machine and relay protection management machine, order is transmitted to relay protection dress It sets and is operated;Meanwhile protective relaying device also by the intermediate equipments such as telecontrol communication machine and relay protection management machine by relevant information Upload to distant place main website.Specific channel is that the 1. dotted line in Fig. 1 is connect using cable or RS485 lines depending on specific protective relaying device Depending on mouthful.
The method of the present embodiment specifically includes following steps:
Step S1:One portable industrial pc is provided, it is distant that protective relaying device remote control is installed on the portable industrial pc Believe joint debugging software;
Step S2:The protective relaying device is disconnected it is not necessary that protective relaying device is out of service with described The communication interface of intermediate equipment(As in Fig. 1 dotted line 1. shown in), by the communication interface reconfiguration of the protective relaying device described in The communication interface of portable industrial pc(As in Fig. 1 dotted line 2. shown in);
Step S3:Protective relaying device remote control remote communication joint debugging software on the portable industrial pc passes through IEC60870- 5-103 stipulations are communicated with the protective relaying device, obtain the protective relaying device codes table file;
Step S4:The protective relaying device remote control remote communication joint debugging software imports and the relay obtained in analyzing step S3 is protected Protection unit codes table file generates the basic database of software;
Step S5:The communication interface of intermediate equipment is connected with the communication interface of the portable industrial pc(Such as void in Fig. 1 LineIt is shown), the protective relaying device remote control remote communication joint debugging software by IEC60870-5-103 stipulations and distant place main website into Row remote control remote communication joint debugging is remotely controlled remote signalling joint debugging to substitute the protective relaying device with distant place main website.
In the present embodiment, the codes table file in step S3 includes soft message, pressing plate and definite value, codes table file format Including TXT, BAT, ini.
In the present embodiment, the basic database of the software include soft pressing plate database, the area containing definite value value data Library, soft message data library, re-setting device window display data library.
In the present embodiment, as shown in Fig. 2, the software architecture of the protective relaying device remote control remote communication joint debugging software Including hardware layer, protocol layer and application layer;The cutting that different level is logically carried out according to the transmission of data, uses three layers Architecture defines basic framework and function module.The hardware layer supports network interface and RS485 interfaces;The stipulations Layer uses IEC60870-5-103 stipulations and is communicated, using FT12 frame formats;The application layer includes that code table obtains export Module, code table import parsing module, throwing moves back soft pressing plate module, re-setting device module, fixed value modification and cuts area's module, the verification of soft message Module etc..
In the present embodiment, the application layer further includes communication parameter setting module, communication message is shown and preserving module, Information preservation reminding module.
Particularly, in the present embodiment, the present invention exports and directly uses skill using the online of protective relaying device code table Art.The design concept of the protective relaying device remote control remote communication joint debugging software is exactly the online export of code table and directly uses, no Editor does not change, with the protective relaying device in real dry run.TXT, BAT, ini lattice of mainstream producer of the software support country Formula code table.Further it is proposed that the new method of the protective relaying device remote control remote communication joint debugging under no cut-off condition.Originally it carries Case is joined to substitute running protective device with distant place main website using running relay protection code table as correct data It adjusts.Primary equipment has a power failure this method or relay protection is out of service that debugging can be completed so as to avoiding, and work is greatly improved Efficiency greatlys save human and material resources, while ensuring the safety of power grid.
The foregoing is merely presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with Modification should all belong to the covering scope of the present invention.

Claims (4)

1. a kind of method of protective relaying device remote control remote communication joint debugging, including issue the distant place main website of remote operation order, relay Protective device, the protective relaying device are connected by intermediate equipment with the distant place main website, and the intermediate equipment includes telemechanical Machine, relay protection management machine;It is characterized in that:Include the following steps:
Step S1:One portable industrial pc is provided, protective relaying device remote control remote communication connection is installed on the portable industrial pc Adjust software;
Step S2:The protective relaying device is disconnected it is not necessary that protective relaying device is out of service with the centre The communication interface of equipment, by the communication interface of the communication interface reconfiguration of the protective relaying device to the portable industrial pc;
Step S3:Protective relaying device remote control remote communication joint debugging software on the portable industrial pc passes through IEC60870-5-103 Stipulations are communicated with the protective relaying device, obtain the protective relaying device codes table file;
Step S4:The relay protection dress that the protective relaying device remote control remote communication joint debugging software is imported and obtained in analyzing step S3 Codes table file is set, the basic database of software is generated;
Step S5:The communication interface of intermediate equipment is connected with the communication interface of the portable industrial pc, the relay protection Device remote control remote communication joint debugging software is remotely controlled remote signalling joint debugging by IEC60870-5-103 stipulations and distant place main website, to substitute The protective relaying device is remotely controlled remote signalling joint debugging with distant place main website;
Wherein, the software architecture of the protective relaying device remote control remote communication joint debugging software include hardware layer, protocol layer and Application layer;The hardware layer supports network interface and RS485 interfaces;The protocol layer use IEC60870-5-103 stipulations into Row communication, using FT12 frame formats;The application layer include code table obtain export module, code table import parsing module, throw move back it is soft Pressing plate module, re-setting device module, fixed value modification cut area's module, soft message verification module.
2. a kind of method of protective relaying device remote control remote communication joint debugging according to claim 1, it is characterised in that:Step S3 In the codes table file include soft message, pressing plate and definite value, codes table file format includes TXT, BAT, ini.
3. a kind of method of protective relaying device remote control remote communication joint debugging according to claim 1, it is characterised in that:It is described soft The basic database of part includes soft pressing plate database, the value data library in the area containing definite value, soft message data library, re-setting device window Display data library.
4. a kind of method of protective relaying device remote control remote communication joint debugging according to claim 1, it is characterised in that:It is described to answer With layer further includes communication parameter setting module, communication message is shown and preserving module, information preservation reminding module.
CN201610125949.3A 2016-03-07 2016-03-07 A kind of method of protective relaying device remote control remote communication joint debugging Active CN105738803B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610125949.3A CN105738803B (en) 2016-03-07 2016-03-07 A kind of method of protective relaying device remote control remote communication joint debugging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610125949.3A CN105738803B (en) 2016-03-07 2016-03-07 A kind of method of protective relaying device remote control remote communication joint debugging

