CN104518564A - Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method - Google Patents

Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method Download PDF

Info

Publication number
CN104518564A
CN104518564A CN201310445365.0A CN201310445365A CN104518564A CN 104518564 A CN104518564 A CN 104518564A CN 201310445365 A CN201310445365 A CN 201310445365A CN 104518564 A CN104518564 A CN 104518564A
Authority
CN
China
Prior art keywords
collusion
region
activating device
automatic switching
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310445365.0A
Other languages
Chinese (zh)
Other versions
CN104518564B (en
Inventor
赵曼勇
董凯达
李建设
金震
文安
张春合
周红阳
严伟
余江
莫天文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
NR Electric Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
NR Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, NR Electric Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201310445365.0A priority Critical patent/CN104518564B/en
Publication of CN104518564A publication Critical patent/CN104518564A/en
Application granted granted Critical
Publication of CN104518564B publication Critical patent/CN104518564B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a backup automatic switching apparatus with an area automatic switching function, used for a power supply system of a dual-source serial supply structure. The backup automatic switching apparatus comprises an area backup automatic switching device and a plurality of acquisition and execution units, the area backup automatic switching device is configured at any one power supply station or any one serial supply transformer station, the plurality of acquisition and execution units are respectively arranged at two power supply stations and each serial supply transformer station, and all the acquisition and execution units respectively interact real-time information with the area backup automatic switching device through a fiber communication network; and each acquisition and execution unit acquires analog quantity information of the station corresponding to each acquisition and execution unit, after converting the analog quantity information into switching quantity information, uploads the switching quantity information to the area backup automatic switching device, at the same time, receives switching-off and switching-on commands transmitted down by the area backup automatic switching device and executes switching-off and switching-on motion. By using the backup automatic switching apparatus provided by the invention, power supply can be quickly recovered for a power-off serial supply transformer station through switching-off and switching-on operation at a time when any one serial supply switch is taken as an open loop point. The invention also discloses a backup automatic switching method for a backup automatic switching apparatus with an area automatic switching function.

