CN107370235B - Based on the adaptive region spare power automatic switching system and method under composite power supply mode - Google Patents

Based on the adaptive region spare power automatic switching system and method under composite power supply mode Download PDF

Info

Publication number
CN107370235B
CN107370235B CN201710551037.7A CN201710551037A CN107370235B CN 107370235 B CN107370235 B CN 107370235B CN 201710551037 A CN201710551037 A CN 201710551037A CN 107370235 B CN107370235 B CN 107370235B
Authority
CN
China
Prior art keywords
station
automatic switching
power supply
switching system
collusion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710551037.7A
Other languages
Chinese (zh)
Other versions
CN107370235A (en
Inventor
周翔
郑玉平
韩伟
周劭亮
沈健
仲雅霓
陈力
魏洁茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201710551037.7A priority Critical patent/CN107370235B/en
Publication of CN107370235A publication Critical patent/CN107370235A/en
Application granted granted Critical
Publication of CN107370235B publication Critical patent/CN107370235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/02Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which an auxiliary distribution system and its associated lamps are brought into service
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Abstract

The invention discloses the adaptive region spare power automatic switching systems and method under a kind of mode based on composite power supply, it is capable of the method for operation of the current compound power grid of automatic identification, pass through the analog quantity and protection signal of substation where acquiring backup auto-activating device in real time, carry out accident analysis positioning, optimal power supply switching strategy is provided with standby throw of wide area in combination with standby throw on the spot, quickly output electrical control order isolated fault, and protection control is carried out to power grid, system response speed is fast, improve power supply reliability, improve power supply quality, promote operation of power networks efficiency, and then improve the reliability of power grid, shorten power off time caused by failure, structural security risk is excluded from source, realize the condition that composite power supply system automatically switches, power grid power supply reliability is set to reach advanced world standards, it has a good application prospect.

