CN109784862A - Power equipment management system and equipment - Google Patents

Power equipment management system and equipment Download PDF

Info

Publication number
CN109784862A
CN109784862A CN201910051300.5A CN201910051300A CN109784862A CN 109784862 A CN109784862 A CN 109784862A CN 201910051300 A CN201910051300 A CN 201910051300A CN 109784862 A CN109784862 A CN 109784862A
Authority
CN
China
Prior art keywords
equipment
network operation
module
monthly
operation personnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910051300.5A
Other languages
Chinese (zh)
Other versions
CN109784862B (en
Inventor
马锦波
田金周
杨锐
吴鑫
高红
朱金勇
韩偲彬
何燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Original Assignee
Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qujing Power Supply Bureau Yunnan Power Grid Co Ltd filed Critical Qujing Power Supply Bureau Yunnan Power Grid Co Ltd
Priority to CN201910051300.5A priority Critical patent/CN109784862B/en
Publication of CN109784862A publication Critical patent/CN109784862A/en
Application granted granted Critical
Publication of CN109784862B publication Critical patent/CN109784862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of power equipment management system and equipment, include: enable monthly plan module in terms of the account data, in terms of state evaluation, in terms of equipment O&M and at least one of in terms of overhaul of the equipments in terms of, generate monthly plan table, and the submission examination & approval for filling in situation and network operation personnel sending for monthly plan table of network operation personnel are received, specific plans table is generated after examination & approval pass through;Approval module obtains monthly plan table and specific plans table, and receives administration of power networks personnel to the approval results of monthly plan table and specific plans table;Statistical module obtains the corresponding basic performance point of grid equipment of network operation personal management, and according to basic performance point and approval results, obtain the monthly score of network operation personnel, solve that heavy workload, easily careless omission error, office automatic degree be high, ineffective technical problem, reach reduction workload, improves the technical effect of accuracy, office automatic degree and working efficiency.

