CN107832856A - Operation management APP method - Google Patents
Operation management APP method Download PDFInfo
- Publication number
- CN107832856A CN107832856A CN201711021753.0A CN201711021753A CN107832856A CN 107832856 A CN107832856 A CN 107832856A CN 201711021753 A CN201711021753 A CN 201711021753A CN 107832856 A CN107832856 A CN 107832856A
- Authority
- CN
- China
- Prior art keywords
- operating personnel
- work order
- cabinet
- operation management
- electrical form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/174—Form filling; Merging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/177—Editing, e.g. inserting or deleting of tables; using ruled lines
- G06F40/18—Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- General Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Computational Linguistics (AREA)
- Tourism & Hospitality (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Quality & Reliability (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of operation management APP method, first, operation management system is built, the operation management system includes including operation management APP and the first electrical form with the smart mobile phone for issuing operator, the smart mobile phone;Background server includes sending work module and the second electrical form, and the smart mobile phone is communicated with the background server and is connected;When sending worker person to need to arrange for operating personnel to detect the equipment of power network, the second electrical form is just opened on background server, work order number, work order state in the second electrical form, send in cell under worker person number, operating personnel number, terminal wealth number, installation site and form caption as terminal type and input work order number, work order state respectively, send worker person number, operating personnel number, terminal wealth number, installation site and terminal type, the wherein input of work order state is 0;It effectively prevent the defects of cumbersome of wasting time and energy in the prior art.
Description
Technical field
The present invention relates to operation management technical field, and in particular to a kind of operation management APP method.
Background technology
With intelligent grid construction continuous development and continue deeply, marketing measurement service, engineering project gradually increase, and grasp
The characteristics of multi-point and wide-ranging is presented at construction operation scene in work person.Meanwhile client is deep for electric service transparence, intelligent interaction
The requirement of change also improves constantly.Therewith paradoxically, send the structural understaffing of worker person more serious, it is difficult to meet operation field
The problems such as management and control requires, measures construction operation site safety, quality, progress, service increasingly highlights.Therefore, how scene is strengthened
Management and control ability, job safety and quality are improved, lift service quality, while effectively reduce management cost, turned into specialized management and work as
Business is anxious.
Specifically, send worker person that the task of detection grid equipment is manually distributed to operator, operator must be from now
Field, which is rushed to, sends worker person place to get task, is then back to Site Detection, and also wants the return form handle with paper shelves after detecting
Testing result, which is given, sends worker person, so wastes time and energy cumbersome.
The content of the invention
To solve the above problems, the invention provides a kind of operation management APP method, effectively prevent in the prior art
Waste time and energy the defects of cumbersome.
In order to overcome deficiency of the prior art, the invention provides a kind of solution of operation management APP method,
It is specific as follows:
A kind of operation management APP method, comprises the following steps:
Step 1:First, operation management system is built, the operation management system is included with the intelligent hand for issuing operator
Machine, the smart mobile phone include operation management APP and the first electrical form;Also include matching somebody with somebody the background service issued and send worker person
Device, the background server include sending work module and the second electrical form, the smart mobile phone and the background server phase
Communication connection;
Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just on background server
The second electrical form is opened, work order number, work order state in the second electrical form, sends worker person number, operating personnel number, terminal money
Work order number, work order state, group are inputted in cell under production number, installation site and form caption as terminal type respectively
Worker person number, operating personnel number, terminal wealth number, installation site and terminal type, the wherein input of work order state are 0;
Step 3:It is described to send work module second electrical form to be sent to the operating personnel with inputting after end of input
In the smart mobile phone of operating personnel corresponding to number;
Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are with regard to basis
The content of terminal wealth number, installation site and terminal type detects to the equipment in the power network in the content;
Step 5:After detection, operation management APP turns on first electrical form, in the work of the first electrical form
Odd numbers, send under worker person number, operating personnel number, terminal wealth number, installation site and form caption as terminal type
The input work order number inputted is inputted in the second electrical form in cell respectively, sends worker person number, operating personnel number, terminal wealth
Number, the information of installation site and terminal type, in addition also under the work order state of the first electrical form this form caption
Input 1 in cell, and being inputted now in the cell under the submission time of the first electrical form this form caption
Time, equipment when inputting detection device in the cell under the failure cause of the first electrical form this form caption
Failure cause and input processing equipment fault in the cell under the treatment measures of the first electrical form this form captions
Measure;
Step 6:Then operation management APP is sent to first electrical form in background server and preserved.
The form caption of first electrical form include work order number, work order state, send worker person number, operating personnel number,
Submission time, terminal wealth number, installation site, terminal type, failure cause and treatment measures;
The form caption of second electrical form include work order number, work order state, send worker person number, operating personnel number,
Terminal wealth number, installation site and terminal type.
For the work order number to send worker person to need to arrange for the numbering to the Detection task of operating personnel, the numbering is the inspection
The identifier of survey task;
The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is the 1 expression Detection task
Complete;
Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;
The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;
The submission time is when the first electrical form being transferred to background server after the completion of the operating personnel detect
Time;
The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;
The installation site is the address of the equipment in power network to be detected;
The terminal type is the title of the equipment in power network to be detected;
The failure cause is the fault category of the equipment in power network to be detected;
The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
Beneficial effects of the present invention are:
Thus discharge task can be carried out on the server by operating personnel, allow operating personnel to perform and by O&M pipe
Result is returned to server by the operation for managing APP, time saving and energy saving, saves operating personnel's turnaround time and energy, is improved
The efficiency of operation management.
Brief description of the drawings
Fig. 1 is the operation management system structural representation of the present invention;
Fig. 2 is a kind of schematic diagram of second electrical form of the present invention;
Fig. 3 is a kind of schematic diagram of first electrical form of the present invention;
Fig. 4 is the schematic diagram of the server cabinet of the present invention.
Fig. 5 is the structural representation of the base of the present invention.
Fig. 6 is the structural representation of the varicose bar of the present invention.
Embodiment
The present invention is described further below in conjunction with embodiment.
In order to overcome deficiency of the prior art, the invention provides a kind of solution of operation management APP method,
It is specific as follows:
As shown in figs 1 to 6, operation management APP method, comprises the following steps:
Step 1:First, operation management system is built, the operation management system is included with the intelligent hand for issuing operator
Machine, the smart mobile phone include operation management APP and the first electrical form;Also include matching somebody with somebody the background service issued and send worker person
Device, the background server include sending work module and the second electrical form, the smart mobile phone and the background server phase
Communication connection;
Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just on background server
The second electrical form as shown in Figure 2 is opened, work order number, work order state in the second electrical form, sends worker person number, operator
Inputted respectively in cell under form caption as member number, terminal wealth number, installation site and terminal type work order number,
Work order state, send worker person number, operating personnel number, terminal wealth number, installation site and terminal type, wherein work order state
Input as 0;
Step 3:It is described to send work module second electrical form to be sent to the operating personnel with inputting after end of input
In the smart mobile phone of operating personnel corresponding to number;
Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are with regard to basis
The content of terminal wealth number, installation site and terminal type detects to the equipment in the power network in the content;
Step 5:After detection, operation management APP turns on first electrical form as shown in Figure 3, first
The work order number of electrical form, send as worker person number, operating personnel number, terminal wealth number, installation site and terminal type
The input work order number inputted is inputted in the second electrical form in cell under form caption respectively, sends worker person number, operator
Member number, the information of terminal wealth number, installation site and terminal type, in addition also the work order state of the first electrical form this
Input 1 in cell under form caption, and the cell under the submission time of the first electrical form this form caption
Middle input time now, inputting detection device in the cell under the failure cause of the first electrical form this form caption
When the equipment failure cause and input in the cell under the treatment measures of the first electrical form this form captions
Manage the measure of the equipment fault;
Step 6:Then operation management APP is sent to first electrical form in background server and preserved.
The form caption of first electrical form include work order number, work order state, send worker person number, operating personnel number,
Submission time, terminal wealth number, installation site, terminal type, failure cause and treatment measures;
The form caption of second electrical form include work order number, work order state, send worker person number, operating personnel number,
Terminal wealth number, installation site and terminal type.
For the work order number to send worker person to need to arrange for the numbering to the Detection task of operating personnel, the numbering is the inspection
The identifier of survey task;
The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is the 1 expression Detection task
Complete;
Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;
The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;
The submission time is when the first electrical form being transferred to background server after the completion of the operating personnel detect
Time;
The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;
The installation site is the address of the equipment in power network to be detected;
The terminal type is the title of the equipment in power network to be detected;
The failure cause is the fault category of the equipment in power network to be detected;
The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
Thus discharge task can be carried out on the server by operating personnel, allow operating personnel to perform and by O&M pipe
Result is returned to server by the operation for managing APP, time saving and energy saving, saves operating personnel's turnaround time and energy, is improved
The efficiency of operation management.
And the background server is arranged in server cabinet, server cabinet is rectangular parallelepiped structure, and in order to save
Space, at present server cabinet often digged pit installed in ground, then server cabinet is placed in hole, has so saved space
It can also prevent the detection service device in server cabinet from going adrift, but server cabinet is placed in hole and row occurs certainly
The defects of not genial humidity of gas is excessive, be difficult to assemble in addition, period of assembly is usually collided and shaken, jeopardize it is described after
Platform server is even allowed to impaired.
The background server is arranged in server cabinet, and the cabinet of the server cabinet is rectangular parallelepiped structure, institute
Stating server cabinet includes cabinet F1, the background server F3 being arranged in cabinet, light source F4, spacer F6 and rectangular-shape
Base B0, the cabinet F1 outer wall lay silica gel water absorbing agent F2;The cabinet F1 is located at rectangular-shape base B0 roof;
The rectangular-shape base B0 is arranged in the pit dug out on ground via cylindric connecting pole A7;The cabinet F1's
Top-down first lumen therethrough is opened up on bottom wall, the outside wall surface with the opposite lower wall of top-down lumen therethrough is provided with two
The sleeve A 8 and plenum fan A9 of head insertion, the sleeve A 8 of two insertion here are in plenum fan A9 and top-down lumen therethrough
Between;The roof of the cabinet F1 is provided with the second lumen therethrough, and the outside wall surface with the opposite roof of the second lumen therethrough is provided with outlet
Fan A3;
The upper surface also mirror image of the roof of the cabinet F1 is provided with a pair of hangers A2;The outer surface of the side wall of the cabinet F1
On be additionally provided with fairlead A6, the fairlead A6 top and bottom be provided with can turn ball A1;The spacer F6 warps
It is located at by varicose bar F7 in the side wall in pit, helical form glass bronze wire F8 is wrapped on the outer wall of the varicose bar F7;It is described
The F9 of plastic sheet one is additionally provided between side wall in spacer F6 and pit;The top and bottom of the spacer F6 are designed with rushing therewith
Molded bending section A0, bending section A0 setting contribute to moving down for the cabinet F1;The inside of the cabinet F1 is also
Provided with light source F4, the light source F4 includes LEDF5;One side of the light source F4 is connected to cable A4, is concatenated on cable A4 disconnected
Road device A5.
The wall of the rectangular-shape base B0 is provided with holding tank B2;The sleeve A 8 and plenum fan A9 of two insertion can
Mobile is located in holding tank B2.
The B1 of plastic sheet two is additionally provided between the lower wall surface of the cabinet F1 and rectangular-shape base B0 roof.
Copper sulphate is filled in the inside of the sleeve A 8 of two insertion.
The varicose bar F7 includes strip connecting rod G1 and outer cover G2, and wherein strip connecting rod G1 is movably located at outer cover
G2 hollow inside.
On the outer surface for the side wall that the breaker A5 is located at cabinet F1.
The LEDF5, outlet fan A3 electrically connect battery and drive mechanism with plenum fan A9.
The rectangular-shape base B0 is arranged at the side in the pit dug out on ground via cylindric connecting pole A7
Formula is:The roof of the cylindric connecting pole A7 is welded on the bottom wall of the rectangular-shape base B0, the cylindric connection
In bottom wall in post A7 bottom wall insertion pit and insert firmly in pit.
When cabinet F1 is located in the pit dug out on ground, ball A1 contributes to moving down for cabinet F1, to
The disastrous effect that the shake can occurred during lower movement is brought by the helical form glass bronze wire F8 and F9 of plastic sheet one subduction shakes, prevents
The background server in cabinet 1 is stopped due to being damaged by shake, effects of the B1 of plastic sheet two with subduction shake, prevents in addition
The background server in cabinet 1 is stopped due to being damaged by shake;The inside that LEDF5 is cabinet F1 supplies light source, helps to tie up
Shield;Hangers A2 contributes to cabinet F1 to pull, and structure is uncomplicated;Outlet fan A3 and plenum fan A9 allows cabinet F1 the inside to form through low
Place improves the airflow performance inside cabinet F1, refrigeration performance is good towards the air motion of eminence;The sleeve A 8 of two insertion
Dehumidifying is performed to importing the air-flow in cabinet F1, improve cabinet F1 keeps away wet performance;Silica gel water absorbing agent F2 has blocked following
Moisture attacks the inside into cabinet F1, it is therefore prevented that the damage of the background server in cabinet F1, increases cabinet F1 work period.
The present invention is described by way of examples above, it will be understood by those of skill in the art that the disclosure is not
It is limited to embodiments described above, in the case of without departing from the scope of the present invention, can makes a variety of changes, changes and replace
Change.
Claims (7)
- A kind of 1. operation management APP method, it is characterised in that comprise the following steps:Step 1:First, operation management system is built, the operation management system is included with the smart mobile phone for issuing operator, institute Stating smart mobile phone includes operation management APP and the first electrical form;Also include matching somebody with somebody the background server issued and send worker person, institute Stating background server includes sending work module and the second electrical form, and the smart mobile phone communicates company with the background server Connect;Step 2:When sending worker person to need to arrange for operating personnel to detect the equipment of power network, just opened on background server Second electrical form, work order number, work order state in the second electrical form, send worker person number, operating personnel number, terminal wealth Number, input work order number, work order state respectively in the cell under form caption as installation site and terminal type, send work Personnel number, operating personnel number, terminal wealth number, installation site and terminal type, the wherein input of work order state are 0;Step 3:After end of input, it is described send work module second electrical form be sent to input operating personnel number it is right In the smart mobile phone of the operating personnel answered;Step 4:Then the operation management APP in smart mobile phone opens second electrical form, and operating personnel are just according to terminal The content of asset number, installation site and terminal type detects to the equipment in the power network in the content;Step 5:After detection, operation management APP turns on first electrical form, in the work order of the first electrical form Number, send list under worker person number, operating personnel number, terminal wealth number, installation site and form caption as terminal type The input work order number inputted is inputted in the second electrical form in first lattice respectively, sends worker person number, operating personnel number, terminal wealth Number, the information of installation site and terminal type, in addition also under the work order state of the first electrical form this form caption Input 1 in cell, and being inputted now in the cell under the submission time of the first electrical form this form caption Time, equipment when inputting detection device in the cell under the failure cause of the first electrical form this form caption Failure cause and input processing equipment fault in the cell under the treatment measures of the first electrical form this form captions Measure;Step 6:Then operation management APP is sent to first electrical form in background server and preserved.
- 2. operation management APP according to claim 1 method, it is characterised in that the form of first electrical form Title includes work order number, work order state, sends worker person number, operating personnel number, submission time, terminal wealth number, installation site, end Hold type, failure cause and treatment measures;The form caption of second electrical form includes work order number, work order state, sends worker person number, operating personnel number, terminal Asset number, installation site and terminal type.
- 3. operation management APP according to claim 2 method, it is characterised in that the work order number is to send worker person to need Will be arranged to the numbering of the Detection task of operating personnel, the numbering is the identifier of the Detection task;The work order state is 0 or 1 expression, is that the 0 expression Detection task is not completed, is that the 1 expression Detection task is complete Into;Described to send worker person number to distribute to the numbering for sending worker person, the numbering is the identifier for sending worker person;The operating personnel number are the numbering for distributing to operating personnel, and the numbering is the identifier of the operating personnel;The submission time be when the first electrical form being transferred to background server after the completion of operating personnel detection when Between;The terminal wealth number is the numbering of the equipment in power network to be detected, and the numbering is the identifier of the equipment;The installation site is the address of the equipment in power network to be detected;The terminal type is the title of the equipment in power network to be detected;The failure cause is the fault category of the equipment in power network to be detected;The treatment measures are the measure for the failure for handling the equipment in power network to be detected.
- 4. operation management APP according to claim 3 method, it is characterised in that the background server is arranged on clothes It is engaged in device rack, the cabinet of the server cabinet is rectangular parallelepiped structure, and the server cabinet includes cabinet, is arranged on cabinet In background server, light source, spacer and rectangular-shape base, the outer wall of the cabinet lays silica gel water absorbing agent;Institute State the roof that cabinet is located at rectangular-shape base;The rectangular-shape base is arranged at described on ground via cylindric connecting pole In the pit dug out;Top-down first lumen therethrough is opened up on the bottom wall of the cabinet, with top-down lumen therethrough phase To lower wall outside wall surface be provided with two insertion sleeve pipe and plenum fan, here two insertion sleeve pipe be in plenum fan and from Between lumen therethrough under above;The roof of the cabinet is provided with the second lumen therethrough, with the outer wall of the opposite roof of the second lumen therethrough Fanned provided with outlet in face;The upper surface of the roof of the cabinet also mirror image is provided with a pair of hangers;It is additionally provided with and leads on the outer surface of the side wall of the cabinet Leader, the top and bottom of the fairlead are provided with the ball of energy turn;The spacer is located in pit via varicose bar Side wall on, helical form glass bronze wire is wrapped on the outer wall of the varicose bar;Between side wall in the spacer and pit also Provided with plastic sheet one;The top and bottom of the spacer are designed with stamping forming bending section therewith, and bending section is provided with Help moving down for the cabinet;Light source is additionally provided with inside the cabinet, the light source includes LED;The one of the light source While being connected to cable, breaker is concatenated on cable.
- 5. operation management APP according to claim 4 method, it is characterised in that the wall of the rectangular-shape base Provided with holding tank;The sleeve pipe of two insertion is movably arranged in holding tank with plenum fan.
- 6. operation management APP according to claim 5 method, it is characterised in that the lower wall surface of the cabinet with it is rectangular Plastic sheet two is additionally provided between the roof of body shape base;Copper sulphate is filled inside the sleeve pipe of two insertion;The varicose bar includes strip connecting rod and outer cover, and wherein strip connecting rod is movably located at the hollow inside of outer cover;The breaker is located on the outer surface of the side wall of cabinet;The LED, outlet fan electrically connect battery and drive mechanism with plenum fan.