Description

Based on the adaptive region spare power automatic switching system and method under composite power supply mode
Technical field
The present invention relates to power system power supply reliability consideration technical fields, and in particular to one kind is based on composite power supply mode Under adaptive region spare power automatic switching system and method.
Background technique
With China's west-to-east power transmission and on national network strategy implementation, electric power safety with electric power networks scale increasingly Expansion is closely linked with people's lives and social stability.The thing of the economy as caused by power grid accident and politics Part is also commonplace at home and abroad.Currently, power grid security has increased to national security problem.Because Automation of Electric Systems is advised Mould is gradually expanded, and a large amount of looped network and short-term road occurs, and the control protection of smart grid and safe distribution of electric power operation are brought Great challenge.
In case throwing the inexorable trend that the intelligent distribution network that control is characterized is the following power distribution network development.For power grid accident Complexity and variability need to study a kind of adaptive region spare power automatic switching system of classification, the operation of automatic identification current electric grid Mode, and multiple spot comprehensive comparison is carried out using real-time network communication, for large-scale complex accident, realize quick, sensitive event Barrier positioning and failure removal, provide recovery policy and are converted to electrical command, be issued to specific spare power automatic switching system executive device, Restore power grid power supply, is current urgent problem.
Summary of the invention
The purpose of the present invention is overcoming the complexity and variability that are directed to power grid accident in the prior art, do not propose feasible Standby throwing control system the problem of.It is of the invention based on the adaptive region spare power automatic switching system and method under composite power supply mode, Be capable of the method for operation of the current compound power grid of automatic identification, by the analog quantity of substation where acquiring backup auto-activating device in real time and Protection signal carries out accident analysis positioning, provides optimal power supply switching plan with standby throw of wide area in combination with standby throw on the spot Slightly, electrical control order isolated fault is quickly exported, and protection control is carried out to power grid, and then realize the standby throwing of electric system, Shorten the power off time of electric network fault, improves power supply quality, have a good application prospect.
In order to achieve the above object, the technical scheme adopted by the invention is that:
A kind of adaptive region spare power automatic switching system under the mode based on composite power supply is applied in double mother partitions band bypass connections Composite power supply mode under, including N number of spare power automatic switching system device, select wherein any one spare power automatic switching system device as it is standby from Central station equipment is thrown, each spare power automatic switching system device is provided with analog acquisition interface, intake acquisition interface and the amount of outputing output Interface;
Double mother partitions are connected separately with a spare power automatic switching system dress with each statements based on collusion station under bypass connection composite power supply mode It sets;
The analog acquisition interface of the spare power automatic switching system device, for being responsible for the line voltage distribution and route at corresponding statements based on collusion station The acquisition of current-mode analog quantity, and busbar voltage is calculated according to collection capacity, and be converted into corresponding electrical quantity status signal, it above send to standby From throwing central station equipment;
The intake acquisition interface of the spare power automatic switching system device, electrical quantity status signal for being responsible for receiving and is opened Signal is measured in pass, and carries out fault location, automatic to determine wide area and on the spot prepared auto restart movement priority, and is filled by prepared auto restart master station It sets and sends electrical control order to corresponding backup auto-activating device;
The amount of the outputing output interface of the spare power automatic switching system device receives the transmission of prepared auto restart central station equipment for being responsible for Electrical control order is completed to realize power switching to the electrical control at corresponding statements based on collusion station.
Adaptive region spare power automatic switching system under the mode above-mentioned based on composite power supply, double mother partition band bypass connections Composite power supply mode under power grid, including single double-bus power station, single independent electrical source station, multiple statements based on collusion station, it is described more A statements based on collusion station forms ring connection, and the single independent electrical source station is that the statements based on collusion station of inside powers, under normal operation mode, open loop Point is the block switch at two sides statements based on collusion station, and remaining statements based on collusion station is coincidence;Under non-normal operation mode, single independent electrical source station Out of service, statements based on collusion station forms annular formula wiring hand in hand, and the statements based on collusion station is stood for single mother partition statements based on collusion.
Adaptive region spare power automatic switching system under the mode above-mentioned based on composite power supply is sent to standby on the backup auto-activating device There are pressure passive state signal, No.1 inlet wire and No. two inlet wires from the electrical quantity status signal for throwing central station equipment, including mother I and mother II There are pressure passive state signal, No.1 inlet wire and No. two inlet wires to have stream without stream mode signal, inlet wire fault current status signal, inlet wire Fault current direction status signal, inlet wire failure zero-sequence current status signal and inlet wire fault negative sequence current status signal.
Adaptive region spare power automatic switching system under the mode above-mentioned based on composite power supply, the prepared auto restart central station equipment are sent Electrical control order, including prepared auto restart allows order, jumping circuit switch command and zygonema way switch order on the spot.
Adaptive region spare power automatic switching system under the mode above-mentioned based on composite power supply, it is characterised in that: N number of prepared auto restart dress It is connected between setting by single mode optical fiber, and carries out real-time data communication in a manner of GOOSE message.