Description

A kind of have backup auto-activating device and the spare power automatic switching method that function is hauled oneself willingly in region
Technical field
The present invention relates to a kind of automatic switching device of electric power system power transmission and distribution, particularly a kind of microcomputer type automatic switching device of standby power supply and method.
Background technology
In recent years, backup auto-activating device is used widely in the electrical network of 220kV and following grade, in the maintenance stabilization of power grids with improve in power supply reliability etc. and serve important function.
Backup auto-activating device wants to play a role, and must have stand-by power supply and the backup circuit breaker being in hot stand-by duty.When working power dead electricity, the switch of the former working power of backup auto-activating device tripping, the switch of the stand-by power supply that closes, realizes the fast automatic input of stand-by power supply, for transformer station restores electricity.The backup circuit breaker being in hot stand-by duty of stand-by power supply is generally called open loop point, only has and there is open loop point, could realize prepared auto restart.Duplicate supply statements based on collusion structure is a kind of electric power-feeding structure common in 110kV electrical network, power to several statements based on collusion transformer stations be cascaded middle by two power stations, in order to suppress short circuit current during Electromagnetic coupling, adopt open loop operation mode, namely one of them statements based on collusion switch is opened, after open loop operation, short circuit current can reduce really, but each statements based on collusion transformer station becomes is powered by single power station, power supply reliability reduces, in this case need to install backup auto-activating device, using another power station as stand-by power supply, by automatic switching to improve power supply reliability.
If use conventional prepared auto restart, open loop point is there is owing to only having one of them transformer station, there is not open loop point in other transformer station, the transformer station that there is not open loop point can control owing to not having the switch of stand-by power supply, conventional prepared auto restart cannot play a role, cause like this except open loop point place transformer station, even if other are respectively stood and install conventional backup auto-activating device and can not work, do not reach the object that fast recovery of power supply improves power supply reliability.For general remote automatic bus transfer equipment, only can realize the prepared auto restart between Liang Ge transformer station, the main electrical scheme for common multiple transformer stations statements based on collusion then cannot be suitable for.For the region prepared auto restart function be embedded in EMS system, because transfer of data time delay is large, the time of the needs that cause restoring electricity is partially long.Also someone proposed the region prepared auto restart strategy of recover by level; the switch at all dead electricity stations of tripping when statements based on collusion transformer station's dead electricity; close a floodgate step by step again and restore electricity; by after accelerated protection tripping again after He Zhong Library; the switching manipulation that this mode relates to often; restore electricity need time also longer, also can have certain impact to system during He Zhong Library.Above-mentioned method all can not rapidly and accurately for dead electricity transformer station restores electricity.
Summary of the invention
Object of the present invention, be that providing a kind of has backup auto-activating device and the spare power automatic switching method that function is hauled oneself willingly in region, it is applicable to duplicate supply statements based on collusion structure, and can realize arbitrary statements based on collusion switch as being operated by breaker tripping and closing during open loop point can be just dead electricity statements based on collusion transformer station fast recovery of power supply.
In order to reach above-mentioned purpose, solution of the present invention is:
Have the backup auto-activating device that function is hauled oneself willingly in region, for the electric power system of duplicate supply statements based on collusion structure, described duplicate supply statements based on collusion structure comprises two power stations and at least two statements based on collusion transformer stations; Described backup auto-activating device comprises region backup auto-activating device and several collection and performance element, described region backup auto-activating device is configured in any one power station or statements based on collusion transformer station, several collection and performance element are separately positioned on two power stations and transformer station of respectively acting in collusion to make each other's confessions, and all collections and performance element are respectively by Networks of Fiber Communications and the mutual real time information of region backup auto-activating device; Described each collection and performance element gather the analog quantity information at its corresponding station, by Networks of Fiber Communications being delivered to region backup auto-activating device after being converted to on-off model, receiving breaker tripping and closing order that described region backup auto-activating device issues simultaneously and performing breaker tripping and closing action.
Above-mentioned power station adopts transformer station, bus or interconnection power supply.
The collection that above-mentioned each station is corresponding and performance element access the busbar voltage at this station, and the bus according to setting has compression set value and bus definite value with no pressure, and being converted into bus has pressure mark and bus sign switch amount with no pressure signal; Access the electric current of two statements based on collusion inlet wires, according to inlet wire fault current definite value and the inlet wire no flow setpoint of setting, being converted into inlet wire has fault current mark and inlet wire without will on-off model of failing to be sold at auction, and in conjunction with busbar voltage, the angle of calculating voltage and electric current, obtains sense of current mark; Gather the trip position contact of two statements based on collusion switches, for the differentiation of system operation mode; Position contact after the conjunction of collection two statements based on collusion switches, for locking prepared auto restart during hand jumping working power; Gather the actuating signal of bus differential protection, be used for identifying busbar fault; Gather and performance element by above-mentioned each flag bit and each switching value by Networks of Fiber Communications being delivered to region backup auto-activating device, carry out integrated decision-making by region backup auto-activating device.
