CN105976092A - Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof - Google Patents
Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof Download PDFInfo
- Publication number
- CN105976092A CN105976092A CN201610273757.7A CN201610273757A CN105976092A CN 105976092 A CN105976092 A CN 105976092A CN 201610273757 A CN201610273757 A CN 201610273757A CN 105976092 A CN105976092 A CN 105976092A
- Authority
- CN
- China
- Prior art keywords
- equipment
- tour
- room
- project
- electricity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 230000007547 defect Effects 0.000 claims abstract description 42
- 230000005611 electricity Effects 0.000 claims description 54
- 238000007689 inspection Methods 0.000 claims description 50
- 230000007812 deficiency Effects 0.000 claims description 28
- 230000001143 conditioned effect Effects 0.000 claims description 7
- 238000009472 formulation Methods 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a method of generating a power distribution room patrol project based on a power distribution equipment structure and a system thereof. Through the system, a standard equipment classification of each power distribution room is predefined. According to a standard power distribution room equipment classification, a patrol project of each equipment and a defect which possibly exists in the corresponding patrol project are made. When patrol equipment is discovered to have the corresponding defect, the defect is input through the system. After the patrol projects of all the equipment in one power distribution room are inspected, the system automatically generates a summary sheet according to the input defect and sends the summary sheet to a client. Records of a defect condition of each equipment in each power distribution room and historical registrations can be found in the system so that calling of historical data is convenient. According to a demand, an operation condition and the historical data of the equipment can be checked anytime and anywhere, which is convenient for analyzing the operation condition of the equipment, and the operation is convenient and fast.
Description
Technical field
The present invention relates to a kind of system, in particular a kind of based on controller switching equipment structural generation distribution
The method and system of project are maked an inspection tour in room.
Background technology
Power distribution room equipment-patrolling inspection is to grasp whether equipment operation condition is just meeting the requirement of code
Often running, with or without equipment deficiency and the situation of threat safe operation, corrective maintenance maintenance work, to protect
Demonstrate,prove the properly functioning of electrical network.If controller switching equipment once breaks down, it is likely to result in serious power failure thing
Therefore, the economic loss that cause the user is huge.
But, the defect of present power distribution room equipment-patrolling test mode and deficiency:
(1) make an inspection tour every time after artificial by tour situation, tour time, have the information such as zero defect to be registered in
Make an inspection tour in minute book, waste time and energy.
(2) data of equipment-patrolling cannot check real time data by terminal units such as networks.
(3) owing to using traditional minute book record to make an inspection tour data, analytical equipment moving law and looking into
Ask historical data loaded down with trivial details time-consumingly.
Therefore, prior art has yet to be improved and developed.
Summary of the invention
It is an object of the invention to provide a kind of based on controller switching equipment structural generation power distribution room tour project
Method and system, it is intended to solve existing power distribution room equipment-patrolling and check that situation is by being manually recorded in note
In record originally, waste time and energy, it is impossible to realize checking real time data, loaded down with trivial details time-consuming the asking of enquiry of historical data
Topic.
Technical scheme is as follows:
A kind of system making an inspection tour project based on controller switching equipment structural generation power distribution room, including:
Equipment account Registration Module, for pre-registering standard device classification, the root that each electricity room is equipped with
Tour project and corresponding tour project according to the standard electric room device class each equipment of formulation there may be
Defect;
Daily tour module, according to the pre-conditioned tour task automatically generating each electricity room, and according to
Tour task makes prompting;
Defect management module, when making an inspection tour each electricity room, the equipment deficiency of record collects, and it is right to generate
Answer the equipment deficiency summary sheet in electricity room, the equipment deficiency summary sheet in corresponding electricity room is sent the most corresponding visitor
Family end, updates the electric room equipment deficiency record of correspondence simultaneously;
Control module, controls the whole system making an inspection tour project based on controller switching equipment structural generation power distribution room
Properly functioning;
Described equipment account Registration Module, daily tour module and defect management module the most all with control
Module connects.