Description

Power equipment management system and equipment
Technical field
The present invention relates to software technology fields, more particularly, to a kind of power equipment management system and equipment.
Background technique
Currently, CHINA SOUTHERN POWER Qujing power supply bureau Triratna patrols fibrillar center manages 11 substations at present, it is related to 500kV extremely The equipment O&M of 10kV voltage class.For the lifecycle management of Improving Equipment, Triratna patrols fibrillar center and blames equipment by region Appoint and divided, by equipment account, equipment O&M, state evaluation and risk assessment, checking experiment, the supervision for scrapping 5 dimensions This management method is known as equipment owner's system to individual by duty fulfillment.
But it since different staff is often responsible for the multiple and different equipment of management, in actual operation, bears The equipment owner for blaming equipment generally requires hand-kept and fills in a large amount of account when carrying out daily equipment management and O&M With various equipment management tables etc., in addition, staff also needs to fill in and declaration moon work plan, approver is according to work people The fortune for the equipment that the monthly plan table that the declaration application of member is submitted understands the action of staff and each staff is responsible for Dimension situation, thus often there is heavy workload, hand filling is easy to appear careless omission and mistake, office automatic degree be not high, work The problems such as making low efficiency.
Summary of the invention
In view of this, to alleviate, there are work the purpose of the present invention is to provide power equipment management system and equipment Amount is big, hand filling is easy to appear careless omission and mistake, office automatic degree be not high, ineffective technical problem.
In a first aspect, the embodiment of the invention provides a kind of power equipment management systems, comprising: monthly plan module, examination & approval Module and statistical module;
In terms of the monthly plan module is used in terms of the Unit account of plant data, equipment state is evaluated, in terms of equipment O&M and Aspect at least one of in terms of overhaul of the equipments, generates the monthly plan table filled in for network operation personnel, and receive the electricity Net staff's fills in the submission examination & approval of situation and network operation personnel sending for monthly plan table, and is being examined After batch, the specific plans table filled in for network operation personnel is generated;
The approval module is used to obtain the monthly plan table and the specific plans that the network operation personnel submit Table, and administration of power networks personnel are received to the approval results of the monthly plan table and the specific plans table;
The statistical module is used to obtain the corresponding basic performance point of grid equipment of the network operation personal management, and According to basic performance point and the approval results, the monthly score of the network operation personnel is obtained.
With reference to first aspect, the embodiment of the invention provides the first possible embodiments of first aspect, wherein institute The system of stating further includes modification application module and exception processes module;
The modification application module is used to show change of plan application form to the network operation personnel, and receives the electricity Net staff's fills in situation;
The approval module is also used to obtain the change of plan application form that the network operation personnel submit, and receives Change approval results of the administration of power networks personnel to the change of plan application form;
The exception processes module is used to change equipment owner when the change approval results are that examination & approval pass through.
With reference to first aspect, the embodiment of the invention provides second of possible embodiments of first aspect, wherein institute State system further include: reminding module;
The reminding module is used to submit the monthly plan table, the specific plans table and institute as shown network operation personnel After stating modification application table, examination & approval are sent to corresponding administration of power networks personnel and are reminded.
With reference to first aspect, the embodiment of the invention provides the third possible embodiments of first aspect, wherein institute Stating statistical module includes:
Performance sets submodule, for determining the corresponding basic performance point of grid equipment;
The score that works sets submodule, for determining the corresponding work score of different auditing results;
Performance computational submodule, one or more grid equipments for obtaining the network operation personal management are corresponding One or more basic performance split-phases are added, obtain performance basis point by one or more basis performance point;
Work to obtain molecular modules, for the auditing result according to the network operation personnel, determines the network operation people The work score of member;
It is monthly to obtain molecular modules, for dividing on the performance basis of the network operation personnel with the network operation personnel's The score that works is added, and obtains monthly score.
With reference to first aspect, the embodiment of the invention provides the 4th kind of possible embodiments of first aspect, wherein institute State the content in terms of monthly plan table includes following four:
Include checking whether to establish grid equipment in terms of Unit account of plant data should have map file inventory and existing map file clear Volume;Check whether the existing map file inventory with described there should be map file inventory consistent;Whether the drawing and picture files of inspection grid equipment It transfers on time and complete;Check whether substation makes a report on equipment changing in CSGII system in time;
It includes checking whether to formulate in terms of equipment state and has equipment O&M plan;Check whether there is the moon meter of grid equipment The formulation drawn;It is responsible for the state evaluation of grid equipment according to situations such as equipment deficiency hidden danger, abnormal tracking, checks grid equipment Whether state evaluation is consistent with the actual conditions of grid equipment;
It include: to check that the factors such as the special method of operation, equipment health status, weather condition cause in terms of equipment operation management Risk variation after, if take dynamic evaluation result carry out dynamic control;Whether monthly analysis report establishment is completed;
It include: to check whether checking experiment program content is consistent with special maintenance strategy in terms of overhaul of the equipments trial.
