CN103905275A - Electric power telecontrol equipment testing method based on IEC61850 replacement services - Google Patents
Electric power telecontrol equipment testing method based on IEC61850 replacement services Download PDFInfo
- Publication number
- CN103905275A CN103905275A CN201410117628.XA CN201410117628A CN103905275A CN 103905275 A CN103905275 A CN 103905275A CN 201410117628 A CN201410117628 A CN 201410117628A CN 103905275 A CN103905275 A CN 103905275A
- Authority
- CN
- China
- Prior art keywords
- electric power
- iec61850
- data
- testing
- power telemechanical
- Prior art date
Links
- 230000011664 signaling Effects 0.000 claims abstract description 13
- 238000004891 communication Methods 0.000 claims description 14
- 230000000875 corresponding Effects 0.000 claims description 3
- 280000255884 Dispatching companies 0.000 abstract description 4
- 238000004088 simulation Methods 0.000 abstract 1
- 230000003319 supportive Effects 0.000 abstract 1
- 238000005516 engineering processes Methods 0.000 description 4
- 238000000034 methods Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 239000000463 materials Substances 0.000 description 2
- 238000006467 substitution reactions Methods 0.000 description 2
- 229940040608 SPS Drugs 0.000 description 1
- 241000197722 Sphaeroceridae Species 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002452 interceptive Effects 0.000 description 1
- 230000001131 transforming Effects 0.000 description 1
- 239000002699 waste materials Substances 0.000 description 1
Abstract
Description
Technical field
The present invention relates to replace service based on IEC61850 and realize the method that electric power telemechanical device is tested, be adapted to, in intelligent grid supporting system technology and intelligent substation electric power telemechanical device information interactive process, belong to power system automation technology field.
Background technology
Along with the application of intelligent substation technology, to intelligent substation, test is the prerequisite that ensures later stage safe and reliable operation.For ensureing the safe and reliable of communication quality between the main factory of automation system for the power network dispatching, need detect through strict networking the electric power telemechanical device of each access dispatching automated system, a kind of method that replaces the electric power telemechanical device test of service based on IEC61850 that the present invention proposes, can realize the remote signalling of sending on tested telemechanical apparatus, the correctness of SOE event and telemetry and real-time are carried out automation detection, ensure tested telemechanical apparatus communication capacity, complete communication quality and assess and form templating test report, the correctness of test result that improved testing efficiency strong guarantee.
Summary of the invention
For solving the deficiencies in the prior art, the object of the present invention is to provide a kind of method that replaces the electric power telemechanical device test of service based on IEC61850.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme:
The electric power telemechanical device method of testing that replaces service based on IEC61850, comprises the steps:
Step 1: set up the main website test macro that possesses the IEC61850MMS client that replaces service function, this main website test macro possesses bay level IED equipment replacement service function, and can receive the information of sending on IED equipment;
Step 2: set up emulation IED equipment, support to replace service function;
Step 3: IEC61850MMS client is served remote measurement and the remote signalling data value of establishing to emulation IED equipment by replacement, and emulation IED equipment is accepted the MMS client value of establishing, will deliver to electric power telemechanical device to be measured in substituted data;
Step 4: compare by the value of sending on the original value to IEC61850 replacement service configuration and electric power telemechanical device to be measured, verify that electric power telemechanical device to be measured receives and the correctness of forwarding data., compare with tested device uplink data sending stream by replacing the data of service down distributing according to main website, comparison result is formed to test report automatically, automatically form test report according to issuing up data flow.
Described electric power telemechanical device comprises remote signalling, SOE event, telemetry parameter information.Described remote signalling parameter comprises imformosome period, burst time value, remote signalling state; Described SOE event comprises that markers, remote signalling state value occur for imformosome period, SOE; Described telemetry parameter comprises imformosome period, remote measurement numerical value.
The support of emulation IED equipment periodically, data variation or always call together and send mode in data.
When test, main website test macro and emulation IED equipment are set up IEC61850 communication connection, set up IEC104 communication connection with tested electric power telemechanical device; The communication connection that tested electric power telemechanical device and emulation IED equipment are set up IEC61850.
