CN107392458A - Based on field device operation intellectual analysis relative influence equipment topological analysis - Google Patents
Based on field device operation intellectual analysis relative influence equipment topological analysis Download PDFInfo
- Publication number
- CN107392458A CN107392458A CN201710579043.3A CN201710579043A CN107392458A CN 107392458 A CN107392458 A CN 107392458A CN 201710579043 A CN201710579043 A CN 201710579043A CN 107392458 A CN107392458 A CN 107392458A
- Authority
- CN
- China
- Prior art keywords
- distribution
- information
- work
- equipment
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 title claims description 11
- 238000010937 topological data analysis Methods 0.000 title claims description 3
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 238000009826 distribution Methods 0.000 claims description 29
- 238000012544 monitoring process Methods 0.000 claims description 16
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 238000012423 maintenance Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 238000011161 development Methods 0.000 abstract description 3
- 238000012795 verification Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 230000003997 social interaction Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a kind of topological structure of electric relation in mobile device application generalized information system.The present invention fully applies existing information construction achievement, expand the advanced application function of power grid GIS, pass through location equipment, using topological structure of electric and equipment account information, according to actual business requirement, bill is automatically generated according to business norms, bill circulation is completed using development of Mobile Internet technology, operating efficiency is improved, work is preferably served, serves society.The present invention solves because business is overlapping, same Data duplication typing, data syn-chronization not in time, it is inconsistent the problems such as, ensure data uniformities, integrality, uniformity, promptness, mitigate operating pressure, improve work incentive.
Description
Technical field
The present invention is based on topological structure of electric in generalized information system and establishes equipment operation experts database, carries out two using mobile device
Ticket make out an invoice business and according to nominal value require intellectual analysis identification positioning security information.
Background technology
With the continuous development of electric network information construction, enterprise needs quick comprehensive information to support decision-making, it is necessary to letter
Prompt convenient Information flow restructuring carrys out power-assisted management innovation.Southern net GIS platform completed in 2013 transmission & distribution net wire frame model and
The storage generaI investigation and typing work of basic data, complete function and the data construction of " figure is opened by the whole province one, transmission & distribution one are thrown the net ".2015
Year completes with south electric network " 6+1 " system Construction, and power information steps on a new stage, in the whole network level of IT application
It is raised to the whole network covering, the level of crew's application.Because the odjective causes such as geographical position, amblent air temperature, allocation of facility are present, cause
Distribution operational management cannot be applied well at county level and following power supply unit, and information system is not only without backman well
Make, but also increase the system maintenance work amount of operation teams and groups.
At present, south electric network " 6+1 " system and southern net GIS platform are good in the application of at county level and above unit, application
Substantially each business module is covered, particularly markets, produce the Business Streams such as major network side, finance, human resources and total management system
Journey is clear, basis is good, high using proficiency, well propulsion and practical application.
In order to solve at county level and following power supply unit to the practical problem of information system, scene work on daytime can be typically used
Make, work overtime at night amended record data and the inspection of the scene of a crime, return to office space application system, return again to work on the spot, be operated folding
Return race.Accordingly even when job schedule is slow, it can also reach practical.
Work on the spot on daytime, amended record data of working overtime at night, data inputting is not in time, working strength is big, pressure is big, Yuan Gonggong
It is poor to make enthusiasm, impracticable, it is that employee's Reduction of Students' Study Load requires to be not suitable for electric network information construction.
Work turning back run, and relatively data promptness is relative meets information system management requirement.Returned from working site
Administrative Area, after handling bill, data entry system, all operation flows freely can circulate in information system.Now, work
The flow such as need to cover as personnel, then carried out the work by data to scene according to related request.During back and forth, flower
The expense plenty of time is hurrying on a journey, if would become hard to obtain timely processing, operating efficiency and society for remote working site problem
Service ability cannot improve.
The content of the invention
The purpose of the present invention is:Based on topological structure of electric in generalized information system, identification rack hierarchical structure, device class and
Its account data establishes a set of intellectual analysis experts database, facilitates work on the spot intelligently to make out an invoice and intelligence using mobile device exploitation is a set of
Positioning site safety risk point, the workbench of south electric network " 6+1 " system that links can be identified, to overcome prior art not
Foot.