With reference to first aspect, the embodiment of the invention provides the 5th kind of possible embodiments of first aspect, wherein institute State system further include: system maintaining module;
The system maintaining module is described basic for modifying the essential information stored in the power equipment management system Information includes personal information and grid equipment information;
The personal information includes address name, User ID, user role information, user teams and groups information, meter belonging to user Category information and management equipment information are divided, wherein user's sort plan information includes production class and assisted class, the user Role Information includes network operation personnel, administration of power networks personnel and system manager;
The grid equipment information includes: device name, device id, equipment purposes, device status information and equipment owner Information, wherein the device status information include in use, deactivate in, repair and neutralize and scrap.
With reference to first aspect, the embodiment of the invention provides the 6th kind of possible embodiments of first aspect, wherein institute State system further include: see module;
It is described to check module for checking clear, the single performance basis point of the monthly plan table of network operation personnel, equipment and monthly Score.
With reference to first aspect, the embodiment of the invention provides the 7th kind of possible embodiments of first aspect, wherein institute State system further include: login module;
The login module for network operation personnel registration, login, nullify, log off, angle rights management and stepping on Record password modification.
Second aspect, the embodiment of the present invention also provide a kind of power equipment management equipment, including memory, processor and deposit Store up the computer program that can be run on the memory and on the processor, wherein the processor executes the meter Above-mentioned first aspect described in any item systems are realized when calculation machine program.
The third aspect, the embodiment of the present invention also provide a kind of meter of non-volatile program code that can be performed with processor Calculation machine readable medium, wherein said program code makes the processor execute any system of above-mentioned first aspect.
The embodiment of the present invention brings following the utility model has the advantages that by monthly plan Module Generation for power supply network work people The monthly plan table that member fills in, and after administration of power networks personnel are examined by approval module through above-mentioned monthly plan table, it automatically generates Specific plans table, statistical module can obtain the corresponding basic performance point of grid equipment of network operation personal management automatically, and According to basic performance point and approval results, the monthly score of network operation personnel is obtained, may not need hand-kept and is filled in big Scale lattice pass and reduce workload, improve accuracy, office automatic degree and working efficiency.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention are in specification, claims And specifically noted structure is achieved and obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of power equipment management system composition schematic diagram provided in an embodiment of the present invention;
Fig. 2 is another composition schematic diagram of power equipment management system provided in an embodiment of the present invention;
Fig. 3 is another composition schematic diagram of power equipment management system provided in an embodiment of the present invention;
Fig. 4 is a kind of statistical module composition schematic diagram provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Currently, CHINA SOUTHERN POWER Qujing power supply bureau Triratna patrols fibrillar center manages 11 substations at present, it is related to 500kV extremely The equipment O&M of 10kV voltage class.For the lifecycle management of Improving Equipment, Triratna patrols fibrillar center and blames equipment by region Appoint and divided, by equipment account, equipment O&M, state evaluation and risk assessment, checking experiment, the supervision for scrapping 5 dimensions This management method is known as equipment owner's system to individual by duty fulfillment.
But it since different staff is often responsible for the multiple and different equipment of management, in actual operation, bears The equipment owner for blaming equipment generally requires hand-kept and fills in a large amount of account when carrying out daily equipment management and O&M With various equipment management tables etc., in addition, staff also needs to fill in and declaration moon work plan, approver is according to work people The fortune for the equipment that the monthly plan table that the declaration application of member is submitted understands the action of staff and each staff is responsible for Dimension situation, thus often there is heavy workload, hand filling is easy to appear careless omission and mistake, office automatic degree be not high, work The problems such as making low efficiency is based on this, and a kind of power equipment management system and equipment provided in an embodiment of the present invention can reduce work It measures, improves accuracy, office automatic degree and working efficiency.
For convenient for understanding the present embodiment, first to a kind of power equipment management system disclosed in the embodiment of the present invention System describes in detail, as shown in Figure 1, may include: monthly plan module 1, approval module 2 and statistical module 3;
In terms of monthly plan module 1 is used in terms of the Unit account of plant data, equipment state is evaluated, in terms of equipment O&M and equipment At least one of maintenance aspect aspect, generates the monthly plan table filled in for network operation personnel, and receive network operation people The submission examination & approval for filling in situation and network operation personnel sending for monthly plan table of member, and after examination & approval pass through, it generates and uses In the specific plans table that network operation personnel fill in;
Here, power equipment management system provided in an embodiment of the present invention can using intelligent terminal as carrier, such as computer, Mobile phone, tablet computer etc., network operation personnel can refer to that General Electric Network employee, network operation personnel log in power equipment management system After system, monthly plan module 1 can be clicked, pop-up monthly plan table fills in the page, exemplary after filling according to page prompts , monthly plan table, which is filled in, can be set submitting button in the page, network operation personnel can click submitting button and submit monthly plan Table is examined, and after examination & approval pass through, monthly plan module 1 can also generate specific plans table, in order to which network operation personnel can be with The specific plans table for being directed to monthly plan performance is submitted in specific plans table.For the ease of examining the meter of network operation personnel Performance is drawn, illustratively, specific plans table can be used for power supply network staff and fill in plan performance explanation, may be used also Plan to complete to prove to upload, plan here is completed to prove to can be graphic form.
