CN105825329A - Safety and quality inspection method based on remote working site monitoring system - Google Patents

Safety and quality inspection method based on remote working site monitoring system Download PDF

Info

Publication number
CN105825329A
CN105825329A CN201610142485.7A CN201610142485A CN105825329A CN 105825329 A CN105825329 A CN 105825329A CN 201610142485 A CN201610142485 A CN 201610142485A CN 105825329 A CN105825329 A CN 105825329A
Authority
CN
China
Prior art keywords
work
information
bit stream
director
picture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610142485.7A
Other languages
Chinese (zh)
Inventor
邱进煊
谢剑
张欣强
苏向阳
杨凌毅
钟晓炜
范嘉祥
欧贤凯
温晓斌
陈亚栋
曹先德
赖必贵
赖兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yixinhai Information Technology Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Fujian Yixinhai Information Technology Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yixinhai Information Technology Co Ltd, State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Fujian Yixinhai Information Technology Co Ltd
Priority to CN201610142485.7A priority Critical patent/CN105825329A/en
Publication of CN105825329A publication Critical patent/CN105825329A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a safety and quality inspection method based on a remote working site monitoring system. On the basis of cooperation of a remote working site monitoring system and a field operation platform, personnel information identification, safety tool device intelligent management, and safety and quality inspection are carried out to realize safety tool device receiving, field personnel fingerprint attendance registration and identity checking, and remote monitoring and controlling on the whole work ticket working flow; and notification of a regulation violation behavior at a working site and examination and scoring are carried out. Therefore, defects of field safety regulation-implementation checking are overcome; field safety supervision of low-voltage meter installation and power connection, urgent repairing, inspection tour making and maintenance, and back brake operation and the like can be realized especially; the supervision staff in charge can perform the safety checking duty on the spot well; remote and real-time monitoring on various working sites and overall-flow and overall-process closed-loop control of the work are realized; various regulation violation behaviors can be controlled and reduced effectively; and regulation violation behaviors with manageability and equipment types can be eliminated.