The data of the data of tested electric power telemechanical device and emulation IED equipment corresponding points are consistent.
Realize the emulation of dispatching automation main station system by computer software, can simulate the whole communication process of actual main website, and support IEC61850 client functionality, can receive the information of sending on intelligent electronic device (IED) equipment, and support to replace service; And realize the emulation of IED equipment by computer software, and input as data using the numerical value that IEC61850 replaces service configuration; Regulation and control main website receives and analyzes the IED data that electric power telemechanical device collection forwards, and compares analysis with replacing the service value of establishing, and completes the test of different stipulations electric power telemechanical devices, correctness and the promptness of checking electric power telemechanical device forwarding information.
The beneficial effect that the present invention reaches:
The present invention's beneficial effect is compared with the prior art, the present invention utilizes IEC61850 to replace service function, realize the IED equipment value of establishing to emulation, and be worth based on this to electric power telemechanical device forward parameter value compare, ensure accuracy and the promptness of comparison data source, the convenient and swift detection electric power telemechanical device ability to communicate of energy, the debugging of original power telemechanical apparatus is complicated, waste time and energy, and detect inadequate problem, the present invention can perfectly solve intelligent substation integration testing, the workload that onsite acceptance link is loaded down with trivial details, manpower and materials are saved, improve networking detection efficiency, can comprehensively test electric power telemechanical device, the fail safe putting into operation for electric power telemechanical device, reliable rows provides guarantee.
Brief description of the drawings
Fig. 1 the present invention is based on the flow chart that IEC61850 replaces the electric power telemechanical device method of testing of service;
Fig. 2 is that IEC61850 replaces service principle realization figure.
Embodiment
As shown in Fig. 1 replaces the electric power telemechanical device method of testing of serving flow chart based on IEC61850, technical solution is described in detail as follows: set up the main website test macro that possesses the IEC61850MMS client that replaces service function by computer software technology, receive the information of sending on the IED equipment of emulation, set up the IED equipment of emulation simultaneously, support to replace service function.IEC61850MMS client is served remote measurement and the remote signalling data value of establishing to emulation IED equipment by replacement, IED analog simulator is accepted the MMS client value of establishing, and support periodicity, data variation, always call together etc. in data and send mode, to delivering to electric power telemechanical device to be measured in substituted data.Compare by the value of sending on the original value to IEC61850 replacement service configuration and electric power telemechanical device to be measured, verify that device to be measured receives and the correctness of forwarding data.
Testing process is mainly divided into following five steps:
(1) main website test macro is set up IEC61850 communication connection to emulation IED equipment, and tested electric power telemechanical device is set up to IEC104 communication connection.The communication connection that tested electric power telemechanical device is also set up IEC61850 with emulation IED equipment.So the data of tested electric power telemechanical device should be consistent with the data of emulation IED equipment corresponding points.
(2) this testing scheme is compared to the data of the data that gather from IEC104 and IEC61850 collection by main website test macro, with correctness and the real-time of verification equipment under test (tested electric power telemechanical device) data processing.
(3) correctness comparison: by data value comparison inspection, owing to may adopting different data transmission formats, data allow to have a less transformed error, by default.
(4) real-time comparison: test by delta data, obtain time difference of new data more with IEC61850 passage and IEC104 passage and obtain the result of the real-time of equipment under test.
(5) output test result, form test report.
For realizing the correctness of test, need the data of comparison automatically to set by this test macro, this programme adopts the substitution value model realization of IEC61850.Be convenient to like this test function and the performance of equipment under test under various value conditions.Fig. 2 is that IEC61850 replaces service principle realization figure, and in the replacement service model of IEC61850, subEna is mainly used in replacing and enables.As this attribute is made as TRUE, the data attribute of the value of representative data example will be set as the same value of the data attribute of storing data instance substitution value always; As this attribute is made as FALSE, the data attribute of the value of representative data example will be based on process values.For different CDC, subEna is used for lower Column Properties:
Thus, the present invention is based on IEC61850 replace the electric power telemechanical device method of testing of service can convenient, fast each electric power telemechanical device of detection electric power telemechanical device communication value, solve in intelligent substation debugging link, electric power telemechanical device is debugged complexity, is wasted time and energy, and detect inadequate problem, manpower and materials are saved, improve networking detection efficiency, can make complete test to each electric power telemechanical device of electric power telemechanical device, the fail safe, the reliable rows that put into operation for electric power telemechanical device provide guarantee.