Approval module 2 is used to obtain the monthly plan table and specific plans table of network operation personnel submission, and receives power grid pipe Approval results of the reason personnel to monthly plan table and specific plans table;
Here, administration of power networks personnel can refer to the network operation personnel with the power of examination and approval, illustratively, can refer to teams and groups Length, the head of a station, Deputy Station Chief and person in charge of the technology aspect etc..Administration of power networks personnel can examine network operation personnel submission monthly plan table and Specific plans table.
Statistical module 3 is used to obtain the corresponding basic performance point of grid equipment of network operation personal management, and according to base Plinth performance point and approval results, obtain the monthly score of network operation personnel.
Here, basic performance point can refer to the performance value of examination network operation personal management grid equipment, monthly to obtain Divide the score that can refer to the examination monthly work of network operation personnel.
Through the embodiment of the present invention, it is automatically raw can to fill in monthly plan module 1 by monthly plan module 1 by network operation personnel At monthly plan table, and administration of power networks personnel by approval module 2 examine by above-mentioned monthly plan table after, be automatically generated for The specific plans table that network operation personnel fill in, administration of power networks personnel can examine network operation personnel by approval module 2 and mention The monthly plan table and specific plans table of friendship, statistical module 3 can automatically derive the monthly score of network operation personnel, may not need Hand-kept and a large amount of tables are filled in, pass and reduce workload, improves accuracy, office automatic degree and working efficiency.
It when equipment owner is busy cannot continue to manage grid equipment, needs to submit modification application, therefore, of the invention real It applies in example, as shown in Fig. 2, grid management systems can also include modification application module 4 and exception processes module 5;
Modification application module 4 is used to show change of plan application form to network operation personnel, and receives network operation personnel Fill in situation;
Here, network operation personnel can click modification application module 4, and modification application module 4 can be to network operation people Member shows change of plan table, and network operation personnel can fill in the change of plan table of pop-up and complete change of plan table on the page Fill in work.
Approval module 2 is also used to obtain the change of plan application form of network operation personnel submission, and receives administration of power networks people Change approval results of the member to change of plan application form;
Here, administration of power networks personnel can pass through examination & approval when receiving the modification application table of network operation personnel submission Module 2 examines modification application table.Here change approval results may include agreeing to and disagreeing two kinds, show as one Batch processing function can also be arranged for approval module 2 in example, when simultaneously there are two and when above review operation not can permit electricity It nets administrative staff and carries out batch processing, to improve working efficiency.
Exception processes module 5 is used to change equipment owner when changing approval results is that examination & approval pass through.
Here, illustratively, after administration of power networks personnel, which examine modification application table, to be passed through, can be set for grid equipment change Standby owner.The mode of specific change equipment owner, can be set in modification application table, allows to specify new equipment owner, Exception processes module 5 directly can change the equipment owner of grid equipment according to modification application table;If not having in modification application table Have and specify new equipment owner, administration of power networks personnel can also be directly that grid equipment setting is new by exception processes module 5 Equipment owner.Specifically it is not particularly limited here.
In order to remind administration of power networks personnel to examine in time, carry out the work in order to avoid delaying network operation personnel, as shown in figure 3, Grid management systems can be with further include: reminding module 6;
Reminding module 6 is used for after shown network operation personnel submit monthly plan table, specific plans table and modification application table, Examination & approval are sent to corresponding administration of power networks personnel to remind.
Illustratively, reminding module 6 can be also used for not passed through examination & approval when the review operation that network operation personnel submit When, examination & approval, which are sent, to network operation personnel unsuccessfully reminds, in order to which network operation personnel can modify or adjust in time, with Exempt to forget later, improves working efficiency.
In embodiments of the present invention, as shown in figure 4, statistical module 3 may include:
Performance sets submodule 31, for determining the corresponding basic performance point of grid equipment;
Here, it is that each grid equipment sets corresponding base that administration of power networks personnel can set submodule 31 by performance Plinth performance point.
The score that works sets submodule 32, for determining the corresponding work score of different auditing results;
Here, it is monthly plan table and specific plans table that administration of power networks personnel can set submodule 32 by work score Auditing result sets corresponding work score.Illustratively, work score can be positive value, or negative value, when audit is tied Fruit be by when, work can be set and be scored at positive value, as bonus point item;When auditing result is not pass through, work can be set It is scored at negative value, as deduction item.A here as example can be counted in practical applications for monthly plan table and in detail Draw table and auditing result flag bit be set, for example, examine logical result be by when, flag bit 1, auditing result be not by when, mark Position can be 0, by the way that flag bit is arranged, can accelerate calculating speed.
Performance computational submodule 33, for obtaining one or more grid equipments corresponding one of network operation personal management A or multiple basic performance point, one or more basic performance split-phases are added, performance basis point is obtained;
Here, the grid equipment of different network operation personal managements is not quite similar, therefore different network operation personnel Basic performance point may also be different.
The molecular modules 34 that work to obtain for the auditing result according to network operation personnel determine the work of network operation personnel Make score;
Here, illustratively, auditing result be by when, can carry out bonus point, auditing result be not by when, Ke Yijin Row deduction of points.
Monthly molecular modules 35, for working the performance basis of network operation personnel point and network operation personnel Split-phase adds, and obtains monthly score.
Here, performance basis point can be obtained by the monthly score of network operation personnel plus work score.
In another embodiment of the present invention, monthly plan table includes the content in terms of following four:
Include checking whether to establish grid equipment in terms of Unit account of plant data should have map file inventory and existing map file clear Volume;Check whether existing map file inventory is consistent with that there should be map file inventory;Check whether the drawing and picture files of grid equipment are transferred on time And it is complete;Check whether substation makes a report on equipment changing in CSGII system in time;
It includes checking whether to formulate in terms of equipment state and has equipment O&M plan;Check whether there is the moon meter of grid equipment The formulation drawn;It is responsible for the state evaluation of grid equipment according to situations such as equipment deficiency hidden danger, abnormal tracking, checks grid equipment Whether state evaluation is consistent with the actual conditions of grid equipment;
It include: to check that the factors such as the special method of operation, equipment health status, weather condition cause in terms of equipment operation management Risk variation after, if take dynamic evaluation result carry out dynamic control;Whether monthly analysis report establishment is completed;
It include: to check whether checking experiment program content is consistent with special maintenance strategy in terms of overhaul of the equipments trial.
Here, the fill substance of specific monthly plan worksheet can need flexible setting according to real work, specifically Monthly plan table content is not particularly limited.
In another embodiment of the present invention, as shown, power equipment management system can also include: system maintenance mould Block;
For system maintaining module for modifying the essential information stored in power equipment management system, essential information includes personnel Information and grid equipment information;
Personal information includes address name, User ID, user role information, user teams and groups information, plan point belonging to user Category information and management equipment information, wherein user's sort plan information includes production class and assisted class, user role information include Network operation personnel, administration of power networks personnel and system manager;
Facility information includes: device name, device id, equipment purposes, device status information and equipment master message, wherein Device status information include in use, deactivate in, repair and neutralize and scrap.
In embodiments of the present invention, power equipment management system further include: check module and login module;
Check that module can be used for checking clear, the single performance basis point of the monthly plan table of network operation personnel, equipment and monthly Score.
Login module can be used for the registration of network operation personnel, login, nullify, logs off, angle rights management and step on Record password modification.
Here, as an example, the whole working principle for introducing lower power equipment management system:
In another embodiment of the present invention, also provide a kind of power equipment management equipment, including memory, processor and Store the computer program that can be run on a memory and on a processor, wherein processor is realized when executing computer program The system of any one of above-described embodiment.
In another embodiment of the present invention, a kind of non-volatile program code that can be performed with processor is also provided Computer-readable medium, wherein the system that program code makes processor execute any one of above-described embodiment.
Simply introduce power equipment management system APP's so that mobile phone is carrier as an example by power equipment management system below Development process:
When power equipment management system APP is designed, C/S structure nesting B/S structure can be used, is backstage, number with JAVA MySQL is used according to library, based on Vue frame, design pattern is then Model- > View- > View-Model and one for front end portion The combined component system that can be combined, the advantage of this design pattern are to reduce controller layers, number with data-driven According to variation directly react at View layers, more efficiently directly, and this mode can build a set of establishment system, pass through group The exploitation of part formula improves working efficiency, and the page can be composed of multiple components, greatly improve the scalability of the page With the reusability of component.Development mode of the design using front and back end separation, front-end and back-end stand-alone development, later period are integrated Joint debugging is realized by ajax and is combined, greatly improves development efficiency.The light rear end weight database in the whole weight front end of design, rear end Part is more frivolous, predominantly the bridge of front end and database, and the logic control of rear end has been moved on to front end to complete, has been subtracted in this way The request time of interface is lacked, all request times are less than 100ms in elementary item, and the quick response time improves user's body It tests.
The needs hair version such as upgrade to application shop in view of traditional APP, user carries out upgrading update again, in view of the business to original Raw APP dependence is smaller, if later iteration upgrades very inconvenience, it is possible to use if using primary APP exploitation The mode of primary APP+H5 page mixed developing, and based on H5 exploitation, this solution can remove hair version from and user is manual Upgrade APP, the program after having upgraded can be deployed to server by developer, and user terminal APP has just updated completion at this time, and does not have to Flow is spent individually to be upgraded.The user experience of this solution is more preferable, can when client, which goes wrong, to be needed to repair With rapidly and quiet completion problem reparation.