What the present invention was realized in:By the topological structure of electric relation in mobile device application generalized information system according to station,
Line, change, family level logical relation, and circuit, shaft tower, shaft tower auxiliary device subordinate relation, distribution automatic switch, ring main unit,
The logical relation of the equipment such as distribution box, switchyard, distribution transformer, wire forms device intelligence analysis storehouse;Had a power failure according to distribution
Business need is overhauled, on GIS figures after positioning maintenance object, power failure range is automatically identified with device intelligence analysis storehouse, opens
Pass, disconnecting link and ground wire information, then require specification filling, form standard instructs work bill according to the ticket of distribution two;It will move
Dynamic network technology, Internet technology, production management system, distribution SCADA system and battalion are with the informatization of monitoring command centre
Achievement is comprehensively utilized, and will be formed work and is got up with Administrative Area linkage, is formed between scene and Office Area, system and system
Slitless connection;Realize that application, execution task are filled in working site, information data returns in real time, synchronous each system, Administrative Area
Real-time monitoring work progress, so as to realize that ticket, Administrative Area examination & verification, the monitoring of live execution task, Administrative Area are filled out in working site
Modern management requirement.
It is an advantage of the invention that:
1st, the present invention fully applies existing information construction achievement, expands the advanced application function of power grid GIS, is set by positioning
It is standby, using topological structure of electric and equipment account information, according to actual business requirement, bill is automatically generated according to business norms,
Bill circulation is completed using development of Mobile Internet technology, operating efficiency is improved, preferably serves work, serves society.
2nd, the present invention is solved because business is overlapping, same Data duplication typing, data syn-chronization not in time, inconsistent etc. ask
Topic, ensure data uniformity, integrality, uniformity, promptness, mitigate operating pressure, improve work incentive.
Brief description of the drawings
Fig. 1 is the workflow diagram of the present invention;
Fig. 2 is the system structure diagram of the present invention;
Embodiment
Embodiments of the invention:Topological structure of electric relation in mobile device application generalized information system, should by mobile device
It is attached according to station, line, change, family level logical relation, and circuit, shaft tower, shaft tower with the topological structure of electric relation in generalized information system
Belong to the logic of the equipment such as equipment subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wire
Relation forms device intelligence analysis storehouse;According to distribution interruption maintenance business need, on GIS figures after positioning maintenance object, use
Device intelligence analysis storehouse automatically identifies power failure range, switch, disconnecting link and ground wire information, then requires to advise according to the ticket of distribution two
Model is filled, and form standard instructs work bill;By mobile network's technology, Internet technology, production management system, distribution
SCADA system and battalion are comprehensively utilized with monitoring command centre informatization achievement, and formation work and Administrative Area are joined
Move up, form slitless connection between scene and Office Area, system and system;Realize that application, execution task are filled in working site,
Information data returns in real time, synchronous each system, the real-time monitoring work progress of Administrative Area, so as to realize working site fill out ticket,
Administrative Area examination & verification, the modern management requirement of live execution task, Administrative Area monitoring.
Specific operating process is as shown in Figure 1:
In step S001, in mobile device application power grid GIS Orientation on map equipment, identification power failure range, equipment is obtained
Information;
Power grid GIS has all topological structure relations and account information of power network, carries out positioning on this basis and sets
Standby, identification power failure range, acquisition account information carry out two tickets and fill content automatically, nominal value content is examined by filling out ticket people,
Modification.
In step S002, after ticket information is filled in completely, fill out ticket people start flow and done by mobile wireless network arrival
Public area is audited, and push flow gives work on the spot director after the completion of person approving's examination & verification, and work on the spot is arranged by director;
In step S003, field personnel to be taken pictures when completing stage sex work as work on the spot according to
According to, while service end is returned, service end establishes monitoring module and checks picture function, and real-time scrolling information informs field condition.
In an embodiment of the present invention, whole system structure is as shown in Figure 2.
1) power grid GIS topological structure application;
Power grid GIS map establishes all power grid architectures, contains station, line, change, family hierarchical relationship, circuit, shaft tower, shaft tower
The equipment such as auxiliary device subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wire is patrolled
The relation of collecting, using distribution net equipment logical relation, selector tower, with regard to front-rear switch position can be found, so as to obtain these
Account information, two ticket contents are produced according to two ticket specification Auto-matchings.
2) work on the spot monitors.
Distribution SCADA system is the critical system of current distribution scheduling monitoring site equipment, and obtaining intelligence by remote signalling opens
The status information of pass, and then field personnel can be ordered, but for manually operated switch, at present or need
Manual operation is wanted, the mode of phone contact, accurately monitoring site can not be worked.Increase monitoring module, mobile terminal scene performed
Journey preserves data uploading pictures in real time, and system is voluntarily analyzed, and identifies hand switch state, while reacts existing well by photo
Field working condition.The action that an operation order is exactly switching switch has been performed to complete, then equipped with photo site, so as to reach
To the purpose of monitoring site work.
3) the integrated application of information system.
Production management system is the management system of whole power network production run, be all devices operating index storing place and
Mouth is counted, the ticket of distribution two issued in mobile terminal is required for entering production management system;While two ticket stubs rows are completed to file
Data automatic synchronization carries out filing statistics to production management system.Distribution SCADA system can be carried out to the operational outfit at scene
Monitoring and control, to realize the various functions such as data acquisition, equipment control, measurement, parameter regulation and various types of signal alarm, collection
Device status data is obtained into the system, is illustrated in monitor supervision platform, facilitates monitoring personnel to hold two ticket stubs row field conditions.It is integrated
Battalion is mainly considered in service society aspect, battalion has and social interaction's work(with monitoring command centre with monitoring command centre
Can, have a power failure rush to repair during, can by work complete information real-time release, inform user's safety at power cut, repairing process and
Send a telegram in reply time etc..
Claims (1)
1. one kind is based on field device operation intellectual analysis relative influence equipment topological analysis, it is characterised in that:By mobile device
Using the topological structure of electric relation in generalized information system according to station, line, change, family level logical relation, circuit, shaft tower, shaft tower are attached
The logic of the equipment such as equipment subordinate relation, distribution automatic switch, ring main unit, distribution box, switchyard, distribution transformer, wire is closed
System forms device intelligence analysis storehouse;According to distribution interruption maintenance business need, on GIS figures after positioning maintenance object, with setting
Standby intellectual analysis storehouse automatically identifies power failure range, switch, disconnecting link and ground wire information, then requires specification according to the ticket of distribution two
Filling, form standard instructs work bill;By mobile network's technology, Internet technology, production management system, distribution SCADA
System and battalion are comprehensively utilized with monitoring command centre informatization achievement, will be formed work and are linked with Administrative Area
Come, form slitless connection between scene and Office Area, system and system;Realize that application, execution task, information are filled in working site
Data return in real time, synchronous each system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579043.3A CN107392458A (en) | 2017-07-17 | 2017-07-17 | Based on field device operation intellectual analysis relative influence equipment topological analysis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579043.3A CN107392458A (en) | 2017-07-17 | 2017-07-17 | Based on field device operation intellectual analysis relative influence equipment topological analysis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107392458A true CN107392458A (en) | 2017-11-24 |
Family
ID=60340363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710579043.3A Pending CN107392458A (en) | 2017-07-17 | 2017-07-17 | Based on field device operation intellectual analysis relative influence equipment topological analysis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107392458A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112231328A (en) * | 2020-10-13 | 2021-01-15 | 国网安徽省电力有限公司安庆供电公司 | Distribution network topology information and GIS information mapping and proofreading method based on artificial intelligence |
