CN103390217A - Power transformation transaction management operating system - Google Patents
Power transformation transaction management operating system Download PDFInfo
- Publication number
- CN103390217A CN103390217A CN2013102973862A CN201310297386A CN103390217A CN 103390217 A CN103390217 A CN 103390217A CN 2013102973862 A CN2013102973862 A CN 2013102973862A CN 201310297386 A CN201310297386 A CN 201310297386A CN 103390217 A CN103390217 A CN 103390217A
- Authority
- CN
- China
- Prior art keywords
- request slip
- unusual fluctuation
- interface
- click
- button
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses a power transformation transaction management operating system. The power transformation transaction management operating system comprises a server, a terminal connected to the server through a network and a work interface connected with the terminal. A power transformation transaction management module is arranged in the server and comprises an application form filling module, an application form audit module, an application form approval module and an application form filing module. The application form filling module receives operating instructions of maintenance workers and performs relevant data processing, the application form audit module receives operation instructions audited by a responsible department and performs relevant data processing, the application form approval module receives operation instructions professionally approved by a department in charge and performs relevant data processing, and the application form filing module receives the operating instructions of the maintenance workers and performs the relevant data processing. Every operation instruction is finished by clicking on the work interface.
Description
Technical field
The invention belongs to power domain, specifically a kind of converting equipment unusual fluctuation MOS.
Background technology
More existing converting equipment unusual fluctuation management system designs are unreasonable, complicated operation.
Summary of the invention
The objective of the invention is to design a cover converting equipment unusual fluctuation MOS, it is applicable to the converting equipment administrative authority of electric substation.
What the present invention will solve is that more existing converting equipment unusual fluctuation management system designs are unreasonable, the problem of complicated operation.
For realizing purpose of the present invention, the operating system that the present invention adopts comprises server and is connected in the terminating machine on server, the working interface that is connected with terminating machine by network.Be provided with converting equipment unusual fluctuation administration module in terminating machine; Include request slip in this converting equipment unusual fluctuation administration module and make a report on module, the request slip auditing module, request slip is examined module and request slip filing module; The operational order that request slip the is made a report on module receiving equipment maintainer line correlation data of going forward side by side are processed, the operational order that the request slip auditing module the receives responsible department's audit line correlation data of going forward side by side are processed, request slip is examined module and is received operational order that competent authorities' sole duty the examines line correlation data of going forward side by side and process, and request slip filing module receiving equipment maintainer's the operational order line correlation data of going forward side by side are processed; Each operational order is completed by clicking working interface;
Described plant maintenance personnel are transmitted operational order by terminating machine to server, the audit of described responsible department is transmitted operational order by terminating machine to server, the sole duty of described competent authorities is examined by terminating machine and is transmitted operational order to server, and described plant maintenance personnel are transmitted operational order by terminating machine to server
The effect that request slip is made a report on module comprises:
The working interface inquire button is clicked in inquiry, inquires corresponding already present power transformation unusual fluctuation request slip, and Query Result is presented at the request slip list;
Newly-increased by clicking the newly-increased request slip of working interface, carry out putting into operation, moving back fortune, change, scrap, allot five kinds of unusual fluctuations operation in plant maintenance, be specially the newly-increased button of click and enter newly-increased request slip interface, fill relevant information, comprise that request slip title, unusual fluctuation type selecting, request slip are described, click is preserved; The unusual fluctuation type comprises and puts into operation, moves back fortune, changes, scraps, allots;
Revise single-click ' modification ' button, eject request slip and revise interface, revise request slip and describe, with the request slip to newly-increased, carry out the modifications such as title, filed request slip can not be revised;
Delete and select the request slip that will delete, click ' deletion ' button, the request slip that deletion is newly-increased, only have the request slip in new establishment and maintenance can carry out deletion action;
Task Authorization is clicked ' Task Authorization ', ejects and authorizes interface; Click ' department's mandates ', ejection department selection interface, can multiselect; Click ' subscriber authorisation ', eject the personnel selection interface, can multiselect; Click ' deletion ' button, can delete the department or the personnel that choose, cancel and authorizing;
The plant maintenance pointing device is safeguarded button, and pop-up device unusual fluctuation management maintenance interface, the left side show the unusual fluctuation tree, and the right shows the machine account information of unusual fluctuation tree node;
Newly-built transformer station is at unusual fluctuation plant maintenance interface, pointing device root vertex button, and right button is selected ' newly-built transformer station ', ejects sub-geographic area choice box, clicks confirmation;
Task is made a report on click ' task is made a report on ', ejects unusual fluctuation request slip flow process and sends interface, and request slip is sent to next link; Click and send button, the prompting flow process sends successfully; Request slip sends to next link: responsible department's audit.