Publications (2)

Publication Number Publication Date
CN105738803A CN105738803A (en) 2016-07-06
CN105738803B true CN105738803B (en) 2018-09-18

Family

ID=56249967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610125949.3A Active CN105738803B (en) 2016-03-07 2016-03-07 A kind of method of protective relaying device remote control remote communication joint debugging

Country Status (1)

Country Link
CN (1) CN105738803B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410964B (en) * 2016-10-14 2019-02-01 国网浙江省电力公司绍兴供电公司 Based on substation relay protection device definite value remote operation method
CN107623312B (en) * 2017-10-27 2019-03-12 国网福建省电力有限公司 A kind of protective relaying device remote control safety measure execution method
CN108650153B (en) * 2018-06-05 2021-08-31 国网江苏省电力有限公司苏州供电分公司 Remote control and remote signaling joint debugging method for transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN102565585A (en) * 2012-01-10 2012-07-11 上海电力学院 Method for building intelligent substation relay protection cooperation simulation testing system
CN103051065A (en) * 2012-12-29 2013-04-17 安徽科大智能电网技术有限公司 Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN104638767A (en) * 2015-02-05 2015-05-20 广东电网有限责任公司电力科学研究院 Intelligent substation test oriented spacer layer data source simulation method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN102565585A (en) * 2012-01-10 2012-07-11 上海电力学院 Method for building intelligent substation relay protection cooperation simulation testing system
CN103051065A (en) * 2012-12-29 2013-04-17 安徽科大智能电网技术有限公司 Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN104638767A (en) * 2015-02-05 2015-05-20 广东电网有限责任公司电力科学研究院 Intelligent substation test oriented spacer layer data source simulation method and device

Also Published As

Publication number Publication date
CN105738803A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
WO2019095910A1 (en) Daily patrol working method and system in substation
CN106059067B (en) A kind of remote monitoring system of electric power system
CN105093033B (en) A kind of analysis method of the comprehensive analysis of fault system based on power network multi-source information
CN101673965B (en) Automatic switching control method for wide-area emergency power source of electric power system
CN104494653B (en) A kind of track traffic synthetic monitoring system
CN105978159B (en) A kind of substation's remote control test is online to exempt to execute checking method
CN104460589B (en) Mobile debugging system with simulation dispatching master station
CN105738803B (en) A kind of method of protective relaying device remote control remote communication joint debugging
CN103051065A (en) Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN102916407A (en) Relay protection and fault information management system for regional power grid
CN104269934B (en) Based on the supervisory control of substation information adjustment method of moving analog scheduling station
CN103887890A (en) Disaster area power grid state monitoring method
CN107968486A (en) A kind of method for scheduling task of intelligent power distribution room monitoring system
CN104636986A (en) Dispatching remote safety remote control checking method based on service
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN110768372A (en) IEC61850 standard-based protection information system source end modeling method
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN107069968A (en) A kind of method, main website, stability control device and the system of remotely modifying definite value
CN105703479B (en) Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension
CN102156948B (en) System for electronically recognizing power line towers and automatically positioning on-pole workers
CN202948304U (en) Improved industrially controlled redundant system
CN106506207A (en) Power communication protocol monitor analysis method and system based on tree
CN101414737A (en) Control method and system for track traffic electric power data acquisition and surveillance
CN206353724U (en) The device of substation secondary device signal distant place involution
CN102325193A (en) Power dispatching automation communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 350003 No. 257, 54 Road, Gulou District, Fuzhou, Fujian

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Address before: 350003 No. 257, 54 Road, Gulou District, Fuzhou, Fujian

Co-patentee before: State Grid Corporation of China

Patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181129

Address after: 350003 No. 257, 54 Road, Gulou District, Fuzhou, Fujian

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Co-patentee after: STATE GRID FUJIAN ECONOMIC Research Institute

Address before: 350003 No. 257, 54 Road, Gulou District, Fuzhou, Fujian

Co-patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.