Based on the spare power automatic switching method there is region as previously mentioned hauling oneself willingly into the backup auto-activating device of function, comprise the steps:
(1) region prepared auto restart adopts discharge and recharge logic, and when system is normally run, a certain statements based on collusion switch is as open loop point, all the other statements based on collusion switches all close a floodgate operation, each substation bus bar voltage all has pressure, puts charging complete, put charge flag through charging setting time rear region prepared auto restart;
(2) after the charging complete of region prepared auto restart, if system has fault to occur, or power station decompression, then region backup auto-activating device selects according to failure condition the statements based on collusion switch being suitable for isolated fault;
(3) through tripping operation time delay, the statements based on collusion switch of the aforementioned selection of tripping of giving an order, trip signal is issued to collection and the performance element execution trip operation of corresponding transformer station by Networks of Fiber Communications, after confirming the tripping of statements based on collusion switch, send through combined floodgate time delay and run circling point statements based on collusion switch command jointly, order of closing a floodgate is issued to the collection of open loop point place transformer station by Networks of Fiber Communications and performance element carries out actual combined floodgate.
After adopting such scheme, the invention has the beneficial effects as follows: the open loop point position of self adaptation duplicate supply statements based on collusion structure, when arbitrary statements based on collusion switch is as open loop point, region backup auto-activating device can identify automatically; Automatically suitable statements based on collusion switch trip can be selected with isolated fault according to system running state, prevent He Zhong Library; The state of comprehensive each transformer station carries out decision-making, simultaneously for the statements based on collusion transformer station of multiple dead electricity restores electricity simultaneously, and can be not limited to the transformer station that there is open loop point; Prepared auto restart course of action only needs breaker tripping and closing to operate, succinctly accurately; No matter the number of statements based on collusion transformer station is how many, this region backup auto-activating device all can be suitable for; Transmit real time information by Networks of Fiber Communications, the region prepared auto restart of multiple transformer station is contained in real realization.
Accompanying drawing explanation
Fig. 1 is the electric power system main electrical scheme schematic diagram that the present invention applies;
Fig. 2 is the logic diagram of region of the present invention prepared auto restart;
Fig. 3 is the schematic diagram of prepared auto restart action situation in region of the present invention.
Embodiment
Below with reference to accompanying drawing, technical scheme of the present invention is described in detail.
The invention provides and a kind of there is the backup auto-activating device that function is hauled oneself willingly in region, be applicable to the electric power system of duplicate supply statements based on collusion structure, shown in figure 1.Power station 1, power station 2 are two power stations, and A station, B station, C station are 3 statements based on collusion transformer stations, and 001-008 is each statements based on collusion switch, and wherein 005 is the open loop point under current operational mode.The scale of the statements based on collusion structure shown in this figure is only a kind of citing, and when the number of act in collusion to make each other's confessions transformer station and statements based on collusion switch increases or reduces, the present invention is still applicable.Duplicate supply in this figure is power station 1, power station 2 in form, for other forms of duplicate supply, I female, II mother of such as same transformer station is respectively as two power supplys, or one of them power supply is interconnection power supply, or two power supplys are all interconnection power supply, and the present invention is still applicable.
Each transformer station (comprising power station and statements based on collusion transformer station) configures one respectively and gathers and performance element, select one of them transformer station to configure a region backup auto-activating device, region backup auto-activating device and each collection and performance element are by the mutual real time information of Networks of Fiber Communications.The analog quantity that every platform collection and performance element need access has: the busbar voltage of our station, the electric current of 2 statements based on collusion inlet wires; The switching value that need access has: the trip position of 2 statements based on collusion switches, close after position, bus bar differential prptection operation signal, blocked region prepared auto restart open into etc.The analog quantity collected is converted into switching value mark by collection and performance element, and the bus according to setting has compression set value, bus definite value with no pressure, and busbar voltage being converted into bus has pressure mark, bus mark with no pressure; According to inlet wire fault current definite value, the inlet wire no flow setpoint of setting, inlet wire current being converted into inlet wire has fault current mark, inlet wire without will of failing to be sold at auction; Utilize busbar voltage, inlet wire current, the angle of calculating voltage and electric current, obtain sense of current mark.Gather and performance element by above-mentioned various flag bit and each switching value by Networks of Fiber Communications being delivered to region backup auto-activating device, carry out integrated decision-making by region backup auto-activating device.
