CN107818371A - Operation management APP method - Google Patents

Operation management APP method Download PDF

Info

Publication number
CN107818371A
CN107818371A CN201711021769.1A CN201711021769A CN107818371A CN 107818371 A CN107818371 A CN 107818371A CN 201711021769 A CN201711021769 A CN 201711021769A CN 107818371 A CN107818371 A CN 107818371A
Authority
CN
China
Prior art keywords
operating personnel
electrical form
work order
cabinet
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711021769.1A
Other languages
Chinese (zh)
Inventor
曹辉
邵凡
薛海涛
施沩
黄伟刚
张驰
鲁燕
何斌
施辉
黄家伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN201711021769.1A priority Critical patent/CN107818371A/en
Publication of CN107818371A publication Critical patent/CN107818371A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/18Packaging or power distribution
    • G06F1/181Enclosures
    • G06F1/182Enclosures with special features, e.g. for use in industrial environments; grounding or shielding against radio frequency interference [RFI] or electromagnetical interference [EMI]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/20Cooling means
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2200/00Indexing scheme relating to G06F1/04 - G06F1/32
    • G06F2200/20Indexing scheme relating to G06F1/20
    • G06F2200/201Cooling arrangements using cooling fluid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Human Computer Interaction (AREA)
  • Public Health (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Electromagnetism (AREA)
  • Computer Hardware Design (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of operation management APP method, when sending worker person to need to arrange for operating personnel to detect the equipment of power network, the second electrical form is just opened on background server, the input of work order state is 0;Background server is arranged in server cabinet, the server cabinet is rectangular parallelepiped structure, the roof of the server cabinet is provided with the liquid storage cabinet for accommodating refrigerating fluid, the two for the cavity that the bottom wall of the liquid storage cabinet for accommodating refrigerating fluid penetrates with two communicates, and the cavity of two insertion is on the edge surface in server cabinet;Effectively prevent wastes time and energy that cumbersome, refrigeration performance is bad, the performance of background server is damaged, the defects of microwave damages to staff's body in the prior art.

