CN102708446B - A kind of method of setting up the emergent intelligent command system of flood control - Google Patents

A kind of method of setting up the emergent intelligent command system of flood control Download PDF

Info

Publication number
CN102708446B
CN102708446B CN201210127197.6A CN201210127197A CN102708446B CN 102708446 B CN102708446 B CN 102708446B CN 201210127197 A CN201210127197 A CN 201210127197A CN 102708446 B CN102708446 B CN 102708446B
Authority
CN
China
Prior art keywords
emergency preplan
emergency
flow process
flood control
prediction scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210127197.6A
Other languages
Chinese (zh)
Other versions
CN102708446A (en
Inventor
江浩
杨克
马军建
姚贵宇
王建平
王立勇
赵宇
李春红
芮钧
李昆朋
徐希涛
李灏书
马少松
薛丽芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JILIN SONGJIANGHE HYDROPOWER Co Ltd
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Nari Technology Co Ltd
State Grid Electric Power Research Institute
Original Assignee
JILIN SONGJIANGHE HYDROPOWER Co Ltd
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JILIN SONGJIANGHE HYDROPOWER Co Ltd, STATE GRID XINYUAN HYDROPOWER CO Ltd, State Grid Corp of China SGCC, Nanjing NARI Group Corp, State Grid Electric Power Research Institute filed Critical JILIN SONGJIANGHE HYDROPOWER Co Ltd
Priority to CN201210127197.6A priority Critical patent/CN102708446B/en
Publication of CN102708446A publication Critical patent/CN102708446A/en
Application granted granted Critical
Publication of CN102708446B publication Critical patent/CN102708446B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Alarm Systems (AREA)

Abstract

The invention discloses the method for setting up the emergent intelligent command system of flood control, the prediction scheme of formulation is carried out to digitlization abstract, build one and comprise the prediction scheme storehouse of all flood control emergency preplan relevant informations, and corresponding emergency preplan entry condition, approving person, prompting personnel and corresponding execution flow process are set; According to the digitlization prediction scheme having generated, in the time that various measuring point information meets emergency preplan entry condition, automatic alarm immediately, and automatically start corresponding emergency preplan; Adopt workflow technology, each emergency preplan set handling is become to a series of mutual linkings, possesses the flow process of the condition of automatically performing, when starting after some emergency preplans, just examine and tasks carrying flow process according to the flow process setting in advance. The emergent intelligence commander of the flood control system queries that the present invention sets up facilitates, is swift in response, operating efficiency is high, command process is directly perceived, be conducive to emergency preplan rehearsal and perfect, flood control emergency command process record is complete.