The time delay of Networks of Fiber Communications transmission information can be less than the level of 1 millisecond, and to gather and each analog quantity is converted to switching value by criterion on the spot by performance element, with region backup auto-activating device only mutual switching value information number, greatly can reduce the length of message transmission like this, be conducive to the fast transport of information, in this case, the requirement of real time interaction information can be reached.By mutual real time information, region backup auto-activating device can reach the operate time precision identical with common backup auto-activating device on the spot, the actual act time can reach Millisecond level, the adjusting and can consider according to the setting principle equal with common prepared auto restart of region prepared auto restart operate time.In this case, can also realize coordinating with the equity of common prepared auto restart, such as, have precedence over the rule of low-pressure side prepared auto restart action according to high-pressure side prepared auto restart, if this cover region prepared auto restart is installed on 110kV electric pressure, region prepared auto restart can be adjusted according to preferential action operate time; The operate time that the prepared auto restart of below 110kV electric pressure can be adjusted as being greater than region prepared auto restart operate time, and identical setting principle when coordinating with ordinary high pressure side prepared auto restart can be adopted.
The action logic reference of region backup auto-activating device as shown in Figure 2, mainly contains following several step:
Step 1: discharge and recharge logic.Region backup auto-activating device adopts discharge and recharge logic, after only having charging complete, just can carry out prepared auto restart operation.When meeting all charge conditions, and when meeting without any discharging condition, charging complete after charging setting time, puts Charging Flag.
Charge condition is the relation of "AND", needs to meet all charge conditions simultaneously, charging complete after charging setting time.Charge condition has:
1) two equal three-phases of power station have pressure;
2) the equal three-phase of each statements based on collusion transformer station has pressure;
3) a certain statements based on collusion switch is at open position, and other statements based on collusion switches are all at closing position, and all switches all do not have malposition to report to the police.
Discharging condition is the relation of "or", and meeting any one discharging condition will discharge, and removes Charging Flag.Discharging condition has:
1) open loop point switch closes;
2) region prepared auto restart sends order of closing a floodgate through short time delay;
3) arbitrary operation statements based on collusion switch (after running the conjunction of statements based on collusion switch, position KKJ becomes 0) is jumped in distant jumping, hand;
4) bus of two power stations is all with no pressure, through stand-by power supply discharge lag with no pressure;
5) after region prepared auto restart sends trip signal, switch failure of acting in collusion to make each other's confessions accordingly;
6) the statements based on collusion position of the switch being chosen as pre-trip switch is abnormal;
7) can not receive the collection of arbitrary transformer station and the information performing substation;
8) there is the outside locking input of blocked region prepared auto restart in arbitrary transformer station;
9) receive the collection of a certain transformer station and the communication abnormality information performing substation, this substation can not receive the information of region backup auto-activating device, if open loop point place transformer station, then blocked region prepared auto restart, if not the then not locking of open loop point place transformer station;
10) backup auto-activating device action in region could be charged after crossing and needing manual confirmation again;
11) open loop point place substation bus fault, or open loop point offside station busbar fault;
12) open loop point place line fault;
13) all break down in open loop point both sides;
14) region prepared auto restart function is exited.
Step 2: the selection of Fault Identification and trip switch.When after charging complete; if system has fault to occur; the statements based on collusion switch that protective relaying device action tripping co-bit is run; or power station decompression causes statements based on collusion transformer station dead electricity; then region backup auto-activating device enters fault location logic; select the statements based on collusion switch being suitable for isolated fault, prevent Backup Power Switch combined floodgate mistiming from closing in fault.
Step 3: at localizing faults and after choosing trip switch, through tripping operation time delay, the statements based on collusion switch that tripping of giving an order is selected, collection and the performance element of tripping operation statements based on collusion switch place transformer station carry out actual trip operation, after confirming the tripping of statements based on collusion switch, send through combined floodgate time delay and run circling point statements based on collusion switch command jointly, collection and the performance element of open loop point place transformer station carry out actual closing operation, by breaker tripping and closing operation, the statements based on collusion transformer station that can be embodied as dead electricity restores electricity.
According to the electric power system shown in Fig. 1, and consider that C station bus hangs with small power supply, when system is run for open loop point with 005 switch, consider the action situation of various abort situation lower area prepared auto restart, reference by location Fig. 3 of fault point.
After the prepared auto restart charging complete of region:
1) there is K1 point failure in A-wire, region prepared auto restart tripping 002 switch isolation fault, and close 005 switch afterwards, for A station, B station restore electricity.
2) there is K2 point failure in A station bus, and region prepared auto restart tripping 004 switch isolation fault, close 005 switch afterwards, for B station restores electricity.
3) there is K3 point failure in second line, and region prepared auto restart tripping 004 switch isolation fault, close 005 switch afterwards, for B station restores electricity.
4) there is K4 point failure in B station bus, and region prepared auto restart discharges, and prevents He Zhong Library.
5) there is K5 point failure in C-wire, and region prepared auto restart discharges, and prevents He Zhong Library.
6) there is K6 point failure in C station bus, and region prepared auto restart discharges, and prevents He Zhong Library.
7) there is K7 point failure in fourth line, and region prepared auto restart tripping 007 switch isolation fault, close 005 switch afterwards, for C station restores electricity.
8) power station 1 decompression, region prepared auto restart tripping 002 switch, close 005 switch afterwards, for A station, B station restore electricity.
9) power station 2 decompression, region prepared auto restart tripping 007 switch, close 005 switch afterwards, for C station restores electricity.
Above embodiment is only and technological thought of the present invention is described, can not limit protection scope of the present invention with this, and every technological thought proposed according to the present invention, any change that technical scheme basis is done, all falls within scope.