Adaptive region spare power automatic switching system under the mode above-mentioned based on composite power supply, the throwing of the prepared auto restart central station equipment It moves back and is completed by the setting operation to control word.
A kind of adaptive region spare power automatic switching method under the mode based on composite power supply is above-mentioned based on composite power supply mode Under adaptive region spare power automatic switching system control method, including composite power supply power grid operate normally control model, composite power supply Power grid abnormal running control model, process are as follows:
Under composite power supply power grid normal operation mode, the recharge logic of each backup auto-activating device is that prepared auto restart charging is patrolled on the spot Volume, each backup auto-activating device judges that it connects whether corresponding statements based on collusion station is in normal inlet wire or bridge for throwing mode, if meeting it Middle one mode, then spare power automatic switching system investment carries out prepared auto restart charging on the spot on the spot, and carries out the mode simultaneously and charge to charging It completes;
If each backup auto-activating device meets prepared auto restart electric discharge logical condition on the spot, on the spot the electric discharge of prepared auto restart investment;
Under composite power supply power grid abnormal running control model, the recharge logic of each backup auto-activating device is that wide area prepared auto restart fills Electric logic, each backup auto-activating device judge that it connects the annular that corresponding statements based on collusion station is formed and hands in hand in wiring, if only one The switch at statements based on collusion station in quartile, simultaneously remaining statements based on collusion station switch all in coincidence and two sections of main power supply station bus have pressure, All statements based on collusion station bus has that pressure, there is no other discharging conditions that it is wide to control each backup auto-activating device if above-mentioned condition meets simultaneously Domain prepared auto restart, and switch stand corresponding backup auto-activating device in quartile statements based on collusion for prepared auto restart on the spot is carried out, and are somebody's turn to do simultaneously Mode charges to charging complete;If each backup auto-activating device meets wide area prepared auto restart electric discharge logical condition, the electric discharge of wide area prepared auto restart.
Adaptive region spare power automatic switching method under the mode above-mentioned based on composite power supply, it is characterised in that: described standby on the spot From electric logical condition is launched, meet one of the following conditions, specially (1) region spare power automatic switching system is not put into;(2) spare to open Pass, which is not at, jumps position;(3) incoming switch is manually disconnected;(4) switch is refused to jump or refuse to close in action process;(5) prepared auto restart on the spot It acts successfully.
Adaptive region spare power automatic switching method under the mode above-mentioned based on composite power supply, it is characterised in that: the wide area is standby From electric logical condition is launched, meet one of the following conditions, specially (1) region spare power automatic switching system is not put into;(2) open loop point Switch coincidence;(3) backup auto-activating device where open loop point receives abnormal;(4) main website receives logical when any backup auto-activating device information Letter is abnormal;(5) two sections of main power supply station bus is without pressure;(6) either switch malposition;(7) any statements based on collusion switch is manually jumped It opens;(8) statements based on collusion switch is refused to jump;(9) certain route at statements based on collusion station throws maintenance;(10) open loop point two sides failure;(11) where open loop point Power station bus-bar fault;(12) open loop point opposite side power station bus-bar fault;(13) line fault where open loop point;(14) where open loop point Route opposite side switchs jump;(15) it is confirmed after system acting;(16) wide area prepared auto restart feed motion.
Adaptive region spare power automatic switching method under the mode above-mentioned based on composite power supply, after charging complete, each prepared auto restart Device determines operational mode automatically, if the following conditions are met for the moment: (1) non-open loop point switch jumps position without stream;(2) power station is female Line is without pressure and outlet is without stream;(3) there is bus differential protection action;(4) there is the movement of route optical-fiber longitudinal difference protection;(5) string where open loop point For station or its opposite side statements based on collusion station are without pressure and inlet wire is without stream, then region spare power automatic switching system starts, and carries out fault location, and tripping is waited to prolong Shi Hou executes the trip signal of isolated fault, when the former main power supply station switch at confirmation close to fault point power loss station jumps position, route Without stream and after bus is without pressure, the line switching of former open loop point is closed, restores to act in collusion to make each other's confessions to power loss by the independent electrical source station of the other side and stand Power supply, realize power switching.
The beneficial effects of the present invention are: adaptive region spare power automatic switching system under the mode of the invention based on composite power supply and Method is capable of the method for operation of the current compound power grid of automatic identification, passes through the mould of substation where acquiring backup auto-activating device in real time Analog quantity and protection signal carry out accident analysis positioning, provide optimal power supply with standby throw of wide area in combination with standby throw on the spot Switching strategy quickly exports electrical control order isolated fault, and carries out protection control to power grid, and system response speed is fast, mentions High power supply reliability improves power supply quality, promotes operation of power networks efficiency, and then improving the reliability of power grid, and shortening failure causes Power off time, exclude structural security risk from source, realize the condition that composite power supply system automatically switches, supply power grid Electric reliability is reached advanced world standards, and is had a good application prospect.
Detailed description of the invention
Fig. 1 is the system block diagram of the adaptive region spare power automatic switching system under the mode of the invention based on composite power supply;
Fig. 2 is schematic diagram of double mother partitions with bypass supply powering mode of the invention;
Fig. 3 is the schematic diagram of chain type powering mode of the invention;