Advantage of the present invention is: convenient management, and simple to operate.
Description of drawings
Fig. 1 is structural relation block diagram of the present invention.
Embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
The present invention includes converting equipment unusual fluctuation administration module and working interface; This operating system comprises converting equipment unusual fluctuation administration module and working interface; Include request slip in this converting equipment unusual fluctuation administration module and make a report on module, the request slip auditing module, request slip is examined module and request slip filing module; Request slip is made a report on module and is processed by operational order wired or network receiving equipment maintainer the line correlation data of going forward side by side, the operational order that the request slip auditing module receives responsible department's audit by the wired or network line correlation data of going forward side by side are processed, request slip is examined module and is received operational order that competent authorities' sole duty the examines line correlation data of going forward side by side by wired or network and process, and request slip filing module is processed by operational order wired or network receiving equipment maintainer the line correlation data of going forward side by side; Each operational order is completed by clicking working interface.
The effect that request slip is made a report on module comprises:
The working interface inquire button is clicked in inquiry, inquires corresponding already present power transformation unusual fluctuation request slip, and Query Result is presented at the request slip list;
Newly-increased by clicking the newly-increased request slip of working interface, carry out putting into operation, moving back fortune, change, scrap, allot five kinds of unusual fluctuations operation in plant maintenance, be specially the newly-increased button of click and enter newly-increased request slip interface, fill relevant information, comprise that request slip title, unusual fluctuation type selecting, request slip are described, click is preserved; The unusual fluctuation type comprises and puts into operation, moves back fortune, changes, scraps, allots;
Revise single-click ' modification ' button, eject request slip and revise interface, revise request slip and describe, with the request slip to newly-increased, carry out the modifications such as title, filed request slip can not be revised;
Delete and select the request slip that will delete, click ' deletion ' button, the request slip that deletion is newly-increased, only have the request slip in new establishment and maintenance can carry out deletion action;
Task Authorization is clicked ' Task Authorization ', ejects and authorizes interface; Click ' department's mandates ', ejection department selection interface, can multiselect; Click ' subscriber authorisation ', eject the personnel selection interface, can multiselect; Click ' deletion ' button, can delete the department or the personnel that choose, cancel and authorizing;
The plant maintenance pointing device is safeguarded button, and pop-up device unusual fluctuation management maintenance interface, the left side show the unusual fluctuation tree, and the right shows the machine account information of unusual fluctuation tree node;
Newly-built transformer station is at unusual fluctuation plant maintenance interface, pointing device root vertex button, and right button is selected ' newly-built transformer station ', ejects sub-geographic area choice box, clicks confirmation;
Task is made a report on click ' task is made a report on ', ejects unusual fluctuation request slip flow process and sends interface, and request slip is sent to next link; Click and send button, the prompting flow process sends successfully; Request slip sends to next link: responsible department's audit;
The effect of converting equipment unusual fluctuation request slip auditing module:
By clicking pending shop order interface, launch converting equipment unusual fluctuation flow process, select responsible department's audit; Double-click the unusual fluctuation request slip that in list, the converting equipment maintainer reports, eject the detailed interface of request slip; Fill in audit time, audit opinion; Beat the equipment that hook selects audit to pass through in the unusual fluctuation equipment list; Click save button, preserve the information of interface input; Click the WBS element and select button, eject WBS elements correlation equipment interface; Click and send button, ejection is examined the link approving person and is selected interface, clicks ACK button; Request slip sends to examines link;
Converting equipment unusual fluctuation request slip is examined the module effect:
By clicking pending shop order interface, launch converting equipment unusual fluctuation flow process, select the full-time audit of competent authorities; Double-click the unusual fluctuation request slip that in list, responsible department's audit is passed through and eject the detailed interface of request slip; Fill in the time of examining, suggestions made after examination; Make hook and select to examine the equipment that passes through in the unusual fluctuation equipment list; Click save button, preserve the information of interface input; Click the WBS element and select button, eject WBS elements correlation equipment interface; Click and send button, eject filing link personnel selection interface, click ACK button.Request slip sends to the filing link;
The effect of converting equipment unusual fluctuation request slip filing module:
The plant maintenance personnel are in the pending shop order interface of oneself, and the unusual fluctuation request slip that selection will be filed, carry out archive operation, the flow process closed loop.
