CN107623312B - A kind of protective relaying device remote control safety measure execution method - Google Patents

A kind of protective relaying device remote control safety measure execution method Download PDF

Info

Publication number
CN107623312B
CN107623312B CN201711025559.XA CN201711025559A CN107623312B CN 107623312 B CN107623312 B CN 107623312B CN 201711025559 A CN201711025559 A CN 201711025559A CN 107623312 B CN107623312 B CN 107623312B
Authority
CN
China
Prior art keywords
remote control
protective relaying
relaying device
safety measure
execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711025559.XA
Other languages
Chinese (zh)
Other versions
CN107623312A (en
Inventor
邱建斌
陈建洪
陈月卿
江秋华
张春欣
翁兰芳
陈志辉
潘钦俤
林国梁
田传锋
吴芳芳
张诗鹏
张振兴
侯晨
池新蔚
张煜
林炜
丁永宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Maintenance Branch of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711025559.XA priority Critical patent/CN107623312B/en
Publication of CN107623312A publication Critical patent/CN107623312A/en
Application granted granted Critical
Publication of CN107623312B publication Critical patent/CN107623312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Abstract

The present invention provides a kind of protective relaying device remote control safety measure execution method comprising following steps: step S1: providing one allows table, and the permission table includes the protective relaying device information for allowing to execute remote control operation;The execution equipment that protective relaying device information automatic synchronization is remotely controlled to relay protection in substation;Step S2: after execution equipment receives telecommand; discriminate whether to allow to operate: access allows table first; whether within the allowable range the device of order execution is inquired according to the protective relaying device information of remote control command; execute remote control command if allowing, it is on the contrary then refuse to execute and feed back illegal operation alarm.The present invention realizes that relay protection remote control joint debugging safety measure executes.The unrelated protective relaying device of joint debugging is subjected to safety measure isolation by " allowing table ", realizes the execution of safety measure.