Description

A kind of method of setting up the emergent intelligent command system of flood control
Technical field
The present invention relates to the emergent intelligent command system of a kind of flood control, relate in particular to a kind of method of setting up the emergent intelligent command system of flood control.
Background technology
The report that World Meteorological Organization (WMO) and Intergovernmental Panel on Climate Change (IPCC) combine issue on August 7th, 2007 points out, the whole world continue to warm there is no question about trend, and the events such as continuous drought, high temperature become more frequent. The extreme event such as continuous drought and high temperature of following some Arid Region of address prediction probably will occur more continually.
American National Natural Disaster Evaluation report is for the first time quoted relevant research and is pointed out: if emergency response in 12~24h can make flood losses reduce 1/5~1/3. Flood season in 2002, China has started the emergency response for flood damage for the first time, and henceforth flood damage emergency response has progressed into the public administration category of governments at all levels, flood control department and relevant departments, and becomes the action by government of public's growing interest.
At present, emergent also the staying in of flood control relies on hydrological telemetry system or artificial observation, carries out artificial forecasting and warning, according to the emergency preplan of papery, relies on the communication apparatus such as intercom, mobile phone to carry out artificial flood control command. There are many shortcomings in this flood control emergency command mode:
1, inquiry is inconvenient: a reservoir (hydroelectric power plant) has various types of emergency preplans conventionally, and an operator on duty can not learn all emergency preplans in the heart by heart, and paper material is inquired about pretty troublesome.
2, reaction speed is slow: various metrical informations are all second even responses for Millisecond of level, and operator on duty, from viewing information again to judging whether that starting corresponding emergency preplan has often passed through for a long time, has affected the quality time of carrying out prediction scheme adversely.
3, inefficiency: when operator on duty confirms to have occurred after emergency preplan, operator on duty notifies each system director to process corresponding event, and contacts corresponding human person's query processing progress, inefficiency. There is the undue operator on duty's of dependence profile and the skilled Grasping level to prediction scheme, be unfavorable for the strong execution of flood control command.
4, command process is not directly perceived: emergency command in the past, what lean on is commanding's individual dispatching, commanding must possess very strong logical thinking ability and space imagining ability, and whole emergency command process is directly perceived not, is unfavorable for the effect that overall situation is grasped and performance is pooled our ideas and make concerted efforts.
5, be unfavorable for the rehearsal of emergency preplan and perfect: written prediction scheme mostly exist orderliness clear not, may a situation arises sufficiently complete shortcoming, the effect of rehearsal is had a greatly reduced quality, because rehearsal process is not directly perceived and information recording is inconvenient, be unfavorable for the perfect of emergency preplan simultaneously.
6, flood control emergency command process record lacks and is difficult to inquiry: commander must not be difficult to really effectively trace real causes, be difficult to effectively sum up the experiences and lessons in flood control command at that time.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of method of setting up the emergent intelligent command system of flood control, while replacing current flood control emergent with the emergent intelligent command system of flood control by manually according to relying on papery prediction scheme to carry out the mode of flood control command.
For solving the problems of the technologies described above, the invention provides the emergent intelligent command system of a kind of flood control.
Technical foundation of the present invention: oracle database technology, workflow technology, WEB application technology based on SSH framework, Forecast of Water Regime technology, geographic information system technology, hydrology technology, ONCALL technology etc.
The method of setting up the emergent intelligent command system of flood control, is characterized in that, comprises following steps:
Digitlization scheme forming: traditional text based papery prediction scheme is carried out to digitlization abstract, solve storage, management, upgrading and the awkward problem of traditionally on paper prediction scheme, build a prediction scheme storehouse that comprises all flood control emergency preplan relevant informations, realize searching, add up and gathering of prediction scheme.
Prediction scheme self-starting: realize the complex logic computing of multiple entry conditions of prediction scheme by script, digitized emergency preplan of foundation, in the time that various measuring point information meets emergency preplan entry condition, automatic alarm immediately, and automatically start corresponding emergency preplan.
Carry out based on the emergency preplan of workflow: adopt workflow technology, each emergency preplan is processed into a series of mutual linkings, possesses the flow process of the condition of automatically performing. When triggering after some emergency preplans, just can carry out tasks carrying according to the flow process setting in advance.
Multisystem interlock information set becomes mutual: after automatically actuated emergency preplan examination & approval are passed through, each step flow process response concrete measure in corresponding emergency preplan, and carry out information interaction with multiple systems such as goods and materials system, personnel management system, gate monitoring system, water regime monitoring system, water adjusting system, mis system, handset short message platforms, the extremely corresponding other system of emergency advance warning distribution of information and corresponding operational staff, the feedback information of implementation status also can be presented in each step flow performing situation fast fast.