Fig. 4 is the backboard plug-in unit schematic diagram of spare power automatic switching system device of the invention;
Fig. 5 is the work-based logic signal of the adaptive region spare power automatic switching method under the mode of the invention based on composite power supply Figure.
Specific embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in Figure 1, the adaptive region spare power automatic switching system under the mode of the invention based on composite power supply, is applied in double mothers Under the composite power supply mode of segmentation band bypass connection, including N number of spare power automatic switching system device, select wherein any one prepared auto restart system Bulk cargo is set as prepared auto restart central station equipment, and each spare power automatic switching system device is provided with analog acquisition interface, intake acquisition connects Mouth and the amount of outputing output interface;
Double mother partitions are connected separately with a spare power automatic switching system dress with each statements based on collusion station under bypass connection composite power supply mode It sets;
The analog acquisition interface of the spare power automatic switching system device, for being responsible for the line voltage distribution and route at corresponding statements based on collusion station The acquisition of current-mode analog quantity, and busbar voltage is calculated according to collection capacity, and be converted into corresponding electrical quantity status signal, it above send to standby From throwing central station equipment;
The intake acquisition interface of the spare power automatic switching system device, electrical quantity status signal for being responsible for receiving and is opened Signal is measured in pass, and carries out fault location, automatic to determine wide area and on the spot prepared auto restart movement priority, and is filled by prepared auto restart master station It sets and sends electrical control order to corresponding backup auto-activating device;
The amount of the outputing output interface of the spare power automatic switching system device receives the transmission of prepared auto restart central station equipment for being responsible for Electrical control order is completed to realize the power switching of power grid to the electrical control at corresponding statements based on collusion station.
As shown in Fig. 2, the power grid under the composite power supply mode of double mother partitions with bypass connection, including single double-bus Power station, single independent electrical source station, multiple statements based on collusion station, the multiple statements based on collusion station forms ring connection, the single independent current source It stands and powers for the statements based on collusion station of inside, under normal operation mode, open loop point is the block switch at two sides statements based on collusion station, remaining statements based on collusion station It is coincidence;Under non-normal operation mode, single independent electrical source station is out of service, and statements based on collusion station forms annular formula wiring hand in hand, The statements based on collusion station is single mother partition statements based on collusion station.
Being sent on the backup auto-activating device to the electrical quantity status signal of prepared auto restart central station equipment, including mother I and mother II has pressure Passive state signal, No.1 inlet wire and No. two inlet wires have pressure passive state signal, No.1 inlet wire and No. two inlet wires to have stream without stream shape State signal, inlet wire fault current status signal, inlet wire fault current direction status signal, inlet wire failure zero-sequence current status signal With inlet wire fault negative sequence current status signal.
The electrical control order that the prepared auto restart central station equipment is sent, including prepared auto restart allows order, jumping circuit to open on the spot Close order and the order of zygonema way switch.
It is connected between N number of backup auto-activating device by single mode optical fiber, and carries out real time data in a manner of GOOSE message and lead to Letter,
The throwing of the prepared auto restart central station equipment is moved back to be completed by the setting operation to control word.
As shown in figure 3, the adaptive region spare power automatic switching method under the mode of the invention based on composite power supply, including compound confession Power grid operates normally control model, composite power supply power grid abnormal running control model, and process is as follows,
Under composite power supply power grid normal operation mode, the recharge logic of each backup auto-activating device is that prepared auto restart charging is patrolled on the spot Volume, each backup auto-activating device judges that it connects whether corresponding statements based on collusion station is in normal inlet wire or bridge for throwing mode, if meeting it Middle one mode, then spare power automatic switching system investment carries out prepared auto restart charging on the spot on the spot, and carries out the mode simultaneously and charge to charging It completes;
If each backup auto-activating device meets prepared auto restart electric discharge logical condition on the spot, on the spot the electric discharge of prepared auto restart investment;
Under composite power supply power grid abnormal running control model, the recharge logic of each backup auto-activating device is that wide area prepared auto restart fills Electric logic, each backup auto-activating device judge that it connects the annular that corresponding statements based on collusion station is formed and hands in hand in wiring, if only one The switch at statements based on collusion station in quartile, simultaneously remaining statements based on collusion station switch all in coincidence and two sections of main power supply station bus have pressure, All statements based on collusion station bus has that pressure, there is no other discharging conditions that it is wide to control each backup auto-activating device if above-mentioned condition meets simultaneously Domain prepared auto restart, and switch stand corresponding backup auto-activating device in quartile statements based on collusion for prepared auto restart on the spot is carried out, and are somebody's turn to do simultaneously Mode charges to charging complete;If each backup auto-activating device meets wide area prepared auto restart electric discharge logical condition, the electric discharge of wide area prepared auto restart.
The electric discharge of the prepared auto restart on the spot logical condition, meets one of the following conditions, specially (1) region prepared auto restart system System is not put into;(2) backup circuit breaker, which is not at, jumps position;(3) incoming switch is manually disconnected;(4) in action process switch refuse jump or It refuses to close;(5) prepared auto restart acts successfully on the spot.