The system of described project of making an inspection tour based on controller switching equipment structural generation power distribution room, wherein, also includes
For the handheld terminal of instant recording equipment deficiency, described handheld terminal and control when making an inspection tour electricity room equipment
Molding block connects.
Patrolling of a kind of system based on controller switching equipment structural generation power distribution room tour project as described above
Vision method, wherein, specifically includes following steps:
Step A: the standard device being pre-registered each electricity room outfit by equipment account Registration Module is divided
Class, the tour project formulating each equipment according to standard electric room device class and corresponding tour project can
The defect that can exist;
Step B: appointed according to the pre-conditioned tour automatically generating each electricity room by daily tour module
Business, daily tour module also makes prompting according to tour task;
Step C: according to equipment account Registration Module produce each electricity room equipment-patrolling project to respectively
The equipment in individual electricity room carries out walkaround inspection;
Step D: the equipment deficiency record found during by tour is in the equipment-patrolling project in corresponding electricity room
In corresponding defect;
Step E: after completing an electric room equipment-patrolling project tour, defect management module is automatically to this electricity
When room is maked an inspection tour, the equipment deficiency of record collects, and generates the equipment deficiency summary sheet in electricity room, by this electricity
The equipment deficiency summary sheet in room sends to corresponding client, updates the electric room equipment deficiency of correspondence simultaneously
Record.
The inspection method of the system of described project of making an inspection tour based on controller switching equipment structural generation power distribution room, its
In, in described step E, defect management module is by note or mail or wechat mode setting electricity room
Standby defect summary sheet sends to corresponding client.
Beneficial effects of the present invention: the present invention is by providing a kind of based on controller switching equipment structural generation distribution
The method and system of project are maked an inspection tour in room, and the standard device being pre-defined each electricity room by system is classified,
Tour project and corresponding tour project according to the standard electric room device class each equipment of formulation may be deposited
Defect, when tour equipment find there is associated disadvantages time, by system by defect typing, when one
After the tour item inspection of the armamentarium in individual electricity room, system automatically generates according to the defect of typing
Summary sheet, then summary sheet is sent to client;The defect situation of the equipment in each electricity room and history
Registration can find record in systems, facilitates calling of historical data;Can the most at any time
Check ruuning situation and the historical data of equipment everywhere, it is simple to analytical equipment operation conditions, operation side
The most quick.
Accompanying drawing explanation
Fig. 1 is the inside of the system making an inspection tour project in the present invention based on controller switching equipment structural generation power distribution room
Connect figure.
Fig. 2 is the tour of the system making an inspection tour project in the present invention based on controller switching equipment structural generation power distribution room
The flow chart of steps of method.
Detailed description of the invention
For making the purpose of the present invention, technical scheme and advantage clearer, clear and definite, referring to the drawings
The present invention is described in more detail for the embodiment that develops simultaneously.
As it is shown in figure 1, a kind of system making an inspection tour project based on controller switching equipment structural generation power distribution room, bag
Include:
Equipment account Registration Module 100, for pre-register each electricity room be equipped with standard device classification,
Tour project and corresponding tour project according to the standard electric room device class each equipment of formulation may be deposited
Defect;
Daily tour module 200, according to the pre-conditioned tour task automatically generating each electricity room, and root
Prompting is made according to tour task;
Defect management module 300, when making an inspection tour each electricity room, the equipment deficiency of record collects, and generates
The equipment deficiency summary sheet in corresponding electric room, sends the equipment deficiency summary sheet in corresponding electricity room to correspondence
Client, updates the electric room equipment deficiency record of correspondence simultaneously;
Control module 400, controls the whole system making an inspection tour project based on controller switching equipment structural generation power distribution room
Properly functioning;
Described equipment account Registration Module 100, daily tour module 200 and defect management module 300 points
All it is not connected with control module 400.