Description

Operation management APP method
Technical field
The present invention relates to operation management technical field, and in particular to a kind of operation management APP method.
Background technology
With intelligent grid construction continuous development and continue deeply, marketing measurement service, engineering project gradually increase, and grasp The characteristics of multi-point and wide-ranging is presented at construction operation scene in work person.Meanwhile client is deep for electric service transparence, intelligent interaction The requirement of change also improves constantly.Therewith paradoxically, send the structural understaffing of worker person more serious, it is difficult to meet operation field The problems such as management and control requires, measures construction operation site safety, quality, progress, service increasingly highlights.Therefore, how scene is strengthened Management and control ability, job safety and quality are improved, lift service quality, while effectively reduce management cost, turned into specialized management and work as Business is anxious.
Specifically, send worker person that the task of detection grid equipment is manually distributed to operator, operator must be from now Field, which is rushed to, sends worker person place to get task, is then back to Site Detection, and also wants the return form handle with paper shelves after detecting Testing result, which is given, sends worker person, so wastes time and energy cumbersome.
The present background server is arranged in server cabinet, and server cabinet is rectangular parallelepiped structure, now clothes Business device rack generally all attends by the defects of refrigeration is bad, often freezes via air-flow, refrigeration performance is bad, to background service The performance of device damages.Background server can launch microwave when working, and staff's body is damaged.
Server cabinet must be thus developed, the cabinet of refrigerating fluid is stored and in institute via being installed on server cabinet The bottom wall for stating cabinet sets up the cavity of two insertion, and the bottom of the cavity causes refrigerating fluid to move back and forth via motor and fin, Improve refrigeration performance.The catch and tuber fern with lumen therethrough through being provided with due to cabinet roof Gou Lu positions, to background server Microwave have the performance of absorption, prevent staff to be damaged in microwave environment lower body, simple in construction and excellent performance.
The content of the invention
To solve the above problems, the invention provides a kind of operation management APP method, effectively prevent in the prior art Wasting time and energy, cumbersome, refrigeration performance is bad, the performance of background server is damaged, microwave damages to staff's body Defect.
In order to overcome deficiency of the prior art, the invention provides a kind of solution of operation management APP method, It is specific as follows:
A kind of operation management APP method, comprises the following steps:
Step 1:First, operation management system is built, the operation management system is included with the intelligent hand for issuing operator Machine, the smart mobile phone include operation management APP and the first electrical form;Also include matching somebody with somebody the background service issued and send worker person Device, the background server include sending work module and the second electrical form, the smart mobile phone and the background server phase Communication connection;
Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just on background server The second electrical form is opened, work order number, work order state in the second electrical form, sends worker person number, operating personnel number, terminal money Work order number, work order state, group are inputted in cell under production number, installation site and form caption as terminal type respectively Worker person number, operating personnel number, terminal wealth number, installation site and terminal type, the wherein input of work order state are 0;
Step 3:It is described to send work module second electrical form to be sent to the operating personnel with inputting after end of input In the smart mobile phone of operating personnel corresponding to number;
Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are with regard to basis The content of terminal wealth number, installation site and terminal type detects to the equipment in the power network in the content;
Step 5:After detection, operation management APP turns on first electrical form, in the work of the first electrical form Odd numbers, send under worker person number, operating personnel number, terminal wealth number, installation site and form caption as terminal type The input work order number inputted is inputted in the second electrical form in cell respectively, sends worker person number, operating personnel number, terminal wealth Number, the information of installation site and terminal type, in addition also under the work order state of the first electrical form this form caption Input 1 in cell, and being inputted now in the cell under the submission time of the first electrical form this form caption Time, equipment when inputting detection device in the cell under the failure cause of the first electrical form this form caption Failure cause and input processing equipment fault in the cell under the treatment measures of the first electrical form this form captions Measure;
Step 6:Then operation management APP is sent to first electrical form in background server and preserved;
The background server is arranged in server cabinet, and the server cabinet is rectangular parallelepiped structure, the service Device rack F1 roof is provided with the liquid storage cabinet F2 for accommodating refrigerating fluid, the bottom wall and two of the liquid storage cabinet F2 for accommodating refrigerating fluid The cavity F3 of head insertion two communicates, and the cavity F3 of two insertion is on the edge surface in server cabinet, institute The cavity F3 of two insertion inside lower portions are stated provided with fin F5, the fin F5 is located at the outer of motor F6 motor swingle Wall, the motor F6 are located on the lower wall surface inside server cabinet;
Conduit is provided with the roof of the liquid storage cabinet F2 for accommodating refrigerating fluid, has been caught in and has been carried from roof in the conduit Lumen therethrough to bottom wall props up plate F8, and the bottom periphery of the lumen therethrough for propping up plate F8 is provided with barrier flaps F9, the barrier Piece F9 is propped up on plate F8 bottom wall described in being located at, and the plate F8 that props up of the lumen therethrough with from roof to bottom wall is provided with tuber fern A0, the server cabinet F1 bottom wall are provided with base F7.
The form caption of first electrical form include work order number, work order state, send worker person number, operating personnel number, Submission time, terminal wealth number, installation site, terminal type, failure cause and treatment measures;
The form caption of second electrical form include work order number, work order state, send worker person number, operating personnel number, Terminal wealth number, installation site and terminal type.
For the work order number to send worker person to need to arrange for the numbering to the Detection task of operating personnel, the numbering is the inspection The identifier of survey task;
The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is the 1 expression Detection task Complete;
Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;
The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;
The submission time is when the first electrical form being transferred to background server after the completion of the operating personnel detect Time;
The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;
The installation site is the address of the equipment in power network to be detected;
The terminal type is the title of the equipment in power network to be detected;
The failure cause is the fault category of the equipment in power network to be detected;
The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
The liquid storage cabinet F2 for accommodating refrigerating fluid is located at server cabinet F1 roof, accommodates the liquid storage cabinet of refrigerating fluid F2 bottom wall completely covers the roof of the server cabinet.
The cavity F3 of two insertion is spiral structure.
The edge surface of one inside the server cabinet F1 is provided with mobile hard disk F4, and mobile hard disk F4 is the same as described The USB port of background server is connected.
The bottom of the tuber fern A0 is put in the nutrient solution in conduit through the lumen therethrough for propping up plate F8.
Beneficial effects of the present invention are:
Thus discharge task can be carried out on the server by operating personnel, allow operating personnel to perform and by O&M pipe Result is returned to server by the operation for managing APP, time saving and energy saving, saves operating personnel's turnaround time and energy, is improved The efficiency of operation management.When with the server cabinet, background server, which is located in server cabinet, can just use, and pass through By on master server rack be provided with accommodate refrigerating fluid liquid storage cabinet and be provided with the bottom for the liquid storage cabinet for accommodating refrigerating fluid The cavity of two insertion, the bottom of the cavity of two insertion cause refrigerating fluid to move back and forth, improve refrigeration via motor and fin Performance.Via being built in the conduit position for accommodating the liquid storage cabinet of refrigerating fluid plate is propped up with the lumen therethrough from roof to bottom wall And tuber fern, there is the performance of absorption to the microwave of background server, prevent staff to be damaged in microwave environment lower body, structure letter Singly excellent performance.
Brief description of the drawings
Fig. 1 is the operation management system structural representation of the present invention;
Fig. 2 is a kind of schematic diagram of second electrical form of the present invention;
Fig. 3 is a kind of schematic diagram of first electrical form of the present invention;
Fig. 4 is the schematic diagram of the server cabinet of the present invention.
Fig. 5 is the exterior contour schematic diagram of the server cabinet of the present invention.
Embodiment
The present invention is described further below in conjunction with embodiment.
In order to overcome deficiency of the prior art, the invention provides a kind of solution of operation management APP method, It is specific as follows:
As Figure 1-Figure 5, operation management APP method, comprises the following steps:
Step 1:First, operation management system is built, the operation management system is included with the intelligent hand for issuing operator Machine, the smart mobile phone include operation management APP and the first electrical form;Also include matching somebody with somebody the background service issued and send worker person Device, the background server include sending work module and the second electrical form, the smart mobile phone and the background server phase Communication connection;
Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just on background server The second electrical form as shown in Figure 2 is opened, work order number, work order state in the second electrical form, sends worker person number, operator Inputted respectively in cell under form caption as member number, terminal wealth number, installation site and terminal type work order number, Work order state, send worker person number, operating personnel number, terminal wealth number, installation site and terminal type, wherein work order state Input as 0;
Step 3:It is described to send work module second electrical form to be sent to the operating personnel with inputting after end of input In the smart mobile phone of operating personnel corresponding to number;
Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are with regard to basis The content of terminal wealth number, installation site and terminal type detects to the equipment in the power network in the content;
Step 5:After detection, operation management APP turns on first electrical form as shown in Figure 3, first The work order number of electrical form, send as worker person number, operating personnel number, terminal wealth number, installation site and terminal type The input work order number inputted is inputted in the second electrical form in cell under form caption respectively, sends worker person number, operator Member number, the information of terminal wealth number, installation site and terminal type, in addition also the work order state of the first electrical form this Input 1 in cell under form caption, and the cell under the submission time of the first electrical form this form caption Middle input time now, inputting detection device in the cell under the failure cause of the first electrical form this form caption When the equipment failure cause and input in the cell under the treatment measures of the first electrical form this form captions Manage the measure of the equipment fault;
Step 6:Then operation management APP is sent to first electrical form in background server and preserved;
The background server is arranged in server cabinet, and the server cabinet is rectangular parallelepiped structure, the service Device rack F1 roof is provided with the liquid storage cabinet F2 for accommodating refrigerating fluid, the bottom wall and two of the liquid storage cabinet F2 for accommodating refrigerating fluid The cavity F3 of head insertion two communicates, and the cavity F3 of two insertion is on the edge surface in server cabinet, institute The cavity F3 of two insertion inside lower portions are stated provided with fin F5, the fin F5 is located at the outer of motor F6 motor swingle Wall, the motor F6 are located on the lower wall surface inside server cabinet;
Conduit is provided with the roof of the liquid storage cabinet F2 for accommodating refrigerating fluid, has been caught in and has been carried from roof in the conduit Lumen therethrough to bottom wall props up plate F8, and the bottom periphery of the lumen therethrough for propping up plate F8 is provided with barrier flaps F9, the barrier Piece F9 is propped up on plate F8 bottom wall described in being located at, and the plate F8 that props up of the lumen therethrough with from roof to bottom wall is provided with tuber fern A0, the server cabinet F1 bottom wall are provided with base F7.
The form caption of first electrical form include work order number, work order state, send worker person number, operating personnel number, Submission time, terminal wealth number, installation site, terminal type, failure cause and treatment measures;
The form caption of second electrical form include work order number, work order state, send worker person number, operating personnel number, Terminal wealth number, installation site and terminal type.
For the work order number to send worker person to need to arrange for the numbering to the Detection task of operating personnel, the numbering is the inspection The identifier of survey task;
The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is the 1 expression Detection task Complete;
Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;
The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;
The submission time is when the first electrical form being transferred to background server after the completion of the operating personnel detect Time;
The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;
The installation site is the address of the equipment in power network to be detected;
The terminal type is the title of the equipment in power network to be detected;
The failure cause is the fault category of the equipment in power network to be detected;
The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
The liquid storage cabinet F2 for accommodating refrigerating fluid is located at server cabinet F1 roof, accommodates the liquid storage cabinet of refrigerating fluid F2 bottom wall completely covers the roof of the server cabinet, can improve refrigeration performance.
The cavity F3 of described two insertion is spiral structure, the cavity F3 of increase two insertion and server interior of equipment cabinet Contact area, improve radiating effect.
The edge surface of one inside the server cabinet F1 is provided with mobile hard disk F4, and mobile hard disk F4 is the same as described The USB port of background server is connected.
The bottom of the tuber fern A0 is put in the nutrient solution in conduit through the lumen therethrough for propping up plate F8.
Thus discharge task can be carried out on the server by operating personnel, allow operating personnel to perform and by O&M pipe Result is returned to server by the operation for managing APP, time saving and energy saving, saves operating personnel's turnaround time and energy, is improved The efficiency of operation management.When with the server cabinet, background server, which is located in server cabinet, can just use, and pass through By on master server rack be provided with accommodate refrigerating fluid liquid storage cabinet and be provided with the bottom for the liquid storage cabinet for accommodating refrigerating fluid The cavity of two insertion, the bottom of the cavity of two insertion cause refrigerating fluid to move back and forth, improve refrigeration via motor and fin Performance.The catch and tuber fern with lumen therethrough through being provided with due to cabinet roof Gou Lu positions, is had to the microwave of background server The performance of absorption, staff is prevented to be damaged in microwave environment lower body, simple in construction and excellent performance.
The present invention is described by way of examples above, it will be understood by those of skill in the art that the disclosure is not It is limited to embodiments described above, in the case of without departing from the scope of the present invention, can makes a variety of changes, changes and replace Change.

Claims (4)

  1. A kind of 1. operation management APP method, it is characterised in that comprise the following steps:
    Step 1:First, operation management system is built, the operation management system is included with the smart mobile phone for issuing operator, institute Stating smart mobile phone includes operation management APP and the first electrical form;Also include matching somebody with somebody the background server issued and send worker person, institute Stating background server includes sending work module and the second electrical form, and the smart mobile phone communicates company with the background server Connect;
    Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just opened on background server Second electrical form, work order number, work order state in the second electrical form, send worker person number, operating personnel number, terminal wealth Number, input work order number, work order state respectively in the cell under form caption as installation site and terminal type, send work Personnel number, operating personnel number, terminal wealth number, installation site and terminal type, the wherein input of work order state are 0;
    Step 3:After end of input, it is described send work module second electrical form be sent to input operating personnel number it is right In the smart mobile phone of the operating personnel answered;
    Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are just according to terminal The content of asset number, installation site and terminal type detects to the equipment in the power network in the content;
    Step 5:After detection, operation management APP turns on first electrical form, in the work order of the first electrical form Number, send list under worker person number, operating personnel number, terminal wealth number, installation site and form caption as terminal type The input work order number inputted is inputted in the second electrical form in first lattice respectively, sends worker person number, operating personnel number, terminal wealth Number, the information of installation site and terminal type, in addition also under the work order state of the first electrical form this form caption Input 1 in cell, and being inputted now in the cell under the submission time of the first electrical form this form caption Time, equipment when inputting detection device in the cell under the failure cause of the first electrical form this form caption Failure cause and input processing equipment fault in the cell under the treatment measures of the first electrical form this form captions Measure;
    Step 6:Then operation management APP is sent to first electrical form in background server and preserved;
    The background server is arranged in server cabinet, and the server cabinet is rectangular parallelepiped structure, the server machine The roof of cabinet is provided with the liquid storage cabinet for accommodating refrigerating fluid, the bottom wall and the chamber of two insertion of the liquid storage cabinet for accommodating refrigerating fluid Two of body communicates, and the cavity of two insertion is on the edge surface in server cabinet, the chamber of two insertion The inside lower portions of body are provided with fin, and the fin is located at the outer wall of the motor swingle of motor, and the motor is located at server machine On lower wall surface inside cabinet;Conduit is provided with the roof of the liquid storage cabinet for accommodating refrigerating fluid, band has been caught in the conduit There is the plate that props up of the lumen therethrough from roof to bottom wall, the bottom periphery of the lumen therethrough for propping up plate is provided with barrier flaps, the resistance Partition is propped up on the bottom wall of plate described in being located at, and the plate that props up of the lumen therethrough with from roof to bottom wall is provided with tuber fern, institute The bottom wall for stating server cabinet is provided with base.
  2. 2. operation management APP according to claim 1 method, it is characterised in that the form of first electrical form Title includes work order number, work order state, sends worker person number, operating personnel number, submission time, terminal wealth number, installation site, end Hold type, failure cause and treatment measures;
    The form caption of second electrical form includes work order number, work order state, sends worker person number, operating personnel number, terminal Asset number, installation site and terminal type.
  3. 3. operation management APP according to claim 2 method, it is characterised in that the work order number is to send worker person to need Will be arranged to the numbering of the Detection task of operating personnel, the numbering is the identifier of the Detection task;
    The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is that the 1 expression Detection task is complete Into;
    Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;
    The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;
    The submission time be when the first electrical form being transferred to background server after the completion of operating personnel detection when Between;
    The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;
    The installation site is the address of the equipment in power network to be detected;
    The terminal type is the title of the equipment in power network to be detected;
    The failure cause is the fault category of the equipment in power network to be detected;
    The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
  4. 4. operation management APP according to claim 3 method, it is characterised in that the liquid storage for accommodating refrigerating fluid Cabinet is located at the roof of server cabinet, and the bottom wall for accommodating the liquid storage cabinet of refrigerating fluid completely covers the roof of the server cabinet Lid;
    The cavity of two insertion is spiral structure;
    The edge surface of one inside the server cabinet is provided with mobile hard disk, and mobile hard disk is the same as the background server USB port be connected;
    The bottom of the tuber fern is put in the nutrient solution in conduit through the lumen therethrough for propping up plate;
    The wall of the rectangular-shape base is provided with holding tank;The sleeve pipe of two insertion is movably arranged in appearance with plenum fan Receive in groove.
CN201711021769.1A 2017-10-27 2017-10-27 Operation management APP method Pending CN107818371A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711021769.1A CN107818371A (en) 2017-10-27 2017-10-27 Operation management APP method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711021769.1A CN107818371A (en) 2017-10-27 2017-10-27 Operation management APP method

Publications (1)

Publication Number Publication Date
CN107818371A true CN107818371A (en) 2018-03-20

Family

ID=61604341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711021769.1A Pending CN107818371A (en) 2017-10-27 2017-10-27 Operation management APP method

Country Status (1)

Country Link
CN (1) CN107818371A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520306A (en) * 2018-03-23 2018-09-11 华翔翔能(湖南)能源科技有限公司 Energy management method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460885A (en) * 2014-11-27 2015-03-25 华为技术有限公司 Case and storage device
CN105321051A (en) * 2015-11-26 2016-02-10 国网安徽省电力公司检修公司 Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof
CN105976092A (en) * 2016-04-28 2016-09-28 广东鹰视能效科技有限公司 Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof
CN107246812A (en) * 2017-06-22 2017-10-13 东莞市联洲知识产权运营管理有限公司 A kind of energy-efficient radiating heat exchange mechanisms

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460885A (en) * 2014-11-27 2015-03-25 华为技术有限公司 Case and storage device
CN105321051A (en) * 2015-11-26 2016-02-10 国网安徽省电力公司检修公司 Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof
CN105976092A (en) * 2016-04-28 2016-09-28 广东鹰视能效科技有限公司 Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof
CN107246812A (en) * 2017-06-22 2017-10-13 东莞市联洲知识产权运营管理有限公司 A kind of energy-efficient radiating heat exchange mechanisms

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520306A (en) * 2018-03-23 2018-09-11 华翔翔能(湖南)能源科技有限公司 Energy management method

Similar Documents

Publication Publication Date Title
CN204924394U (en) A equipment for large -scale water pitcher liquid level switch of check -up
CN204284944U (en) Vaccum drainage means
CN107818371A (en) Operation management APP method
CN108591019A (en) A kind of waste-heat recovery device of air compressor machine
CN206097313U (en) Measurement turnover cabinet
CN104948913A (en) Zero-leakage safe alkali discharging device and method thereof
CN207970489U (en) Lithium battery diaphragm extraction equipment
CN204544859U (en) There is the cleaning equipment of liquid shunt device
CN207675909U (en) A kind of touch screen battery data logging device with cooling mechanism
CN207095881U (en) A kind of tea maker equipment for testing service life
CN207170470U (en) The more receptacle fixtures of supersonic wave cleaning machine
CN104689638B (en) Machine bearing abluent concentration filter circulating device
CN207989438U (en) A kind of hydraulic oil container heat sink
CN102638365B (en) A kind of implementation method of webmaster magnanimity automatic device discovery
CN202196059U (en) Detachable hot acid erosion testing apparatus
CN205001815U (en) Dress system is let out to fluid
CN207664456U (en) A kind of recyclable low-voltage electrical cabinet
CN205141092U (en) Battery discharge machine
CN220835249U (en) Airport and high-speed emergency deicing fluid configuration equipment
CN107832856A (en) Operation management APP method
CN206662874U (en) A kind of lathe negative pressure of vacuum drainage arrangement
CN215647930U (en) Machine cabinet
CN207247168U (en) A kind of steam boiler structure
CN205787949U (en) A kind of computer-controlled intelligent constant-temperature controls equipment
CN203780943U (en) Folding turnover frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180320