The wide area prepared auto restart electric discharge logical condition, meets one of the following conditions, specially (1) region prepared auto restart system System is not put into;(2) open loop point switchs coincidence;(3) backup auto-activating device where open loop point receives abnormal;(4) main website receives any Communication abnormality when backup auto-activating device information;(5) two sections of main power supply station bus is without pressure;(6) either switch malposition;(7) appoint One statements based on collusion switch is by artificial tripping;(8) statements based on collusion switch is refused to jump;(9) certain route at statements based on collusion station throws maintenance;(10) open loop point two sides event Barrier;(11) power station bus-bar fault where open loop point;(12) open loop point opposite side power station bus-bar fault;(13) route event where open loop point Barrier;(14) route opposite side where open loop point switchs jump;(15) it is confirmed after system acting;(16) wide area prepared auto restart closes a floodgate dynamic Make.
After charging complete, each backup auto-activating device determines operational mode automatically, if the following conditions are met for the moment: (1) non- Open loop point switch jumps position without stream;(2) power station bus is without pressure and outlet is without stream;(3) there is bus differential protection action;(4) there is route light Fine longitudinal difference protection movement;(5) statements based on collusion station where open loop point or its opposite side statements based on collusion station are without pressure and inlet wire is without stream, then region prepared auto restart system System starting, carries out fault location, after waiting tripping delay, executes the trip signal of isolated fault, when confirmation is lost close to fault point The former main power supply station switch in power station jumps position, route without stream and after bus is without pressure, the line switching of former open loop point is closed, by another Restore to realize the power switching of power grid to the power supply at power loss statements based on collusion station in the independent electrical source station of side.
" charging " word of above-mentioned record adopts the term inside automatic switching device of standby power supply, and region spare power automatic switching system allows Each condition (such as pressing plate, control word, the position of the switch, busbar voltage) of work starts to charge after meeting, and the charged time (can pass through Fixed value adjusting is generally defaulted as 15 seconds) charging preparation is completed afterwards, logic is thrown in charging complete standby to be started, herein Charging is interpreted as region spare power automatic switching system and meets operating condition, ready.
Below according to the adaptive region spare power automatic switching system and method under the mode of the invention based on composite power supply, one is introduced Specific embodiment,
In embodiment as shown in Figure 2, under normal operation, 1 double mother partition power station, 1 independent electrical source station is gone here and there with 3 For in double mother partitions band bypass connection powering mode primary connection at station, the block switch at the station C and the station E is open loop point, power station A Band outlet switch A1 A2, and C station mother I is powered with the station E mother II by power station A;Power station B band outlet switch B1 B2, and the station C I Female, E station mother II and the station D are powered by power station B.Each route is it is possible that line fault, power station and statements based on collusion station may Bus-bar fault occurs, when any of the above-described failure, which occurs, leads to certain bus loss of pressure, the present invention understands tripping close to fault point power loss The former main power supply switch stood, prepared auto restart, preferential combination switch C3 close E3 if unsuccessful from throwing on the spot for starting;
When power station B is overhauled, when B1D4 and B2D5 route is out of service, as shown in figure 3, the station C D E becomes to pull bangle Formula statements based on collusion structure, the point of open loop at this time can be any line switching or block switch in the structure, and other switches are in coincidence Operation, under this method of operation, line fault or bus-bar fault may occur everywhere for K1-K10, line switching A1, A2, It may occur to switch jump failure at C1, C2, C3, D1, D2, D3, E1, E2, E3, bus loss of pressure event may occur for power station Barrier.If any of the above-described failure, which occurs, leads to three certain bus power loss in station, the present invention can automatic tripping close on the switch of fault point, Open loop point D1 is closed, the statements based on collusion station after ensureing isolated fault is respectively by two sections of bussed supplies of power station A.
Adaptive region spare power automatic switching system of the invention can support the chain type at 2 220kV power stations, 2 to 5 statements based on collusion stations to supply Power mode, the statements based on collusion station number of chain type Connection Mode does not exceed 5 under normal circumstances, which can be currently electric with automatic identification Net operational mode is simultaneously corresponding on the spot for throwing and wide area for throwing movement according to fault type investment.Such as K7 failure, the station D is standby on the spot to be thrown It may all be acted with the standby throwing of wide area, integrated spare power automatic switching system acts wide area preferentially for throwing, if wide area is unsuccessful for throwing, can carry out The station D is standby on the spot to throw.
As shown in Figure 1, region spare power automatic switching system configures entire spare power automatic switching system according to the principle of hierarchical control, in power supply Backup auto-activating device is respectively set in station of standing and act in collusion to make each other's confessions, can be chosen according to operating condition wherein a device as prepared auto restart master station dress It sets.The serial connection of physical layer is carried out between each backup auto-activating device by single mode optical fiber, data flow passes through respective backup auto-activating device Embedded ethernet switching module carries out serial data communication, and link layer star is established between backup auto-activating device and sub-station device Connection simplifies communication wires, reduces the hardware cost that data communication is carried out by using external switching equipment, each backup auto-activating device Busbar voltage is calculated according to collected line voltage distribution and line current analog quantity and is converted into the status signal of respective electric amount, Such as bus has pressure, bus to have stream, route without signals such as streams without pressure, route, switchs with corresponding statements based on collusion station and adjacent power station Amount signal together in a manner of remote signalling displacement on send to prepared auto restart central station equipment.