Description

A kind of protective relaying device remote control safety measure execution method
Technical field
The invention belongs to technical field of power systems, more particularly, to the conventional power transformation based on IEC60870-5-103 specification It stands and the safety measure of the relay protection device of intelligent substation remote control of IEC61850 specification executes.
Background technique
As the development and Unattended substation of intelligent station deepen constantly application, the country has carried out fills relay protection Set the promotion applied research work of remote operation.Mainly have: a protective relaying device distant place, which is thrown, moves back soft pressing plate remote control joint debugging (referred to as " relay protection remote control joint debugging "), a relay protection distant place throw move back soft pressing plate safety measure execute research etc..This programme emphasis is to relay The throwing of a protection distant place is moved back the execution of soft pressing plate safety measure and is studied, referred to as " relay protection is remotely controlled joint debugging safety measure and executes ".
Relay protection remote control joint debugging safety measure executes purpose and mainly prevents from being accidentally remotely controlled when remote control, and equipment is caused to lose Deprotection, overstepping (being especially configured with to the single set protection of only configuration or double sets a set of the case where having logged out), it is existing Safety measure executes method and rests on the mode that is manually isolated only to realize.The protective device of commissioning device is moved back first when joint debugging It runs out.Then carry out safety measure execution, when safety measure executes staff by with the unrelated A/B net cable in remote control interval It pulls out or RS485 connection releases.Relay protection is remotely controlled reconnection after joint debugging work, and protective device puts into operation.
The safety measure execution of existing relay protection remote control joint debugging work has the disadvantage that
(1) workload that prior art safety measure executes is counted according to protective device greatly very much, a 500kV Substation probably has 60-90 set protective device to need to do safety measure isolation.People monitoring is required according to safety measure ticket stubs row One man operation partition method calculates, and whole station is done and (only be executed) intelligent station and needs 1-1.5 hour, and normal station is due to needs Solution line then needs to expend 1.5 times or more times.
(2) after the safety measure of prior art is finished, the protective device of safety measure is carried out during joint debugging Soft message information can not on send to monitoring backstage and regulation main website.If there is protection act during remote control joint debugging, protect Signal can not on send to monitoring backstage and regulation main website, to a distant place analysis protection act state cause biggish delay, after influencing Continuous work (route line walking, fault point investigation etc.), extends equipment and resumes operation the time.
(3) the safety measure execution of the technical solution need to operate secondary circuit in normal station, easily cause on secondary circuit Failure (such as direct current lost territory is accidentally taken out stitches).
(4) after unattended implementation, relay protection remote control joint debugging will be normalization work, frequent plug cable and releasing RS-485 line is easy to accelerate network interface and terminal damage, causes communication failure.
Summary of the invention
In view of this, the present invention proposes that a kind of protective relaying device remote control safety measure executes method.
The invention adopts the following technical scheme: a kind of protective relaying device remote control safety measure executes method, it is special Sign is: the following steps are included: step S1: providing one allows table, and the permission table includes the relay for allowing to execute remote control operation Protective device information;The execution equipment that protective relaying device information automatic synchronization is remotely controlled to relay protection in substation;Step S2: After execution equipment receives telecommand, discriminate whether to allow to operate: access allows table first, is protected according to the relay of remote control command Whether within the allowable range protection unit information inquire the device of order execution, and remote control command is executed if allowing.
In an embodiment of the present invention, in step S2 if it is do not allow execute equipment then refuse to execute and feed back illegal behaviour It alerts.
In an embodiment of the present invention, it is chosen by visual operation screen and executes protective relaying device remote control connection It adjusts.
In an embodiment of the present invention, the corresponding correctness of protective relaying device information in table is allowed to pass through soft report before being remotely controlled The verification of literary signal confirms.
Compared with prior art, the invention has the following advantages that
(1) present invention realizes that relay protection remote control joint debugging safety measure executes.By " allow table " by unrelated distant of joint debugging Control interval carries out safety measure isolation, realizes the execution of safety measure.
(2) remote control that remote control executes equipment (monitoring backstage, conservative management machine, telemechanical host) executes program upgrading, increases The differentiation for " whether allowing to operate " in remote control implementation procedure.With " allow table " be according to " permission " for controlling its remote control operation or " forbidding ".
(3) it can show and update synchronous " allowing table ", and the remote control exception information for executing equipment can be received, provide exception Alarm.
(4) " allowing table " proposed by the present invention is one of method table, and " allowing table " reverse side is (to forbid " not allowing table " The device of operation both needs to manually perform the device of safety measure in existing scheme) or calculate the scope of " allow table ".For setting The safety measure that " allowing table " Lai Shixian switch tool that switch tool is remotely controlled in substation is remotely controlled executes, and also calculates " allowing table " Scope.
Detailed description of the invention
Fig. 1 is that embodiment conventional power plant protective relaying device remote control safety measure execution method network structure is shown Meaning.
Fig. 2 is that embodiment intelligent Power Station protective relaying device remote control safety measure execution method network structure is shown Meaning.
Fig. 3 is that remote control executes flow diagram.
Specific embodiment
Explanation is further explained to the present invention in the following with reference to the drawings and specific embodiments.
Protective relaying device remote control safety measure execution method network structure is as illustrated in fig. 1 and 2, and monitoring backstage is protected Shield supervisor, telemechanical host are the execution equipment of protective relaying device remote control.In Fig. 2, for intelligent station, telemechanical master Machine and monitoring backstage independently, each can individually complete remote control work.In Fig. 1, for normal station, telemechanical host with Monitoring backstage, which needs to complete remote control work, finally to execute ability by conservative management machine (using IEC60870-5-103 agreement) It can complete.This programme software complete the update of " allow table " with work asynchronously, and the exception for being remotely controlled non-permitted interval can be quoted Warning information.The remote control procedure for executing equipment is improved simultaneously, increases the differentiation of " whether allowing to operate ".
A kind of protective relaying device remote control safety measure execution method comprising following steps: step S1: one is provided Allow table, the permission table includes the protective relaying device information for allowing to execute remote control operation;Protective relaying device information is automatic It is synchronized to the execution equipment that relay protection is remotely controlled in substation;Step S2: after execution equipment receives telecommand, differentiation is No to allow to operate: access allows table first, and the device of order execution is inquired according to the protective relaying device information of remote control command Whether within the allowable range, remote control command is executed if allowing, it is on the contrary then refuse to execute and feed back illegal operation alarm.
In an embodiment of the present invention, in step S2 if it is do not allow execute equipment then refuse to execute and feed back illegal behaviour It alerts.
In an embodiment of the present invention, it is chosen by visual operation screen and executes relay protection remote control joint debugging.
In an embodiment of the present invention, the corresponding correctness of protective relaying device information passes through soft message signals before being remotely controlled Verification is to confirm.
Remote control implementation procedure is as shown in Figure 3 after the present invention realizes.As shown in figure 3, receiving telecommand executing equipment Afterwards, increase the differentiation of " whether allowing to operate ", first access " allowing table ", looked into according to the protective relaying device information of remote control command Whether within the allowable range the device for asking order execution, executes remote control command if allowing, on the contrary it is then to transmission command end " refusal order " is returned, is stopped operation, while providing illegal operation alarm.Wherein " allowing table ", unification updates, is synchronous, works as execution Equipment is received and is updated immediately " after synch command ".
Realize that the present invention need to execute the remote control execution journey of equipment (monitoring backstage, conservative management machine, telemechanical host) to remote control Sequence changes, addition " inquiry allows table " the step in remote control implementation procedure, and can judge to execute object (device Information) it is whether consistent with " allowing table ", feedback higher level executes equipment correlation remote information.The present invention, which can show and update, " to be permitted Perhaps table ", and the illegal remote control exception information for executing equipment can be received, provide abnormality alarming.
Joint debugging starts, by protective device it is out of service after, chosen by visual operation screen execute " relay protection Interval (general once to choose a protective device) need to be debugged when remote control joint debugging ", the present invention will allow to execute the guarantor of remote control operation Shield " protective relaying device information " automatic synchronization is to relay protection in the station such as monitoring backstage, conservative management machine, telemechanical host in station The execution equipment of remote control, to complete the execution of safety measure.Being somebody's turn to do " protective relaying device information " corresponding correctness can pass through The verification of preceding soft message signals is remotely controlled to confirm and (simulate the device signal, can confirm device information after verification is correct).When distant Control executes equipment when receiving remote control operation order, operation equipment access first it is synchronized after allow to operate " protective relaying device Information table " (referred to as " allow table ", similarly hereinafter), institute's remote control device can just be continued to execute within " allowing table " in this device it is all can Control object, it is on the contrary then return to " refusal " order to corresponding end of issuing an order.The safety for thereby realizing relay protection remote control joint debugging is arranged Apply execution.Present invention realization greatly improves safety measure and executes working efficiency, and saving of time rate is up to 95% or more.The present invention can be with It realizes that relay protection remote control joint debugging safety measure executes to send on the relay protection information for not influencing non-debugging interval.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.