Power equipment management system APP is easy to operate easy to spread: equipment owner's closed loop mechanism of control not only runs people Member can be used, and transmission of electricity and distribution department can also use, it is only necessary to which editing program launched work in advance has pole High promotional value easily;
By power equipment management system APP can take pictures upload plan complete evidence, prevented from source discovery ask Topic needs the operating mode done over again of working overtime, and reduces the wasting of resources, realizes lean work;
Performance docking may be implemented by power equipment management system APP, it is very clear: can directly to dock performance and examine It comments, conducive to the culture of equipment master recognizantion, can directly dock corresponding performance appraisal according to plan performance monthly As a result;
It may be implemented freely join when equipment owner changes by power equipment management system APP, it is convenient fast Victory prevents to omit, joins the problems such as unclear from source.
The effect that supervision and management can be effectively played by power equipment management system APP is conducive to equipment owner actively Work is implemented, equipment fault defect is actively discovered, tracking problem defect processing improves equipment O&M quality, lifting means health Operation degree reduces failure frequency, reduces repairing number, reduces power off time, to increase economic benefit, realizes enterprise Lean management objectives.
Unless specifically stated otherwise, the opposite step of the component and step that otherwise illustrate in these embodiments, digital table It is not limit the scope of the invention up to formula and numerical value.
The technical effect of power equipment management equipment provided by the embodiment of the present invention, realization principle and generation and aforementioned Embodiment of the method is identical, and to briefly describe, product embodiments part does not refer to place, can refer to corresponding in aforementioned system embodiment Content.
It is apparent to those skilled in the art that for convenience and simplicity of description, the power grid of foregoing description The specific work process of equipment management equipment, can be with reference to the corresponding process in aforementioned system embodiment, and details are not described herein.
In all examples being illustrated and described herein, any occurrence should be construed as merely illustratively, without It is as limitation, therefore, other examples of exemplary embodiment can have different values.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
The flow chart and block diagram in the drawings show the system of multiple embodiments according to the present invention, method and computer journeys The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation A part of one module, section or code of table, a part of the module, section or code include one or more use The executable instruction of the logic function as defined in realizing.It should also be noted that in some implementations as replacements, being marked in box The function of note can also occur in a different order than that indicated in the drawings.For example, two continuous boxes can actually base Originally it is performed in parallel, they can also be executed in the opposite order sometimes, and this depends on the function involved.It is also noted that It is the combination of each box in block diagram and or flow chart and the box in block diagram and or flow chart, can uses and execute rule The dedicated hardware based system of fixed function or movement is realized, or can use the group of specialized hardware and computer instruction It closes to realize.
In addition, in the description of the embodiment of the present invention unless specifically defined or limited otherwise, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
The computer program product of power equipment management system and equipment is carried out provided by the embodiment of the present invention, including is deposited The computer readable storage medium of the executable non-volatile program code of processor, the instruction that said program code includes are stored up It can be used for executing previous methods method as described in the examples, specific implementation can be found in embodiment of the method, and details are not described herein.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, it can be with It realizes by another way.The apparatus embodiments described above are merely exemplary, for example, the division of the unit, Only a kind of logical function partition, there may be another division manner in actual implementation, in another example, multiple units or components can To combine or be desirably integrated into another system, or some features can be ignored or not executed.Another point, it is shown or beg for The mutual coupling, direct-coupling or communication connection of opinion can be through some communication interfaces, device or unit it is indirect Coupling or communication connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product It is stored in the executable non-volatile computer-readable storage medium of a processor.Based on this understanding, of the invention Technical solution substantially the part of the part that contributes to existing technology or the technical solution can be with software in other words The form of product embodies, which is stored in a storage medium, including some instructions use so that One computer equipment (can be personal computer, server or the network equipment etc.) executes each embodiment institute of the present invention State all or part of the steps of method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read- Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can be with Store the medium of program code.
Finally, it should be noted that embodiment described above, only a specific embodiment of the invention, to illustrate the present invention Technical solution, rather than its limitations, scope of protection of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, those skilled in the art should understand that: anyone skilled in the art In the technical scope disclosed by the present invention, it can still modify to technical solution documented by previous embodiment or can be light It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover in protection of the invention Within the scope of.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. a kind of power equipment management system characterized by comprising monthly plan module, approval module and statistical module;
In terms of the monthly plan module is used in terms of the Unit account of plant data, equipment state is evaluated, in terms of equipment O&M and equipment At least one of maintenance aspect aspect, generates the monthly plan table filled in for network operation personnel, and receive the power grid work That makees personnel fills in the submission examination & approval of situation and network operation personnel sending for monthly plan table, and passes through in examination & approval Afterwards, the specific plans table filled in for network operation personnel is generated;
The approval module is used to obtain the monthly plan table and the specific plans table that the network operation personnel submit, and Administration of power networks personnel are received to the approval results of the monthly plan table and the specific plans table;
The corresponding basic performance of grid equipment that the statistical module is used to obtain the network operation personal management is divided, and according to Basic performance point and the approval results, obtain the monthly score of the network operation personnel.
2. power equipment management system according to claim 1, which is characterized in that the system also includes modification application moulds Block and exception processes module;
The modification application module is used to show change of plan application form to the network operation personnel, and receives the power grid work That makees personnel fills in situation;
The approval module is also used to obtain the change of plan application form that the network operation personnel submit, and receives power grid Change approval results of the administrative staff to the change of plan application form;
The exception processes module is used to change equipment owner when the change approval results are that examination & approval pass through.
3. power equipment management system according to claim 2, which is characterized in that the system also includes: reminding module;
The reminding module is used to submit the monthly plan table, the specific plans table and the change as shown network operation personnel After more application form, examination & approval are sent to corresponding administration of power networks personnel and are reminded.
4. power equipment management system according to claim 1, which is characterized in that the statistical module includes:
Performance sets submodule, for determining the corresponding basic performance point of grid equipment;
The score that works sets submodule, for determining the corresponding work score of different auditing results;
Performance computational submodule, one or more grid equipments for obtaining the network operation personal management are one corresponding Or multiple basic performance point, one or more basic performance split-phases are added, performance basis point is obtained;
Work to obtain molecular modules, for the auditing result according to the network operation personnel, determines the network operation personnel's Work score;
It is monthly to obtain molecular modules, for the work by the performance basis of the network operation personnel point with the network operation personnel Score is added, and obtains monthly score.
5. power equipment management system according to claim 1, which is characterized in that the monthly plan table includes following four The content of aspect:
Include checking whether to establish grid equipment in terms of Unit account of plant data should have map file inventory and existing map file inventory;Inspection Look into whether the existing map file inventory with described there should be map file inventory consistent;Check whether the drawing and picture files of grid equipment press time shift It hands over and complete;Check whether substation makes a report on equipment changing in CSGII system in time;
It includes checking whether to formulate in terms of equipment state and has equipment O&M plan;Check whether there is the monthly plan of grid equipment It formulates;It is responsible for the state evaluation of grid equipment according to situations such as equipment deficiency hidden danger, abnormal tracking, checks the state of grid equipment It evaluates whether to be consistent with the actual conditions of grid equipment;
It include: wind caused by checking the factors such as the special method of operation, equipment health status, weather condition in terms of equipment operation management After the variation of danger, if dynamic evaluation result is taken to carry out dynamic control;Whether monthly analysis report establishment is completed;
It include: to check whether checking experiment program content is consistent with special maintenance strategy in terms of overhaul of the equipments trial.
6. power equipment management system according to claim 1, which is characterized in that the system also includes: system maintenance Module;
The system maintaining module is for modifying the essential information stored in the power equipment management system, the essential information Including personal information and grid equipment information;
The personal information includes address name, User ID, user role information, user teams and groups information, plan point belonging to user Category information and management equipment information, wherein user's sort plan information includes production class and assisted class, the user role Information includes network operation personnel, administration of power networks personnel and system manager;
The facility information includes: device name, device id, equipment purposes, device status information and equipment master message, wherein The device status information include in use, deactivate in, repair and neutralize and scrap.
7. power equipment management system according to claim 1, which is characterized in that the system also includes: check module;
It is described to check module for checking monthly plan table, clear, the single performance basis point of equipment and the monthly score of network operation personnel.
8. power equipment management system according to claim 1, which is characterized in that the system also includes: login module;
The login module for network operation personnel registration, login, nullify, log off, angle rights management and log in it is close Code modification.
9. a kind of power equipment management equipment, including memory, processor and it is stored on the memory and can be at the place The computer program run on reason device, which is characterized in that the processor realizes aforesaid right when executing the computer program It is required that 1 to 8 described in any item systems.
10. a kind of computer-readable medium for the non-volatile program code that can be performed with processor, which is characterized in that described Program code makes the processor execute any system of the claim 1-8.
CN201910051300.5A 2019-01-18 2019-01-18 Power grid equipment management system and equipment Active CN109784862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910051300.5A CN109784862B (en) 2019-01-18 2019-01-18 Power grid equipment management system and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910051300.5A CN109784862B (en) 2019-01-18 2019-01-18 Power grid equipment management system and equipment