Claims (4)

1. have the backup auto-activating device that function is hauled oneself willingly in region, for the electric power system of duplicate supply statements based on collusion structure, described duplicate supply statements based on collusion structure comprises two power stations and at least two statements based on collusion transformer stations; It is characterized in that: described backup auto-activating device comprises region backup auto-activating device and several collection and performance element, described region backup auto-activating device is configured in any one power station or statements based on collusion transformer station, several collection and performance element are separately positioned on two power stations and transformer station of respectively acting in collusion to make each other's confessions, and all collections and performance element are respectively by Networks of Fiber Communications and the mutual real time information of region backup auto-activating device; Described each collection and performance element gather the analog quantity information at its corresponding station, by Networks of Fiber Communications being delivered to region backup auto-activating device after being converted to on-off model, receiving breaker tripping and closing order that described region backup auto-activating device issues simultaneously and performing breaker tripping and closing action.
2. a kind of as claimed in claim 1 have the backup auto-activating device that function is hauled oneself willingly in region, it is characterized in that: the collection that described each station is corresponding and performance element access the busbar voltage at this station, bus according to setting has compression set value and bus definite value with no pressure, and being converted into bus has pressure mark and bus sign switch amount with no pressure signal; Access the electric current of two statements based on collusion inlet wires, according to inlet wire fault current definite value and the inlet wire no flow setpoint of setting, being converted into inlet wire has fault current mark and inlet wire without will on-off model of failing to be sold at auction, and in conjunction with busbar voltage, the angle of calculating voltage and electric current, obtains sense of current mark; Gather the trip position contact of two statements based on collusion switches, for the differentiation of system operation mode; Position contact after the conjunction of collection two statements based on collusion switches, for locking prepared auto restart during hand jumping working power; Gather the actuating signal of bus differential protection, be used for identifying busbar fault; Gather and performance element by above-mentioned each flag bit and each switching value by Networks of Fiber Communications being delivered to region backup auto-activating device, carry out integrated decision-making by region backup auto-activating device.
3. a kind of as claimed in claim 1 or 2 have the backup auto-activating device that function is hauled oneself willingly in region, it is characterized in that: described power station adopts transformer station, bus or interconnection power supply.
4., based on the spare power automatic switching method there is region as claimed in claim 1 hauling oneself willingly into the backup auto-activating device of function, it is characterized in that comprising the steps:
(1) region prepared auto restart adopts discharge and recharge logic, and when system is normally run, a certain statements based on collusion switch is as open loop point, all the other statements based on collusion switches all close a floodgate operation, each substation bus bar voltage all has pressure, puts charging complete, put charge flag through charging setting time rear region prepared auto restart;
(2) after the charging complete of region prepared auto restart, if system has fault to occur, or power station decompression, then region backup auto-activating device selects according to failure condition the statements based on collusion switch being suitable for isolated fault;
(3) through tripping operation time delay, the statements based on collusion switch of the aforementioned selection of tripping of giving an order, trip signal is issued to collection and the performance element execution trip operation of corresponding transformer station by Networks of Fiber Communications, after confirming the tripping of statements based on collusion switch, send through combined floodgate time delay and run circling point statements based on collusion switch command jointly, order of closing a floodgate is issued to the collection of open loop point place transformer station by Networks of Fiber Communications and performance element carries out actual combined floodgate.
CN201310445365.0A 2013-09-26 2013-09-26 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method Active CN104518564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310445365.0A CN104518564B (en) 2013-09-26 2013-09-26 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310445365.0A CN104518564B (en) 2013-09-26 2013-09-26 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method

Publications (2)

Publication Number Publication Date
CN104518564A true CN104518564A (en) 2015-04-15
CN104518564B CN104518564B (en) 2017-02-22

Family

ID=52793460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310445365.0A Active CN104518564B (en) 2013-09-26 2013-09-26 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method

Country Status (1)