Description

Safety based on operation field long distance control system and quality checking method
Technical field
The present invention relates to safety based on operation field long distance control system and quality checking method.
Background technology
Currently, in terms of power production management, particularly in terms of work ticket management, electric power constituent parts is managed by GPMS and PMS2.0 system, management process is the most perfect, and the circulation of each link is unimpeded, but work ticket itself has lacked on-the-spot management and control link, also lack follow-up safety supervision and evaluate link, it is impossible to field operation whole process is realized closed loop management and control.In terms of operation field security management and control, the supervision of current operation field still strengthens management and control by the way of arranging duplex (supervision director), still lacks superior technique means guarantee site operation safety, reduces all kinds of generation violating the regulations.
Summary of the invention
It is an object of the invention to provide a kind of safety based on operation field long distance control system and quality checking method, to overcome defect present in prior art.
For achieving the above object, the technical scheme is that a kind of safety based on operation field long distance control system and quality checking method, realize in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and issue and be directed into the task management module in operation field long distance control system by this work ticket, as mission bit stream, and is issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform of coupling, the mission bit stream that described task management module issues, as platform end mission bit stream, supervision director or work director select platform end task according to the task status of platform end mission bit stream, and complete Work tool and claim;
Step S03: supervision director or work director obtain manual working ticket license hurdle picture by field operation platform, and acquired work ticket manual working ticket license hurdle picture is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to described platform end mission bit stream, obtain supervision director, work director and the finger print information of other staff successively, and it being uploaded to described task management module, acquired finger print information is mated by described task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S06: supervision director or work director are by the earth lead task release module in field operation platform, according to described platform end mission bit stream, determine the earth lead installing people with earth lead information matches and earth lead guardian, generate hanging earthing conductor mission bit stream, and this hanging earthing conductor mission bit stream is issued to the field operation platform of earth lead guardian coupling;Earth lead guardian performs hanging earthing conductor task by field operation platform according to hanging earthing conductor mission bit stream, obtain on-the-spot hanging earthing conductor tasks carrying picture, and it being uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S07: supervision director or work director obtain on-the-spot distribution or power supply unit warning mark picture and equipment fence photo by field operation platform, and it being uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S08: supervision director or work director obtain every page of picture corresponding to manual working ticket job content by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S09: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S10: earth lead guardian obtains earth lead installing people by field operation platform and removes earth lead tasks carrying photo, and it is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream, and compare with on-the-spot hanging earthing conductor tasks carrying picture, confirm that earth lead is all recalled;
Step S11: supervision director or work director obtain manual working ticket end column picture by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S12: according to described platform end mission bit stream, obtain other staff, work director and the finger print information of supervision director successively, and it being uploaded to described task management module, acquired finger print information is mated by described task management module with this mission bit stream;
Step S13: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S14: the inspection judge paper unit in described operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, this field operation is carried out inspection scoring, and this inspection score information is sent to checking and administration unit, generate inspection scoring reference information, audit for inspecting personnel.
In an embodiment of the present invention, described task management module includes task import unit and job enquiry display unit;The work ticket that described GPMS unit is signed and issued is PDF file;
Described task import unit imports work ticket and realizes in accordance with the following steps:
Step S011: determine work ticket kind, planning work time started, planning work end time and supervision director according to work ticket information;
Step S012: select and import the work ticket issued by work ticket link subelement;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;Described personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Step S014: according to work ticket information, determines hanging earthing conductor information, and generates work ticket pre-review information;Described work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Step S015: according to work ticket information, risk point data base obtains job safety risk information by job safety;
Step S016: according to work ticket information, obtain primary managing security tools and instruments information by managing security tools and instruments data base;
Step S017: according to work ticket information, obtain individual soldier's facility information by individual soldier's device databases, complete the importing of work ticket;
Described work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Described work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure;
Described job safety risk information includes: dangerous spot type information and the precautionary measures information mated with described dangerous spot type information;Described dangerous spot type information mates with the field operation type information in described work ticket information;Described field operation type information includes one-level scene type information and the two grades of on-the-spot type informations mated with one-level scene type information;Described one-level scene type information includes: homework type, power distribution patrol, distribution operation and distribution are maked an inspection tour;Two grades of on-the-spot type informations of described power distribution patrol coupling include: 1.10kV circuit contact chopper switch both sides nuclear phase, transformer load is measured, measurement of Grounding Resistance, wires cross crosses over range measurement, low-voltage live line work, cable branch box, ring main unit, distribution transforming station works, cable works, cable testing, adjust sag, high-voltage line trackside surveys load, change spark gap, fuse switch, restringing, with changing shaft tower, with zapping becomes, change on-pole switch, disconnecting link, grounding resistance measurement works, insulation measurement works, the energy storing structure of switchgear, turnaround of unit, cut and subtract trees, distribution transformer load measurement works, controller switching equipment test and accident treatment;The described dangerous spot type information with changing wire coupling includes: protection against electric shock, puts high pendant and puts object and hit;Described precautionary measures information carries out pre-stored according to described dangerous spot type information;
Described primary managing security tools and instruments information includes: staff place electricity institute, company or external coordination troop information and the primary Work tool information with this electricity institute, company or external coordination troop Info Link;Described primary Work tool information includes: Work tool title, Work tool numbering and Work tool picture;
Described individual soldier's facility information includes: staff place electricity or company information and with this electricity or the thin information of photographic head that links of company information and use status information;
In an embodiment of the present invention, Work tool administrative unit in described operation field long distance control system obtains mission bit stream by described role management unit, during described mission bit stream issues, described Work tool administrative unit, according to mission bit stream, obtains secondary security Work tool information by described managing security tools and instruments data base, determines Work tool state, if this Work tool of Work tool condition prompting is in storehouse, then select this Work tool, and revise the Work tool state of this Work tool, complete Work tool outbound;If Work tool condition prompting is not in storehouse, then select the alternative Work tool that this Work tool links, and revise the Work tool state of this alternative Work tool, complete Work tool outbound;
Described secondary security Work tool information includes: staff place electricity institute, company or external coordination troop information and the secondary Work tool information with this electricity institute, company or external coordination troop Info Link;Described secondary Work tool information includes: Work tool title, Work tool numbering, Work tool test period next time, Work tool current test result, Work tool state and Work tool picture;
In described managing security tools and instruments data base, primary managing security tools and instruments information and secondary security Work tool information all can carry out increasing newly, revise and deleting.
In an embodiment of the present invention, in described step S2, after supervision director or work director select platform end task according to the task status of platform end mission bit stream, can select and obtain the job safety risk information corresponding with this platform end mission bit stream.
In an embodiment of the present invention, described job enquiry display unit for security audit staff check task status be respectively the most in the works, perform in, complete, cancelled and project terminate mission bit stream;
Described mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows described mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Described work on the spot Process Tracking table includes: described mission bit stream, Work tool information, the manual working ticket license hurdle picture that field operation platform is uploaded, supervision director goes into operation the information of registering, work director goes into operation the information of registering, crewmember goes into operation the information of registering, scene goes into operation personnel's picture, on-the-spot hanging earthing conductor tasks carrying picture, on-the-spot distribution or power supply unit warning mark picture, equipment fence photo, staff's field operation photo, remove earth lead tasks carrying photo, manual working ticket end column picture, supervision director knocks off the information of registering, work director knocks off the information of registering, crewmember knocks off the information of registering and knocks off in scene personnel's picture;Described work on the spot Process Tracking table obtains, by the network communication unit in described operation field long distance control system, the data that described field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in described execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Described work on the spot Process Tracking table corresponding to mission bit stream that completed is for providing the field operation implementation status to this subtask for described inspection scoring unit.
In an embodiment of the present invention, described inspection scoring unit combines the described information integrity percentage ratio having completed work on the spot Process Tracking table offer corresponding to mission bit stream and whether information mates, determine inspection scoring mark, and the missing information item of work on the spot Process Tracking table is provided;After described checking and administration unit obtains this inspection scoring mark and missing information item, determining the type of violation that missing information item is corresponding, on-the-spot act of violating regulations information and the task scoring uploaded in conjunction with supervision director or work director generate inspection scoring reference information with reference to data base;
Described inspection score information includes: checks result, inspection situation, personnel violating the regulations, number of times violating the regulations, character violating the regulations, classification violating the regulations, violating the regulations score and punish the amount of money;
Described on-the-spot act of violating regulations information includes: on-the-spot type of violation and on-the-spot picture violating the regulations;
Described task score data storehouse provides the deduction mark that type of violation is corresponding;
Described type of violation includes: the super rule of employee are violating the regulations, behavior is violating the regulations, device is violating the regulations and management is violating the regulations.
In an embodiment of the present invention, described platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, work on the spot member, dress ground wire information, Work tool title and Work tool numbering;Described task status includes: pending, perform in, complete and earth lead.
In an embodiment of the present invention, described on-the-spot tasks carrying picture includes: choose earth lead numbering picture, installation position bar picture, the earthing pole picture beaten, upper boom electrical verification picture, the earth lead picture that hangs up properly;
Described dismounting earth lead tasks carrying photo includes: remove earth lead numbering picture.
In an embodiment of the present invention, described on-the-spot field operation platform is equipped on an intelligent PDA or a smart mobile phone.
nullCompared to prior art,The method have the advantages that a kind of based on operation field long distance control system safety proposed by the invention and quality checking method,By the cooperation between operation field long distance control system and field operation platform,By personal information identification、Managing security tools and instruments intelligent management system and safety are checked with quality,Achieve and managing security tools and instruments is received management、Field Force's fingerprint attendance and identification checkup、Work ticket work flow overall process is implemented remotely to monitor and management and control,And the act of violating regulations of operation field is circulated a notice of、Examination is scored,Make up site safety and hold the deficiency that rule check,Particularly press-fit table connect electricity to low、Repairing、Make an inspection tour and safeguard、The site safety supervision of grid switching operation etc.,Mg-GIK Polarized liquid director fulfils safety inspection responsibility in scene,Realize all kinds of operation field remote real-time monitorings and operation whole process、The closed loop management and control of overall process,Effectively control and reduce various actions to break rules and regulations,Stop managerial and device violating the regulations.