Prepared auto restart central station equipment carries out fault location according to the electrical quantity status signal and on-off model received, automatically Determine wide area and prepared auto restart acts priority on the spot, sends tripping according to standby throwing success or not classification or close a floodgate and order to corresponding Backup auto-activating device;Remaining backup auto-activating device executes the order of central station equipment, and the tripping received, order of closing a floodgate are converted to routine Contact is outputed and is linked into tradition tripping, closing circuit realizes jump, the operation of zygonema way switch, the conjunction of substation where being completed at the same time The functions such as lock after accelerated protection, PT broken string, CT broken string.
It is known that the protective device in power station includes: power station configuration busbar protective device;Statements based on collusion station configuration bus protection Device and equipment for protecting optical fibre longitudinal difference;The wherein action connection point of the busbar protective device and equipment for protecting optical fibre longitudinal difference at each statements based on collusion station It is separately connected the intake acquisition interface of corresponding sub-station device.
As shown in figure 4, backup auto-activating device, which is carried on the back, inserts CPU card, AC plug-in unit, two blocks of IO plug-in units and power insert.CPU card is negative Blame analog acquisition and calculating, substation state logic operation and line status analysis, operational mode identification, standby throwing logical operation With movement.And integrated ethernet switching module, it is responsible for transmitting-receiving breaker tripping and closing order, respective switch amount signal and each section of system The MESSAGE EXCHANGE of point;Line voltage distribution and current-mode analog quantity are converted small signal by AC plug-in unit;IO plug-in unit is responsible for opening adopting into signal Collection and tripping, outlet of closing a floodgate.
As shown in figure 5, the work-based logic of the adaptive region spare power automatic switching method under the mode of the invention based on composite power supply, Region spare power automatic switching system can be normal to transport by the corresponding operational mode of breath automatic identification of delivering letters on each device, in the present embodiment In row situation, each transformer substation spare power automatic switching assembly first carries out standby throwing logic on the spot when breaking down.When route B1D4 and B2D5 are equal When the fault condition of power loss occurs, region spare power automatic switching system understands the switch on the tripping route, and preferentially closes C3 switch.If from throwing Unsuccessful, then tripping C3 is switched, and closes E3 switch.When bypass supply station is out of service, for the string under chain type Connection Mode For circuit, meet only one switch in quartile, and when operating status meets preset operational mode and charge condition, region is standby By adjusting, wide area is completed in delay to self-operation system and standby throw is charged on the spot.Under charge condition, meet any discharging condition, then for certainly Throwing system is discharged immediately.In the case where grid collapses, spare power automatic switching system can be according to operational mode, fault type, failure Position preferentially selects the standby purpose thrown to realize fast recovery of power supply of wide area.After system completes fault location, complete set start-up is waited The trip signal (while sending the order of tripping small power supply) of isolated fault is executed after tripping delay, confirmation trip switch becomes quartile And it is switched without waiting delay of closing a floodgate to close open loop point after stream mode again.If wide area prepared auto restart is unsuccessful, starts standby throw on the spot and patrol Volume, and ensure to avoid together in TU1 in fault bus figure to be tripping delay, TU3 is delay of closing a floodgate.
Region spare power automatic switching system action logic and operation of power networks state, statements based on collusion station number, open loop point position, electric network fault class Type is closely related.When electric network fault, system central station equipment selects to be suitble to according to statements based on collusion station number, open loop point position, fault type Prepared auto restart logic, tripping close to fault point power loss station former main power supply switch, close statements based on collusion circuit original place in open loop point Line switching.By taking the practical different operational modes of Fig. 2 and power grid shown in Fig. 3 as an example, its fault actions logic is analyzed, it is specific as follows Shown in table 1, table 2:
1 pair of mother partition band bypass supply wiring prepared auto restart action logic table of table
Serial number Fault location Spare power automatic switching system action logic
1. K1 point failure BRKR Breaker A1 C1, combination switch C3
2. K2 point failure BRKR Breaker C1 C3, the station C is standby to launch electricity
3. K3 point failure BRKR Breaker C2 C3, the station C is standby to launch electricity
4. K4 point failure BRKR Breaker C2 D1, combination switch C3
5. K5 point failure BRKR Breaker D4 D1 D3, combination switch C3
6. K6 point failure BRKR Breaker D5 D2 D3, combination switch E3
7. K7 point failure BRKR Breaker D2 E1, combination switch E3
8. K8 point failure BRKR Breaker E1 E3, the station E is standby to launch electricity
9. K9 point failure BRKR Breaker E2 C3, the station E is standby to launch electricity
10. K10 point failure BRKR Breaker A2 E2, combination switch E3
11. K11 point failure BRKR Breaker D4 B1
12. K12 point failure BRKR Breaker D5 B2
13. The equal power loss of B1D4 and B2D5 BRKR Breaker D4 B1 D5 B2, combination switch C3
2 chain type wiring of table is standby to throw action logic table
To sum up, the adaptive region spare power automatic switching system and method under the mode of the invention based on composite power supply, can be automatic The method of operation for identifying current compound power grid passes through the analog quantity and protection act of substation where acquiring backup auto-activating device in real time Signal carries out accident analysis positioning, provides optimal power supply switching strategy with standby throw of wide area in combination with standby throw on the spot, quickly defeated Electrical control order isolated fault out, and protection control is carried out to power grid, system response speed is fast, improves power supply reliability, changes Kind power supply quality promotes operation of power networks efficiency, and then improves the reliability of power grid, shortens power off time caused by failure, from source Structural security risk is excluded on head, realizes the condition that composite power supply system automatically switches, power grid power supply reliability is made to reach state Border advanced level, has a good application prospect.
Basic principles and main features and advantage of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (10)

1. based on the adaptive region spare power automatic switching system under composite power supply mode, it is characterised in that: apply by double mother partition bands Under the composite power supply mode of road wiring, including N number of spare power automatic switching system device, wherein any one spare power automatic switching system device is made for selection For prepared auto restart central station equipment, each spare power automatic switching system device is provided with analog acquisition interface, intake acquisition interface and outputs Measure output interface;
Double mother partitions are connected separately with a spare power automatic switching system device with each statements based on collusion station under bypass connection composite power supply mode;
The analog acquisition interface of the spare power automatic switching system device, for being responsible for the line voltage distribution and line current at corresponding statements based on collusion station Analog acquisition, and busbar voltage is calculated according to collection capacity, and be converted into corresponding electrical quantity status signal, it above send to prepared auto restart Central station equipment;
The intake acquisition interface of the spare power automatic switching system device, electrical quantity status signal and switching value for being responsible for receiving Signal, and fault location is carried out, it is automatic to determine wide area and on the spot prepared auto restart movement priority, and sent out by prepared auto restart central station equipment Send electrical control order to corresponding spare power automatic switching system device;
The amount of the outputing output interface of the spare power automatic switching system device receives the electrical of prepared auto restart central station equipment transmission for being responsible for Control command is completed to realize power switching to the electrical control at corresponding statements based on collusion station.
2. the adaptive region spare power automatic switching system under the mode according to claim 1 based on composite power supply, it is characterised in that: Power grid under the composite power supply mode of double mother partitions with bypass connection, including single double-bus power station, single independent electrical Source station, multiple statements based on collusion station, the multiple statements based on collusion station form ring connection, and the single independent electrical source station is that the statements based on collusion station of inside supplies Electricity, under normal operation mode, open loop point is the block switch at two sides statements based on collusion station, and remaining statements based on collusion station is coincidence;Improper fortune Under row mode, single independent electrical source station is out of service, and statements based on collusion station forms annular formula wiring hand in hand, and the statements based on collusion station is single mother stock Section statements based on collusion station.
3. the adaptive region spare power automatic switching system under the mode according to claim 1 based on composite power supply, it is characterised in that: Being sent on the spare power automatic switching system device to the electrical quantity status signal of prepared auto restart central station equipment, including mother I and mother II has pressure without pressure Status signal, No.1 inlet wire and No. two inlet wires have pressure passive state signal, No.1 inlet wire and No. two inlet wires to have stream to believe without stream mode Number, inlet wire fault current status signal, inlet wire fault current direction status signal, inlet wire failure zero-sequence current status signal and into Line fault negative sequence current status signal.
4. the adaptive region spare power automatic switching system under the mode according to claim 1 based on composite power supply, it is characterised in that: The electrical control order that the prepared auto restart central station equipment is sent, including on the spot prepared auto restart allow order, jumping circuit switch command and Zygonema way switch order.
5. the adaptive region spare power automatic switching system under the mode according to claim 1 based on composite power supply, it is characterised in that: It is connected between N number of spare power automatic switching system device by single mode optical fiber, and carries out real-time data communication in a manner of GOOSE message.
6. the adaptive region spare power automatic switching system under the mode according to claim 1 based on composite power supply, it is characterised in that: The throwing of the prepared auto restart central station equipment is moved back to be completed by the setting operation to control word.
7. based on the adaptive region spare power automatic switching method under composite power supply mode, it is characterised in that: for any one of claim 1-6 The control method based on the adaptive region spare power automatic switching system under composite power supply mode, including composite power supply power grid are normal Control model, composite power supply power grid abnormal running control model are run, process is as follows,
Under composite power supply power grid normal operation mode, the recharge logic of each spare power automatic switching system device is that prepared auto restart charging is patrolled on the spot Volume, each spare power automatic switching system device judges that it connects whether corresponding statements based on collusion station is in normal inlet wire or bridge for throwing mode, if full Foot one of which mode, then spare power automatic switching system investment carries out prepared auto restart charging on the spot on the spot, and carries out the mode simultaneously and charge to Charging complete;
If each spare power automatic switching system device meets prepared auto restart electric discharge logical condition on the spot, on the spot the electric discharge of prepared auto restart investment;
Under composite power supply power grid abnormal running control model, the recharge logic of each spare power automatic switching system device is that wide area prepared auto restart fills Electric logic, each spare power automatic switching system device judge that it connects the annular that corresponding statements based on collusion station is formed and hands in hand in wiring, if only Switch of the switch at one statements based on collusion station in quartile while remaining statements based on collusion station is all in coincidence and two sections of main power supply station bus There are pressure, all statements based on collusion station bus to have pressure, if above-mentioned condition meets simultaneously control each prepared auto restart there is no other discharging conditions System and device wide area prepared auto restart, and switch are in quartile and act in collusion to make each other's confessions the corresponding spare power automatic switching system device in station for carrying out on the spot for certainly It throws, and carries out the mode simultaneously and charge to charging complete;If each spare power automatic switching system device meets wide area prepared auto restart electric discharge logic item Part, then wide area prepared auto restart discharges.
8. the adaptive region spare power automatic switching method under the mode according to claim 7 based on composite power supply, it is characterised in that: The electric discharge of the prepared auto restart on the spot logical condition, meets one of the following conditions, specially (1) region spare power automatic switching system is not thrown Enter;(2) backup circuit breaker, which is not at, jumps position;(3) incoming switch is manually disconnected;(4) switch is refused to jump or refuse to close in action process; (5) prepared auto restart acts successfully on the spot.
9. the adaptive region spare power automatic switching method under the mode according to claim 7 based on composite power supply, it is characterised in that: The wide area prepared auto restart electric discharge logical condition, meets one of the following conditions, specially (1) region spare power automatic switching system is not thrown Enter;(2) open loop point switchs coincidence;(3) the spare power automatic switching system device where open loop point receives abnormal;(4) main website receives any standby Communication abnormality when self-operation system device information;(5) two sections of main power supply station bus is without pressure;(6) either switch malposition;(7) Any statements based on collusion switch is by artificial tripping;(8) statements based on collusion switch is refused to jump;(9) certain route at statements based on collusion station throws maintenance;(10) open loop point two sides Failure;(11) power station bus-bar fault where open loop point;(12) open loop point opposite side power station bus-bar fault;(13) route where open loop point Failure;(14) route opposite side where open loop point switchs jump;(15) it is confirmed after system acting;(16) wide area prepared auto restart closes a floodgate dynamic Make.
10. the adaptive region spare power automatic switching method under the mode according to claim 7 based on composite power supply, feature exist In: after charging complete, each spare power automatic switching system device determines operational mode automatically, if the following conditions are met for the moment: (1) non-to open Circling point switch jumps position without stream;(2) power station bus is without pressure and outlet is without stream;(3) there is bus differential protection action;(4) there is circuit optical fiber Longitudinal difference protection movement;(5) statements based on collusion station where open loop point or its opposite side statements based on collusion station are without pressure and inlet wire is without stream, then region spare power automatic switching system Starting carries out fault location, after waiting tripping delay, executes the trip signal of isolated fault, when confirmation is close to fault point power loss The former main power supply station switch stood jumps position, route without stream and after bus is without pressure, the line switching of former open loop point is closed, by the other side Independent electrical source station restore to power loss statements based on collusion station power supply, realize power switching.
CN201710551037.7A 2017-07-07 2017-07-07 Based on the adaptive region spare power automatic switching system and method under composite power supply mode Active CN107370235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710551037.7A CN107370235B (en) 2017-07-07 2017-07-07 Based on the adaptive region spare power automatic switching system and method under composite power supply mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710551037.7A CN107370235B (en) 2017-07-07 2017-07-07 Based on the adaptive region spare power automatic switching system and method under composite power supply mode