More than show and described general principle of the present invention, principal character and advantage.The technical staff of the industry should understand, and above-mentioned case study on implementation does not limit the present invention in any form, and all employings are equal to replaces or technical scheme that the mode of equivalent transformation obtains, all drops in protection scope of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410117628.XA CN103905275A (en) | 2014-03-27 | 2014-03-27 | Electric power telecontrol equipment testing method based on IEC61850 replacement services |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410117628.XA CN103905275A (en) | 2014-03-27 | 2014-03-27 | Electric power telecontrol equipment testing method based on IEC61850 replacement services |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103905275A true CN103905275A (en) | 2014-07-02 |
Family
ID=50996432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410117628.XA CN103905275A (en) | 2014-03-27 | 2014-03-27 | Electric power telecontrol equipment testing method based on IEC61850 replacement services |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103905275A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104579817A (en) * | 2014-11-14 | 2015-04-29 | 国家电网公司 | Communication loop test method based on GOOSE (generic object-oriented substation event) logics |
CN104820635A (en) * | 2015-04-07 | 2015-08-05 | 南京国电南自电网自动化有限公司 | Method of testing robustness of closed loop protocol based on semantic analysis of dynamic script |
CN105511294A (en) * | 2015-11-24 | 2016-04-20 | 积成电子股份有限公司 | Simulated-IED-device-based simulated telecontrol virtual debugging method |
CN106301976A (en) * | 2015-05-22 | 2017-01-04 | 上海研电电力科技有限公司 | A kind of intelligent substation schedule information automated testing method |
CN107861000A (en) * | 2017-11-01 | 2018-03-30 | 南京国电南自电网自动化有限公司 | A kind of method of automatic test substation intelligent alarm function |
CN108322348A (en) * | 2018-02-11 | 2018-07-24 | 国网江苏省电力有限公司电力科学研究院 | Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically |
CN108649698A (en) * | 2018-06-05 | 2018-10-12 | 国网江苏省电力有限公司苏州供电分公司 | Conventional substation telemechanical simulation checking system |
CN109885025A (en) * | 2019-03-07 | 2019-06-14 | 国网冀北电力有限公司检修分公司 | A kind of test macro and method of monitoring system of electric substation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103368265A (en) * | 2013-07-25 | 2013-10-23 | 云南电网公司大理供电局 | Unidirectional cross-security subzone transformer substation comprehensive measurement and control platform and measurement and control method thereof |
CN103412208A (en) * | 2013-07-15 | 2013-11-27 | 国家电网公司 | Intelligent substation electric telecontrol device closed loop test method |
CN103545930A (en) * | 2013-10-29 | 2014-01-29 | 广州供电局有限公司 | Method and system for collecting substation area protection data based on telecontrol equipment |
-
2014
- 2014-03-27 CN CN201410117628.XA patent/CN103905275A/en not_active Application Discontinuation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103412208A (en) * | 2013-07-15 | 2013-11-27 | 国家电网公司 | Intelligent substation electric telecontrol device closed loop test method |
CN103368265A (en) * | 2013-07-25 | 2013-10-23 | 云南电网公司大理供电局 | Unidirectional cross-security subzone transformer substation comprehensive measurement and control platform and measurement and control method thereof |
CN103545930A (en) * | 2013-10-29 | 2014-01-29 | 广州供电局有限公司 | Method and system for collecting substation area protection data based on telecontrol equipment |
Non-Patent Citations (2)
Title |
---|
高翔: "数字化变电站若干关键技术研究", 《中国博士学位论文全文数据库工程科技Ⅱ辑》 * |
高翔: "智能变电站技术应用探讨", 《供用电》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104579817A (en) * | 2014-11-14 | 2015-04-29 | 国家电网公司 | Communication loop test method based on GOOSE (generic object-oriented substation event) logics |
CN104820635A (en) * | 2015-04-07 | 2015-08-05 | 南京国电南自电网自动化有限公司 | Method of testing robustness of closed loop protocol based on semantic analysis of dynamic script |
CN104820635B (en) * | 2015-04-07 | 2017-11-21 | 南京国电南自电网自动化有限公司 | A kind of self-closing ring gauge about robustness testing method based on the semantic parsing of dynamic script |
CN106301976A (en) * | 2015-05-22 | 2017-01-04 | 上海研电电力科技有限公司 | A kind of intelligent substation schedule information automated testing method |
CN105511294A (en) * | 2015-11-24 | 2016-04-20 | 积成电子股份有限公司 | Simulated-IED-device-based simulated telecontrol virtual debugging method |
CN105511294B (en) * | 2015-11-24 | 2018-05-01 | 积成电子股份有限公司 | Simulation telemechanical Virtual Debugging method based on emulation IED devices |
CN107861000A (en) * | 2017-11-01 | 2018-03-30 | 南京国电南自电网自动化有限公司 | A kind of method of automatic test substation intelligent alarm function |
CN108322348A (en) * | 2018-02-11 | 2018-07-24 | 国网江苏省电力有限公司电力科学研究院 | Supervisory control of substation information checks and accepts signal triggering running subsystem and method automatically |
CN108322348B (en) * | 2018-02-11 | 2021-01-26 | 国网江苏省电力有限公司电力科学研究院 | Transformer substation monitoring information automatic acceptance signal triggering operation subsystem and method |
CN108649698A (en) * | 2018-06-05 | 2018-10-12 | 国网江苏省电力有限公司苏州供电分公司 | Conventional substation telemechanical simulation checking system |
CN109885025A (en) * | 2019-03-07 | 2019-06-14 | 国网冀北电力有限公司检修分公司 | A kind of test macro and method of monitoring system of electric substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105373655B (en) | A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station | |
CN104734364B (en) | The method and system of relay protection device of intelligent substation SV, GOOSE input test | |
CN107196801B (en) | Automatic platform district topology identification system | |
CN202794365U (en) | Automatic testing system for power distribution monitoring terminals | |
CN103823199B (en) | Intelligent substation relay-protection tester automated detection system and detection method | |
CN106643765B (en) | Method for calculating acquisition abnormal maintenance time length | |
CN103166323B (en) | System for monitoring secondary circuit model on line in real time based on protection device | |
CN102955882B (en) | Automatic detection simulation analog system of ultra-large intelligent electric energy meter | |
CN106872856B (en) | Power distribution network fault active first-aid repair system and method based on multi-element fault collection | |
CN103200051B (en) | Intelligent substation message emulating is tested and is associated message analysis system and method | |
CN103454516A (en) | Intelligent transformer substation secondary equipment health state diagnosis method | |
CN103869190A (en) | Real time simulation system-based power distribution terminal automatic closed-loop test platform | |
CN104122474B (en) | A kind of intelligent distribution type feeder automation logic testing system | |
CN103746882B (en) | The method of intelligent substation station level test | |
CN103176084B (en) | Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system | |
KR20100053895A (en) | Testing method and its apparatus of digital substation merging unit | |
CN102768705B (en) | IEC (International Electrotechnical Commission) 61968-based power distribution network model interoperation and functional verification method | |
CN103312035B (en) | Integrated simulation adjusting-testing system and simulation adjusting-testing method for intelligent substation | |
CN104539051B (en) | A kind of secondary equipment of intelligent converting station online evaluation system | |
CN203608218U (en) | Communication device of electric energy quality monitoring device IEC61850 consistency detection system | |
CN103107914B (en) | Distant place electric quantity acquisition terminal detection method and system | |
CN104868599B (en) | A kind of intelligent substation message emulating test and correlation analysis system and emulation mode | |
CN104483643B (en) | Modeling method based on detection platform of fault indicator for physical simulation of power distribution network | |
CN104330759A (en) | Value traceability and monitoring method for low-voltage current transformer automation verification system | |
CN204156610U (en) | A kind of intelligent distribution network fault processing module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140702 |
|
RJ01 | Rejection of invention patent application after publication |