Accompanying drawing explanation
Fig. 1 is on-the-spot long distance control system and the schematic diagram of field operation platform in the present invention.
The mission bit stream schematic diagram that Fig. 2 provides for job enquiry display unit in one embodiment of the invention.
The Work tool information schematic diagram that Fig. 3 provides for Work tool administrative unit in one embodiment of the invention.
The platform end mission bit stream schematic diagram that Fig. 4 provides for field operation platform in one embodiment of the invention.
The earth lead task that Fig. 5 provides for field operation platform in one embodiment of the invention issues schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawings, technical scheme is specifically described.
The present invention provides a kind of safety based on operation field long distance control system and quality checking method, realizes in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and issue and be directed into the task management module in operation field long distance control system by this work ticket, as mission bit stream, and is issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform of coupling, the mission bit stream that task management module issues, as platform end mission bit stream, supervision director or work director select platform end task according to the task status of platform end mission bit stream, and complete Work tool and claim, as shown in Figure 4;
Step S03: supervision director or work director obtain manual working ticket license hurdle picture by field operation platform, and acquired work ticket manual working ticket license hurdle picture is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to platform end mission bit stream, obtain supervision director, work director and the finger print information of other staff successively, and it being uploaded to task management module, acquired finger print information is mated by task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at scene is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S06: supervision director or work director are by the earth lead task release module in field operation platform, according to platform end mission bit stream, determine the earth lead installing people with earth lead information matches and earth lead guardian, generate hanging earthing conductor mission bit stream, and this hanging earthing conductor mission bit stream is issued to the field operation platform of earth lead guardian coupling;Earth lead guardian performs hanging earthing conductor task by field operation platform according to hanging earthing conductor mission bit stream, obtain on-the-spot hanging earthing conductor tasks carrying picture, and it being uploaded to task management module, this picture is mated by task management module with this mission bit stream, as shown in Figure 5;
Step S07: supervision director or work director obtain on-the-spot distribution or power supply unit warning mark picture and equipment fence photo by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S08: supervision director or work director obtain every page of picture corresponding to manual working ticket job content by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S09: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S10: earth lead guardian obtains earth lead installing people by field operation platform and removes earth lead tasks carrying photo, and it is uploaded to task management module, this picture is mated by task management module with this mission bit stream, and compare with on-the-spot hanging earthing conductor tasks carrying picture, confirm that earth lead is all recalled;
Step S11: supervision director or work director obtain manual working ticket end column picture by field operation platform, and are uploaded to task management module, and this picture is mated by task management module with this mission bit stream;
Step S12: according to platform end mission bit stream, obtains other staff, work director and the finger print information of supervision director successively, and is uploaded to task management module, and acquired finger print information is mated by task management module with this mission bit stream;
Step S13: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at scene is uploaded to task management module, this picture is mated by task management module with this mission bit stream;
Step S14: the inspection judge paper unit in operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, this field operation is carried out inspection scoring, and this inspection score information is sent to checking and administration unit, generate inspection score information, audit for inspecting personnel.
Further, in the present embodiment, task management module includes task import unit and job enquiry display unit;The work ticket that GPMS unit is signed and issued is PDF file;
Task import unit imports work ticket and realizes in accordance with the following steps:
Step S011: determine work ticket kind, planning work time started, planning work end time and supervision director according to work ticket information;
Step S012: select and import the work ticket issued by work ticket link subelement;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;Personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Step S014: according to work ticket information, determines hanging earthing conductor information, and generates work ticket pre-review information;Work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Step S015: according to work ticket information, risk point data base obtains job safety risk information by job safety;
Step S016: according to work ticket information, obtain primary managing security tools and instruments information by managing security tools and instruments data base;
Step S017: according to work ticket information, obtain individual soldier's facility information by individual soldier's device databases, complete the importing of work ticket;
Work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure;
Job safety risk information includes: dangerous spot type information and the precautionary measures information mated with dangerous spot type information;Dangerous spot type information mates with the field operation type information in work ticket information;Field operation type information includes one-level scene type information and the two grades of on-the-spot type informations mated with one-level scene type information;One-level scene type information includes: homework type, power distribution patrol, distribution operation and distribution are maked an inspection tour;Further, in the present embodiment, two grades of on-the-spot type informations of power distribution patrol coupling include: 1.10kV circuit contact chopper switch both sides nuclear phase, transformer load is measured, measurement of Grounding Resistance, wires cross crosses over range measurement, low-voltage live line work, cable branch box, ring main unit, distribution transforming station works, cable works, cable testing, adjust sag, high-voltage line trackside surveys load, change spark gap, fuse switch, restringing, with changing shaft tower, with zapping becomes, change on-pole switch, disconnecting link, grounding resistance measurement works, insulation measurement works, the energy storing structure of switchgear, turnaround of unit, cut and subtract trees, distribution transformer load measurement works, controller switching equipment test and accident treatment;Further, in the present embodiment, include with changing the dangerous spot type information of wire coupling: protection against electric shock, put high pendant and anti-object hits;Precautionary measures information carries out pre-stored according to dangerous spot type information;And operation field long distance control system can issue content according to specific tasks and receive the site safety operation side information uploaded of field operation platform and be updated the precautionary measures information of dangerous spot type information and correspondence, namely, user oneself editor is allowed to safeguard, it is allowed to revise after user's accumulation safety experience.
In the present embodiment, the precautionary measures that protection against electric shock is corresponding include: 1, have in operating area and joint use or during parallel neighbouring more than 35kV alive circuit, should install earth lead in operating area additional and use individual's safety wire.2, before electrical verification personnel on site electrical verification, checking that electroscope is the most intact with high tension generator, operator should wear insulating glove.3, electrical verification on same shaft tower multilamellar (high and low pressure) circuit, it is necessary to priori low pressure posteriority high pressure, priori lower floor posteriority upper strata, nearby, posteriority at a distance, tests upper strata after must hanging up properly ground wire after identifying the true no-voltage of orlop to priori again.4, forbid that staff passes through, without electrical verification, the 10kV of ground connection and following circuit, upper layer circuit is carried out electrical verification.5, after the clear and definite no-voltage of circuit experience, earth lead three-phase shortcircuit should be installed immediately.6, should order from the near to the remote, from down to up operate during installing earth lead, installing, dismounting ground wire all should use insulating bar and wear insulating glove.
The precautionary measures corresponding to preventing fall from height include: 1, when the work of upper and lower shaft tower plane aloft and displacement, fall arrest backup device must be had protect, must not carry weight, and wear soft sole, in case sole skidding.2, climbing is attached with the easy concrete wire sliding thing and should use climb plank, and takes corresponding non-skid feature.3, working on vertical ladder, ladder should be about 60 degree with the oblique angle on ground, and staff must stand on the stile that ladder top is no less than 1 meter;Double ladder must have firm hinge and limit the slide fastener of aperture.4, use overall process to fasten chin belt, prevent safety helmet landing in operation, lose protection.5, before using of seat belts qualified through visual examination;Use the two-insurance safety belt having standby rope, seat belt and protection rope should divide on the firm component hanging over tower bar different parts, forbid low height of hanging to use.Prevent seat belt from deviating from from masthead, or damaged by sharp thing.When 6, having people on tower bar, forbid to adjust or remove bracing wire.
Anti-object hits the corresponding precautionary measures and includes: 1, forbid personnel to stand in the vertical lower at operation.Should arrange fence below operating point, non-working person forbids to enter.2, high-rise working should use kit bag, and transmission object application rope bolt jail is transmitted up and down, forbids upper and lower throwing;When using all kinds of instrument, should hold, the most uniformly, fall to prevent instrument from slipping out of the hand and hurt sb.'s feelings.3, when tower bar cannot avoid square crossing operation up and down, the measure that Junk prevention is hurted sb.'s feelings should be carried out, mutually to correlate during operation, close fit.
Primary managing security tools and instruments information includes: staff place electricity institute, company or external coordination troop information and the primary Work tool information with this electricity institute, company or external coordination troop Info Link;Primary Work tool information includes: Work tool title, Work tool numbering and Work tool picture;
Individual soldier's facility information includes: staff place electricity or company information and with this electricity or the thin information of photographic head that links of company information and use status information;
Further, in the present embodiment, Work tool administrative unit in operation field long distance control system obtains mission bit stream by role management unit, and during mission bit stream issues, Work tool administrative unit is according to mission bit stream, secondary security Work tool information is obtained by managing security tools and instruments data base, determine Work tool state, if this Work tool of Work tool condition prompting is in storehouse, then select this Work tool, and revise the Work tool state of this Work tool, complete Work tool outbound;If Work tool condition prompting is not in storehouse, then select the alternative Work tool that this Work tool links, and revise the Work tool state of this alternative Work tool, complete Work tool outbound, if all there is Work tool state not in storehouse during selection instrument, then send warning prompt by this system and manage system to Tools treasury, by the use of Tools treasury management system coordination Work tool, as can be temporarily transferred Work tool from the Work tool storehouse that other electricity institutes, company or external coordination troop are corresponding temporarily.
Secondary security Work tool information includes: staff place electricity institute, company or external coordination troop information and the secondary Work tool information with this electricity institute, company or external coordination troop Info Link;Secondary Work tool information includes: Work tool title, Work tool numbering, Work tool test period next time, Work tool current test result, Work tool state and Work tool picture, as shown in Figure 3;
In managing security tools and instruments data base, primary managing security tools and instruments information and secondary security Work tool information all can carry out increasing newly, revise and deleting.
Further, in the present embodiment, in step s 2, after supervision director or work director select platform end task according to the task status of platform end mission bit stream, can select and obtain the job safety risk information corresponding with this platform end mission bit stream.
Further, in the present embodiment, job enquiry display unit for security audit staff check task status be respectively the most in the works, perform in, complete, cancelled and project terminate mission bit stream;
Mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status, as shown in Figure 2;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Work on the spot Process Tracking table includes: mission bit stream, Work tool information, the manual working ticket license hurdle picture that field operation platform is uploaded, supervision director goes into operation the information of registering, work director goes into operation the information of registering, crewmember goes into operation the information of registering, scene goes into operation personnel's picture, on-the-spot hanging earthing conductor tasks carrying picture, on-the-spot distribution or power supply unit warning mark picture, equipment fence photo, staff's field operation photo, remove earth lead tasks carrying photo, manual working ticket end column picture, supervision director knocks off the information of registering, work director knocks off the information of registering, crewmember knocks off the information of registering and knocks off in scene personnel's picture;That is, the picture that gathered of field operation platform or finger print information are all uploaded in this system, and correspondence progress of work Track Table at the scene.Work on the spot Process Tracking table obtains, by the network communication unit in operation field long distance control system, the data that field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Complete work on the spot Process Tracking table corresponding to mission bit stream for providing the field operation implementation status to this subtask for inspection scoring unit.