Claims (2)

1. a kind of protective relaying device remote control safety measure executes method, it is characterised in that: the following steps are included:
Step S1: providing one allows table, and the permission table includes the protective relaying device information for allowing to execute remote control operation;Relay The execution equipment that protective device information automatic synchronization is remotely controlled to relay protection in substation;
Step S2: after execution equipment receives telecommand, discriminate whether to allow to operate: access allows table first, according to remote control Whether within the allowable range the protective relaying device information of order inquire the device of order execution, and remote control is executed if allowing Order;The corresponding correctness of protective relaying device information is confirmed by the verification of soft message signals before being remotely controlled in permission table.
2. protective relaying device remote control safety measure according to claim 1 executes method, it is characterised in that: step Then refuse to execute and feed back illegal operation alarm if it is not allowing to execute equipment in S2;It is selected by visual operation screen It takes and executes protective relaying device remote control joint debugging.
CN201711025559.XA 2017-10-27 2017-10-27 A kind of protective relaying device remote control safety measure execution method Active CN107623312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711025559.XA CN107623312B (en) 2017-10-27 2017-10-27 A kind of protective relaying device remote control safety measure execution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711025559.XA CN107623312B (en) 2017-10-27 2017-10-27 A kind of protective relaying device remote control safety measure execution method