At least four of described terminating machines, be respectively request slip and make a report on terminating machine, and request slip audit terminal machine, request slip are examined terminating machine and request slip filing terminating machine.Described terminating machine is PC or mobile terminal or computing machine.
Claims (7)
1. a converting equipment unusual fluctuation MOS, comprise server and be connected in the terminating machine on server, the working interface that is connected with terminating machine by network, it is characterized in that in server being provided with converting equipment unusual fluctuation administration module; Include request slip in this converting equipment unusual fluctuation administration module and make a report on module, the request slip auditing module, request slip is examined module and request slip filing module; The operational order that request slip the is made a report on module receiving equipment maintainer line correlation data of going forward side by side are processed, the operational order that the request slip auditing module the receives responsible department's audit line correlation data of going forward side by side are processed, request slip is examined module and is received operational order that competent authorities' sole duty the examines line correlation data of going forward side by side and process, and request slip filing module receiving equipment maintainer's the operational order line correlation data of going forward side by side are processed; Each operational order is completed by clicking working interface;
Described plant maintenance personnel are transmitted operational order by terminating machine to server, described responsible department examines by terminating machine to the server operation instruction, the sole duty of described competent authorities is examined by terminating machine and is transmitted operational order to server, and described plant maintenance personnel are transmitted operational order by terminating machine to server.
2. converting equipment unusual fluctuation MOS according to claim 1 is characterized in that request slip makes a report on the effect of module and comprise:
The working interface inquire button is clicked in inquiry, inquires corresponding already present power transformation unusual fluctuation request slip, and Query Result is presented at the request slip list;
Newly-increased by clicking the newly-increased request slip of working interface, carry out putting into operation, moving back fortune, change, scrap, allot five kinds of unusual fluctuations operation in plant maintenance, be specially the newly-increased button of click and enter newly-increased request slip interface, fill relevant information, comprise that request slip title, unusual fluctuation type selecting, request slip are described, click is preserved; The unusual fluctuation type comprises and puts into operation, moves back fortune, changes, scraps, allots;
Revise single-click ' modification ' button, eject request slip and revise interface, revise request slip and describe, with the request slip to newly-increased, carry out the modifications such as title, filed request slip can not be revised;
Delete and select the request slip that will delete, click ' deletion ' button, the request slip that deletion is newly-increased, only have the request slip in new establishment and maintenance can carry out deletion action;
Task Authorization is clicked ' Task Authorization ', ejects and authorizes interface; Click ' department's mandates ', ejection department selection interface, can multiselect; Click ' subscriber authorisation ', eject the personnel selection interface, can multiselect; Click ' deletion ' button, can delete the department or the personnel that choose, cancel and authorizing;
The plant maintenance pointing device is safeguarded button, and pop-up device unusual fluctuation management maintenance interface, the left side show the unusual fluctuation tree, and the right shows the machine account information of unusual fluctuation tree node;
Newly-built transformer station is at unusual fluctuation plant maintenance interface, pointing device root vertex button, and right button is selected ' newly-built transformer station ', ejects sub-geographic area choice box, clicks confirmation;
Task is made a report on click ' task is made a report on ', ejects unusual fluctuation request slip flow process and sends interface, and request slip is sent to next link; Click and send button, the prompting flow process sends successfully; Request slip sends to next link: responsible department's audit.
3.