Publications (2)

Publication Number Publication Date
CN107370235A CN107370235A (en) 2017-11-21
CN107370235B true CN107370235B (en) 2019-08-16

Family

ID=60305938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710551037.7A Active CN107370235B (en) 2017-07-07 2017-07-07 Based on the adaptive region spare power automatic switching system and method under composite power supply mode

Country Status (1)

Country Link
CN (1) CN107370235B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109510299A (en) * 2018-11-05 2019-03-22 国电南瑞科技股份有限公司 Fault identification and decision system under a kind of Heavy-haul Freight railway over-zone feeding mode
CN109842204B (en) * 2019-04-11 2021-06-29 国网江苏省电力有限公司镇江供电分公司 Method for controlling standby power supply to be switched on at power supply side of hot standby circuit based on optical fiber channel
CN110601350A (en) * 2019-09-23 2019-12-20 云南电网有限责任公司曲靖供电局 High-voltage self-adaptive area spare power automatic switching system and spare power automatic switching control method thereof
CN111553554A (en) * 2020-03-20 2020-08-18 云南电网有限责任公司普洱供电局 Regional spare power automatic switching control system and operation risk management and control method thereof
CN111900803A (en) * 2020-08-07 2020-11-06 国网湖北省电力有限公司荆门供电公司 Recursive remote backup power automatic switching method and device based on GOOSE communication
CN112383033A (en) * 2020-10-10 2021-02-19 国网辽宁省电力有限公司电力科学研究院 System and method suitable for local rapid spare power automatic switching of power distribution network ring network line
CN113964930B (en) * 2021-11-08 2023-06-27 国网湖南省电力有限公司 Automatic cooperative control method and system for standby power supply of series power supply transformer substation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007020356A (en) * 2005-07-11 2007-01-25 Mitsubishi Electric Corp Uninterruptible power supply controller
JP2009153304A (en) * 2007-12-20 2009-07-09 Panasonic Electric Works Co Ltd Power supply system
CN104518564A (en) * 2013-09-26 2015-04-15 中国南方电网有限责任公司 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN104953697A (en) * 2015-04-23 2015-09-30 南京国电南自电网自动化有限公司 Spare power automatic switching system and method of chain type electrical-network
CN105515169A (en) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 Multilevel spare power automatic switching system, priority cooperation method, and construction method
CN105610236A (en) * 2016-01-14 2016-05-25 江苏金智科技股份有限公司 Method for automatic switching of emergency power supply of series network

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007020356A (en) * 2005-07-11 2007-01-25 Mitsubishi Electric Corp Uninterruptible power supply controller
JP2009153304A (en) * 2007-12-20 2009-07-09 Panasonic Electric Works Co Ltd Power supply system
CN104518564A (en) * 2013-09-26 2015-04-15 中国南方电网有限责任公司 Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN105515169A (en) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 Multilevel spare power automatic switching system, priority cooperation method, and construction method
CN104953697A (en) * 2015-04-23 2015-09-30 南京国电南自电网自动化有限公司 Spare power automatic switching system and method of chain type electrical-network
CN105610236A (en) * 2016-01-14 2016-05-25 江苏金智科技股份有限公司 Method for automatic switching of emergency power supply of series network

Also Published As

Publication number Publication date
CN107370235A (en) 2017-11-21

Similar Documents

Publication Publication Date Title
CN107370235B (en) Based on the adaptive region spare power automatic switching system and method under composite power supply mode
CN105762775A (en) Power grid self-healing system in 110kV chain type power supply mode and self-healing logic
CN107069676B (en) Distribution network failure positions and quickly isolates recovery control method
CN104319871B (en) Transformer station domain island protection and backup automatic switching integrated method
CN104518564B (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN103840439B (en) Main website coordinates the power distribution automation guard method realized with distributed terminal
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN104167808A (en) Automatic 220kV spare power switching method
CN109995024A (en) A kind of multistage power grid collaboration self-healing system and self-healing method
CN105896729A (en) Power distribution network based on FTUs and method for diagnosing and isolating faults
CN204068430U (en) A kind of intelligence longitudinally interconnected feeder automation control system
CN103001327A (en) Centralized protection measurement and control system of digital traction substation
CN106340951A (en) Hierarchical distributed intelligent regional bus-bar automatic transfer switch system
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN110492600A (en) Substation's novel intelligent DC power system and maintaining method
CN218102655U (en) High voltage control system
CN102684299B (en) Method and device for achieving spare automatic switching mode of various inlet lines of transformer substation
CN108736476A (en) Power grid self-healing system and method based on match cognization Yu multiple agent hybrid algorithm
CN110398668A (en) A kind of looped network of DC power on-line monitoring system and method
CN110601350A (en) High-voltage self-adaptive area spare power automatic switching system and spare power automatic switching control method thereof
CN104485732A (en) In-put control method for standby powers of transformer substations
CN106300339A (en) A kind of Fault Isolation based on unit style power distribution network and service restoration method
CN105207346B (en) Region spare power automatic switching method and system
CN203632361U (en) Logic controlling device for 110kV line automatic bus transfer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant