CN102968689A - Intelligent monitoring method for remote control of power transformation overhaul work - Google Patents
Intelligent monitoring method for remote control of power transformation overhaul work Download PDFInfo
- Publication number
- CN102968689A CN102968689A CN2012104639509A CN201210463950A CN102968689A CN 102968689 A CN102968689 A CN 102968689A CN 2012104639509 A CN2012104639509 A CN 2012104639509A CN 201210463950 A CN201210463950 A CN 201210463950A CN 102968689 A CN102968689 A CN 102968689A
- Authority
- CN
- China
- Prior art keywords
- mobile phone
- phone terminal
- work
- leader
- repairing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses an intelligent monitoring method for remote control of a power transformation overhaul work and relates to the technical field of remote control of power transformation overhaul works. A system is provided with a background server and four levels of mobile phone terminals, and a working staff mobile phone terminal, a site management personnel mobile phone terminal and a working area and county region leader mobile phone terminal are located through a wireless network and displayed on a remote control system map, and thus, system location for personnel with the three levels of mobile phone terminals is realized; by using the three levels of mobile phone terminals, corresponding site work is finished according to relevant work management processes set by a system, information feedback is finished in a mobile phone terminal remote control system, and the information can be transmitted to the background server through the wireless network, so that the site work condition can be inquired by company leader and partial manager mobile phone terminals and the background server in real time, and real-time communication can be realized through the system. The intelligent monitoring method has the advantages of replacing the traditional management mode, accurately feeding back the site work condition in real time and saving a great number of manpower and material resources.
Description
Technical field
The present invention relates to substation equipment maintenance and repair work strange land management and control technical field, specifically a kind of intelligence of strange land management and control
The energy supervisory system is suitable for substation field overhaul management under " general overhaul " System Construction.
Background technology
Along with carrying out of " general overhaul " System Construction work, 110 kilovolts and following power transmission and transforming equipment O﹠M and maintenance implementation integrated management, the inspection of former transmission of electricity fortune, the inspection of distribution fortune, power transformation operation, substation equipment maintenance and repair and five center personnel of distribution engineering management and business are carried out merger and reorganization, former county's corporate business function is managed concentratedly, set up overhauling company, implement the 35-110 of company of cities and counties kv substation, transmission line of electricity and city 10(20) kilovolt and following distribution net equipment O﹠M and maintenance integrative operation.
Xuzhou company administers 4 directly under work area, territory, 6 counties maintenance branch office, 6 county companies, in order to strengthen on-the-spot standardized management, company has formulated " leading cadre and managerial personnel put in place to the hilllock administrative manual ", requires city company leader and related management personnel to on-the-spot supervision and management.But because the administrative area is wide, the working site is many, the related management personnel amount is limited, can't realize comprehensive on-the-spot supervision and management, and jurisdiction transformer station of counties territory maintenance branch office is remote, wants two-way time to bring very big difficulty to field management work about three hours.Along with current urban district and surrounding area economy develop increasingly, increasing to power demands, transformer station's quantity will constantly increase, and power transmission and transforming equipment O﹠M and service work meeting are more and more, realize that on-the-spot supervision and management difficulty is increasing.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the invention provides a kind of substation equipment maintenance and repair work strange land control intelligent method for supervising, solved a site examining and repairing management and control difficult problem not in place, realize the uploading in real time of site examining and repairing relevant information, feed back, interchange and query function.
The present invention realizes with following technical scheme: a kind of substation equipment maintenance and repair work strange land control intelligent method for supervising, the mobile phone terminal that comprises a background server and four levels, the mobile phone terminal of four levels is respectively the on-the-spot staff of teams and groups mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal, company leader and part managerial personnel mobile phone terminal, staff's mobile phone terminal is used for finishing site examining and repairing work and repairing work Plays equalization instructs the implementation status of card to feed back, site administrator's mobile phone terminal is used for finishing service work and repairing working stamndard flow process and Real-time Feedback site examining and repairing information, work area and territory, county leader's mobile phone terminal are used for feedback leading cadre put in place to the hilllock situation and on-the-spot supervision situation information, company leader and part managerial personnel mobile phone terminal are used for the work of Real Time Monitoring site examining and repairing and repairing process of work, leading cadre's situation that puts in place to the hilllock, and carry out information interchange with the field personnel;
Concrete method for supervising: by wireless network staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal are positioned and are presented on the managing and control system map of strange land, realize these three grades of mobile phone terminals are held personnel's system location; These three grades of mobile phone terminals are finished corresponding work on the spot according to the related work management process of system's setting and finish the information feedback in the managing and control systems of mobile phone terminal strange land, by wireless network transmissions to background server, but company leader and part managerial personnel mobile phone terminal and background server real-time query work on the spot situation, and can exchange in real time by system, concrete to field staff's service work statement into question and proposition, ask staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal require to reply in real time according to company leader and part managerial personnel mobile phone terminal and background server.