Country Link
CN (1) CN104518564B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105207346A (en) * 2015-09-10 2015-12-30 广东电网有限责任公司珠海供电局 Area backup automatic switch method and system
CN106208351A (en) * 2016-08-12 2016-12-07 广州供电局有限公司 The method and system of small power supply cut by region spare power automatic switching system connection
CN106385011A (en) * 2016-09-26 2017-02-08 中国电力工程顾问集团中南电力设计院有限公司 Fault range identification device and identification method for intelligent regional spare power automatic switching system
CN106655462A (en) * 2015-10-29 2017-05-10 贵州电网公司兴义供电局 Dual main station area backup power automatic switching method
CN107370235A (en) * 2017-07-07 2017-11-21 国电南瑞科技股份有限公司 Based on the adaptive region spare power automatic switching system and method under composite power supply pattern
CN107834690A (en) * 2017-10-20 2018-03-23 中国石油化工集团公司 Upper and lower level apparatus for fast switching interlock method and linked system
CN108181500A (en) * 2017-12-28 2018-06-19 中国南方电网有限责任公司超高压输电公司南宁局 A kind of power transmission and transforming equipment closes a floodgate determines method without pressure definite value
CN108599095A (en) * 2018-06-22 2018-09-28 深圳供电局有限公司 The peace of a kind of integrated mother prepared auto restart and main transformer backup power automatic switching function is from device
CN108899901A (en) * 2018-08-03 2018-11-27 深圳供电局有限公司 A kind of 10kV bus prepared auto restart starting method and system
CN109245101A (en) * 2018-11-13 2019-01-18 国网四川省电力公司天府新区供电公司 The method for promoting statements based on collusion substation's power supply reliability
CN109842204A (en) * 2019-04-11 2019-06-04 国网江苏省电力有限公司镇江供电分公司 Stand-by heat line electricity source based on optical-fibre channel controls in-put of spare power supply method
CN110571808A (en) * 2019-10-25 2019-12-13 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device
CN110601350A (en) * 2019-09-23 2019-12-20 云南电网有限责任公司曲靖供电局 High-voltage self-adaptive area spare power automatic switching system and spare power automatic switching control method thereof
CN111682508A (en) * 2020-04-10 2020-09-18 南京智汇电力技术有限公司 Differential protection and rapid self-healing method suitable for regional power distribution network
CN113964930A (en) * 2021-11-08 2022-01-21 国网湖南省电力有限公司 Automatic standby power supply switching cooperative control method and system for series power supply transformer substation
CN114207975A (en) * 2019-03-29 2022-03-18 西门子股份公司 Method for coordinating protection devices in a power distribution network