Further, in the present embodiment, inspection scoring unit combines and has completed information integrity percentage ratio that work on the spot Process Tracking table corresponding to mission bit stream provide and whether information mates, and determines inspection scoring mark, and provides the missing information item of work on the spot Process Tracking table;After checking and administration unit obtains this inspection scoring mark and missing information item, determine the type of violation that missing information item is corresponding, on-the-spot act of violating regulations information and the task scoring uploaded in conjunction with supervision director or work director generate inspection scoring reference information with reference to data base, audit for inspecting personnel, inspecting personnel can coupling system provide above-mentioned thin information and work on the spot Process Tracking table particular content amendment, perfect, and finally confirm above-mentioned inspection mark reference information.
Inspection scoring reference information includes: checks result, inspection situation, personnel violating the regulations, number of times violating the regulations, character violating the regulations, classification violating the regulations, violating the regulations score and punish the amount of money;
On-the-spot act of violating regulations information includes: on-the-spot type of violation and on-the-spot picture violating the regulations;
Task score data storehouse provides the deduction mark that type of violation is corresponding;
Type of violation includes: the super rule of employee are violating the regulations, behavior is violating the regulations, device is violating the regulations and management is violating the regulations;The super rule of employee are violating the regulations to be included: drive when intoxicated, work (operation) loses monitoring, high-rise working safety belt buckling free, ticketless operation, ticketless work, power failure operation not electrical verification, not hanging earthing conductor, broadens the scope of work and step on alive circuit shaft tower in handplay change peace safety measure, line outage operation by mistake, having high pendant and production operation under object strike risk without authorization.
Further, in the present embodiment, platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, teams and groups working member, dress ground wire information, Work tool title and Work tool numbering;Task status includes: pending, perform in, complete and earth lead.
Further, in the present embodiment, on-the-spot tasks carrying picture includes: choose earth lead numbering picture, installation position bar picture, the earthing pole picture beaten, upper boom electrical verification picture, the earth lead picture that hangs up properly;
Remove earth lead tasks carrying photo to include: remove earth lead numbering picture.
In order to allow those skilled in the art further appreciate that a kind of based on operation field long distance control system safety proposed by the invention and quality checking method, illustrate below in conjunction with instantiation, operation field long distance control system and field operation platform mate by the way of such as Fig. 1, on-the-spot long distance control system is equipped on the server of far-end security monitoring, and field operation platform is equipped on intelligent PDA or smart mobile phone with the form of APP.
Further, in the present embodiment, the confirmation work being completed worker information by fingerprint is provided, field operation personnel need to be registered by fingerprint on site instrument, when registering, APP demonstrates that the photo of the people that registers, name, registered units and teams and groups' information are checked for on-the-spot duplex automatically, personal information of knocking off when registering is registered and personnel amendment information is compared with going into operation, it is ensured that consistent with personal information when knocking off when going into operation.Company leader and management personnel, put in place to hilllock and all can be registered by fingerprint.After personnel's fingerprint attendance put in place to hilllock, system can automatically be screened to superintend and direct and be entangled personnel or self-check personnel, and put in place to hilllock by the safe fulfilling of leader and management personnel respectively and carry out classified statistic, it found is violating the regulations automatically according to anti-detailed rules and regulations violating the regulations, superintends and directs according to supervisor and entangles or self-check carries out violating the regulations scoring and punishing.
Further, in the present embodiment, also provide for managing security tools and instruments store management, by managing security tools and instruments binding RFID internet label (unique identifier), and utilize fixing read write line scanning RFID internet label to carry out managing security tools and instruments classification warehouse-in, by mating of Tools treasury management system and operation field long distance control system, in real time according to task renewal Work tool state in system;When receiving, system passes through antenna automatic induced RF ID internet label, accurately identifies the identity of each Work tool, and the work ticket managing security tools and instruments list information obtained with inspection platform contrasts one by one, guarantee managing security tools and instruments correctly goes out warehouse-in, it is achieved the closed loop management of managing security tools and instruments.
Further, in the present embodiment, the safety of operation field long distance control system and quality management are to serve as theme with work ticket, APP is carrier, it is auxiliary for managing system with online individual soldier's video monitoring and intelligent and safe Tools treasury, realize managing security tools and instruments is received, work ticket is permitted, Field Force goes into operation fingerprint attendance, pre-shift meeting (is stood in line, three check), safety measure (hanging earthing conductor, disconnect and closing, installing purse seine or Sign Board), work ticket implementation status before going into operation, processing quality during construction operation and risk point management and control (risk point prompting, implement the precautionary measures), completion, remove safety measure, work ticket terminates, knock off and register, the work ticket operation whole processes such as meeting after Ban (war team), overall process implements supervision and management and control.It is violating the regulations that personnel on site's safety inspections at different levels find, upload to check platform by photo violating the regulations and record violating the regulations by APP, carry out issuing after examination & verification confirms through inspector, the exposure desk process that is pushed to violating the regulations after issue exposes, and automatically carries out statistical analysis according to sum violating the regulations, character violating the regulations, classification violating the regulations, teams and groups violating the regulations etc..
After breaking rules and regulations to score, system is according to automatically generating " punishment on contravention of regulation, rectification notice ", and it is handed down to business or the generation department head's APP terminal broken rules and regulations, department head makes a report on " safety is violating the regulations analyzes rectification closed loop list ", personnel violating the regulations are after electronic signature confirms rectification, being authorized by department safety first person liable and signed electronically again confirmation, inspector on duty exercises supervision examination & verification.Pinpoint the problems in supervising for safety, " the safety management problem notice " can signed and issued in inspection platform establishment and the company leader with specific duties of issuing.Supervised being found to have was occurred in violation " ban ", " red line " or this month 2 and above serious department violating the regulations, and inspection platform automatically forms " pre-alert notification book of scoring the most violating the regulations ", and by safety supervision, department head signs and issues.Checking oneself supervise and examine or department and be found to have serious violating the regulations teams and groups or accumulative violating the regulations scoring reaches the employee of 6 points, inspection platform automatically forms " safety pre-alert notification book of scoring violating the regulations ", teams and groups or employee department director signs and issues.
Further, in the present embodiment, native system is mainly made up of headend equipment, transmission network, server, operational terminal four major part.
1, headend equipment: intelligent PDA, individual soldier's equipment, field camera, smart mobile phone etc..It is mainly used in receiving task, completes the collection of scene image information by regulation flow nodes and upload to check desk in time.
2, network service: utilize mobile 4G network to solve not stationarity and the transmission rate issues of video image of working site.Utilize Bluetooth Communication Technology, it is achieved PDA terminal and the wireless connections of auxiliary device (such as photographing unit, fingerprint machine etc.) and timely information transmission.
3, server: be mainly used in storage and the coordinated operation of types of applications program of Various types of data, it is achieved required function.
4, operational terminal: the computers such as the main video monitoring platform at You Zhigui center, safety random check check desk, exposure platform and the Tools treasury supervisor of each teams and groups, safety random check operational terminal, it is achieved work ticket work is derived and importing, work ticket managing security tools and instruments receive management, the supervision and check of on-the-spot long-distance video and guidance, the safety random check of each flow nodes of work ticket and exposure violating the regulations etc..
Further, in the present embodiment, when importing work ticket, also can be in the following way: teams and groups' work ticket signed by completes after work ticket signs and issues in GPMS system, work ticket is poured out USB flash disk, then from USB flash disk, work ticket is imported to check platform by inspection terminal computer, and choose the managing security tools and instruments needed for operation from corresponding operation team managing security tools and instruments storehouse, select risk prevention system point according to work ticket job task, choose individual soldier's equipment.Which is automatically imported with said system and matches, for the importing of work ticket.Task being assigned after completing, inspection platform increases a task, and the director that simultaneously works receives an assignment instructions with supervision director's APP terminal.
Work director holds PDA to managing security tools and instruments storehouse, and corresponding managing security tools and instruments is got in comparison task managing security tools and instruments list.If the work many necks of director, few neck, by mistake neck, Tools treasury management system all can automatically send alarm sound, and will send information warning to inspection platform, send note remind to related management personnel, supervision director.If now find Work tool problematic (use expires, exceed the time limit not test (N.T.) or test defective, badly damaged, fault etc.), after Warehouse Keeper confirms, can exchange, and on store management machine, carry out failure logging, then Work tool is prohibited to receive.When giving back, Warehouse Keeper compares task managing security tools and instruments list with work director, check confirmation face to face and do not damage, if damage, fault, loss, manager carries out record after confirming with work director immediately on supervisor, and sends information reminding to related management personnel and supplement in time or update.
Field Force need to be registered by fingerprint on site instrument, checks check desk and PDA can check and demonstrate the photo of the people that registers, name, registered units and teams and groups' information in time when registering.For guaranteeing to supervise director with construction teams and groups simultaneously with going out, register and must carry out in order.Go into operation and register: supervision director works director shift member;Knock off and register in contrast.When registering, system retrieves fingerprint register information automatically, and note abnormalities prompting.
(1) occur that Fei Ben teams and groups employee, system automatic spring relevant information point out supervision;
(2) unregistered employee, the unregistered personnel of system automatic spring, prompting must not be engaged in skilled worker's work.
Company leader and management personnel are put in place to hilllock and all can be registered by fingerprint instrument, system will be according to log-on message, automatic distinguishing is superintended and directed and is entangled personnel or self-check personnel, and this task relevant information is issued to the APP of the personnel of registering automatically, carries out site safety inspection for management personnel.
Work director logins APP and checks platform terminal, and system can show related work task automatically, clicks on the task needing to perform, and starts to perform step by step by flow process prompting, does not complete to enter next step.After completing, photo upload to platform can be checked by system automatically for inspector, and inspector pinpoints the problems and can directly correct by rollback, and carries out record violating the regulations.
(1) work ticket license: mainly completing takes pictures to work ticket license hurdle uploads.
(2) pre-shift meeting: pre-shift meeting is stood in line, managing security tools and instruments inspection etc. is taken pictures.
(3) earth lead installing: include that the installing of installation position, earthing pole, electrical verification, hanging earthing conductor etc. are taken pictures.Setting packet hanging earthing conductor, need to select corresponding guardian and installing people at APP correspondence installing earth lead, installing task can be transmitted to guardian by system automatically, and is completed to take pictures and upload by guardian.
(4) other safety measures: include that construction teams and groups supplement safety measure (as disconnected low tension switch), installing fence and warning mark etc..
(5) work ticket implementation status before going into operation: whole part work ticket is taken pictures page by page and uploads.
(6) processing quality and security risk point management and control: it is important that to site construction technology and quality (such as embedded depth of electric pole and basis, joint, mounting process etc.), operating personnel holds rule behavior, security risk prevention and control measure is implemented, work director and shift's member's change record etc. are taken pictures and uploaded;If desired, inspector can retrieve for examination on-the-spot individual soldier's video at any time, checks that field operation personnel hold rule situation in real time.
(7) earth lead is removed: take pictures the earth lead recalled, and the earth lead used with during installing carries out checking digit and quantity, it is ensured that all recall.
(8) work ticket termination: the work ticket terminated is patted according to uploading.
(9) meeting after class: upload standing in line to take pictures after class.
Further, in the present embodiment, picket violating the regulations is divided into supervise and examine to superintend and direct entangling and self-check.Superintend and direct to entangle and include that put in place inspection, scene of company leader's safety inspection, safety supervision personnel to hilllock is held rule and checked and remotely check.Self-check includes producing and business department management personnel put in place to hilllock inspection, shift management personnel to hilllock put in place inspection, supervise (work) director's site inspection.The personnel that put in place to hilllock are after fingerprint attendance, system can automatically be screened to superintend and direct and be entangled personnel or self-check personnel, and put in place to hilllock by the safe fulfilling of leader and management personnel respectively and carry out classified statistic, it found is violating the regulations automatically according to anti-detailed rules and regulations violating the regulations, superintend and direct according to supervise and examine and entangle or department's self-check or teams and groups' self-check carry out record violating the regulations and punishment on contravention of regulation, which grade to find which grade violating the regulations processes violating the regulations and penetrate analysis management responsibility by.
Further, in the present embodiment, it is violating the regulations that personnel on site's safety inspections at different levels find, upload to check platform by photo violating the regulations and record violating the regulations by APP, carry out issuing after examination & verification confirms through inspector, the inspection platform homepage that is pushed to violating the regulations after issue carries out exposure, and this work director APP receives violation information the most simultaneously simultaneously.Zhi Gui center is set up a large-screen display to roll specially and is play violation information.APP terminal also can consult whole violation information of exposure platform.Zhi Gui center inspector on duty according to the principle of " which rank of find, which rank of examination ", breaks rules and regulations situation according to scene, and analysis management responsibility by anti-detailed rules for the implementation violating the regulations, is implemented violating the regulations scoring and related management responsibility, after related personnel authorizes, carried out examination violating the regulations.
Further, in the present embodiment, superintend and direct and entangle violating the regulations process by discovery of company level and examination.Find serious and above or repeat to break rules and regulations, system automatically forms " safety rectification violating the regulations notice ", and it is issued to business or the production division director broken rules and regulations, department head should be by " four do not let slip " requirement, breaking rules and regulations to be tracked closed loop management to every, make a report on " safety is violating the regulations analyzes rectification closed loop list ", the personnel that break rules and regulations are after electronics (fingerprint) Signature Confirmation is rectified and improved, being authorized by department safety first person liable and signed electronically again confirmation, inspector on duty exercises supervision examination & verification.Pinpoint the problems in superintending and checking for safety, can work out at inspection platform and issue " the safety management problem notice " signed and issued by company leader with specific duties.To being found to have by supervise and examine, 2 and above serious department violating the regulations occurring in violation " ban ", " red line " or this month, inspection platform automatically forms " pre-alert notification book of scoring the most violating the regulations ", safety supervision Section director signs and issues.Checking oneself supervise and examine or department and be found to have serious violating the regulations teams and groups or accumulative violating the regulations scoring reaches the employee of 6 points, inspection platform automatically forms " safety pre-alert notification book of scoring violating the regulations ", teams and groups or employee department director signs and issues.
Further, the following function of the offer of the operation field long distance control system in the present embodiment:
System login: open browser, the network address of input native system, enter the system login page, inputs user name (my name) and password.User's login system for the first time has prompting initial password, modified as needed to modify after password entrance system.Login system laggard enter the homepage page, task in the works can be checked, perform in task, complete the quantity statistics of task.
Task management:
Importing work ticket: select the work ticket pdf document needing to import, input service personnel's name and earth lead information, click preview generates the essential information of work ticket and facilitates information to check.
1) work ticket kind is selected, including a kind of ticket, two kinds of tickets, low force-note, repairing list and job order.
2) work ticket needing to import is selected.
3) input service personnel name one by one, clicks on and adds staff's button.
4) input hanging earthing conductor information one by one, click on and add button.
5) preview checking work ticket information is clicked on.
Job safety risk point is analyzed.Input keyword search content, or directly open homework type and select.
Select managing security tools and instruments.Select Tools treasury, open Work tool list, choose required Work tool.
Select individual soldier's equipment, select individual soldier's equipment that work teams and groups are corresponding.
Task overview:
Check the status information of all working ticket, including in the works, perform neutralize complete.
Plan target
Can check that task status is calculated task, click on work ticket numbering and can open the essential information checking task.
Execution task
Click on execution task, can check that task status is executory task, click on work ticket numbering and can open the implementation progress checking task.
Complete task
Can check that task status is completed task, click work ticket numbering can be opened and checks the execution information of task and carry out inspection examination.
Inspection examination
Inspector carries out inspection scoring to the situation violating the regulations of task.
Work tool manages
Tools treasury for company and external coordination troop carries out intelligent management.
1, electric company's Tools treasury.
2, external coordination construction team Tools treasury.
The in-out-storehouse management service selecting Work tool according to work ticket, newly-built Work tool service are provided.
Exposure desk
It is exposed according to examination information violating the regulations.
Facility personnel
Supervision system: company leader, safety supervision department and hold rule team
Guarantee system: people's money portion, portion of the party and the masses, regulation and control center, fortune inspection portion, sales department, Township Merging management department, office, development division, fleet, Finance Department;Wherein, Township Merging management department includes next stage power supply station.
External coordination construction team: electric power at different levels, construction or installing engineering company limited
Further, the following function of the offer of the field operation platform in the present embodiment:
System login
1, intelligent terminal, long-range auditing system client end AP K is installed, opens the name of system input user, login system, notice that the setting of IP address is consistent with the IP address of service end.Noting the version number of system, if there being renewal, can automatically update after login, according to prompting, redaction is installed.
2, pending: after work signed by imports to work ticket to check platform, system is issued to work supervision director and work director task automatically.After work supervision director or work director log in mobile phone remote auditing system, new task will be received, click task enters work ticket details, and click starts to perform work ticket can eject a prompted dialog frame, clicks on and confirms to start to perform the flow process of work ticket.Note the on-stream time of work ticket, without then not starting to on-stream time to perform work ticket flow process.
3, in performing: when work ticket starts to perform backed off after random system, the when of logging on, in commission to search the work ticket task having begun to perform but be not over, click on task and enter work ticket details, click on and start to perform work ticket continuation operation task.
4, completing: after task has performed, can check completed task from here, task of clicking on enters work ticket details, clicks on and checks that work ticket can check the relevant information of task.
5, earth lead: after work supervision director or work director select installing people and the guardian of hanging earthing conductor, the task of hanging earthing conductor is distributed to guardian, guardian uses user name (name) and password login APP just can receive the task of hanging earthing conductor, and click task can start the task of hanging earthing conductor.
Task flow process
1) work ticket license: completing takes pictures to work ticket license hurdle uploads.
2) go into operation fingerprint attendance: carries out fingerprint attendance by work supervision director (if having in work ticket), work director, shift group membership successively.Note: before button is registered in click, first fingerprint instrument is opened.Click on button prompts " in connection equipment " of registering for the first time, when waiting prompting " to be successfully connected bluetooth equipment ", again tap on button of registering and just can carry out fingerprint attendance.Being not turned off with fingerprint instrument as long as system does not exit, work director and shift member afterwards register all without connection equipment, it is possible to carry out fingerprint attendance.
3) pre-shift meeting: pre-shift meeting is stood in line, managing security tools and instruments inspection etc. is taken pictures.
4) hanging earthing conductor task: work supervision director or work director click on after selecting the installing people of hanging earthing conductor and guardian and issue, and hanging earthing conductor task is transmitted to guardian.
5) perform earth lead task: guardian logs in APP by step operation task, choose earth lead numbering including shooting, electrical verification on earthing pole that shooting installation position bar number, shooting are beaten, shooting bar, shoot the flow processs such as the earth lead that hangs up properly.
6) other safety measures: shooting includes that construction teams and groups supplement safety measure (as disconnected low tension switch), installing fence and warning mark etc..
7) whole part work ticket is shot: every for work ticket one page is taken pictures.
8) processing quality and security risk point management and control: it is important that to site construction technology and quality (such as embedded depth of electric pole and basis, joint, mounting process etc.), operating personnel holds rule behavior, security risk prevention and control measure is implemented, work director and shift's member's change record etc. are taken pictures and uploaded;If desired, inspector can retrieve for examination on-the-spot individual soldier's video at any time, checks that field operation personnel hold rule situation in real time.
9) earth lead is removed: take pictures the earth lead recalled, and the earth lead used with during installing carries out checking digit and quantity, it is ensured that all recall.
10) work ticket termination: the work ticket terminated is patted according to uploading.
11) knock off fingerprint attendance: carry out fingerprint attendance by shift group membership, work director, work supervision director (if having in work ticket) successively, contrary with order when going into operation.
12) meeting after class: upload standing in line to take pictures after class.
13) work ticket operation terminates, and click returns to the homepage, and can check relevant task information.
14) risk point information inspection, clicks the exclamation mark icon in the upper right corner, can check the risk point information of this work ticket.If information content relatively many can dragging up and down is checked.
Expanded function
1) leader registers, and clicks on leader's button of registering and opens leader and register the page.
2) self-check, clicks on self-check button and opens the page, clicks on act of violating regulations button input violation information, takes pictures scene violating the regulations simultaneously, can only record an act of violating regulations every time, can clap multiple pictures.If it find that a plurality of breaking rules and regulations can repeatedly enter page record.
3) working member's change, click working member changes button and opens the page, as personnel need to leave away, clicks on member and leaves away, and then clicks on member's increase as increased personnel.Personnel amendment needs work director just can change after registering.
4) work director change, click work director changes button and opens the page, and work director's change needs work signed by agree to could change successfully.Work signed by logs in the announcement information that can receive work director change after remotely checking APP, and signed by just can change successfully after agreeing to change.
Put in place APP to hilllock
Leader to register at the long-range auditing system of work supervision director after putting in place to hilllock, can log in oneself mobile phone Shang Dao hilllock simultaneously and put in place APP.Sign in hilllock and put in place after system, all working mission bit stream worked today can be checked.Can carry out superintending and checking for each work ticket task the act of violating regulations information record that entangles and take pictures, the violation information found can be checked, on-the-spot implementation status and the progress of work ticket task can be checked.
It is above presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, when produced function is without departing from the scope of technical solution of the present invention, belong to protection scope of the present invention.

Claims (9)

1. a safety based on operation field long distance control system and quality checking method, it is characterised in that realize in accordance with the following steps:
Step S01: sign and issue unit by teams and groups' work ticket and obtain the work ticket signed and issued through GPMS unit, and issue and be directed into the task management module in operation field long distance control system by this work ticket, as mission bit stream, and is issued to the field operation platform of coupling;
Step S02: supervision director or work director in staff receive, by the field operation platform of coupling, the mission bit stream that described task management module issues, as platform end mission bit stream, supervision director or work director select platform end task according to the task status of platform end mission bit stream, and complete Work tool and claim;
Step S03: supervision director or work director obtain manual working ticket license hurdle picture by field operation platform, and acquired work ticket manual working ticket license hurdle picture is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S04: field operation platform and a wireless fingerprint acquiring unit are mated by supervision director or work director, according to described platform end mission bit stream, obtain supervision director, work director and the finger print information of other staff successively, and it being uploaded to described task management module, the finger print information of acquisition is mated by described task management module with this mission bit stream;
Step S05: supervision director or work director are gone into operation personnel's picture by field operation platform acquisition scene, and the personnel's picture that gone into operation at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S06: supervision director or work director are by the earth lead task release module in field operation platform, according to described platform end mission bit stream, determine the earth lead installing people with earth lead information matches and earth lead guardian, generate hanging earthing conductor mission bit stream, and this hanging earthing conductor mission bit stream is issued to the field operation platform of earth lead guardian coupling;Earth lead guardian performs hanging earthing conductor task by field operation platform according to hanging earthing conductor mission bit stream, obtain on-the-spot hanging earthing conductor tasks carrying picture, and it being uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S07: supervision director or work director obtain on-the-spot distribution or power supply unit warning mark picture and equipment fence photo by field operation platform, and it being uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S08: supervision director or work director obtain every page of picture corresponding to manual working ticket job content by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S09: supervision director or work director obtain the field operation photo of other staff by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S10: earth lead guardian takes over business ground wire installing people by the acquisition of field operation platform and removes earth lead tasks carrying photo, and it is uploaded to described task management module, this picture is mated by described management module with this mission bit stream, and compare with on-the-spot hanging earthing conductor tasks carrying picture, confirm that earth lead is all recalled;
Step S11: supervision director or work director obtain manual working ticket end column picture by field operation platform, and are uploaded to described task management module, and this picture is mated by described task management module with this mission bit stream;
Step S12: according to described platform end mission bit stream, obtain other staff, work director and the finger print information of supervision director successively, and it being uploaded to described task management module, acquired finger print information is mated by described task management module with this mission bit stream;
Step S13: supervision director or work director are knocked off personnel's picture by field operation platform acquisition scene, and personnel's picture of being knocked off at described scene is uploaded to described task management module, this picture is mated by described task management module with this mission bit stream;
Step S14: the inspection judge paper unit in described operation field long distance control system is according to the mission bit stream after being mated by above-mentioned steps, this field operation is carried out inspection scoring, and this inspection score information is sent to checking and administration unit, generate inspection scoring reference information, audit for inspecting personnel.
Safety based on operation field long distance control system the most according to claim 1 and quality checking method, it is characterised in that described task management module includes task import unit and job enquiry display unit;The work ticket that described GPMS unit is signed and issued is PDF file;
Described task import unit imports work ticket and realizes in accordance with the following steps:
Step S011: determine work ticket kind, planning work time started, planning work end time and supervision director according to work ticket information;
Step S012: select and import the work ticket issued by work ticket link subelement;
Step S013: according to work ticket information, accesses personnel assignment data base, and adds field personnel's name information according to accessing result correspondence;Described personnel assignment data base is used for storing staff's name information, staff's finger print information, staff's work state information, staff academic title's information, staff's post information and staff's technology qualification information;
Step S014: according to work ticket information, determines hanging earthing conductor information, and generates work ticket pre-review information;Described work ticket pre-review information includes work ticket draft bank, planning work time started, planning work end time and working line;
Step S015: according to work ticket information, risk point data base obtains job safety risk information by job safety;
Step S016: according to work ticket information, obtain primary managing security tools and instruments information by managing security tools and instruments data base;
Step S017: according to work ticket information, obtain individual soldier's facility information by individual soldier's device databases, complete the importing of work ticket;
Described work ticket kind includes: a kind of ticket, two kinds of tickets, low force-note, repairing list and job order;
Described work ticket information includes: work ticket kind, work ticket numbering, department, work teams and groups, work director, operating crew, working line, job site or equipment, change/power distribution station, line name, the dual title of equipment, a stopping bar number, job content, projected operating times and safety measure;
Described job safety risk information includes: dangerous spot type information and the precautionary measures information mated with described dangerous spot type information;Described dangerous spot type information mates with the field operation type information in described work ticket information;Described field operation type information includes one-level scene type information and the two grades of on-the-spot type informations mated with one-level scene type information;Described one-level scene type information includes: homework type, power distribution patrol, distribution operation and distribution are maked an inspection tour;Two grades of on-the-spot type informations of described power distribution patrol coupling include: 1.10kV circuit contact chopper switch both sides nuclear phase, transformer load is measured, measurement of Grounding Resistance, wires cross crosses over range measurement, low-voltage live line work, cable branch box, ring main unit, distribution transforming station works, cable works, cable testing, adjust sag, high-voltage line trackside surveys load, change spark gap, fuse switch, restringing, with changing shaft tower, with zapping becomes, change on-pole switch, disconnecting link, grounding resistance measurement works, insulation measurement works, the energy storing structure of switchgear, turnaround of unit, cut and subtract trees, distribution transformer load measurement works, controller switching equipment test and accident treatment;The described dangerous spot type information with changing wire coupling includes: protection against electric shock, puts high pendant and puts object and hit;Described precautionary measures information carries out pre-stored according to described dangerous spot type information;
Described primary managing security tools and instruments information includes: staff place electricity institute, company or external coordination troop information and the primary Work tool information with this electricity institute, company or external coordination troop Info Link;Described primary Work tool information includes: Work tool title, Work tool numbering and Work tool picture;
Described individual soldier's facility information includes: staff place electricity or company information and with this electricity or the thin information of photographic head that links of company information and use status information.
Safety based on operation field long distance control system the most according to claim 1 and quality checking method, it is characterized in that, Work tool administrative unit in described operation field long distance control system obtains mission bit stream by described role management unit, during described mission bit stream issues, described Work tool administrative unit is according to mission bit stream, secondary security Work tool information is obtained by described managing security tools and instruments data base, determine Work tool state, if this Work tool of Work tool condition prompting is in storehouse, then select this Work tool, and revise the Work tool state of this Work tool, complete Work tool outbound;If Work tool condition prompting is not in storehouse, then select the alternative Work tool that this Work tool links, and revise the Work tool state of this alternative Work tool, complete Work tool outbound;
Described secondary security Work tool information includes: staff place electricity institute, company or external coordination troop information and the secondary Work tool information with this electricity institute, company or external coordination troop Info Link;Described secondary Work tool information includes: Work tool title, Work tool numbering, Work tool test period next time, Work tool current test result, Work tool state and Work tool picture;
In described managing security tools and instruments data base, primary managing security tools and instruments information and secondary security Work tool information all can carry out increasing newly, revise and deleting.
Safety based on operation field long distance control system the most according to claim 2 and quality checking method, it is characterized in that, in described step S2, after supervision director or work director select platform end task according to the task status of platform end mission bit stream, can select and obtain the job safety risk information corresponding with this platform end mission bit stream.
Safety based on operation field long distance control system the most according to claim 2 and quality checking method, it is characterized in that, described job enquiry display unit for security audit staff check task status be respectively the most in the works, perform in, complete, cancelled and project terminate mission bit stream;
Described mission bit stream includes: work ticket numbering, planning work time started, planning work end time, working line title, field personnel, work director, supervision director and task status;
Work ticket numbering in calculated mission bit stream links with the work ticket imported, and shows described mission bit stream and work ticket information, and mission bit stream, after issuing, is converted to mission bit stream in execution in the works;
Work ticket numbering in executory mission bit stream and completed mission bit stream all links to a work on the spot Process Tracking table;Described work on the spot Process Tracking table includes: described mission bit stream, Work tool information, the manual working ticket license hurdle picture that field operation platform is uploaded, supervision director goes into operation the information of registering, work director goes into operation the information of registering, crewmember goes into operation the information of registering, scene goes into operation personnel's picture, on-the-spot hanging earthing conductor tasks carrying picture, on-the-spot distribution or power supply unit warning mark picture, equipment fence photo, staff's field operation photo, remove earth lead tasks carrying photo, manual working ticket end column picture, supervision director knocks off the information of registering, work director knocks off the information of registering, crewmember knocks off the information of registering and knocks off in scene personnel's picture;Described work on the spot Process Tracking table obtains, by the network communication unit in described operation field long distance control system, the data that described field operation platform is uploaded, and provides above-mentioned information in a tabular form;
The task that the work on the spot Process Tracking table that in described execution, mission bit stream is corresponding is carrying out for the information real-time tracking provided by this work on the spot Process Tracking table;Described work on the spot Process Tracking table corresponding to mission bit stream that completed is for providing the field operation implementation status to this subtask for described inspection scoring unit.
Safety based on operation field long distance control system the most according to claim 5 and quality checking method, it is characterized in that, whether the information integrity percentage ratio and the information that have completed work on the spot Process Tracking table offer corresponding to mission bit stream described in described inspection scoring unit combination mate, determine inspection scoring mark, and the missing information item of work on the spot Process Tracking table is provided;After described checking and administration unit obtains this inspection scoring mark and missing information item, determining the type of violation that missing information item is corresponding, on-the-spot act of violating regulations information and the task scoring uploaded in conjunction with supervision director or work director generate inspection scoring reference information with reference to data base;
Described inspection score information includes: checks result, inspection situation, personnel violating the regulations, number of times violating the regulations, character violating the regulations, classification violating the regulations, violating the regulations score and punish the amount of money;
Described on-the-spot act of violating regulations information includes: on-the-spot type of violation and on-the-spot picture violating the regulations;
Described task score data storehouse provides the deduction mark that type of violation is corresponding;
Described type of violation includes: the super rule of employee are violating the regulations, behavior is violating the regulations, device is violating the regulations and management is violating the regulations.
Safety based on operation field long distance control system the most according to claim 1 and quality checking method, it is characterized in that, described platform end mission bit stream includes: task type, task status, mission number, time started, end time, supervision director, work director, job content, work on the spot member, dress ground wire information, Work tool title and Work tool numbering;Described task status includes: pending, perform in, complete and earth lead.
Safety based on operation field long distance control system the most according to claim 1 and quality checking method, it is characterized in that, described on-the-spot tasks carrying picture includes: choose earth lead numbering picture, installation position bar picture, the earthing pole picture beaten, upper boom electrical verification picture, the earth lead picture that hangs up properly;
Described dismounting earth lead tasks carrying photo includes: remove earth lead numbering picture.
Safety based on operation field long distance control system the most according to claim 1 and quality checking method, it is characterised in that described on-the-spot field operation platform is equipped on an intelligent PDA or a smart mobile phone.
CN201610142485.7A 2016-03-14 2016-03-14 Safety and quality inspection method based on remote working site monitoring system Pending CN105825329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610142485.7A CN105825329A (en) 2016-03-14 2016-03-14 Safety and quality inspection method based on remote working site monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610142485.7A CN105825329A (en) 2016-03-14 2016-03-14 Safety and quality inspection method based on remote working site monitoring system

Publications (1)

Publication Number Publication Date
CN105825329A true CN105825329A (en) 2016-08-03

Family

ID=56988053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610142485.7A Pending CN105825329A (en) 2016-03-14 2016-03-14 Safety and quality inspection method based on remote working site monitoring system

Country Status (1)

Country Link
CN (1) CN105825329A (en)

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339828A (en) * 2016-11-01 2017-01-18 胡晓光 WeChat platform based on-site security risk management and control method
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system
CN106404052A (en) * 2016-08-26 2017-02-15 隆鑫通用动力股份有限公司 Vehicle road test method and system
CN106651124A (en) * 2016-11-03 2017-05-10 中建八局第建设有限公司 Construction workers' peccancy control method, terminal, server and system
CN106845648A (en) * 2016-12-09 2017-06-13 国网北京市电力公司 Data processing method and device
CN106845760A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Management system for safety instruments and management method
CN107085772A (en) * 2017-05-15 2017-08-22 广东电网有限责任公司惠州供电局 A kind of major network work of electric power system ticket anticipation management system and method
CN107103407A (en) * 2017-03-29 2017-08-29 国网上海市电力公司 A kind of power transmission cable based on Internet of Things installs management system
CN107203850A (en) * 2017-06-02 2017-09-26 四川创立信息科技有限责任公司 The intelligence s ervice platform of management and control is standardized based on service process
CN107230016A (en) * 2017-05-26 2017-10-03 广东电网有限责任公司佛山供电局 A kind of method and system interacted towards power network auxiliary tone with inspection business information
CN107301516A (en) * 2017-09-11 2017-10-27 国网山东省电力公司即墨市供电公司 A kind of method and system of work about electric power site safety management
CN107437139A (en) * 2017-07-13 2017-12-05 刘光起 A kind of intelligent enterprise-quality, safety ratio are to method for monitoring
CN107563635A (en) * 2017-08-29 2018-01-09 国网福建省电力有限公司 The long-range audit system of distribution line engineering construction quality and method
CN107561345A (en) * 2017-09-27 2018-01-09 国网安徽省电力公司检修公司 Electrical verification control device based on ID cards
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
CN107798916A (en) * 2017-09-21 2018-03-13 长安大学 The express way driving safety intelligent early-warning system and method for bus or train route people collaboration
CN107798489A (en) * 2017-12-01 2018-03-13 国网河南省电力公司鹤壁供电公司 A kind of electric network operation site safety management method based on wechat platform
CN107830932A (en) * 2017-09-26 2018-03-23 国家电网公司 Inspection device detects in transformer station
CN107945083A (en) * 2017-10-27 2018-04-20 广东电网有限责任公司云浮供电局 A kind of operation process management method and system
CN107967562A (en) * 2017-11-29 2018-04-27 国网山西省电力公司太原供电公司 A kind of construction site job safety remote-control system and method
CN108596447A (en) * 2018-03-30 2018-09-28 广东电网有限责任公司 A kind of intelligent electric power construction operation inspection of the scene of a crime mobile application method based on risk assessment
CN108960554A (en) * 2018-02-09 2018-12-07 珠海优特电力科技股份有限公司 It is a kind of to run and maintenance safety control device, system and method
CN109002897A (en) * 2018-08-29 2018-12-14 国网河南省电力公司检修公司 Field operation in transformer substation security management and control system and method based on robot technology
CN109074613A (en) * 2016-08-12 2018-12-21 株式会社小松制作所 Managing device, construction management system and positional information managing method
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109409649A (en) * 2018-09-11 2019-03-01 浙江大有集团有限公司 The safe standing of collective-owned enterprise's encased column base and site operation control platform
CN109559401A (en) * 2017-09-22 2019-04-02 福建福清核电有限公司 A kind of intelligent work order actuator and its application method
CN109784613A (en) * 2018-11-30 2019-05-21 西安图迹信息科技有限公司 Electric power field work managing and control system anti-violating the regulations
CN110705896A (en) * 2019-10-12 2020-01-17 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN111885522A (en) * 2020-06-28 2020-11-03 国家电网有限公司 Live working detection system and method
CN111931960A (en) * 2020-09-08 2020-11-13 浙江海盐力源环保科技股份有限公司 Power station work ticket intelligent transportation and management system with dynamic feedback of Internet of things
CN112016803A (en) * 2020-07-23 2020-12-01 浙江图盛输变电工程有限公司温州科技分公司 Cross-professional power grid risk safety management and control system fusing operation big data
CN112257547A (en) * 2020-10-19 2021-01-22 国网浙江杭州市萧山区供电有限公司 Transformer substation safety measure identification method based on deep learning
CN112734397A (en) * 2021-01-22 2021-04-30 南京生兴有害生物防治技术股份有限公司 Personnel safety report management method applied to construction management software for preventing and controlling pine wilt disease
CN112990586A (en) * 2021-03-22 2021-06-18 海南电网有限责任公司澄迈供电局 Intelligent video monitoring method and system for distribution network operation
CN113066247A (en) * 2021-02-26 2021-07-02 广东能源集团科学技术研究院有限公司 Intelligent monitoring system for operation of power distribution room based on cloud edge cooperation
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113256057A (en) * 2021-04-06 2021-08-13 国网河北省电力有限公司衡水供电分公司 Power system inspection method and server
CN113435724A (en) * 2021-06-18 2021-09-24 云南电网有限责任公司临沧供电局 System and method for remote monitoring and management of distribution network operation
CN113469445A (en) * 2021-07-09 2021-10-01 华能左权煤电有限责任公司 Risk management and control real-time tracking system based on field operation
CN113537783A (en) * 2021-07-19 2021-10-22 国网吉林省电力有限公司吉林供电公司 Intelligent management and control method for power grid maintenance safety risk
CN113887777A (en) * 2021-06-01 2022-01-04 贵州电网有限责任公司 Three-phase-exceeding prevention early warning system for electric power field operation
CN114092888A (en) * 2021-12-03 2022-02-25 国网四川省电力公司电力科学研究院 Electric power operation laboratory personnel risk detection system that electrocutes
CN114691668A (en) * 2022-05-30 2022-07-01 国网浙江省电力有限公司 Inspection data automatic processing method suitable for multidimensional measurement asset management
CN114818995A (en) * 2022-06-27 2022-07-29 广东电网有限责任公司佛山供电局 Method, device and equipment for identifying and early warning illegal work without work ticket
CN114842616A (en) * 2022-05-17 2022-08-02 南京远能电力工程有限公司 Method for improving safety supervision efficiency of electric power construction process
CN117011106A (en) * 2023-07-19 2023-11-07 江苏思行达信息技术有限公司 Engineering supervision safety supervision system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049876A (en) * 2012-12-25 2013-04-17 富阳市供电局 Extranet client management and control method for electric power working site management and control system
CN103646314A (en) * 2013-12-13 2014-03-19 国家电网公司 Team safety activity management system control method based on web site
CN103729712A (en) * 2013-10-25 2014-04-16 国家电网公司 Intelligent security control method of electric power field operating personnel
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049876A (en) * 2012-12-25 2013-04-17 富阳市供电局 Extranet client management and control method for electric power working site management and control system
CN103729712A (en) * 2013-10-25 2014-04-16 国家电网公司 Intelligent security control method of electric power field operating personnel
CN103646314A (en) * 2013-12-13 2014-03-19 国家电网公司 Team safety activity management system control method based on web site
CN104036348A (en) * 2014-05-30 2014-09-10 段君寨 Electronic mobile operation order system

Cited By (55)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109074613A (en) * 2016-08-12 2018-12-21 株式会社小松制作所 Managing device, construction management system and positional information managing method
CN109074613B (en) * 2016-08-12 2023-10-27 株式会社小松制作所 Construction management system and position information management method
CN106404052A (en) * 2016-08-26 2017-02-15 隆鑫通用动力股份有限公司 Vehicle road test method and system
CN106404052B (en) * 2016-08-26 2019-09-10 隆鑫通用动力股份有限公司 Road vehicle test method and system
CN106408254A (en) * 2016-09-06 2017-02-15 江苏智通交通科技有限公司 Highway engineering project supervision system
CN106339828A (en) * 2016-11-01 2017-01-18 胡晓光 WeChat platform based on-site security risk management and control method
CN106651124A (en) * 2016-11-03 2017-05-10 中建八局第建设有限公司 Construction workers' peccancy control method, terminal, server and system
CN106845648A (en) * 2016-12-09 2017-06-13 国网北京市电力公司 Data processing method and device
CN106845760A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Management system for safety instruments and management method
CN107103407A (en) * 2017-03-29 2017-08-29 国网上海市电力公司 A kind of power transmission cable based on Internet of Things installs management system
CN107085772A (en) * 2017-05-15 2017-08-22 广东电网有限责任公司惠州供电局 A kind of major network work of electric power system ticket anticipation management system and method
CN107230016A (en) * 2017-05-26 2017-10-03 广东电网有限责任公司佛山供电局 A kind of method and system interacted towards power network auxiliary tone with inspection business information
CN107230016B (en) * 2017-05-26 2020-06-09 广东电网有限责任公司佛山供电局 Method and system for power grid distribution and dispatching and routing inspection service information interaction
CN107203850A (en) * 2017-06-02 2017-09-26 四川创立信息科技有限责任公司 The intelligence s ervice platform of management and control is standardized based on service process
CN107437139A (en) * 2017-07-13 2017-12-05 刘光起 A kind of intelligent enterprise-quality, safety ratio are to method for monitoring
CN107563635A (en) * 2017-08-29 2018-01-09 国网福建省电力有限公司 The long-range audit system of distribution line engineering construction quality and method
CN107301516A (en) * 2017-09-11 2017-10-27 国网山东省电力公司即墨市供电公司 A kind of method and system of work about electric power site safety management
CN107798916B (en) * 2017-09-21 2020-07-28 长安大学 Vehicle-road-person cooperative expressway driving safety intelligent early warning system and method
CN107798916A (en) * 2017-09-21 2018-03-13 长安大学 The express way driving safety intelligent early-warning system and method for bus or train route people collaboration
CN109559401A (en) * 2017-09-22 2019-04-02 福建福清核电有限公司 A kind of intelligent work order actuator and its application method
CN107830932A (en) * 2017-09-26 2018-03-23 国家电网公司 Inspection device detects in transformer station
CN107561345A (en) * 2017-09-27 2018-01-09 国网安徽省电力公司检修公司 Electrical verification control device based on ID cards
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
CN107945083A (en) * 2017-10-27 2018-04-20 广东电网有限责任公司云浮供电局 A kind of operation process management method and system
CN107967562A (en) * 2017-11-29 2018-04-27 国网山西省电力公司太原供电公司 A kind of construction site job safety remote-control system and method
CN107798489A (en) * 2017-12-01 2018-03-13 国网河南省电力公司鹤壁供电公司 A kind of electric network operation site safety management method based on wechat platform
CN108960554A (en) * 2018-02-09 2018-12-07 珠海优特电力科技股份有限公司 It is a kind of to run and maintenance safety control device, system and method
CN108596447A (en) * 2018-03-30 2018-09-28 广东电网有限责任公司 A kind of intelligent electric power construction operation inspection of the scene of a crime mobile application method based on risk assessment
CN109002897A (en) * 2018-08-29 2018-12-14 国网河南省电力公司检修公司 Field operation in transformer substation security management and control system and method based on robot technology
CN109409649A (en) * 2018-09-11 2019-03-01 浙江大有集团有限公司 The safe standing of collective-owned enterprise's encased column base and site operation control platform
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109784613A (en) * 2018-11-30 2019-05-21 西安图迹信息科技有限公司 Electric power field work managing and control system anti-violating the regulations
CN110705896A (en) * 2019-10-12 2020-01-17 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN110705896B (en) * 2019-10-12 2023-03-24 广联达科技股份有限公司 Mechanical operation management early warning method, system and medium
CN111885522A (en) * 2020-06-28 2020-11-03 国家电网有限公司 Live working detection system and method
CN112016803A (en) * 2020-07-23 2020-12-01 浙江图盛输变电工程有限公司温州科技分公司 Cross-professional power grid risk safety management and control system fusing operation big data
CN111931960A (en) * 2020-09-08 2020-11-13 浙江海盐力源环保科技股份有限公司 Power station work ticket intelligent transportation and management system with dynamic feedback of Internet of things
CN112257547A (en) * 2020-10-19 2021-01-22 国网浙江杭州市萧山区供电有限公司 Transformer substation safety measure identification method based on deep learning
CN112734397A (en) * 2021-01-22 2021-04-30 南京生兴有害生物防治技术股份有限公司 Personnel safety report management method applied to construction management software for preventing and controlling pine wilt disease
CN113066247A (en) * 2021-02-26 2021-07-02 广东能源集团科学技术研究院有限公司 Intelligent monitoring system for operation of power distribution room based on cloud edge cooperation
CN112990586A (en) * 2021-03-22 2021-06-18 海南电网有限责任公司澄迈供电局 Intelligent video monitoring method and system for distribution network operation
CN113191591A (en) * 2021-03-31 2021-07-30 内蒙古科电数据服务有限公司 On-site monitoring method for electric power operating personnel
CN113256057A (en) * 2021-04-06 2021-08-13 国网河北省电力有限公司衡水供电分公司 Power system inspection method and server
CN113887777A (en) * 2021-06-01 2022-01-04 贵州电网有限责任公司 Three-phase-exceeding prevention early warning system for electric power field operation
CN113435724A (en) * 2021-06-18 2021-09-24 云南电网有限责任公司临沧供电局 System and method for remote monitoring and management of distribution network operation
CN113469445A (en) * 2021-07-09 2021-10-01 华能左权煤电有限责任公司 Risk management and control real-time tracking system based on field operation
CN113537783A (en) * 2021-07-19 2021-10-22 国网吉林省电力有限公司吉林供电公司 Intelligent management and control method for power grid maintenance safety risk
CN114092888A (en) * 2021-12-03 2022-02-25 国网四川省电力公司电力科学研究院 Electric power operation laboratory personnel risk detection system that electrocutes
CN114092888B (en) * 2021-12-03 2023-05-02 国网四川省电力公司电力科学研究院 Electric shock risk detection system for laboratory personnel in electric power operation laboratory
CN114842616A (en) * 2022-05-17 2022-08-02 南京远能电力工程有限公司 Method for improving safety supervision efficiency of electric power construction process
CN114691668A (en) * 2022-05-30 2022-07-01 国网浙江省电力有限公司 Inspection data automatic processing method suitable for multidimensional measurement asset management
CN114691668B (en) * 2022-05-30 2022-08-26 国网浙江省电力有限公司 Inspection data automatic processing method suitable for multidimensional measurement asset management
CN114818995A (en) * 2022-06-27 2022-07-29 广东电网有限责任公司佛山供电局 Method, device and equipment for identifying and early warning illegal work without work ticket
CN114818995B (en) * 2022-06-27 2022-10-04 广东电网有限责任公司佛山供电局 Method, device and equipment for identifying and early warning non-work ticket violation operation
CN117011106A (en) * 2023-07-19 2023-11-07 江苏思行达信息技术有限公司 Engineering supervision safety supervision system

Similar Documents

Publication Publication Date Title
CN105825329A (en) Safety and quality inspection method based on remote working site monitoring system
CN105809355A (en) Personnel information identification method based on working field remote monitoring system
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
CN110971878B (en) Engineering field management system
CN106056347A (en) Engineering project management cloud platform system based on video monitoring
CN106330919A (en) Operation and maintenance safety auditing method and system
CN103942635B (en) A kind of coal mine gas safe and intelligent cruising inspection system
CN106485298A (en) A kind of equipment routing inspection maintaining method based on Quick Response Code
CN112153345A (en) On-site intelligent anti-violation management and control platform based on 5G application operation
CN108197779A (en) Build service management
CN111882090A (en) Intelligent rail transit safety management and control system and operation control method thereof
CN109784613A (en) Electric power field work managing and control system anti-violating the regulations
CN109858819B (en) Management system of fire operation ticket
CN111861799A (en) Intelligent construction site management system and method
CN109110646A (en) Implementation method, system and the storage medium of a kind of pair of safety of tower crane inspection management
CN113961998A (en) Building construction management system and management method for BIM
CN106384491A (en) Mobile intelligent device based HSE data acquisition instrument
CN105184519A (en) Standardized safety operation tracing management system
CN111178465A (en) Transformer substation construction operator safety control system based on information passive storage and active positioning
KR20220133620A (en) Construction site safty control system using video analysis technology
CN105701612A (en) Overhauling isolation management system
CN113114747B (en) Intelligent auxiliary decision-making method for work ticket permission link
CN104778562B (en) A kind of safe eye supervising platform system in job site
CN110910288A (en) Intelligent safe bottom-crossing system
CN113114746B (en) Intelligent aid decision-making method for work ticket finishing link

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160803