The invention has the beneficial effects as follows: substitute the conventional management pattern, in real time, feed back on-site working condition exactly, save a large amount of human and material resources.
Description of drawings
The present invention is described further below in conjunction with drawings and Examples.
Fig. 1 is principle of the invention block diagram;
Fig. 2 is the site examining and repairing process flow diagram;
Fig. 3 is the emergency first-aid repair process flow diagram.
Embodiment
As shown in Figure 1, substation equipment maintenance and repair work strange land control intelligent method for supervising adopts the C-S architectural framework, by mobile phone terminal and terminal software system, the background service management system forms, utilize modern advanced wireless-transmission network technology to realize voice, picture, the remote transmission of feedback information, the field staff fills out the related procedure work of selecting in real time, and be back in real time the background server system, backstage related management personnel can check all work programs and corresponding safety practice, but real time inspection work on the spot situation, and can carry out information and picture interaction by mobile phone terminal or server, realize the location of whole transformer stations on map by transformer station's longitude and latitude, realize the position display of personnel at different levels on the map by 3G network.Grass-roots unit's typing manufacturing program of a month and related security risk pre-control card, job instruction card, high-risk operations Risk-warning and power grid risk early warning thereof.Utilize the transformer station longitude and latitude to realize location on the map, and every production schedule information all is associated with corresponding transformer station, and shows production schedule executing state at map.By the design of four level mobile phone terminal systems and background server systemic-function, realize that site examining and repairing, repairing, leading cadre put in place to the hilllock, on-the-spot management and control function.
The mobile phone terminal of four levels is respectively the on-the-spot staff of teams and groups mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal, company leader and part managerial personnel mobile phone terminal, staff's mobile phone terminal is used for finishing site examining and repairing work and repairing work Plays equalization instructs the implementation status of card to feed back, site administrator's mobile phone terminal is used for finishing service work and repairing working stamndard flow process and Real-time Feedback site examining and repairing information, work area and territory, county leader's mobile phone terminal are used for feedback leading cadre put in place to the hilllock situation and on-the-spot supervision situation information, company leader and part managerial personnel mobile phone terminal are used for the work of Real Time Monitoring site examining and repairing and repairing process of work, leading cadre's situation that puts in place to the hilllock, and carry out information interchange with the field personnel.Hold personal information feedback, monitoring, interaction by four level mobile phone terminals, realize the strange land management and control to work on the spot.
Concrete method for supervising: by wireless network staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal are positioned and are presented on the managing and control system map of strange land, realize these three grades of mobile phone terminals are held personnel's system location; These three grades of mobile phone terminals are finished corresponding work on the spot according to the related work management process of system's setting and finish the information feedback in the managing and control systems of mobile phone terminal strange land, by wireless network transmissions to background server, but company leader and part managerial personnel mobile phone terminal and background server real-time query work on the spot situation, and can exchange in real time by system, concrete to field staff's service work statement into question and proposition, ask staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal require to reply in real time according to company leader and part managerial personnel mobile phone terminal and background server.
The course of work: when the related personnel carries out corresponding work, initiate corresponding workflow by mobile phone terminal, shown in Fig. 2 site examining and repairing process flow diagram, it is interactive with background system that click enters beginning, setting process for " get redy to start off---in the way---arrive (need change photograph taking transformer station sign over to)---enter on-the-spot the preparation---meeting (recording) before the worker---hold work ticket---on-the-spot license---on-the-spot peace is arranged and dangerous point source is told somebody what one's real intentions are---starting working---security risk pre-control card (this pre-control card that relates to is called in click; choose in real time; do not finish this work and also can carry out follow-up work)---standardization job on-the-spot instructs card (click is called this effect that relates to and instructed to block and choose in real time; show the time of choosing, not finish this work and also can carry out follow-up work)---meeting behind the worker (recording)---return (need change photograph taking transformer station over to identifies) "; Shown in Fig. 3 emergency first-aid repair process flow diagram, pour dispatching system electric network fault information into each terminal, after receiving information, click enters the emergency first-aid repair module, carry out interaction with the backstage, setting process for " repairing is prepared---set out---arrive (need change over to and take transformer station's sign)---enter the scene---accident defect processings---disposition illustrates (can attached photo)---return "; Leading cadre and managerial personnel put in place to the hilllock process of feedback set the feedback project for " confirm action on the same day, worker front can situation, correctly whether standardized work instruct card, security risk analysis pre-control card, work ticket to fill in, whether the site safety measure complete, meeting after the inspection of Employee Security safety appliance, work on the spot development condition, worker ", and setting procedure end functions.