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105207346A (en) * 2015-09-10 2015-12-30 广东电网有限责任公司珠海供电局 Area backup automatic switch method and system
CN106655462A (en) * 2015-10-29 2017-05-10 贵州电网公司兴义供电局 Dual main station area backup power automatic switching method
CN106655462B (en) * 2015-10-29 2023-03-28 贵州电网公司兴义供电局 Double-master-station regional spare power automatic switching method
CN106208351B (en) * 2016-08-12 2018-06-08 广州供电局有限公司 Region spare power automatic switching system connection cuts the method and system of small power supply
CN106208351A (en) * 2016-08-12 2016-12-07 广州供电局有限公司 The method and system of small power supply cut by region spare power automatic switching system connection
CN106385011A (en) * 2016-09-26 2017-02-08 中国电力工程顾问集团中南电力设计院有限公司 Fault range identification device and identification method for intelligent regional spare power automatic switching system
CN107370235B (en) * 2017-07-07 2019-08-16 国电南瑞科技股份有限公司 Based on the adaptive region spare power automatic switching system and method under composite power supply mode
CN107370235A (en) * 2017-07-07 2017-11-21 国电南瑞科技股份有限公司 Based on the adaptive region spare power automatic switching system and method under composite power supply pattern
CN107834690A (en) * 2017-10-20 2018-03-23 中国石油化工集团公司 Upper and lower level apparatus for fast switching interlock method and linked system
CN107834690B (en) * 2017-10-20 2020-09-01 中国石油化工集团公司 Linkage method and linkage system for upper and lower rapid switching devices
CN108181500A (en) * 2017-12-28 2018-06-19 中国南方电网有限责任公司超高压输电公司南宁局 A kind of power transmission and transforming equipment closes a floodgate determines method without pressure definite value
CN108181500B (en) * 2017-12-28 2020-02-14 中国南方电网有限责任公司超高压输电公司南宁局 Method for determining non-pressure fixed value of switching-on of power transmission and transformation equipment
CN108599095A (en) * 2018-06-22 2018-09-28 深圳供电局有限公司 The peace of a kind of integrated mother prepared auto restart and main transformer backup power automatic switching function is from device
CN108599095B (en) * 2018-06-22 2023-07-11 深圳供电局有限公司 Safety device integrating bus-tie spare power automatic switching and main transformer spare power automatic switching functions
CN108899901A (en) * 2018-08-03 2018-11-27 深圳供电局有限公司 A kind of 10kV bus prepared auto restart starting method and system
CN109245101B (en) * 2018-11-13 2022-03-11 国网四川省电力公司天府新区供电公司 Method for improving power supply reliability of series-supply transformer substation
CN109245101A (en) * 2018-11-13 2019-01-18 国网四川省电力公司天府新区供电公司 The method for promoting statements based on collusion substation's power supply reliability
CN114207975A (en) * 2019-03-29 2022-03-18 西门子股份公司 Method for coordinating protection devices in a power distribution network
CN109842204A (en) * 2019-04-11 2019-06-04 国网江苏省电力有限公司镇江供电分公司 Stand-by heat line electricity source based on optical-fibre channel controls in-put of spare power supply method
CN109842204B (en) * 2019-04-11 2021-06-29 国网江苏省电力有限公司镇江供电分公司 Method for controlling standby power supply to be switched on at power supply side of hot standby circuit based on optical fiber channel
CN110601350A (en) * 2019-09-23 2019-12-20 云南电网有限责任公司曲靖供电局 High-voltage self-adaptive area spare power automatic switching system and spare power automatic switching control method thereof
CN110571808B (en) * 2019-10-25 2021-09-14 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device
CN110571808A (en) * 2019-10-25 2019-12-13 广东电网有限责任公司 Remote spare power automatic switching line association setting verification method and spare power automatic switching device
CN111682508A (en) * 2020-04-10 2020-09-18 南京智汇电力技术有限公司 Differential protection and rapid self-healing method suitable for regional power distribution network
CN113964930A (en) * 2021-11-08 2022-01-21 国网湖南省电力有限公司 Automatic standby power supply switching cooperative control method and system for series power supply transformer substation
CN113964930B (en) * 2021-11-08 2023-06-27 国网湖南省电力有限公司 Automatic cooperative control method and system for standby power supply of series power supply transformer substation

Also Published As

Publication number Publication date
CN104518564B (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN102710008B (en) Three-bus four-section standby power automatic operation device self-adaption in service and out of service control method
CN103887879B (en) Petal-shaped distribution protection control system
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN102157923B (en) Hierarchical control method for self-healing electric distribution network
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN102769278A (en) Layering protective system
CN103138390A (en) Power distribution network fault handling method based on self-recovering control
CN204089179U (en) Radial pattern power distribution network self-healing control system
CN106532683A (en) Self-healing method of 110kV transformer station hand-in-hand power supply
CN210780230U (en) Switch device for switching high power from off-grid to grid-connected
CN109787224B (en) Method for generating regional power grid load transfer strategy for preventing cascading overload
CN110932395B (en) Communication system of low-voltage intelligent spare power automatic switching
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN107959286B (en) 3/2 wiring mode-based dynamic reconstruction method for power transmission network
CN103855810A (en) Self-healing security and stability system for 110KV substation
CN105391038A (en) Area protection based intelligent terminal in power network and control method for intelligent terminal
CN204156594U (en) A kind of region backup auto-activating device
CN102185372B (en) Method and device for generating backup automatic switchover control model based on EMS (energy management system)
CN103532221A (en) Spare-power automatic switching implementation method of lines under wiring and operating modes of self-adaptive 330kV substation
CN110912253B (en) Low-voltage intelligent spare power automatic switching system
CN101924394A (en) Substation load stabilizing system and realizing method thereof
CN101707397A (en) Auto-switch-on system on basis of power grid dispatching and implementation method thereof
CN202550668U (en) Distributed power distribution network management terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant