CN109901492A - A kind of power scheduling monitoring system monitoring information comparison acceptance method - Google Patents
A kind of power scheduling monitoring system monitoring information comparison acceptance method Download PDFInfo
- Publication number
- CN109901492A CN109901492A CN201711303474.3A CN201711303474A CN109901492A CN 109901492 A CN109901492 A CN 109901492A CN 201711303474 A CN201711303474 A CN 201711303474A CN 109901492 A CN109901492 A CN 109901492A
- Authority
- CN
- China
- Prior art keywords
- monitoring information
- information
- monitoring
- power scheduling
- automatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of power scheduling monitoring system monitoring informations to compare acceptance method, is collected conclusion to monitoring information first, forms monitoring information point table, and be standardized to monitoring information point table;Classification processing is carried out to substation's dispatching terminal monitoring information of certain time period again, keeps it corresponding with monitoring information point table association;Pass through period substation's dispatching terminal monitoring information corresponding in power scheduling monitoring system extraction step two again;The warning information of same period, same equipment are identified, and according to the incidence relation in step 2, are compared, matching rate is compared and reaches 80% or more person, examination passes through, and processing is marked to not up to 80% warning information, by manually being reviewed.The application is no longer compared examination by real-time communication mode one by one, can be significantly improved monitoring information checking and accepting efficiency, be liberated the productive forces.
Description
Technical field
The present invention relates to a kind of power scheduling monitoring system monitoring informations to compare acceptance method.
Background technique
The monitoring system that electric dispatching department uses at present does not have warning information and checks and accepts function, this works all by supervising
Personnel are compared examination, efficiency pole by artificial real-time communication mode one by one in control personnel and station in distant place substation
It is low.
Summary of the invention
The purpose of the application is to propose a kind of power scheduling monitoring system prison for improving monitoring information checking and accepting efficiency
It controls information intelligent and compares acceptance method.
The technical solution of the application is achieved in that a kind of power scheduling monitoring system monitoring information compares examination side
Method comprising the steps of: step 1 is collected conclusion to monitoring information first, forms monitoring information point table, and believe monitoring
Breath point table is standardized, and complies with " monitoring information specification " requirement;Step 2: again to the substation of certain time period
Dispatching terminal monitoring information carries out classification processing, keeps it corresponding with monitoring information point table association;Step 3: being supervised again by power scheduling
Corresponding period substation's dispatching terminal monitoring information in control system extraction step two;Step 4: to same period, same equipment
Warning information identified, and according to the incidence relation in step 2, be compared, compare matching rate and reach 80% or more person,
Examination passes through, and processing is marked to not up to 80% warning information, by manually being reviewed.
Due to implementing above-mentioned technical proposal, the application can not only liberate staff in monitoring personnel and substation station,
It is set no longer to be compared examination one by one by real-time communication mode, moreover it is possible to which it is automatically complete to execute intelligent alignment algorithm using computer
It is checked and accepted at monitoring information, checking and accepting efficiency is 10 times or more manually checked and accepted, and accuracy rate is up to 90% or more.Application of the invention,
Monitoring information checking and accepting efficiency can be significantly improved, is liberated the productive forces.
Specific embodiment
The application is not limited by following embodiments, can be determined according to the technical solution of the application and actual conditions specific
Embodiment.
Embodiment: a kind of power scheduling monitoring system monitoring information, which compares acceptance method and relies on, integrated automatic checks and accepts system
System is completed, and the automatic Acceptance Test System of integration checks and accepts work including the automatic Accreditation Tool of distal end integration and proximal end integration automatically
Tool;The automatic Accreditation Tool of distal end integration is portable tester, and the automatic Accreditation Tool of proximal end integration is integrated in
In smart grid Dispatching Control System.
Automatically Accreditation Tool includes: for the distal end integration
Functional module is checked, is identified for the warning information to same period, same equipment, and according to by sometime
Substation's dispatching terminal monitoring information of section carries out classification processing, closes its generated association corresponding with monitoring information point table association
System is compared;
Client functionality module, realization receive monitoring information;
FTP functional module, realization are read out monitoring information;
Distal information acceptance report functional module realizes the information forward to the multiple channels of data communication gate machine and monitoring backstage
Information carry out artificial nucleus to generate acceptance report.
Automatically Accreditation Tool includes: for the proximal end integration
Point table information check functional module, is realized to the regulation preposition telecontrol information of main website and the supervisory control of substation information audited
Fixed value list is checked;
Server-side functional module realizes artificial triggering or the variation of automatic trigger advance data, for checking regulation master information just
True property;
Advance data correctness checks functional module, realizes that the data arrived to regulation main website preamble reception carry out correctness verification.
A kind of power scheduling monitoring system monitoring information comparison acceptance method comprising the steps of:
Step 1, the automatic Accreditation Tool of distal end integration read the monitoring information of data communication gateway machine by FTP functional module
It is collected conclusion, forms monitoring information point table, and be standardized to monitoring information point table, complies with " monitoring letter
Breath specification " it requires;
Step 2: integration automatic Accreditation Tool in distal end again sorts out substation's dispatching terminal monitoring information of certain time period
Processing, keeps it corresponding with monitoring information point table association;
Step 3: passing through the integrated automatic Accreditation Tool extraction step in the proximal end being integrated in smart grid Dispatching Control System again
Corresponding period substation's dispatching terminal monitoring information in two;
Step 4: identified to the warning information of same period, same equipment, and according to the incidence relation in step 2,
It being compared, compares matching rate and reach 80% or more person, examination passes through, processing is marked to not up to 80% warning information,
By manually being reviewed.
The above technical characteristic constitutes the most preferred embodiment of the application, with stronger adaptability and best implementation effect
Fruit can increase and decrease inessential technical characteristic according to actual needs, to meet the needs of different situations.
Claims (4)
1. a kind of power scheduling monitoring system monitoring information compares acceptance method comprising the steps of:
Step 1 is collected conclusion to monitoring information first, forms monitoring information point table, and mark to monitoring information point table
Quasi-ization processing;
Step 2: carrying out classification processing to substation's dispatching terminal monitoring information of certain time period again, make itself and monitoring information point
Table association corresponds to;
Step 3: passing through period substation's dispatching terminal monitoring information corresponding in power scheduling monitoring system extraction step two again;
Step 4: identified to the warning information of same period, same equipment, and according to the incidence relation in step 2,
It being compared, compares matching rate and reach 80% or more person, examination passes through, processing is marked to not up to 80% warning information,
By manually being reviewed.
2. a kind of power scheduling monitoring system monitoring information as described in claim 1 compares acceptance method, which is characterized in that one
Kind power scheduling monitoring system monitoring information compares acceptance method and relies on integrated automatic Acceptance Test System completion, the integration
Automatic Acceptance Test System includes the automatic Accreditation Tool of distal end integration and the automatic Accreditation Tool of proximal end integration;The distal end integration
Automatic Accreditation Tool is portable tester, and the automatic Accreditation Tool of proximal end integration is integrated in smart grid scheduling controlling system
In system.
3. a kind of power scheduling monitoring system monitoring information as claimed in claim 2 compares acceptance method, which is characterized in that institute
Stating the automatic Accreditation Tool of distal end integration includes: check functional module, for the warning information to same period, same equipment
It is identified, and carries out classification processing according to by substation's dispatching terminal monitoring information of certain time period, make itself and monitoring information
Incidence relation caused by point table association is corresponding is compared;Client functionality module, realization receive monitoring information;
FTP functional module, realization are read out monitoring information;Distal information acceptance report functional module is realized to data communication network
The information of multiple channel forwardings of shutting down and the information on monitoring backstage carry out artificial nucleus to generation acceptance report.
4. a kind of power scheduling monitoring system monitoring information as claimed in claim 2 compares acceptance method, which is characterized in that institute
Stating the automatic Accreditation Tool of proximal end integration includes: a table information check functional module, is realized to the regulation preposition telecontrol information of main website
It is checked with the supervisory control of substation information fixed value list audited;Server-side functional module realizes artificial triggering or automatic touching
Advance data variation is sent out, for checking regulation master information correctness;Advance data correctness checks functional module, and realization is exchanged
The data that control main website preamble reception arrives carry out correctness verification.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711303474.3A CN109901492A (en) | 2017-12-11 | 2017-12-11 | A kind of power scheduling monitoring system monitoring information comparison acceptance method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711303474.3A CN109901492A (en) | 2017-12-11 | 2017-12-11 | A kind of power scheduling monitoring system monitoring information comparison acceptance method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109901492A true CN109901492A (en) | 2019-06-18 |
Family
ID=66941510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711303474.3A Pending CN109901492A (en) | 2017-12-11 | 2017-12-11 | A kind of power scheduling monitoring system monitoring information comparison acceptance method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109901492A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110598805A (en) * | 2019-10-15 | 2019-12-20 | 广东电网有限责任公司 | Method and system for identifying monitoring information of power system |
CN110737752A (en) * | 2019-10-15 | 2020-01-31 | 广东电网有限责任公司 | electric power monitoring information identification method, device and system |
CN110737753A (en) * | 2019-10-15 | 2020-01-31 | 广东电网有限责任公司 | method and system for identifying monitoring information of power system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104184208A (en) * | 2014-08-13 | 2014-12-03 | 国家电网公司 | Integrated automation information proofreading system of transformer substation |
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN106329730A (en) * | 2016-09-14 | 2017-01-11 | 国网江苏省电力公司连云港供电公司 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
CN106570781A (en) * | 2016-11-02 | 2017-04-19 | 国家电网公司 | Intelligent transformer station monitoring information step-by-step checking and accepting method based on three-layer double-network structure |
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
-
2017
- 2017-12-11 CN CN201711303474.3A patent/CN109901492A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104184208A (en) * | 2014-08-13 | 2014-12-03 | 国家电网公司 | Integrated automation information proofreading system of transformer substation |
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN106329730A (en) * | 2016-09-14 | 2017-01-11 | 国网江苏省电力公司连云港供电公司 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
CN106570781A (en) * | 2016-11-02 | 2017-04-19 | 国家电网公司 | Intelligent transformer station monitoring information step-by-step checking and accepting method based on three-layer double-network structure |
CN106971351A (en) * | 2017-03-27 | 2017-07-21 | 国网江苏省电力公司电力科学研究院 | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
Non-Patent Citations (1)
Title |
---|
朱明星等: "智能变电站遥信自动验收系统的研制与应用", 《科技创新与应用》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110598805A (en) * | 2019-10-15 | 2019-12-20 | 广东电网有限责任公司 | Method and system for identifying monitoring information of power system |
CN110737752A (en) * | 2019-10-15 | 2020-01-31 | 广东电网有限责任公司 | electric power monitoring information identification method, device and system |
CN110737753A (en) * | 2019-10-15 | 2020-01-31 | 广东电网有限责任公司 | method and system for identifying monitoring information of power system |
CN110737752B (en) * | 2019-10-15 | 2022-08-19 | 广东电网有限责任公司 | Electric power monitoring information identification method, device and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106971351B (en) | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method | |
CN109901492A (en) | A kind of power scheduling monitoring system monitoring information comparison acceptance method | |
CN110401692B (en) | Integrated automatic checking and accepting system and method for monitoring information of transformer substation | |
CN103812577A (en) | Method for automatically identifying and learning abnormal radio signal type | |
CN104052633A (en) | Integrated testing method for intelligent station 61850 and telecontrol 104 protocol | |
CN108073722B (en) | Automatic verification device and method for newly-built substation main and sub-station graphs and models | |
CN104270779A (en) | Wireless network fault cause preprocessing method and wireless network fault work order dispatching system | |
CN109559064A (en) | The operation and maintenance method of gate based on Internet of Things | |
CN107680193A (en) | A kind of mobile patrolling and checking management system and its application method | |
CN103905275A (en) | Electric power telecontrol equipment testing method based on IEC61850 replacement services | |
CN108996344A (en) | A kind of elevator faults maintenance response system and its method based on cell phone application | |
CN106056218A (en) | Equipment monthly maintenance scheduling optimization method considering overload and transient stability constraint | |
CN112084873A (en) | Five-prevention safety auxiliary method based on face recognition | |
CN103440693A (en) | Anti-error system and method for power grid region | |
CN110503215A (en) | Method based on image recognition technology identification equipment state, failure and processing exception | |
CN104578412B (en) | A kind of detection method of the condition detecting system based on big data technology | |
CN205986326U (en) | Transformer substation's hyperbaric chamber intelligent recognition device | |
CN103544104B (en) | Testing method for power distribution terminal remote control functional software module | |
CN109191006A (en) | A kind of method of 110 kV main transformer N-1 risk automatically scanning of power grid analysis | |
CN104573366A (en) | Method for verifying electric quantity data based on calculation of electric power load integrals | |
CN104317868A (en) | Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application | |
CN112101916A (en) | Method and device for quickly standardizing monitoring information point table and computer readable storage medium | |
CN208147865U (en) | A kind of sound recognition system applied to robot used for intelligent substation patrol | |
CN105224729A (en) | Based on the information access method of inspection of substation secondary device panoramic information simulation | |
CN105006890B (en) | A kind of intelligent substation device program managing and control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190618 |
|
WD01 | Invention patent application deemed withdrawn after publication |