Publications (2)

Publication Number Publication Date
CN109784862A true CN109784862A (en) 2019-05-21
CN109784862B CN109784862B (en) 2023-04-18

Family

ID=66501606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910051300.5A Active CN109784862B (en) 2019-01-18 2019-01-18 Power grid equipment management system and equipment

Country Status (1)

Country Link
CN (1) CN109784862B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110750526A (en) * 2019-10-17 2020-02-04 北京五维星宇科技有限公司 Method and apparatus for generating single package use plan, and storage medium
CN110990620A (en) * 2019-12-11 2020-04-10 云南电网有限责任公司保山供电局 Intelligent transformer substation drawing and document data management method based on intelligent technology application
CN112200403A (en) * 2020-08-24 2021-01-08 南方电网数字电网研究院有限公司 A capability management method for power industry operation and maintenance dispatching system
CN114154966A (en) * 2021-12-17 2022-03-08 深圳供电局有限公司 Power grid equipment management system and power grid equipment management method
CN118195554A (en) * 2024-05-15 2024-06-14 国网江西省电力有限公司信息通信分公司 Main management method and system for basic data of power grid

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101303750A (en) * 2008-06-24 2008-11-12 江苏省烟草公司南通市公司 System for managing enterprise performance evaluation
CN101324940A (en) * 2008-07-28 2008-12-17 河南中光学集团有限公司 System and method for managing performance check diary
CN101702212A (en) * 2009-11-12 2010-05-05 上海众恒信息产业有限公司 Approval system and method
CN101887547A (en) * 2010-06-30 2010-11-17 广西电网公司电力科学研究院 Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment
CN102073927A (en) * 2010-12-30 2011-05-25 浪潮集团山东通用软件有限公司 Cooperative office-based project type working plan management system
CN103164775A (en) * 2013-03-16 2013-06-19 云南电网公司 Automatic evaluation platform and method for power grid equipment status
CN103390217A (en) * 2013-07-16 2013-11-13 嘉兴市恒光电力建设有限责任公司华创分公司 Power transformation transaction management operating system
CN107016502A (en) * 2017-03-30 2017-08-04 中建地下空间有限公司 A kind of pipe gallery intelligent management system
CN107784485A (en) * 2018-01-22 2018-03-09 柴建霖 A kind of grid equipment state evaluation system
CN107844840A (en) * 2017-11-21 2018-03-27 合肥海诺恒信息科技有限公司 A kind of enterprise's information technoloy equipment operation management system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101303750A (en) * 2008-06-24 2008-11-12 江苏省烟草公司南通市公司 System for managing enterprise performance evaluation
CN101324940A (en) * 2008-07-28 2008-12-17 河南中光学集团有限公司 System and method for managing performance check diary
CN101702212A (en) * 2009-11-12 2010-05-05 上海众恒信息产业有限公司 Approval system and method
CN101887547A (en) * 2010-06-30 2010-11-17 广西电网公司电力科学研究院 Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment
CN102073927A (en) * 2010-12-30 2011-05-25 浪潮集团山东通用软件有限公司 Cooperative office-based project type working plan management system
CN103164775A (en) * 2013-03-16 2013-06-19 云南电网公司 Automatic evaluation platform and method for power grid equipment status
CN103390217A (en) * 2013-07-16 2013-11-13 嘉兴市恒光电力建设有限责任公司华创分公司 Power transformation transaction management operating system
CN107016502A (en) * 2017-03-30 2017-08-04 中建地下空间有限公司 A kind of pipe gallery intelligent management system
CN107844840A (en) * 2017-11-21 2018-03-27 合肥海诺恒信息科技有限公司 A kind of enterprise's information technoloy equipment operation management system
CN107784485A (en) * 2018-01-22 2018-03-09 柴建霖 A kind of grid equipment state evaluation system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110750526A (en) * 2019-10-17 2020-02-04 北京五维星宇科技有限公司 Method and apparatus for generating single package use plan, and storage medium
CN110990620A (en) * 2019-12-11 2020-04-10 云南电网有限责任公司保山供电局 Intelligent transformer substation drawing and document data management method based on intelligent technology application
CN112200403A (en) * 2020-08-24 2021-01-08 南方电网数字电网研究院有限公司 A capability management method for power industry operation and maintenance dispatching system
CN114154966A (en) * 2021-12-17 2022-03-08 深圳供电局有限公司 Power grid equipment management system and power grid equipment management method
CN118195554A (en) * 2024-05-15 2024-06-14 国网江西省电力有限公司信息通信分公司 Main management method and system for basic data of power grid
CN118195554B (en) * 2024-05-15 2024-07-26 国网江西省电力有限公司信息通信分公司 A master management method and system for power grid basic data

Also Published As

Publication number Publication date
CN109784862B (en) 2023-04-18

Similar Documents

Publication Publication Date Title
CN109784862A (en) Power equipment management system and equipment
Hoogsteen et al. Demkit: a decentralized energy management simulation and demonstration toolkit
CN105719126B (en) system and method for scheduling Internet big data tasks based on life cycle model
CN108959633A (en) It is a kind of that the method and apparatus of customer service are provided
CN104574002A (en) Asset management information processing method based on big data analysis and asset management information processing device based on big data analysis
CN109144880A (en) The management method and system of image file, equipment, storage medium
CN101364284A (en) Production management system for electrical power system
CN113822585A (en) Intelligent smelting factory informatization management system
CN109389518A (en) Association analysis method and device
Soltani et al. Automated planning for feature model configuration based on stakeholders' business concerns
Mustafee et al. Investigating execution strategies for hybrid models developed using multiple M&S methodologies.
CN117273428A (en) An industrial chain resilience assessment method and system based on multi-chain coupling
Schwarz et al. ABMland-a tool for agent-based model development on urban land use change
CN113094406A (en) Power marketing data management method and system
Sandhu et al. A reusability evaluation model for OO-based software components
CN110297914A (en) Corpus labeling method and device
Du et al. Dynamic selection of services under temporal constraints in cloud computing
CN107230031A (en) Eco industrial park Third Party Reverse Logistics system network platform
CN104200338A (en) Line loss statistics and decision analysis system
Eydi et al. Multi-period configuration of forward and reverse integrated supply chain networks through transport mode
Ataee Gortolmesh et al. Business process modeling through hybrid simulation approach (case study: One of the iranian banks)
Shikhli et al. Data Acquisition Model for Analyzing Schedule Delays Using KDD: Knowledge Discovery and Datamining
Gerlach et al. Critical Success Factors for AI-driven Smart Energy Services.
Broderick et al. Technique to interconnect and control co‐simulation systems
van Amelsvoort SG-rating–Putting values on smart grid architectures

Legal Events

Date Code Title Description