The beneficial effect that the present invention reaches:
The emergent intelligent command system of flood control that the present invention sets up has following advantage:
1, inquiry is convenient: being built into flood control emergency preplan storehouse after the emergency preplan digitlization of various paperys, facilitate related personnel's searching, adding up and gathering emergency preplan.
2, be swift in response: the various measurement data of Real-Time Monitoring are also associated with the entry condition of various emergency preplans it, can accomplish quick initiate emergency plan, carry out and save the quality time for prediction scheme.
3, operating efficiency is high: the automatic initiate emergency plan of computer, do not rely on operator on duty's profile and the skilled Grasping level to prediction scheme, and effective guarantee flood control command is proper effectively.
4, command process is directly perceived: the real time information of whole contingency procedure is all fed back in interface, and commanding can see emergency command progress intuitively, is conducive to bring into play the effect that whole headquarter pool our ideas and make concerted efforts.
5, be conducive to the rehearsal of emergency preplan and perfect: the process of whole emergency drilling can display intuitively, facilitate the later stage to sum up and perfect.
6, flood control emergency command process record is complete: the information of emergency command overall process can be recorded in computer, conveniently recalls and sums up experience and lessons.
Brief description of the drawings
Fig. 1 digitlization scheme forming process flow diagram flow chart;
Fig. 2 prediction scheme self-starting process flow chart
The emergency preplan flowchart of Fig. 3 based on workflow;
Fig. 4 multisystem interlock information set becomes interaction diagrams.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described. Following examples are only for technical scheme of the present invention is more clearly described, and can not limit the scope of the invention with this.
The emergent intelligence commander of flood control of the present invention system made process is as follows:
One, digitlization scheme forming process:
Traditional text based papery prediction scheme is carried out to digitlization abstract, solve storage, management, upgrading and the awkward problem of traditionally on paper prediction scheme, build a prediction scheme storehouse that comprises all flood control emergency preplan relevant informations, realize searching, add up and gathering of prediction scheme.
The flow chart of digitlization scheme forming process, as Fig. 1, is divided into several classification prediction schemes each emergency preplan according to entry condition difference. For each classification prediction scheme, corresponding emergency preplan entry condition, approving person, prompting personnel and corresponding execution flow process are set.
Two, prediction scheme self-starting process:
As shown in Figure 2, realize the complex logic computing of multiple entry conditions of prediction scheme by script, according to the digitized emergency preplan having generated, in the time that various measuring point information meets emergency preplan entry condition, automatic alarm immediately, and automatically start corresponding emergency preplan.
Three, the emergency preplan based on workflow is carried out:
Adopt workflow technology, each emergency preplan is processed into a series of mutual linkings, possesses the flow process of the condition of automatically performing. When triggering after some emergency preplans, just can examine and tasks carrying flow process according to the flow process setting in advance.
As shown in Figure 3, when emergency preplan is carried out, first, when emergency preplan is waited for examination & approval, if do not change approving person, examine emergency preplan by the approving person who sets, if transmission is the suggestions made after examination of agreeing to initiate emergency plan, emergency preplan directly or pass through by amendment examination & approval, enters flow performing; If approving person sends is the suggestions made after examination of disagreeing with initiate emergency plan, can the dissenting reason of typing, or suggestion that can typing amendment emergency preplan return to amendment.
Four, multisystem interlock information set becomes mutual:
After automatically actuated emergency preplan examination & approval are passed through, each step flow process response concrete measure in corresponding emergency preplan, and carry out information interaction with multiple systems such as goods and materials system, personnel management system, gate monitoring system, water regime monitoring system, water adjusting system, mis system, handset short message platforms, the extremely corresponding other system of emergency advance warning distribution of information and corresponding operational staff, the feedback information of implementation status also can be presented in each step flow performing situation fast fast.
As shown in Figure 4, for the every step flow process in emergency preplan, computer is carried out emergency preplan and is carried out instruction, automatically information is sent to other system and handset short message platform. Other system after receiving information feeds back process information, and cell phone platform sends to corresponding executor execution information, and executor feeds back implementation status by SMS recovery function and is stored in this step procedure information after handling task.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the technology of the present invention principle; can also make some improvement and distortion, these improvement and distortion also should be considered as protection scope of the present invention.