In native system, by equipment account Registration Module 100 in advance by the standard provisioned in each electricity room
Device class is registered in system, formulates necessary tour project according to the classification of each standard device, with
And may there is which defect in tour project accordingly, sets the most in advance in system;Daily tour
Module 200 according to condition set in advance (can according to time interval set tour task, as every
Within 10th, i.e. electricity room equipment is carried out walkaround inspection;May be set in the specific date carries out walkaround inspection, as
Set and every month 10 electricity room is carried out walkaround inspection;Deng) automatically generate each electricity room tour task,
And make prompting (personnel send information to tour) according to tour task;Tour personnel are to each electricity
The equipment in room is maked an inspection tour, and when the equipment of checking exists certain defect, opens phase the most in systems
Answer the standard device classification options in electricity room, the defect choosing of system Automatic-expanding relevant device and this equipment
, tour personnel choose corresponding option according to defect;When the armamentarium in an electric room is all maked an inspection tour complete
After, the equipment deficiency in this electricity room is collected by defect management module 300, and the equipment generating electricity room lacks
Fall into summary sheet, equipment deficiency summary sheet is sent to corresponding client, updates the electric room of correspondence simultaneously
Equipment deficiency record.
The personnel that make an inspection tour for convenience carry out record when making an inspection tour electricity room equipment to equipment deficiency, described based on
Controller switching equipment structural generation power distribution room is maked an inspection tour the system of project and is also included for when making an inspection tour electricity room equipment
Time recording equipment defect handheld terminal 500, described handheld terminal 500 is connected with control module 400:
When tour personnel check equipment there is certain defect time, immediately by handheld terminal 500 in systems
Point opens the standard device classification options in corresponding electricity room, system Automatic-expanding relevant device and this equipment
Defect option, tour personnel choose corresponding option according to defect, and so, the equipment deficiency of tour can be
Time be uploaded in system, replace artificial paper notes record.
As described above item is maked an inspection tour based on controller switching equipment structural generation power distribution room as in figure 2 it is shown, a kind of
The inspection method of purpose system, specifically includes following steps:
Step A: the standard being pre-registered each electricity room outfit by equipment account Registration Module 100 is set
Back-up class, formulate the tour project of each equipment according to standard electric room device class and make an inspection tour item accordingly
Mesh defect that may be present;
Step B: automatically generate patrolling of each electricity room according to pre-conditioned by daily tour module 200
Depending on task, daily tour module 200 also makes prompting according to tour task;
Step C: according to the equipment-patrolling project in each electricity room that equipment account Registration Module 100 produces
The equipment in each electricity room is carried out walkaround inspection;
Step D: the equipment deficiency record found during by tour is in the equipment-patrolling project in corresponding electricity room
In corresponding defect;
Step E: after completing an electric room equipment-patrolling project tour, defect management module 300 is the most right
When this electricity room is maked an inspection tour, the equipment deficiency of record collects, and generates the equipment deficiency summary sheet in electricity room, will
The equipment deficiency summary sheet in this electricity room sends to corresponding client, updates the electric room equipment of correspondence simultaneously
Defect record.
Specifically, in step B, described appoints according to the pre-conditioned tour automatically generating each electricity room
Business can be to set tour task according to time interval, as i.e. maked an inspection tour electricity room equipment every 10 days
Check;May be set in special time and carry out walkaround inspection, as set every month 10, electricity room is carried out
Walkaround inspection;Deng.Condition is maked an inspection tour according to actual needs by default, when triggering tour condition,
Daily tour module 200 automatically sends prompting and reminds tour personnel to carry out equipment-patrolling.
Specifically, in step E, defect management module 300 can pass through note, mail, wechat etc.
The equipment deficiency summary sheet in electricity room is sent to corresponding client by mode.
The standard device that the technical program pre-defines each electricity room by system is classified, according to standard electric
Room device class formulates the tour project of each equipment and corresponding tour project defect that may be present,
When tour equipment finds to there is associated disadvantages, by system by defect typing, complete when an electric room
After the tour item inspection of portion's equipment, system automatically generates summary sheet according to the defect of typing, then
Summary sheet is sent to client;Defect situation and the history registration of the equipment in each electricity room can
Find record in systems, facilitate calling of historical data;Can check the most whenever and wherever possible and set
Standby ruuning situation and historical data, it is simple to analytical equipment operation conditions, convenient to operation.
It should be appreciated that the application of the present invention is not limited to above-mentioned citing, to ordinary skill
For personnel, can be improved according to the above description or convert, all these modifications and variations are all answered
Belong to the protection domain of claims of the present invention.
Claims (4)
1. the system making an inspection tour project based on controller switching equipment structural generation power distribution room, it is characterised in that
Including:
Equipment account Registration Module, for pre-registering standard device classification, the root that each electricity room is equipped with
Tour project and corresponding tour project according to the standard electric room device class each equipment of formulation there may be
Defect;
Daily tour module, according to the pre-conditioned tour task automatically generating each electricity room, and according to
Tour task makes prompting;
Defect management module, when making an inspection tour each electricity room, the equipment deficiency of record collects, and it is right to generate
Answer the equipment deficiency summary sheet in electricity room, the equipment deficiency summary sheet in corresponding electricity room is sent the most corresponding visitor
Family end, updates the electric room equipment deficiency record of correspondence simultaneously;
Control module, controls the whole system making an inspection tour project based on controller switching equipment structural generation power distribution room
Properly functioning;
Described equipment account Registration Module, daily tour module and defect management module the most all with control
Module connects.
The most according to claim 1 based on controller switching equipment structural generation power distribution room make an inspection tour project be
System, it is characterised in that also include for make an inspection tour electricity room equipment time instant recording equipment deficiency hand-held
Terminal, described handheld terminal is connected with control module.
3. make an inspection tour item based on controller switching equipment structural generation power distribution room as claimed in claim 1 or 2 for one kind
The inspection method of purpose system, it is characterised in that specifically include following steps:
Step A: the standard device being pre-registered each electricity room outfit by equipment account Registration Module is divided
Class, the tour project formulating each equipment according to standard electric room device class and corresponding tour project can
The defect that can exist;
Step B: appointed according to the pre-conditioned tour automatically generating each electricity room by daily tour module
Business, daily tour module also makes prompting according to tour task;
Step C: according to equipment account Registration Module produce each electricity room equipment-patrolling project to respectively
The equipment in individual electricity room carries out walkaround inspection;
Step D: the equipment deficiency record found during by tour is in the equipment-patrolling project in corresponding electricity room
In corresponding defect;
Step E: after completing an electric room equipment-patrolling project tour, defect management module is automatically to this electricity
When room is maked an inspection tour, the equipment deficiency of record collects, and generates the equipment deficiency summary sheet in electricity room, by this electricity
The equipment deficiency summary sheet in room sends to corresponding client, updates the electric room equipment deficiency of correspondence simultaneously
Record.
The most according to claim 3 based on controller switching equipment structural generation power distribution room make an inspection tour project be
The inspection method of system, it is characterised in that in described step E, defect management module passes through note or postal
The equipment deficiency summary sheet in electricity room is sent to corresponding client by part or wechat mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610273757.7A CN105976092A (en) | 2016-04-28 | 2016-04-28 | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610273757.7A CN105976092A (en) | 2016-04-28 | 2016-04-28 | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105976092A true CN105976092A (en) | 2016-09-28 |
Family
ID=56994076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610273757.7A Pending CN105976092A (en) | 2016-04-28 | 2016-04-28 | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105976092A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107818371A (en) * | 2017-10-27 | 2018-03-20 | 国网江苏省电力公司南通供电公司 | Operation management APP method |
CN107832856A (en) * | 2017-10-27 | 2018-03-23 | 国网江苏省电力公司南通供电公司 | Operation management APP method |
CN113162228A (en) * | 2021-03-23 | 2021-07-23 | 广东鹰视能效科技有限公司 | Power distribution equipment operation and maintenance system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102136162A (en) * | 2010-12-25 | 2011-07-27 | 江西九江供电公司 | Power transmission line polling system |
EP2922017A1 (en) * | 2014-03-20 | 2015-09-23 | LSIS Co., Ltd. | Apparatus for data processing of energy management system |
CN105096048A (en) * | 2015-08-07 | 2015-11-25 | 国网浙江省电力公司丽水供电公司 | Power distribution line intelligent tour inspection system |
-
2016
- 2016-04-28 CN CN201610273757.7A patent/CN105976092A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102136162A (en) * | 2010-12-25 | 2011-07-27 | 江西九江供电公司 | Power transmission line polling system |
EP2922017A1 (en) * | 2014-03-20 | 2015-09-23 | LSIS Co., Ltd. | Apparatus for data processing of energy management system |
CN105096048A (en) * | 2015-08-07 | 2015-11-25 | 国网浙江省电力公司丽水供电公司 | Power distribution line intelligent tour inspection system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107818371A (en) * | 2017-10-27 | 2018-03-20 | 国网江苏省电力公司南通供电公司 | Operation management APP method |
CN107832856A (en) * | 2017-10-27 | 2018-03-23 | 国网江苏省电力公司南通供电公司 | Operation management APP method |
CN113162228A (en) * | 2021-03-23 | 2021-07-23 | 广东鹰视能效科技有限公司 | Power distribution equipment operation and maintenance system |
CN113162228B (en) * | 2021-03-23 | 2024-01-09 | 广东鹰视能效科技有限公司 | Distribution equipment operation and maintenance system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105785201B (en) | A kind of power distribution network fault analysis method and study and judge system | |
CN106990383A (en) | A kind of method and device for tearing back electric energy meter sorting open | |
CN106875114A (en) | The SMS platform optimization system and method for distribution repairing maneuvering platform | |
CN109767081B (en) | Method and device for generating power worksheet | |
CN103325153A (en) | Inspection method and inspection system | |
CN104680905B (en) | A kind of teaching process automatic monitoring system and monitoring method for being applied to experimental teaching | |
CN103107914B (en) | Distant place electric quantity acquisition terminal detection method and system | |
CN103166323A (en) | System for monitoring secondary circuit model on line in real time based on protection device | |
CN106845647A (en) | The tour repair method of charging station, apparatus and system | |
CN105160864A (en) | Operating data monitoring system and method for intelligent ammeters | |
CN204856196U (en) | Intelligent production line process control system of bearing thing networking | |
CN108965374A (en) | Integrated monitoring apparatus, comprehensive monitoring and controlling method and storage medium | |
CN113406438B (en) | Intelligent fault diagnosis method suitable for low-voltage transformer area and operation and maintenance system thereof | |
CN107609660A (en) | A kind of Work tool information management and control automated system | |
CN107580054A (en) | Industrial equipment Reverse Turning Control method and system based on Internet of Things | |
CN105471982A (en) | Interaction method and system for internet-of-things gateway and cloud platform | |
CN110209723A (en) | A kind of equipment information collection system based on Internet of Things big data | |
CN105976092A (en) | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof | |
CN104391244A (en) | Closed loop test method of relay protection apparatus and system thereof | |
CN109472476A (en) | A kind of power failure identifying and analyzing method and system | |
CN108320235A (en) | A kind of management system for monitoring | |
CN105894602A (en) | Work order processing method and device | |
CN106059090A (en) | Prompt system based on scheduling automation system and work method thereof | |
CN109492134A (en) | A kind of method and system that concentrator side handles the assets information of communication unit | |
CN103217597A (en) | Construction method of general test template of digital relay protective device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160928 |
|
RJ01 | Rejection of invention patent application after publication |