Claims (1)
1. substation equipment maintenance and repair work strange land control intelligent method for supervising, it is characterized in that: the mobile phone terminal that adopts a background server and four levels, the mobile phone terminal of four levels is respectively the on-the-spot staff of teams and groups mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal, company leader and part managerial personnel mobile phone terminal, staff's mobile phone terminal is used for finishing site examining and repairing work and repairing work Plays equalization instructs the implementation status of card to feed back, site administrator's mobile phone terminal is used for finishing service work and repairing working stamndard flow process and Real-time Feedback site examining and repairing information, work area and territory, county leader's mobile phone terminal are used for feedback leading cadre put in place to the hilllock situation and on-the-spot supervision situation information, company leader and part managerial personnel mobile phone terminal are used for the work of Real Time Monitoring site examining and repairing and repairing process of work, leading cadre's situation that puts in place to the hilllock, and carry out information interchange with the field personnel;
Concrete method for supervising: by wireless network staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal are positioned and are presented on the managing and control system map of strange land, realize these three grades of mobile phone terminals are held personnel's system location; These three grades of mobile phone terminals are finished corresponding work on the spot according to the related work management process of system's setting and finish the information feedback in the managing and control systems of mobile phone terminal strange land, by wireless network transmissions to background server, but company leader and part managerial personnel mobile phone terminal and background server real-time query work on the spot situation, and can exchange in real time by system, concrete to field staff's service work statement into question and proposition, ask staff's mobile phone terminal, site administrator's mobile phone terminal, work area and territory, county leader's mobile phone terminal require to reply in real time according to company leader and part managerial personnel mobile phone terminal and background server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104639509A CN102968689A (en) | 2012-11-16 | 2012-11-16 | Intelligent monitoring method for remote control of power transformation overhaul work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104639509A CN102968689A (en) | 2012-11-16 | 2012-11-16 | Intelligent monitoring method for remote control of power transformation overhaul work |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102968689A true CN102968689A (en) | 2013-03-13 |
Family
ID=47798819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104639509A Pending CN102968689A (en) | 2012-11-16 | 2012-11-16 | Intelligent monitoring method for remote control of power transformation overhaul work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102968689A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103390217A (en) * | 2013-07-16 | 2013-11-13 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Power transformation transaction management operating system |
CN103685479A (en) * | 2013-11-30 | 2014-03-26 | 国家电网公司 | Informationized mobile control system for infrastructure projects |
CN105072419A (en) * | 2015-08-28 | 2015-11-18 | 国网浙江省电力公司湖州供电公司 | Visual platform based on transformer substation |
CN106296443A (en) * | 2015-06-29 | 2017-01-04 | 国网河南省电力公司平顶山供电公司 | A kind of transmission line equipment quantity of state intellectualized analysis platform |
CN107392458A (en) * | 2017-07-17 | 2017-11-24 | 雷山供电局 | Based on field device operation intellectual analysis relative influence equipment topological analysis |
CN108490839A (en) * | 2018-04-28 | 2018-09-04 | 三电电缆股份有限公司 | A kind of stretcher of cable epithelium |
CN108537471A (en) * | 2018-06-14 | 2018-09-14 | 宁夏京能宁东发电有限责任公司 | A kind of flow management and control system and its data processing method of work ticket |
CN112329540A (en) * | 2020-10-10 | 2021-02-05 | 广西电网有限责任公司电力科学研究院 | Identification method and system for overhead transmission line operation in-place supervision |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1434661A (en) * | 2003-01-30 | 2003-08-06 | 武汉奥发科技工程有限公司 | Method for multi-stage monitor and mobile monitor of GPS/mobile telephone location |
CN101067654A (en) * | 2007-05-10 | 2007-11-07 | 南京师范大学 | Travelling group team management system based mobile positioning technique and GIS |
CN101237161A (en) * | 2007-12-14 | 2008-08-06 | 张伟良 | Remote monitoring management system for power supply overhaul secure operation |
CN201797601U (en) * | 2010-08-14 | 2011-04-13 | 中国石油化工集团公司 | Electric power circuit polling information management device |
CN102610001A (en) * | 2011-01-24 | 2012-07-25 | 吴晓明 | Automatic monitoring system for power line patrol |
-
2012
- 2012-11-16 CN CN2012104639509A patent/CN102968689A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1434661A (en) * | 2003-01-30 | 2003-08-06 | 武汉奥发科技工程有限公司 | Method for multi-stage monitor and mobile monitor of GPS/mobile telephone location |
CN101067654A (en) * | 2007-05-10 | 2007-11-07 | 南京师范大学 | Travelling group team management system based mobile positioning technique and GIS |
CN101237161A (en) * | 2007-12-14 | 2008-08-06 | 张伟良 | Remote monitoring management system for power supply overhaul secure operation |
CN201797601U (en) * | 2010-08-14 | 2011-04-13 | 中国石油化工集团公司 | Electric power circuit polling information management device |
CN102610001A (en) * | 2011-01-24 | 2012-07-25 | 吴晓明 | Automatic monitoring system for power line patrol |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103390217A (en) * | 2013-07-16 | 2013-11-13 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Power transformation transaction management operating system |
CN103390217B (en) * | 2013-07-16 | 2016-08-10 | 嘉兴市恒光电力建设有限责任公司华创分公司 | Converting equipment unusual fluctuation management operating system |
CN103685479A (en) * | 2013-11-30 | 2014-03-26 | 国家电网公司 | Informationized mobile control system for infrastructure projects |
CN106296443A (en) * | 2015-06-29 | 2017-01-04 | 国网河南省电力公司平顶山供电公司 | A kind of transmission line equipment quantity of state intellectualized analysis platform |
CN105072419A (en) * | 2015-08-28 | 2015-11-18 | 国网浙江省电力公司湖州供电公司 | Visual platform based on transformer substation |
CN105072419B (en) * | 2015-08-28 | 2018-03-23 | 国网浙江省电力公司湖州供电公司 | Based on substation visual platform |
CN107392458A (en) * | 2017-07-17 | 2017-11-24 | 雷山供电局 | Based on field device operation intellectual analysis relative influence equipment topological analysis |
CN108490839A (en) * | 2018-04-28 | 2018-09-04 | 三电电缆股份有限公司 | A kind of stretcher of cable epithelium |
CN108537471A (en) * | 2018-06-14 | 2018-09-14 | 宁夏京能宁东发电有限责任公司 | A kind of flow management and control system and its data processing method of work ticket |
CN112329540A (en) * | 2020-10-10 | 2021-02-05 | 广西电网有限责任公司电力科学研究院 | Identification method and system for overhead transmission line operation in-place supervision |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102968689A (en) | Intelligent monitoring method for remote control of power transformation overhaul work | |
CN110378606B (en) | Mobile visual safety management and control system | |
CN106990328B (en) | Distribution network emergency repair abnormal data analysis and fault positioning system and method | |
CN106203830A (en) | Promote Distribution Network Failure response and the electric service system of repairing ability | |
CN102956021A (en) | Power grid comprehensive visualization method based on multi-service system information fusion | |
CN106872856B (en) | Power distribution network fault active first-aid repair system and method based on multi-element fault collection | |
CN105564465A (en) | System and method for controlling maintenance operation of railway electrical service signal equipment | |
CN112132443B (en) | Reliability distribution network power supply management and control system | |
CN106682826A (en) | Emergency repair command platform for distribution network | |
CN103427417A (en) | Power distribution network fault processing method based on multi-source information fusion | |
CN103177396A (en) | Intelligentized whole-employee overall-process full-profession multidimensional risk management and control platform for site operations of power supply enterprises | |
CN103761625A (en) | Outage management system based on information exchange bus and data processing method thereof | |
CN109871965A (en) | A kind of breakdown repair App platform of combination GIS and power customer fault location information | |
WO2021114856A1 (en) | Multisource data-based uninterruptible power supply system | |
CN108267670B (en) | Distribution network fault study and judgment early warning system and implementation method thereof | |
CN206584222U (en) | A kind of supercentral station's centralized monitoring system | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN106355256A (en) | Multivariate visualization overhaul management system | |
CN111310969A (en) | Unmanned repair analysis and order distribution method based on GIS map | |
CN115641070A (en) | Multi-level multi-department linkage handling method and deduction device for power grid emergency | |
CN109064140A (en) | Internet of things equipment operation management system | |
CN110689214A (en) | Material supply intelligent collection management control platform | |
CN107392458A (en) | Based on field device operation intellectual analysis relative influence equipment topological analysis | |
CN205158452U (en) | Railway upper track operation safety control system | |
CN110866061A (en) | Information visualization system based on GIS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130313 |