Claims (2)

1. a method of setting up the emergent intelligent command system of flood control, is characterized in that, comprises following steps:
(1) digitlization scheme forming: the prediction scheme of formulation is carried out to digitlization abstract, build and comprise the prediction scheme storehouse of all flood control emergency preplan relevant informations, and corresponding emergency preplan entry condition, approving person, prompting personnel and corresponding execution flow process are set;
(2) prediction scheme self-starting: according to the digitlization prediction scheme having generated, in the time that various measuring point information meets emergency preplan entry condition, automatic alarm immediately, and automatically start corresponding emergency preplan;
(3) emergency preplan based on workflow is carried out: adopt workflow technology, each emergency preplan set handling is become to a series of mutual linkings, possesses the flow process of the condition of automatically performing, when starting after some emergency preplans, just examine and tasks carrying flow process according to the flow process setting in advance;
In tasks carrying flow process, adopt multisystem interlock information set to become mutual mode:
After automatically actuated emergency preplan examination & approval are passed through, each step flow process response concrete measure in corresponding emergency preplan, and carry out information interaction with goods and materials system, personnel management system, gate monitoring system, water regime monitoring system, water adjusting system, mis system, the multiple systems of handset short message platform, computer is rapidly the extremely corresponding system of emergency advance warning distribution of information and corresponding operational staff, and the feedback information of implementation status is also shown in each step flow performing situation;
In step (2), in emergency preplan entry condition, comprise the step of by script, multiple entry conditions of prediction scheme being carried out logical operation;
In step (1), each emergency preplan in prediction scheme storehouse is divided into several classification prediction schemes according to entry condition difference; For each classification prediction scheme, corresponding emergency preplan entry condition, approving person, prompting personnel and corresponding execution flow process are set.
2. the method for setting up the emergent intelligent command system of flood control according to claim 1, it is characterized in that, computer is carried out emergency preplan and is carried out instruction, automatically emergency advance warning information is sent to after handset short message platform, handset short message platform sends to corresponding executor execution information, and executor feeds back implementation status by SMS recovery function and is stored in this step flow performing situation information after handling task.
CN201210127197.6A 2012-04-27 2012-04-27 A kind of method of setting up the emergent intelligent command system of flood control Active CN102708446B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210127197.6A CN102708446B (en) 2012-04-27 2012-04-27 A kind of method of setting up the emergent intelligent command system of flood control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210127197.6A CN102708446B (en) 2012-04-27 2012-04-27 A kind of method of setting up the emergent intelligent command system of flood control

Publications (2)

Publication Number Publication Date
CN102708446A CN102708446A (en) 2012-10-03
CN102708446B true CN102708446B (en) 2016-05-25

Family

ID=46901178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210127197.6A Active CN102708446B (en) 2012-04-27 2012-04-27 A kind of method of setting up the emergent intelligent command system of flood control

Country Status (1)

Country Link
CN (1) CN102708446B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778534A (en) * 2014-11-13 2015-07-15 安徽四创电子股份有限公司 Dynamically-adjustable government emergency process method and system
CN106384213A (en) * 2016-12-10 2017-02-08 福建四创软件有限公司 Intelligent flood prevention on duty management method based on neural network algorithm
CN107059759B (en) * 2017-05-24 2022-06-17 上海市城市建设设计研究总院(集团)有限公司 Control method of automatic flood prevention early warning and evacuation system in waterfront area
CN107563928A (en) * 2017-07-14 2018-01-09 广州大正新材料科技有限公司 Based on shared safe intelligent emergent command system
CN107622453A (en) * 2017-11-06 2018-01-23 国网河南省电力公司登封市供电公司 A kind of power regulation application command methods
CN107609847A (en) * 2017-11-06 2018-01-19 国网河南省电力公司登封市供电公司 One kind scheduling routine work based reminding method
CN107945049A (en) * 2017-11-27 2018-04-20 重庆川仪自动化股份有限公司 A kind of wisdom water utilities emergency response method and system based on technology of Internet of things
CN109191358A (en) * 2018-10-19 2019-01-11 中电科新型智慧城市研究院有限公司 Urban Flood control prevention waterlogging monitoring commander's operating system
CN113962072B (en) * 2021-10-12 2022-09-20 深圳市城市公共安全技术研究院有限公司 Emergency plan checking method and device and computer readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216926A (en) * 2008-01-09 2008-07-09 深圳市海力特科技有限责任公司 An urban emergency commanding operation system and the corresponding implementation method
CN102209099A (en) * 2011-01-21 2011-10-05 河海大学 Method and system for emergent disposal work of unexpected flood of key water control project

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080004911A1 (en) * 2006-06-30 2008-01-03 Laplante Pierre System and method for processing health information
GB2467332A (en) * 2009-01-30 2010-08-04 Kajavatan Arulanandam Stock control and order work flow management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216926A (en) * 2008-01-09 2008-07-09 深圳市海力特科技有限责任公司 An urban emergency commanding operation system and the corresponding implementation method
CN102209099A (en) * 2011-01-21 2011-10-05 河海大学 Method and system for emergent disposal work of unexpected flood of key water control project