CN112580970A (en) * | 2020-12-15 | 2021-03-30 | 西安华海众和电力科技有限公司 | Energy mapping platform based on GIS and power grid holographic sensing |
CN112835998A (en) * | 2020-12-31 | 2021-05-25 | 国家电网公司华中分部 | Generation method of power grid dynamic topological graph |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102096856A (en) * | 2010-12-03 | 2011-06-15 | 湖州电力局 | Method for generating electricity production work sheet simplified diagram on the basis of power grid topology |
CN102968689A (en) * | 2012-11-16 | 2013-03-13 | 江苏省电力公司徐州供电公司 | Intelligent monitoring method for remote control of power transformation overhaul work |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN104484835A (en) * | 2014-12-10 | 2015-04-01 | 国家电网公司 | Application of power grid GIS on mobile equipment |
CN105976268A (en) * | 2016-05-23 | 2016-09-28 | 国网山东省电力公司临沂供电公司 | Power grid planning and processing method based on mobile GIS platform |
-
2017
- 2017-07-17 CN CN201710579043.3A patent/CN107392458A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102096856A (en) * | 2010-12-03 | 2011-06-15 | 湖州电力局 | Method for generating electricity production work sheet simplified diagram on the basis of power grid topology |
CN102968689A (en) * | 2012-11-16 | 2013-03-13 | 江苏省电力公司徐州供电公司 | Intelligent monitoring method for remote control of power transformation overhaul work |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN104484835A (en) * | 2014-12-10 | 2015-04-01 | 国家电网公司 | Application of power grid GIS on mobile equipment |
CN105976268A (en) * | 2016-05-23 | 2016-09-28 | 国网山东省电力公司临沂供电公司 | Power grid planning and processing method based on mobile GIS platform |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112231328A (en) * | 2020-10-13 | 2021-01-15 | 国网安徽省电力有限公司安庆供电公司 | Distribution network topology information and GIS information mapping and proofreading method based on artificial intelligence |
CN112231328B (en) * | 2020-10-13 | 2022-11-01 | 国网安徽省电力有限公司安庆供电公司 | Distribution network topology information and GIS information mapping and proofreading method based on artificial intelligence |
CN112580970A (en) * | 2020-12-15 | 2021-03-30 | 西安华海众和电力科技有限公司 | Energy mapping platform based on GIS and power grid holographic sensing |
CN112835998A (en) * | 2020-12-31 | 2021-05-25 | 国家电网公司华中分部 | Generation method of power grid dynamic topological graph |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103941745B (en) | For without the mobile substation of man-machine polling transmission line and method of work | |
CN103812052B (en) | A kind of for without the centralized monitoring system of man-machine polling transmission line and monitoring method | |
CN106203830A (en) | Promote Distribution Network Failure response and the electric service system of repairing ability | |
CN105564465B (en) | A kind of railway electric signal plant maintenance operation control system and method | |
CN107121606B (en) | Intelligent terminal for transformer substation operation and patrol | |
CN107392458A (en) | Based on field device operation intellectual analysis relative influence equipment topological analysis | |
CN108267670B (en) | Distribution network fault study and judgment early warning system and implementation method thereof | |
CN102708446B (en) | A kind of method of setting up the emergent intelligent command system of flood control | |
CN107391747A (en) | Community management method, apparatus, system, storage medium and server | |
CN105809575A (en) | Mobile operation system and method for water and electricity production management | |
CN102880790A (en) | Personal digital assistant (PDA)-mode-based field standard operating system and operating flow | |
CN107123172A (en) | A kind of intelligent cruising inspection system | |
CN102968689A (en) | Intelligent monitoring method for remote control of power transformation overhaul work | |
CN111792487A (en) | Elevator intelligent management system and management method based on big data platform | |
CN106845834A (en) | Transmission line of electricity hidden danger management method and system based on mobile phone A PP | |
CN103177327A (en) | Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures | |
CN109977066B (en) | Emergency delivery all-in-one machine of territory wisdom | |
CN109034404A (en) | A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses | |
CN105375374B (en) | A kind of station Intelligent toolbox and its application method | |
CN108764409A (en) | Secondary device machine account management system | |
CN106408455A (en) | Railway electric power supply and distribution facility informatization record data processing system and method | |
CN201984525U (en) | Remote subway construction inspection system based on GIS (geographic information system) and GPRS (general packet radio service) | |
CN109146329A (en) | A kind of power distribution network repairing command comprehensive display platform | |
CN108288245A (en) | A kind of cultural turn platform based on big data | |
CN116503021A (en) | Digital tool system and method for on-site rush repair of power base unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |