CN202550688U CN2012201843773U CN201220184377U CN202550688U CN 202550688 U CN202550688 U CN 202550688U CN 2012201843773 U CN2012201843773 U CN 2012201843773U CN 201220184377 U CN201220184377 U CN 201220184377U CN 202550688 U CN202550688 U CN 202550688U
Authority
CN
China
Prior art keywords
remote
power
control
signaling
remote control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201843773U
Other languages
Chinese (zh)
Inventor
孙建国
陈莉
谭向红
齐昕
苏国庆
陈浩
拱志新
赵传伟
董晓岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Corp filed Critical Tianjin Electric Power Corp
Priority to CN2012201843773U priority Critical patent/CN202550688U/en
Application granted granted Critical
Publication of CN202550688U publication Critical patent/CN202550688U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to a FA functional test simulator under non-power off state, its technical characterstic is: the remote-control testing device is formed by connecting a shell and a testing simulation circuit inside the shell, wherein the testing simulation circuit is formed by connecting a direct-current power supply, a remote-control testing module and a remote-signaling simulation module, the remote-control testing module comprises a plurality of paths of remote-control state indicating lamps and a controllable silicon, a remote-control pulse signal is connected to a control electrode of the controllable silicon, each path of remote-control state indicating lamp is connected with one controllable silicon, the remote-signaling simulation module comprises a plurality of paths of double-pole double-throw switches and corresponding remote-signaling state indicating lamps, and each path of double-pole double-throw switches is connected with two remote. The utility model relates to a rationally, avoided the switch action effectively and verified remote control, remote signaling function, guaranteed the FA functional test under the non-power off state, opened brand-new situation for FA field test, also provide effectual method for the comprehensive acceptance of city distribution automation test point engineering.

Description

一种非停电状态下FA功能测试仿真模拟器A Simulation Simulator for FA Function Test in Non-power-off State

技术领域 technical field

本实用新型属于电力配电自动化领域,尤其是一种非停电状态下FA功能测试仿真模拟器。The utility model belongs to the field of electric power distribution automation, in particular to a FA function test simulation simulator in a non-power failure state.

背景技术 Background technique

随着国民经济的高速发展,国家对电力的需求日益增长,同时对供电可靠性的要求也越来越高,配电自动化(DA)是提高电力企业供电可靠性和供电质量、扩大供电能力、实现配电网高效经济运行的重要手段,已得到越来越多电力科研人员的重视。为保证配电自动化产品质量,系统在投运前需要对系统的各个环节进行联调和测试,但在现有条件下,系统在研发过程和出厂测试过程中由于无法采集配电网运行的实时数据,馈线自动化(FA)的联调和某些功能的测试无法完整地进行,有些功能需到现场进行调试。但是,现场均为带负荷的运行设备,为了保证供电可靠性不可以对用户停电,非停电状态下的功能测试就显得尤为重要。另外,在配电网自动化改造过程中对停电时间要求就十分严格,进入测试阶更不允许对用户停电,为了保证供电可靠性,在非停电条件下对FA进行功能测试是目前迫切需要解决的问题。With the rapid development of the national economy, the country's demand for electricity is increasing, and at the same time, the requirements for power supply reliability are also getting higher and higher. Distribution automation (DA) is to improve the reliability and quality of power supply for power companies, expand power supply capacity, An important means to realize efficient and economical operation of distribution network has been paid more and more attention by electric power researchers. In order to ensure the quality of distribution automation products, the system needs to conduct joint debugging and testing of all aspects of the system before it is put into operation. , the joint commissioning of feeder automation (FA) and the testing of some functions cannot be carried out completely, and some functions need to be debugged on site. However, the site is all operating equipment with loads. In order to ensure the reliability of the power supply, it is not possible to cut off the power to the users, so the functional test in the non-power-off state is particularly important. In addition, in the process of distribution network automation transformation, the requirements for power outage time are very strict, and it is not allowed to power off users when entering the test stage. In order to ensure the reliability of power supply, it is urgent to solve the function test of FA under non-power outage conditions question.

实用新型内容 Utility model content

本实用新型的目的在于克服现有技术的不足,提供一种设计合理、可靠性高且使用方便的非停电状态下FA功能测试仿真模拟器。The purpose of the utility model is to overcome the deficiencies of the prior art, and provide a FA function test simulation simulator in a non-power-off state with reasonable design, high reliability and convenient use.

本实用新型解决其技术问题是采取以下技术方案实现的:The utility model solves its technical problem and realizes by taking the following technical solutions:

一种非停电状态下FA功能测试仿真模拟器,由机壳及其内部的测试仿真电路连接构成,在机壳上设置有多路遥控状态指示灯、多路遥信状态指示灯及与多路遥信状态指示灯相对应的双刀双掷开关;测试仿真电路由直流电源、遥控测试模块和遥信模拟模块连接构成,遥控测试模块包括多路遥控状态指示灯和可控硅,遥控脉冲信号连接到可控硅的控制极上,每路遥控状态指示灯均与一个可控硅相连,直流电源加载在每个可控硅及遥控状态指示灯之间;遥信模拟模块包括多路双刀双掷开关及相应的遥信状态指示灯,每路双刀双掷开关均连接两个遥信状态指示灯,直流电源加载在每个双刀双掷开关及遥信状态指示灯之间,通过拨动开关使对应的遥信状态指示灯发光,并向主站发送遥信脉冲信号。An FA function test simulation simulator in a non-power-off state, which is composed of a casing and its internal test simulation circuit. The casing is provided with multiple remote control status indicators, multiple remote signaling status indicators, and multiple The double-pole double-throw switch corresponding to the remote signal status indicator light; the test simulation circuit is composed of a DC power supply, a remote control test module and a remote signal analog module. Connected to the control pole of the thyristor, each remote control status indicator is connected to a thyristor, and the DC power is loaded between each thyristor and the remote control status indicator; the remote signaling analog module includes multiple double poles Double-throw switch and corresponding remote signaling status indicator light, each double-pole double-throw switch is connected to two remote signaling status indicator lights, DC power is loaded between each double-pole double-throw switch and remote signaling status indicator light, through Toggle the switch to make the corresponding remote signaling status indicator glow, and send a remote signaling pulse signal to the master station.

而且,所述的直流电源为3V直流电源。Moreover, the said DC power supply is a 3V DC power supply.

而且,所述的遥控状态指示灯和遥信状态指示灯均为发光二极管。Moreover, both the remote control status indicator light and the remote signaling status indicator light are light emitting diodes.

本实用新型的优点和积极效果是:Advantage and positive effect of the present utility model are:

本实用新型设计合理,通过遥控测试模块和遥信模拟模块可以接收断路器跳合闸信号、接收保护信号、模拟断路器跳合闸信号等遥控脉冲信号并发送模拟遥信变位信号,有效地避免了开关动作而又验证了遥控、遥信功能,保证了在非停电状态下的FA功能测试,为FA现场测试打开了全新的局面,也为城市配电自动化试点工程的全面验收提供了有效的方法。The utility model has a reasonable design, and can receive circuit breaker tripping and closing signals, receive protection signals, simulate circuit breaker tripping and closing signals and other remote control pulse signals through the remote control test module and the remote signal simulation module, and send simulated remote signal displacement signals, effectively It avoids switching action and verifies the functions of remote control and remote signaling, ensuring the FA function test in the non-power-off state, opening up a new situation for FA field testing, and also providing an effective test for the comprehensive acceptance of urban power distribution automation pilot projects. Methods.

附图说明 Description of drawings

图1是本实用新型的机壳前面板示意图;Fig. 1 is the schematic diagram of the front panel of the casing of the present utility model;

图2是本实用新型的测试仿真电路原理图;Fig. 2 is the schematic diagram of the test simulation circuit of the present utility model;

图3是本实用新型应用测试方案所选开闭站的接线示意图。Fig. 3 is a schematic diagram of the wiring of the switching station selected in the application test scheme of the utility model.

具体实施方式 Detailed ways

以下结合附图对本实用新型实施例做进一步详述。Embodiments of the utility model are described in further detail below in conjunction with the accompanying drawings.

一种非停电状态下FA功能测试仿真模拟器,由机壳及其内部的测试仿真电路连接构成。如图1所示,在机壳的前面板1上设置有16路遥控状态指示灯2、8路遥信状态指示灯3和8路双刀双掷开关4,遥控状态指示灯和遥信状态指示灯均采用发光二极管。测试仿真电路由3V直流电源、遥控测试模块和遥信模拟模块连接构成实现遥控接收、遥信发送功能,如图2所示。遥控测试模块包括16路发光二极管和16个可控硅,遥控脉冲信号连接到可控硅的控制极上,每路发光二极管均连接一个可控硅相连,3V直流电源加载在可控硅及发光二级管之间,遥控脉冲信号传送到遥控测试模块上触发二极管发光,即可判断是否接收到断路器跳合闸信号,可控硅的工作电压为0.8~1V,与遥控脉冲所产生的电压相吻合。遥信模拟模块包括8路双刀双掷开关及16个发光二极管,每路双刀双掷开关均连接两个发光二极管,3V直流电源加载在双刀双掷开关及发光二极管之间,拨动开关可以导通电路使与其对应的二极管发光,并同时发送一脉冲信号使主站接收到相应的遥信信号,实现了遥信模拟功能。The utility model relates to a FA function test emulation simulator in a non-power-off state, which is composed of a casing and an internal test emulation circuit connection. As shown in Figure 1, on the front panel 1 of the casing, there are 16 remote control status indicator lights 2, 8 remote signaling status indicator lights 3, and 8 double pole double throw switches 4, remote control status indicator lights and remote signaling status indicators. The indicator lights are all light-emitting diodes. The test simulation circuit is composed of a 3V DC power supply, a remote control test module and a remote signal simulation module connected to realize the functions of remote control reception and remote signal transmission, as shown in Figure 2. The remote control test module includes 16 light-emitting diodes and 16 thyristors. The remote control pulse signal is connected to the control pole of the thyristor. Each light-emitting diode is connected to a thyristor. The 3V DC power is loaded on the thyristor and the light Between the two diodes, the remote control pulse signal is transmitted to the remote control test module to trigger the diode to emit light, and it can be judged whether the circuit breaker tripping signal is received. match. The remote signaling analog module includes 8 double-pole double-throw switches and 16 light-emitting diodes. Each double-pole double-throw switch is connected to two light-emitting diodes. The switch can turn on the circuit to make the corresponding diode light up, and at the same time send a pulse signal to make the master station receive the corresponding remote signaling signal, realizing the remote signaling simulation function.

本FA功能测试仿真模拟器在使用时,将遥控测试模块的出线接到FA遥控出口压板上,当主站下发遥控命令时,遥控脉冲信号到达遥控测试模块使相应的发光二极管发光。将相应的遥信模拟模块接到与其对应遥信信号端子上,当拨动开关导通电路时,会有电压传回FA测控装置,从而使主站接收到相应的遥信信号,当开关拨到上面时,上面一排二极管发光,拨到下面时,下面一排二极管亮发光。When the FA function test simulator is in use, connect the outgoing line of the remote control test module to the FA remote control outlet pressure plate. When the master station sends a remote control command, the remote control pulse signal reaches the remote control test module to make the corresponding LED light up. Connect the corresponding remote signaling analog module to its corresponding remote signaling signal terminal. When the toggle switch conducts the circuit, there will be voltage transmitted back to the FA measurement and control device, so that the master station receives the corresponding remote signaling signal. When the switch is turned on When it is on the top, the upper row of diodes will glow, and when it is turned to the bottom, the lower row of diodes will be on.

本FA功能测试仿真模拟器可应用于配电自动化调试验收中,集中式、就地式均可。下面以就地式FA为例进行说明,如图3所示,该配电自动化环网由配电站NK124和配电站NK800两条馈线连接构成。根据负荷分布情况,将利2305负2开关设置为联络开关,在NK124和NK800的源端增设分界断路器并设置相应保护,确保产生故障电流时此分界断路器先于10KV出线开关动作,保证了整个过程中对用户不停电。测试过程中用继电保护测试仪在电流端子上加各种类型的故障电流来模拟各种不同故障,主站监听到故障信息后启动故障处理流程,通过分析故障位置、故障类型等信息进行决策分析并发出故障隔离指令,即可实现在非停电状态下集中式FA的功能测试。在测试遥控功能时,首先确定现场所有开关在远方位置,并将现场所有遥控投入连接压板断开,不允许对开关直接进行遥控操作,为了测试FA遥控信号,我们在每个开闭站内的遥控出口压板处接入本FA功能测试仿真模拟器接,当控合继电器动作后遥控脉冲会使模拟断路器上的小灯会变亮,此时我们认为遥控操作成功。在测试遥信功能时,同样在遥信端子处接入本FA功能测试仿真模拟器,当模拟断路器显示开关控合成功后手动拨动模拟断路器上的开关使“开关状态”的遥信端子形成通路,即可上报开关合信号;若模拟断路器上显示开关控分成功则拨动开关使“开关状态”遥信端子断开,此时主站端将收到开关分信号。同样,将任何一路遥信端子接入模拟断路器均可实现遥信信号的上传。This FA function test simulation simulator can be used in the commissioning and acceptance of distribution automation, both centralized and local. In the following, the on-site FA is taken as an example. As shown in Figure 3, the distribution automation ring network is composed of two feeder connections of the distribution station NK124 and the distribution station NK800. According to the load distribution, the Li 2305 negative 2 switch is set as a tie switch, and a boundary circuit breaker is added at the source end of NK124 and NK800 and corresponding protection is set to ensure that the boundary circuit breaker operates before the 10KV outlet switch when a fault current occurs, ensuring During the whole process, there is no power outage to the user. During the test, the relay protection tester is used to add various types of fault currents to the current terminals to simulate various faults. After monitoring the fault information, the master station starts the fault processing process and makes decisions by analyzing fault location, fault type and other information By analyzing and issuing fault isolation instructions, the functional test of the centralized FA can be realized in the non-power-off state. When testing the remote control function, first make sure that all the switches on the site are in remote locations, and disconnect all the remote control input and connection pressure plates on the site, and direct remote control operations on the switches are not allowed. In order to test the FA remote control signal, we use the remote The outlet pressure plate is connected to the FA function test simulation simulator. When the control relay operates, the remote control pulse will make the small light on the simulated circuit breaker light up. At this time, we believe that the remote control operation is successful. When testing the remote signaling function, the FA function test simulation simulator is also connected to the remote signaling terminal. When the analog circuit breaker shows that the switch control is successfully completed, manually toggle the switch on the analog circuit breaker to make the "switch state" remote signaling When the terminal forms a path, the switch close signal can be reported; if the analog circuit breaker shows that the switch control is successful, toggle the switch to disconnect the "switch state" remote signaling terminal, and the master station will receive the switch close signal. Similarly, connecting any remote signaling terminal to an analog circuit breaker can realize uploading of remote signaling signals.

本FA功能测试仿真模拟器按照接入电网的开闭站数目对该区域馈线终端进行调试验收,先对2条馈线段组成的环网进行调试验收,随着工程进度增加参与主站端调试的馈线段数目,最终实现对试点区域内全部开闭站的集中式联调。通过配电自动化的全面使用,在发生故障时主站监听到故障信号后直接启动DA程序,在最短的时间内隔离了故障,将从根本上减少用户平均停电次数,缩短用户平均停电时间,减少停电总时户数,从而提高供电可靠率。This FA function test simulation simulator conducts commissioning and acceptance of the regional feeder terminal according to the number of switching stations connected to the power grid. The number of feeder sections will be adjusted, and finally the centralized joint commissioning of all switching stations in the pilot area will be realized. Through the comprehensive use of power distribution automation, when a fault occurs, the master station will directly start the DA program after monitoring the fault signal, and isolate the fault in the shortest time, which will fundamentally reduce the average number of power outages for users, shorten the average power outage time for users, and reduce The total number of households during power outages, thereby improving the reliability of power supply.

需要强调的是,本实用新型所述的实施例是说明性的,而不是限定性的,因此本实用新型并不限于具体实施方式中所述的实施例。凡是根据本实用新型的技术方案得出的其他实施方式,同样属于本实用新型保护的范围。It should be emphasized that the embodiments described in the present invention are illustrative rather than restrictive, so the present invention is not limited to the embodiments described in the specific implementation. All other implementations obtained according to the technical solution of the present utility model also belong to the scope of protection of the utility model.

Claims (3)

1.一种非停电状态下FA功能测试仿真模拟器,其特征在于:由机壳及其内部的测试仿真电路连接构成,在机壳上设置有多路遥控状态指示灯、多路遥信状态指示灯及与多路遥信状态指示灯相对应的双刀双掷开关;测试仿真电路由直流电源、遥控测试模块和遥信模拟模块连接构成,遥控测试模块包括多路遥控状态指示灯和可控硅,遥控脉冲信号连接到可控硅的控制极上,每路遥控状态指示灯均与一个可控硅相连,直流电源加载在每个可控硅及遥控状态指示灯之间;遥信模拟模块包括多路双刀双掷开关及相应的遥信状态指示灯,每路双刀双掷开关均连接两个遥信状态指示灯,直流电源加载在每个双刀双掷开关及遥信状态指示灯之间,通过拨动开关使对应的遥信状态指示灯发光,并向主站发送遥信脉冲信号。1. FA function test emulation simulator under a kind of non-power-off state, it is characterized in that: be formed by the test emulation circuit connection of casing and its inside, be provided with multi-channel remote control status indicator light, multi-channel remote signal status on the casing The indicator light and the double-pole double-throw switch corresponding to the multi-channel remote signal status indicator light; the test simulation circuit is composed of a DC power supply, a remote control test module and a remote signal simulation module. The remote test module includes a multi-channel remote control status indicator light and a SCR, the remote control pulse signal is connected to the control pole of the SCR, each remote control status indicator is connected to a SCR, and the DC power is loaded between each SCR and the remote control status indicator; remote signal simulation The module includes multiple DPDT switches and corresponding remote signaling status indicators. Each DPDT switch is connected to two remote signaling status indicators. DC power is loaded on each DPDT switch and remote signaling status indicators. Between the indicator lights, the corresponding remote signaling status indicator light is illuminated by a toggle switch, and a remote signaling pulse signal is sent to the master station. 2.根据权利要求1所述的一种非停电状态下FA功能测试仿真模拟器,其特征在于:所述的直流电源为3V直流电源。2. The FA function test emulation simulator in a non-power-off state according to claim 1, characterized in that: said DC power supply is a 3V DC power supply. 3.根据权利要求1所述的一种非停电状态下FA功能测试仿真模拟器,其特征在于:所述的遥控状态指示灯和遥信状态指示灯均为发光二极管。3. The FA function test simulation simulator in a non-power-off state according to claim 1, characterized in that: the remote control status indicator light and the remote signaling status indicator light are both light-emitting diodes.
CN2012201843773U 2012-04-27 2012-04-27 A Simulation Simulator for FA Function Test in Non-power-off State Expired - Fee Related CN202550688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201843773U CN202550688U (en) 2012-04-27 2012-04-27 A Simulation Simulator for FA Function Test in Non-power-off State

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201843773U CN202550688U (en) 2012-04-27 2012-04-27 A Simulation Simulator for FA Function Test in Non-power-off State

Publications (1)

Publication Number Publication Date
CN202550688U true CN202550688U (en) 2012-11-21

Family

ID=47171256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201843773U Expired - Fee Related CN202550688U (en) 2012-04-27 2012-04-27 A Simulation Simulator for FA Function Test in Non-power-off State

Country Status (1)

Country Link
CN (1) CN202550688U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103051065A (en) * 2012-12-29 2013-04-17 安徽科大智能电网技术有限公司 Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN103840559A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Looped network outdoor station fault simulator and fault simulation method thereof
CN103837785A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Feeder automation detection and simulation system
CN109581153A (en) * 2019-01-13 2019-04-05 国网江西省电力有限公司电力科学研究院 A kind of 10kV feeder automation test simulation breaker
CN118430222A (en) * 2024-03-26 2024-08-02 国网北京市电力公司 Remote control function detection device and remote control function detection method of measurement and control device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103051065A (en) * 2012-12-29 2013-04-17 安徽科大智能电网技术有限公司 Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN103840559A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Looped network outdoor station fault simulator and fault simulation method thereof
CN103837785A (en) * 2014-03-28 2014-06-04 国网上海市电力公司 Feeder automation detection and simulation system
CN109581153A (en) * 2019-01-13 2019-04-05 国网江西省电力有限公司电力科学研究院 A kind of 10kV feeder automation test simulation breaker
CN118430222A (en) * 2024-03-26 2024-08-02 国网北京市电力公司 Remote control function detection device and remote control function detection method of measurement and control device

Similar Documents

Publication Publication Date Title
CN101739877B (en) Simulation training system of 10KV typical customer distribution room
CN202218067U (en) Automated intelligent information pointing system of electric power system
CN202550688U (en) A Simulation Simulator for FA Function Test in Non-power-off State
CN103364663B (en) Intelligent device for simulating transformer substation primary equipment behavior
CN112285447B (en) A switch drawer test circuit and test equipment
CN103837785A (en) Feeder automation detection and simulation system
CN104076805A (en) Test system for automatic control equipment of power distribution network
CN104849591B (en) A kind of power distribution automation integration test detection means
CN203365563U (en) Intelligent simulated circuit breaker
CN204009008U (en) A kind of intelligent substation protective relaying device proving installation
CN104298228A (en) Detection device and method for intelligent high-voltage switch control system
CN202305690U (en) Passive spare power supply automatic switching tester
CN204065268U (en) A kind of backup auto-activating device detection module for laboratory
CN210780231U (en) Intelligent distributed comprehensive test platform
CN212845642U (en) A Feeder Automation Function Verification Test System
CN202548291U (en) Special controller for testing mechanical behavior of pole-mounted vacuum automatic distribution switch
CN203191816U (en) Test System for Automatic Control Equipment of Distribution Network
CN202339392U (en) High-efficiency cable detector
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN204065175U (en) A kind of mimic-disconnecting switch being applicable to intelligent substation multi-voltage grade operation circuit
CN202976623U (en) Simulation demonstration device used for training remote electrical load control
CN204316171U (en) A kind of debugging operations platform of automatic change-over controller
CN204203426U (en) MRR relay rapid verification platform
CN202362426U (en) Test device of vacuum circuit breaker
CN206321718U (en) A kind of simple mimic-disconnecting switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130522

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130522

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300010 HEBEI, TIANJIN TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130522

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Tianjin Electric Power Corp.

Address before: 300010 Tianjin city Hebei District Wujing Road No. 39

Patentee before: Tianjin Electric Power Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20190427