Also Published As

Publication number Publication date
CN102708446A (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102708446B (en) A kind of method of setting up the emergent intelligent command system of flood control
CN113283704B (en) Intelligent power grid fault handling system and method based on knowledge graph
CN105564465B (en) A kind of railway electric signal plant maintenance operation control system and method
WO2022116548A1 (en) Power emergency command system
CN106960292A (en) A kind of operation flow monitoring system and method applied to Utilities Electric Co.
CN203324773U (en) Wind farm centralized control system
CN106815709A (en) One kind service quick response center support system and method
CN112785458A (en) Intelligent management and maintenance system for bridge health big data
CN113450065A (en) Production operation management system and method for wind power plant
CN107968482B (en) New energy power generation station management platform
CN110619469A (en) New energy power station operation management system
CN103065228B (en) Have a power failure monitoring assessment method for early warning and equipment
CN108964269A (en) Power distribution network O&M and total management system
CN107153903A (en) A kind of rural power grids circuit high-low pressure equipment operation management system
CN111756581A (en) Power distribution network operation fault processing method and device, computer equipment and storage medium
CN106780153A (en) It is a kind of in real time multi-functional back brake, patrol and examine operation note system
CN110932405A (en) Intelligent monitoring and analyzing system for power transformation equipment based on big data
CN102467705A (en) Early warning mechanism for controlling operational risk of container terminal and method for implementing early warning mechanism
CN115994187A (en) Hidden danger link type full-period safety management method and system based on distributed collaboration
CN116094174A (en) Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium
CN116503021A (en) Digital tool system and method for on-site rush repair of power base unit
CN115934714A (en) Information storage and classification system for micro-grid
CN107784485A (en) A kind of grid equipment state evaluation system
CN112446619A (en) Power distribution network emergency repair processing method and device
CN112305980A (en) Operation management platform for comprehensive monitoring of intelligent building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JILIN SONGJIANGHE HYDROELECTRIC POWER GENERATION C

Free format text: FORMER OWNER: NANJING NARI CO., LTD.

Effective date: 20121226

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jiang Hao

Inventor after: Li Kunpeng

Inventor after: Xu Xitao

Inventor after: Li Haoshu

Inventor after: Ma Shaosong

Inventor after: Xue Lifang

Inventor after: Yang Ke

Inventor after: Ma Junjian

Inventor after: Yao Guiyu

Inventor after: Wang Jianping

Inventor after: Wang Liyong

Inventor after: Zhao Yu

Inventor after: Li Chunhong

Inventor after: Rui Jun

Inventor before: Jiang Hao

Inventor before: Ma Shaosong

Inventor before: Xue Lifang

Inventor before: Ma Junjian

Inventor before: Wang Jianping

Inventor before: Zhao Yu

Inventor before: Li Chunhong

Inventor before: Rui Jun

Inventor before: Li Kunpeng

Inventor before: Xu Xitao

Inventor before: Li Haoshu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIANG HAO MA JUNJIAN WANG JIANPING ZHAO YU LI CHUNHONG RUI JUN LI KUNPENG XU XITAO LI HAOSHU MA SHAOSONG XUE LIFANG TO: JIANG HAO YANG KE MA JUNJIAN YAO GUIYU WANG JIANPING WANG LIYONG ZHAO YU LI CHUNHONG RUI JUN LI KUNPENG XU XITAO LI HAOSHU MA SHAOSONG XUE LIFANG

TA01 Transfer of patent application right

Effective date of registration: 20121226

Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Applicant after: State Grid Electric Power Research Insititute

Applicant after: Jilin Songjianghe Hydropower Co., Ltd.

Applicant after: Nanjing Nari Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Hydropower Co., Ltd.

Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Applicant before: State Grid Electric Power Research Insititute

Applicant before: Nanjing Nari Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171122

Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Co-patentee after: Jilin Songjianghe Hydropower Co., Ltd.

Patentee after: State Grid Electric Power Research Insititute

Co-patentee after: NARI Technology Development Co., Ltd.

Co-patentee after: State Grid Corporation of China

Co-patentee after: State Grid Xinyuan Hydropower Co., Ltd.

Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Co-patentee before: Jilin Songjianghe Hydropower Co., Ltd.

Patentee before: State Grid Electric Power Research Insititute

Co-patentee before: Nanjing Nari Co., Ltd.

Co-patentee before: State Grid Corporation of China

Co-patentee before: State Grid Xinyuan Hydropower Co., Ltd.

TR01 Transfer of patent right