- 7. operation management APP according to claim 6 method, it is characterised in that the rectangular-shape base is via circle The mode that column connecting pole is arranged in the pit dug out on ground is:The roof of the cylindric connecting pole is welded in institute On the bottom wall for stating rectangular-shape base, in the bottom wall in the bottom wall insertion pit of the cylindric connecting pole and insert firmly in pit In.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711021753.0A CN107832856A (en) | 2017-10-27 | 2017-10-27 | Operation management APP method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711021753.0A CN107832856A (en) | 2017-10-27 | 2017-10-27 | Operation management APP method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107832856A true CN107832856A (en) | 2018-03-23 |
Family
ID=61649731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711021753.0A Pending CN107832856A (en) | 2017-10-27 | 2017-10-27 | Operation management APP method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107832856A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108576421A (en) * | 2018-05-02 | 2018-09-28 | 江苏佳谷生物科技有限公司 | A kind of liquid vitamin E feeds and preparation method rich in nanometer selenium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104460885A (en) * | 2014-11-27 | 2015-03-25 | 华为技术有限公司 | Case and storage device |
CN105321051A (en) * | 2015-11-26 | 2016-02-10 | 国网安徽省电力公司检修公司 | Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof |
CN105976092A (en) * | 2016-04-28 | 2016-09-28 | 广东鹰视能效科技有限公司 | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof |
CN107246812A (en) * | 2017-06-22 | 2017-10-13 | 东莞市联洲知识产权运营管理有限公司 | A kind of energy-efficient radiating heat exchange mechanisms |
-
2017
- 2017-10-27 CN CN201711021753.0A patent/CN107832856A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104460885A (en) * | 2014-11-27 | 2015-03-25 | 华为技术有限公司 | Case and storage device |
CN105321051A (en) * | 2015-11-26 | 2016-02-10 | 国网安徽省电力公司检修公司 | Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof |
CN105976092A (en) * | 2016-04-28 | 2016-09-28 | 广东鹰视能效科技有限公司 | Method of generating power distribution room patrol project based on power distribution equipment structure and system thereof |
CN107246812A (en) * | 2017-06-22 | 2017-10-13 | 东莞市联洲知识产权运营管理有限公司 | A kind of energy-efficient radiating heat exchange mechanisms |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108576421A (en) * | 2018-05-02 | 2018-09-28 | 江苏佳谷生物科技有限公司 | A kind of liquid vitamin E feeds and preparation method rich in nanometer selenium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204167692U (en) | A kind of safety-type cable stable electric equipment installation chamber | |
CN105780381A (en) | Commercial washing machine maintenance and management system | |
KR101921873B1 (en) | Line post insulator device | |
CN107832856A (en) | Operation management APP method | |
CN106950424A (en) | Charging pile supervising device and management platform | |
CN207199917U (en) | A kind of power supervisor PDU boxes | |
CN206758888U (en) | A kind of distribution box for being easily installed and safeguarding | |
CN212292377U (en) | Wire arrangement storage device based on big data service terminal | |
CN106946141A (en) | A kind of sucked type plays hanging box paw | |
CN207375454U (en) | A kind of more size cloth grass automatic layboys | |
CN106338632A (en) | Precise-Beidou-positioning-based intelligent grid management host | |
CN211577266U (en) | Intelligent prepayment power metering box | |
CN204719260U (en) | A kind of operating means for optical fiber welding welding machine | |
CN207099509U (en) | A kind of installs case for the network equipment | |
CN206246798U (en) | A kind of PCB layout structure of solenoid valve controller | |
CN202548264U (en) | Anode device for transposing online detection short circuit points | |
CN207542724U (en) | A kind of architectural electricity pipe well and system | |
CN103543509A (en) | Method and system for laying optical cables in intelligent transformer substation | |
CN207124373U (en) | A kind of Winder of electric power cabinet | |
CN206096395U (en) | Battery tester | |
CN209460813U (en) | A kind of intelligent building intelligent management system | |
CN208271113U (en) | A kind of computer power adapter easy to use | |
CN204462301U (en) | Modularization core checking apparatus | |
CN205060871U (en) | Automatic long -range mark waste product device of packing assembly line | |
CN204154829U (en) | A kind of test run frock of fan coil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180323 |
|
RJ01 | Rejection of invention patent application after publication |