Converting equipment unusual fluctuation MOS according to claim 1, the effect that it is characterized in that converting equipment unusual fluctuation request slip auditing module are by clicking pending shop order interface, launch converting equipment unusual fluctuation flow process, select responsible department's audit; Double-click the unusual fluctuation request slip that in list, the converting equipment maintainer reports, eject the detailed interface of request slip; Fill in audit time, audit opinion; Beat the equipment that hook selects audit to pass through in the unusual fluctuation equipment list; Click save button, preserve the information of interface input; Click the WBS element and select button, eject WBS elements correlation equipment interface; Click and send button, ejection is examined the link approving person and is selected interface, clicks ACK button; Request slip sends to examines link.
4.
Converting equipment unusual fluctuation MOS according to claim 1, is characterized in that power transformation establishes
The effect that standby unusual fluctuation request slip is examined module is by clicking pending shop order interface, launches converting equipment unusual fluctuation flow process, selects the full-time audit of competent authorities; Double-click the unusual fluctuation request slip that in list, responsible department's audit is passed through and eject the detailed interface of request slip; Fill in the time of examining, suggestions made after examination; Make hook and select to examine the equipment that passes through in the unusual fluctuation equipment list; Click save button, preserve the information of interface input; Click the WBS element and select button, eject WBS elements correlation equipment interface; Click and send button, eject filing link personnel selection interface, click ACK button; Request slip sends to the filing link.
5.
Converting equipment unusual fluctuation MOS according to claim 1, the effect that it is characterized in that converting equipment unusual fluctuation request slip filing module is that the plant maintenance personnel are in the pending shop order interface of oneself, the unusual fluctuation request slip that selection will be filed, carry out archive operation, the flow process closed loop.
6.
Converting equipment unusual fluctuation MOS according to claim 1, is characterized in that at least four of described terminating machines, is respectively request slip and makes a report on terminating machine, and request slip audit terminal machine, request slip are examined terminating machine and request slip filing terminating machine.
7.
Converting equipment unusual fluctuation MOS according to claim 1, is characterized in that described terminating machine is PC or mobile terminal or computing machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310297386.2A CN103390217B (en) | 2013-07-16 | 2013-07-16 | Converting equipment unusual fluctuation management operating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310297386.2A CN103390217B (en) | 2013-07-16 | 2013-07-16 | Converting equipment unusual fluctuation management operating system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103390217A true CN103390217A (en) | 2013-11-13 |
CN103390217B CN103390217B (en) | 2016-08-10 |
Family
ID=49534481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310297386.2A Expired - Fee Related CN103390217B (en) | 2013-07-16 | 2013-07-16 | Converting equipment unusual fluctuation management operating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103390217B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104978632A (en) * | 2015-06-29 | 2015-10-14 | 江苏鸿信系统集成有限公司 | Mobile phone terminal repair worksheet management method |
CN109784862A (en) * | 2019-01-18 | 2019-05-21 | 云南电网有限责任公司曲靖供电局 | Power equipment management system and equipment |
CN113094420A (en) * | 2021-04-23 | 2021-07-09 | 廊坊市讯云数据科技有限公司 | IT asset management system and management method for data center |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101887547A (en) * | 2010-06-30 | 2010-11-17 | 广西电网公司电力科学研究院 | Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment |
CN101980264A (en) * | 2010-10-22 | 2011-02-23 | 河南省电力公司平顶山供电公司 | Equipment defect maintenance method in power system |
CN102663545A (en) * | 2012-03-23 | 2012-09-12 | 电子科技大学 | Power distribution network maintenance operation management system based on intelligent mobile phone |
US20130036031A1 (en) * | 2011-08-02 | 2013-02-07 | South Central Planning and Development Commission | System for monitoring land use activities |
CN102968689A (en) * | 2012-11-16 | 2013-03-13 | 江苏省电力公司徐州供电公司 | Intelligent monitoring method for remote control of power transformation overhaul work |
CN102999025A (en) * | 2012-11-08 | 2013-03-27 | 中国电力科学研究院 | Wind power monitoring and fault diagnosis system |
CN103065213A (en) * | 2012-12-14 | 2013-04-24 | 河南省电力公司许昌供电公司 | Converting station standardization inspection and acceptance auxiliary method based on workflow engine |
-
2013
- 2013-07-16 CN CN201310297386.2A patent/CN103390217B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101887547A (en) * | 2010-06-30 | 2010-11-17 | 广西电网公司电力科学研究院 | Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment |
CN101980264A (en) * | 2010-10-22 | 2011-02-23 | 河南省电力公司平顶山供电公司 | Equipment defect maintenance method in power system |
US20130036031A1 (en) * | 2011-08-02 | 2013-02-07 | South Central Planning and Development Commission | System for monitoring land use activities |
CN102663545A (en) * | 2012-03-23 | 2012-09-12 | 电子科技大学 | Power distribution network maintenance operation management system based on intelligent mobile phone |
CN102999025A (en) * | 2012-11-08 | 2013-03-27 | 中国电力科学研究院 | Wind power monitoring and fault diagnosis system |
CN102968689A (en) * | 2012-11-16 | 2013-03-13 | 江苏省电力公司徐州供电公司 | Intelligent monitoring method for remote control of power transformation overhaul work |
CN103065213A (en) * | 2012-12-14 | 2013-04-24 | 河南省电力公司许昌供电公司 | Converting station standardization inspection and acceptance auxiliary method based on workflow engine |
Non-Patent Citations (1)
Title |
---|
马智: "电力通信流程管理系统间工单接口的设计与实现", 《中国优秀硕士学位论文全文数据库(工程科技II辑)》, no. 3, 15 March 2010 (2010-03-15) * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104978632A (en) * | 2015-06-29 | 2015-10-14 | 江苏鸿信系统集成有限公司 | Mobile phone terminal repair worksheet management method |
CN109784862A (en) * | 2019-01-18 | 2019-05-21 | 云南电网有限责任公司曲靖供电局 | Power equipment management system and equipment |
CN113094420A (en) * | 2021-04-23 | 2021-07-09 | 廊坊市讯云数据科技有限公司 | IT asset management system and management method for data center |
Also Published As
Publication number | Publication date |
---|---|
CN103390217B (en) | 2016-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105868936B (en) | Intelligent operation and maintenance system applied to integrated operation and maintenance of transformer equipment | |
CN102521693A (en) | Administrative information mobile approval management system | |
CN103140845A (en) | Method and apparatus for obtaining feedback from a device | |
CN110162548B (en) | Big data analysis system for electric power bidding items | |
CN104778414A (en) | Vulnerability management system and method | |
CN102298738A (en) | intelligent audit management system | |
CN109345168A (en) | A kind of petrochemical plant mounting material storage management method and system | |
CN106408351A (en) | WeChat based CRM system for small and medium enterprises | |
CN104240072A (en) | Multi-channel network integrated payment system and multi-channel network integrated payment method | |
CN103390217A (en) | Power transformation transaction management operating system | |
CN102880790A (en) | Personal digital assistant (PDA)-mode-based field standard operating system and operating flow | |
CN106022706A (en) | Holographic presentation system of E-contract main body and correlation execution process information | |
CN104715420A (en) | Method and device for processing electric power engineering data | |
CN103065213A (en) | Converting station standardization inspection and acceptance auxiliary method based on workflow engine | |
CN104680355A (en) | Novel-technology cloud computing enterprise information movement management system | |
CN106651356A (en) | Two-dimensional code payment system for electric meters | |
CN106339760A (en) | Communication cable maintenance management information system | |
RU122793U1 (en) | DEVICE OF AUTOMATED FORMATION, CALCULATION AND ANALYSIS OF WORKERS SALES AT THE PRODUCTION ENTERPRISE | |
CN102591289A (en) | Cement plant managing and controlling integrated system | |
CN104504527A (en) | Client-based intellectual property management system | |
CN104240160A (en) | Cloud ordering system and ordering method thereof | |
CN201995020U (en) | Trusteeship call center system with performance calculating and managing functions | |
CN106779889A (en) | Petrol station invoice management method based on mobile interchange equipment | |
CN104680269A (en) | Novel cloud computing enviromental protection enterprise information movement computer management motherboard | |
CN104517179A (en) | Intelligent catering daily analysis system based on cloud storage and cloud computation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 Termination date: 20170716 |