Publications (2)

Publication Number Publication Date
CN107623312A CN107623312A (en) 2018-01-23
CN107623312B true CN107623312B (en) 2019-03-12

Family

ID=61093310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711025559.XA Active CN107623312B (en) 2017-10-27 2017-10-27 A kind of protective relaying device remote control safety measure execution method

Country Status (1)

Country Link
CN (1) CN107623312B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116009926B (en) * 2023-03-27 2023-06-02 广东电网有限责任公司中山供电局 Remote upgrading method, device and system for relay protection device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7085938B1 (en) * 2000-06-27 2006-08-01 General Electric Company Protective relay with embedded web server
CN104076807B (en) * 2013-03-28 2017-06-06 北京电力经济技术研究院 The adjustment method of the automated system of intelligent substation
CN106549493B (en) * 2015-09-23 2020-08-04 珠海优特电力科技股份有限公司 Transformer substation anti-misoperation unlocking control device and control method
CN105738803B (en) * 2016-03-07 2018-09-18 国网福建省电力有限公司 A kind of method of protective relaying device remote control remote communication joint debugging
CN106505731B (en) * 2016-10-26 2019-10-18 南京能云电力科技有限公司 A kind of intelligent substation and scheduling are to test case intelligent generating system and a method
CN106483890B (en) * 2016-12-23 2019-04-26 国网浙江省电力有限公司衢州供电公司 A kind of regulation intelligent anti-error operation system based on operation ticket system

Also Published As

Publication number Publication date
CN107623312A (en) 2018-01-23

Similar Documents

Publication Publication Date Title
CN105406603B (en) A kind of power grid regulation end anti-incorrect manipulation deadlock method
CN101813928B (en) Automated one-machine multiple-station intelligent five-defense system of energy system transformer substation
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN104283215A (en) Detection and test method and device of intelligent distributed power distribution terminal
CN103679275A (en) Processing method aiming at overtime unconfirmed warning information of automatic scheduling system
CN105406589A (en) Intellectual press plate system for relay protection of transformer substation
CN106208372A (en) Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN104965429A (en) Automation monitoring system and restarting control device
CN107623312B (en) A kind of protective relaying device remote control safety measure execution method
CN104952155A (en) Long-range prepayment and shot-time rapid power transmission system and method
CN105446202A (en) Five-prevention control system for transformer station
CN104967216A (en) Transformer station, monitoring system and monitoring method
CN205178647U (en) Relay protection of transformer substation intelligence clamp plate system
CN104617674A (en) Method for remotely operating recloser soft pressing plate
CN102064609B (en) 500kV unmanned transformer station-based remote control method for protective soft pressing plate
CN107046439B (en) Beidou distribution network automation system
CN106655520B (en) Ensure the method that relay protection remote operation securely and reliably executes
CN102868218A (en) Transition method for improving monitoring system in intelligent improvement of ordinary transformer substation
CN103208859A (en) Comprehensive anti-misoperation system of intelligent transformer station
CN204241919U (en) Protection screen pressing plate running status real time monitoring device
CN203180640U (en) Integrated anti-error operation system of intelligent transformer station
KR102036041B1 (en) Power acquisition monitoring system
CN105429289A (en) Remote control method and remote control system for reclosing
CN101951029A (en) Substation real-time monitoring device with ground wire faulty operation prevention locking
CN103105843A (en) Anti-error checking module for monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant