CN109165869A - A kind of construction managing and control system and management-control method - Google Patents

A kind of construction managing and control system and management-control method Download PDF

Info

Publication number
CN109165869A
CN109165869A CN201811075054.9A CN201811075054A CN109165869A CN 109165869 A CN109165869 A CN 109165869A CN 201811075054 A CN201811075054 A CN 201811075054A CN 109165869 A CN109165869 A CN 109165869A
Authority
CN
China
Prior art keywords
construction
module
information
mobile terminal
materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811075054.9A
Other languages
Chinese (zh)
Inventor
王鑫根
杨程
麦霭庭
熊淦辉
单伟权
林伟坤
叶烨
江联儿
李朔宇
袁博政
谢润生
叶锦荣
莫灼钦
吴吉鸿
袁广南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201811075054.9A priority Critical patent/CN109165869A/en
Publication of CN109165869A publication Critical patent/CN109165869A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of construction managing and control system and management-control method, which includes: the server and mobile terminal connected by communication network;The mobile terminal is one or more, is located at construction site, for giving the data transmission of construction site to the server;The server is located at control room, for handling the data sent by one or more mobile terminals, and manages to construction site.The embodiment of the present invention provides a kind of construction managing and control system and management-control method, by construction site carry out in real time, the control of specification and various dimensions, improve construction efficiency and quality control dynamics, strengthen goods and materials tracking and management, facilitate duty fulfillment.

Description

A kind of construction managing and control system and management-control method
Technical field
The present embodiments relate to construction control technical field more particularly to a kind of construction managing and control systems and management-control method.
Background technique
During low-voltage collecting meter reading and meter rotation project implementation, it is related to project construction progress, project construction matter Various management such as amount, goods and materials service condition, personal scheduling distribution, project manager is difficult to be managed collectively, real-time tracking, Complete monitoring causes project control low efficiency, difficulty big.
Site operation manages process and lacks standardization platform, and construction efficiency and quality control dynamics have to be hoisted, pipe Reason level and efficiency have to be strengthened.
Summary of the invention
The present invention provides a kind of construction managing and control system and management-control method, so as to solve the deficiencies in the prior art.
To achieve the above object, the present invention provides technical solution below:
In a first aspect, the embodiment of the present invention provides a kind of construction managing and control system, comprising: the service connected by communication network Device and mobile terminal;The mobile terminal is one or more, is located at construction site, for giving the data transmission of construction site The server;The server is located at control room, for handling the data sent by one or more mobile terminals, and Construction site is managed.
Further, in the construction managing and control system, the server includes: construction plan import system, task distribution System and material Management System;
The mobile terminal includes: construction data download module, module of registering, material request module, acquisition data upload Module, locating module and auditing result receiving module, in which:
The construction data download module, for downloading construction information for construction personnel, the construction information includes: construction Mission bit stream, construction task and construction personnel's corresponding informance and construction plan information;
The module of registering, for registering for construction personnel;
The material request module receives request for inputting goods and materials according to practice of construction situation for construction personnel;
The acquisition data uploading module, for for construction personnel upload construction before acquire electricity box and ammeter information, with And construction completion pictorial information, construction data and construction image after construction completion;
The locating module, using GIS and GPS positioning technology, for obtaining the position location information of mobile terminal in real time, And it is uploaded to server;
The auditing result receiving module, for receiving being commented by the credit rating that administrative staff make of transmitting from server Valence is referred to for construction personnel, so that construction personnel does over again when receiving and auditing unacceptable information.
Further, in the construction managing and control system, the construction plan import system includes: that enterprise and personnel register mould Block and project send work and construction plan input module;
The enterprise and personnel's registration module, for receiving the registration information of construction personnel and administrative staff;
The project sends work and construction plan input module, for appointing for administrative staff's typing construction task information, construction Business and construction personnel's corresponding informance and construction plan information;Wherein, the construction plan information includes week plan and monthly plan.
Further, in the construction managing and control system, the task distribution system includes: communication module, field conduct pipe Manage module, construction auditing module, construction auditing result input module and statistical analysis module;
The communication module, based on by construction task information, construction task and construction personnel's corresponding informance and construction It draws information and is sent to mobile terminal, for using the construction personnel of mobile terminal to download and obtaining relevant information;
The field conduct management module, the construction data transmitted for receiving mobile terminal, so that administrative staff are real-time Inquiry;It is also used to receive the position location information that mobile terminal transmits, and the real-time exhibition mobile terminal in the form of map red dot Position location information;Wherein, the construction data includes: live electricity box relationship, family table relationship, measuring terminal rotation state, applies Worker person, construction time and construction work amount;
The construction auditing module includes: construction work amount audit unit and construction technology quality audit unit;
The construction work amount audits unit, for receiving by the image information of mobile terminal acquisition and being recorded by mobile terminal The project amount information entered, so that administrative staff check;Wherein, the project amount information include: rotation ammeter, electricity box and Use tubing, wire rod, switch, mutual inductor;
The construction technology quality audit unit is believed for receiving the electricity box acquired before construction by mobile terminal and ammeter Breath, and construction completion pictorial information, construction data and the construction image acquired after construction completion by mobile terminal is received, with Construction technology quality is audited according to the correlation data of construction front and back for the quality audit personnel in administrative staff;
The construction auditing result input module, for inputting the quality etc. made to construction technology quality for administrative staff Grade evaluation, and it is sent to mobile terminal;
The statistical analysis module, for current construction performance, construction total amount, process schedule to be counted and divided Analysis;It is also used to the demographics according to the acquisition of information site operation personnel that register and the construction efficiency statistics of construction personnel.
Further, in the construction managing and control system, the material Management System includes: materials warehousing module, goods and materials neck With module, goods and materials tracing module and material storage warning module;
The materials warehousing module, for inputting storage goods and materials data for administrative staff, the storage goods and materials data includes: Goods and materials title, quantity and model.
The goods and materials receive module, receive request for receiving the goods and materials by construction personnel's input that mobile terminal transmits, To be determined whether to agree to that the goods and materials receive request by administrative staff, and feedback information is transferred to mobile terminal;
Goods and materials tracing module scraps situation and goods and materials use state information for receiving the goods and materials that mobile terminal transmits, and In conjunction with information is received, the whereabouts, storage, dosage of goods and materials are obtained, realize to project construction with goods and materials in library, receive, using carrying out Detail tracking, real-time exhibition material storage situation;
Material storage warning module, for judging whether goods and materials quantity is lower than critical value, and in material storage less than critical It is issued warning signal when value.
Further, in the construction managing and control system, the communication network includes: mobile communication network operator service Device and base station or wireless router;
The mobile communication network operator server is connect with the base station or wireless router;
Network is connect with the mobile terminal by wireless communication for the base station or wireless router.
Second aspect, the embodiment of the present invention provides a kind of construction management-control method, using construction described in above-mentioned first aspect Managing and control system executes, which comprises
The server receives the registration information of construction personnel and administrative staff;
Construction task information, construction task and construction personnel's corresponding informance that the server inputs administrative staff and Construction plan information is sent to mobile terminal;
The mobile terminal receive and transmit for construction personnel's download server construction task information, construction task with apply Worker person's corresponding informance and construction plan information;
The server receives the materials warehousing information of administrative staff's input, and sends it to mobile terminal;
The goods and materials that the mobile terminal receives construction personnel's input receive request, and send it to server;
The server receives the goods and materials that mobile terminal transmits and receives request, and by the agreement of administrative staff's input or not The feedback information of agreement is sent to mobile terminal, and counts to goods and materials whereabouts, dosage, storage;
The mobile terminal is by construction data, and the position location information obtained is sent to server in real time, and is applying After the completion of work, the image information of acquisition and the project amount information of typing are sent to server, so that administrative staff check; Wherein, when the construction data includes: live electricity box relationship, family table relationship, measuring terminal rotation state, construction personnel, construction Between and construction work amount;The project amount information includes: rotation ammeter, electricity box and use tubing, wire rod, switch, mutual inductor;
The server receives the construction data, image information and project amount information, and completes to current construction Amount, construction total amount, process schedule carry out statistics and analysis, the quality audit result inputted by administrative staff are sent to mobile whole End.
The embodiment of the present invention provides a kind of construction managing and control system and management-control method, pass through to construction site carry out in real time, rule The control of model and various dimensions improves construction efficiency and quality control dynamics, strengthens goods and materials tracking and management, responsibility is facilitated to fall It is real.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of structural schematic diagram for construction managing and control system that the embodiment of the present invention one provides;
Fig. 2 is a kind of structural schematic diagram for construction managing and control system that the embodiment of the present invention one provides;
Fig. 3 is a kind of flow diagram of management-control method of constructing provided by Embodiment 2 of the present invention.
Appended drawing reference:
Server 100, mobile terminal 200, communication network 300;
Construction plan import system 110, task distribution system 120, material Management System 130;
Enterprise and personnel's registration module 111, project send work and construction plan input module 112;
Communication module 121, field conduct management module 122, auditing module 123 of constructing, auditing result input module of constructing 124, statistical analysis module 125;
Materials warehousing module 131, goods and materials receive module 132, goods and materials tracing module 133, material storage warning module 134;
Construction data download module 210, module of registering 220, material request module 230 acquire data uploading module 240, Locating module 250, auditing result receiving module 260;
Mobile communication network operator server 310, base station or wireless router 320.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention rather than limiting the invention.It also should be noted that in order to just Only the parts related to the present invention are shown in description, attached drawing rather than entire infrastructure.
Embodiment one
Fig. 1 is a kind of structural schematic diagram for construction managing and control system that the embodiment of the present invention one provides.As shown in Figure 1, this hair Bright embodiment provides a kind of construction managing and control system, comprising: the server 100 and mobile terminal 200 connected by communication network;Institute Mobile terminal 200 is stated as one or more, is located at construction site, for giving the data transmission of construction site to the server 100;The server 100 is located at control room, for handling the data sent by one or more mobile terminals 200, and Construction site is managed.
Preferably, in the construction managing and control system, the server 100 includes: construction plan import system 110, task Distribution system 120 and material Management System 130;
The mobile terminal 200 include: construction data download module 210, module of registering 220, material request module 230, Acquire data uploading module 240, locating module 250 and auditing result receiving module 260, in which:
The construction data download module 210, for downloading construction information for construction personnel, the construction information includes: Construction task information, construction task and construction personnel's corresponding informance and construction plan information;
The module 220 of registering, for registering for construction personnel;
The material request module 230 receives request for inputting goods and materials according to practice of construction situation for construction personnel;
The acquisition data uploading module 240, for for construction personnel upload construction before acquire electricity box and ammeter information, And construction completion pictorial information, construction data and construction image after construction completion;
The locating module 250, using GIS and GPS positioning technology, the position for obtaining mobile terminal 200 in real time is fixed Position information, and it is uploaded to server 100;
The auditing result receiving module 260, for receiving the quality made by administrative staff transmitted from server 100 Grade evaluation, refers to for construction personnel, so that construction personnel does over again when receiving and auditing unacceptable information.
Preferably, in the construction managing and control system, the construction plan import system 110 includes: enterprise and personnel's registration Module 111 and project send work and construction plan input module 112;
The enterprise and personnel's registration module 111, for receiving the registration information of construction personnel and administrative staff;
The project sends work and construction plan input module 112, for for administrative staff's typing construction task information, construction Task and construction personnel's corresponding informance and construction plan information;Wherein, the construction plan information includes week plan and moon meter It draws.
Preferably, in the construction managing and control system, the task distribution system 120 includes: communication module 121, scene reality Apply management module 122, construction auditing module 123, construction auditing result input module 124 and statistical analysis module 125;
The communication module 121 is used for construction task information, construction task and construction personnel's corresponding informance and construction Plan information is sent to mobile terminal 200, for using the construction personnel of mobile terminal 200 to download and obtaining relevant information;
The field conduct management module 122, the construction data transmitted for receiving mobile terminal 200, for administrator Member's real-time query;It is also used to receive the position location information that mobile terminal 200 transmits, and real-time exhibition moves in the form of map red dot The position location information of dynamic terminal 200;Wherein, the construction data includes: live electricity box relationship, family table relationship, measuring terminal Rotation state, construction personnel, construction time and construction work amount;
The construction auditing module 123 includes: construction work amount audit unit and construction technology quality audit unit;
The construction work amount audits unit, for receiving the image information acquired by mobile terminal 200 and by mobile whole The project amount information of 200 typings is held, so that administrative staff check;Wherein, the project amount information include: rotation ammeter, Electricity box and use tubing, wire rod, switch, mutual inductor;
The construction technology quality audit unit, for receiving the electricity box acquired before construction by mobile terminal 200 and electricity Table information, and receive construction completion pictorial information, construction data and the construction acquired after construction completion by mobile terminal 200 Image, so that the quality audit personnel in administrative staff audit construction technology quality according to the correlation data of construction front and back;
The construction auditing result input module 124, for inputting the matter made to construction technology quality for administrative staff Grade evaluation is measured, and is sent to mobile terminal 200;
The statistical analysis module 125, for being counted to current construction performance, construction total amount, process schedule And analysis;It is also used to the demographics according to the acquisition of information site operation personnel that register and the construction efficiency statistics of construction personnel.
Wherein, process schedule can be obtained by comparing with construction plan information.It in the analysis process, can be into one Step carries out the analysis of various dimensions project process according to project, region, unit in charge of construction.
Preferably, in the construction managing and control system, the material Management System 130 includes: materials warehousing module 131, object Money receives module 132, goods and materials tracing module 133 and material storage warning module 134;
The materials warehousing module 131, for inputting storage goods and materials data, the storage goods and materials data packet for administrative staff It includes: goods and materials title, quantity and model.
The goods and materials receive module 132, receive for receiving the goods and materials by construction personnel's input that mobile terminal 200 transmits Request, to be determined whether to agree to that the goods and materials receive request by administrative staff, and is transferred to mobile terminal 200 for feedback information;
Goods and materials tracing module 133 scraps situation and goods and materials use state letter for receiving the goods and materials that mobile terminal 200 transmits Breath, and combine and receive information, obtains the whereabouts, storage, dosage of goods and materials, realizes to project construction goods and materials in library, receives, uses Carry out detail tracking, real-time exhibition material storage situation;
Material storage warning module 134 for judging whether goods and materials quantity is lower than critical value, and is less than in material storage and faces It is issued warning signal when dividing value.
In one embodiment, referring to FIG. 2, preferably, the construction managing and control system further includes communication network 300, The communication network 300 includes: mobile communication network operator server 310 and base station or wireless router 320;
The mobile communication network operator server 310 is connect with the base station or wireless router 320;The base station Or network is connect wireless router 320 with the mobile terminal 200 by wireless communication.
The embodiment of the present invention provides a kind of construction managing and control system, by carrying out real-time, specification and various dimensions to construction site Control, improve construction efficiency and quality control dynamics, strengthen goods and materials tracking and management, facilitate duty fulfillment.
Embodiment two
Referring to Fig. 3, for a kind of flow diagram for management-control method of constructing provided by Embodiment 2 of the present invention.This method by Construction managing and control system provided by the embodiment of the present invention executes, and steps are as follows:
S401, the server receive the registration information of construction personnel and administrative staff.
Construction task information, the construction task that S402, the server input administrative staff letter corresponding with construction personnel Breath and construction plan information are sent to mobile terminal.
S403, mobile terminal reception and the construction task information transmitted for construction personnel's download server, construction are appointed Business and construction personnel's corresponding informance and construction plan information.
S404, the server receive the materials warehousing information of administrative staff's input, and send it to mobile terminal.
The goods and materials that S405, the mobile terminal receive construction personnel's input receive request, and send it to server.
S406, the server receive the goods and materials that transmit of mobile terminal and receive request, and administrative staff are inputted same Meaning or dissenting feedback information are sent to mobile terminal, and count to goods and materials whereabouts, dosage, storage.
S407, the mobile terminal are by construction data, and the position location information obtained is sent to server in real time, and After the completion of construction, the image information of acquisition and the project amount information of typing are sent to server, for administrative staff's progress Verification;Wherein, the construction data includes: live electricity box relationship, family table relationship, measuring terminal rotation state, construction personnel, applies Between working hour and construction work amount;The project amount information include: rotation ammeter, electricity box and using tubing, wire rod, switch, mutually Sensor.
S408, the server receive the construction data, image information and project amount information, and to current construction Performance, construction total amount, process schedule carry out statistics and analysis, and the quality audit result inputted by administrative staff is sent to shifting Dynamic terminal.
The embodiment of the present invention provides a kind of construction management-control method, by carrying out real-time, specification and various dimensions to construction site Control, improve construction efficiency and quality control dynamics, strengthen goods and materials tracking and management, facilitate duty fulfillment.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (7)

1. a kind of construction managing and control system characterized by comprising the server and mobile terminal connected by communication network;Institute Mobile terminal is stated as one or more, is located at construction site, for giving the data transmission of construction site to the server;It is described Server is located at control room, carries out for handling the data sent by one or more mobile terminals, and to construction site Control.
2. construction managing and control system according to claim 1, it is characterised in that:
The server includes: construction plan import system, task distribution system and material Management System;
The mobile terminal include: construction data download module, module of registering, material request module, acquisition data uploading module, Locating module and auditing result receiving module, in which:
The construction data download module, for downloading construction information for construction personnel, the construction information includes: construction task Information, construction task and construction personnel's corresponding informance and construction plan information;
The module of registering, for registering for construction personnel;
The material request module receives request for inputting goods and materials according to practice of construction situation for construction personnel;
The acquisition data uploading module, for uploading the electricity box and ammeter information, Yi Jishi that acquire before construction for construction personnel Construction completion pictorial information, construction data and construction image after work completion;
The locating module, using GIS and GPS positioning technology, for obtaining the position location information of mobile terminal in real time, and on Reach server;
The auditing result receiving module, for receiving the quality grade of evaluation made by administrative staff transmitted from server, It is referred to for construction personnel, so that construction personnel does over again when receiving and auditing unacceptable information.
3. construction managing and control system according to claim 2, which is characterized in that the construction plan import system includes: enterprise Industry and personnel's registration module and project send work and construction plan input module;
The enterprise and personnel's registration module, for receiving the registration information of construction personnel and administrative staff;
The project sends work and construction plan input module, for for administrative staff's typing construction task information, construction task with Construction personnel's corresponding informance and construction plan information;Wherein, the construction plan information includes week plan and monthly plan.
4. the construction managing and control system stated according to claim 2, which is characterized in that the task distribution system include: communication module, Field conduct management module, construction auditing module, construction auditing result input module and statistical analysis module;
The communication module, for believing construction task information, construction task and construction personnel's corresponding informance and construction plan Breath is sent to mobile terminal, for using the construction personnel of mobile terminal to download and obtaining relevant information;
The field conduct management module, the construction data transmitted for receiving mobile terminal, for administrative staff's real-time query; It is also used to receive the position location information that mobile terminal transmits, and the position of real-time exhibition mobile terminal is fixed in the form of map red dot Position information;Wherein, the construction data include: live electricity box relationship, family table relationship, measuring terminal rotation state, construction personnel, Construction time and construction work amount;
The construction auditing module includes: construction work amount audit unit and construction technology quality audit unit;
The construction work amount audits unit, for receiving by the image information of mobile terminal acquisition and by mobile terminal typing Project amount information, so that administrative staff check;Wherein, the project amount information includes: rotation ammeter, electricity box and use Tubing, wire rod, switch, mutual inductor;
The construction technology quality audit unit, for receiving the electricity box and ammeter information that are acquired before construction by mobile terminal, And construction completion pictorial information, construction data and the construction image acquired after construction completion by mobile terminal is received, for Quality audit personnel in administrative staff audit construction technology quality according to the correlation data of construction front and back;
The construction auditing result input module, the credit rating for making for administrative staff's input to construction technology quality are commented Valence, and it is sent to mobile terminal;
The statistical analysis module, for carrying out statistics and analysis to current construction performance, construction total amount, process schedule; It is also used to the demographics according to the acquisition of information site operation personnel that register and the construction efficiency statistics of construction personnel.
5. construction managing and control system according to claim 2, which is characterized in that the material Management System includes: that goods and materials enter Library module, goods and materials receive module, goods and materials tracing module and material storage warning module;
The materials warehousing module, for inputting storage goods and materials data for administrative staff, the storage goods and materials data includes: goods and materials Title, quantity and model.
The goods and materials receive module, receive request for receiving the goods and materials by construction personnel's input that mobile terminal transmits, with by Administrative staff determine whether to agree to that the goods and materials receive request, and feedback information is transferred to mobile terminal;
Goods and materials tracing module is scrapped situation and goods and materials use state information for receiving the goods and materials that mobile terminal transmits, and is combined Information is received, obtains the whereabouts, storage, dosage of goods and materials, realizes to project construction with goods and materials in library, receive, using carrying out detail Tracking, real-time exhibition material storage situation;
Material storage warning module, for judging whether goods and materials quantity is lower than critical value, and when material storage is less than critical value It issues warning signal.
6. construction managing and control system according to claim 1, which is characterized in that the communication network includes: mobile radio communication Network carrier server and base station or wireless router;
The mobile communication network operator server is connect with the base station or wireless router;
Network is connect with the mobile terminal by wireless communication for the base station or wireless router.
7. a kind of construction management-control method is executed, which is characterized in that described using construction managing and control system described in claim 1-6 Method includes:
The server receives the registration information of construction personnel and administrative staff;
Construction task information, construction task and the construction personnel's corresponding informance and construction that the server inputs administrative staff Plan information is sent to mobile terminal;
Construction task information, construction task and the constructor that the mobile terminal is received and transmitted for construction personnel's download server Member's corresponding informance and construction plan information;
The server receives the materials warehousing information of administrative staff's input, and sends it to mobile terminal;
The goods and materials that the mobile terminal receives construction personnel's input receive request, and send it to server;
The server receives the goods and materials that mobile terminal transmits and receives request, and agreeing or disagreeing with administrative staff's input Feedback information be sent to mobile terminal, and goods and materials whereabouts, dosage, storage are counted;
The mobile terminal is by construction data, and the position location information obtained is sent to server in real time, and is constructing The image information of acquisition and the project amount information of typing are sent to server, so that administrative staff check by Cheng Hou;Its In, the construction data includes: live electricity box relationship, family table relationship, measuring terminal rotation state, construction personnel, construction time With construction work amount;The project amount information includes: rotation ammeter, electricity box and use tubing, wire rod, switch, mutual inductor;
The server receives the construction data, image information and project amount information, and to current construction performance, apply Work total amount, process schedule carry out statistics and analysis, and the quality audit result inputted by administrative staff is sent to mobile terminal.
CN201811075054.9A 2018-09-14 2018-09-14 A kind of construction managing and control system and management-control method Pending CN109165869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811075054.9A CN109165869A (en) 2018-09-14 2018-09-14 A kind of construction managing and control system and management-control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811075054.9A CN109165869A (en) 2018-09-14 2018-09-14 A kind of construction managing and control system and management-control method

Publications (1)

Publication Number Publication Date
CN109165869A true CN109165869A (en) 2019-01-08

Family

ID=64879530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811075054.9A Pending CN109165869A (en) 2018-09-14 2018-09-14 A kind of construction managing and control system and management-control method

Country Status (1)

Country Link
CN (1) CN109165869A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110216789A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of intelligent control system of bridge subsection precasting yard
CN110216788A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of Intelligentized control method of bridge subsection precasting yard
CN110349679A (en) * 2019-05-23 2019-10-18 北京新研汇医药研发有限公司 A kind of clinical test resource statistics method, sponsor's selection method and system
CN110414791A (en) * 2019-06-28 2019-11-05 中国一冶集团有限公司 A kind of system and method for the distribution of electrical construction task and examination based on BIM
CN110472933A (en) * 2019-07-26 2019-11-19 中国能源建设集团广东省电力设计研究院有限公司 A kind of marketing programs managing and control system
CN111242409A (en) * 2019-12-20 2020-06-05 广东电网有限责任公司 Marketing construction data management and control platform
CN111550048A (en) * 2020-05-12 2020-08-18 贝晶晶 Accurate construction early warning method and positioning device thereof
CN111832937A (en) * 2020-07-10 2020-10-27 安徽明坦信息科技有限公司 Accurate control auxiliary system for capital construction project and implementation method
CN112163832A (en) * 2020-09-25 2021-01-01 中铁一局集团电务工程有限公司 Online security quality management method and device, mobile terminal and storage medium
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN113570327A (en) * 2021-07-06 2021-10-29 廖妹远 Construction supervision intelligent management system and supervision method

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN204794355U (en) * 2015-06-08 2015-11-18 广东电网有限责任公司东莞供电局 Electricity energy measurement device site operations removes supervisory systems
CN205068480U (en) * 2015-10-09 2016-03-02 广东电网有限责任公司东莞供电局 On --spot management and control of transformer substation's construction operation system for electric power system
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN105825329A (en) * 2016-03-14 2016-08-03 国网福建省电力有限公司 Safety and quality inspection method based on remote working site monitoring system
JP2017054530A (en) * 2014-07-30 2017-03-16 明豊ファシリティワークス株式会社 Project current status management system
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN106896749A (en) * 2017-03-10 2017-06-27 中铁四局集团有限公司 construction management client based on BIM technology
CN107292538A (en) * 2017-07-25 2017-10-24 浙江精工钢结构集团有限公司 A kind of live material visual intelligent management system of Construction of Steel Structure
CN107545610A (en) * 2017-09-30 2018-01-05 上海法赫桥梁隧道养护工程技术有限公司 A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
US20180068276A1 (en) * 2016-09-07 2018-03-08 Fujitsu Limited Schedule management method and schedule management device
CN207115482U (en) * 2017-08-01 2018-03-16 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control system
CN108171477A (en) * 2017-12-29 2018-06-15 金螳螂家装电子商务(苏州)有限公司 A kind of data embedding method applied to house ornamentation building site monitor supervision platform
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN108446866A (en) * 2018-04-26 2018-08-24 中船第九设计研究院工程有限公司 A kind of wisdom site safety management platform system framework

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017054530A (en) * 2014-07-30 2017-03-16 明豊ファシリティワークス株式会社 Project current status management system
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN204794355U (en) * 2015-06-08 2015-11-18 广东电网有限责任公司东莞供电局 Electricity energy measurement device site operations removes supervisory systems
CN205068480U (en) * 2015-10-09 2016-03-02 广东电网有限责任公司东莞供电局 On --spot management and control of transformer substation's construction operation system for electric power system
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN105825329A (en) * 2016-03-14 2016-08-03 国网福建省电力有限公司 Safety and quality inspection method based on remote working site monitoring system
US20180068276A1 (en) * 2016-09-07 2018-03-08 Fujitsu Limited Schedule management method and schedule management device
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN106896749A (en) * 2017-03-10 2017-06-27 中铁四局集团有限公司 construction management client based on BIM technology
CN107292538A (en) * 2017-07-25 2017-10-24 浙江精工钢结构集团有限公司 A kind of live material visual intelligent management system of Construction of Steel Structure
CN207115482U (en) * 2017-08-01 2018-03-16 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control system
CN107657546A (en) * 2017-09-29 2018-02-02 杭州惠嘉信息科技有限公司 A kind of electricity power engineering site safety management-control method and system based on Internet of Things
CN107545610A (en) * 2017-09-30 2018-01-05 上海法赫桥梁隧道养护工程技术有限公司 A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN108171477A (en) * 2017-12-29 2018-06-15 金螳螂家装电子商务(苏州)有限公司 A kind of data embedding method applied to house ornamentation building site monitor supervision platform
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN108446866A (en) * 2018-04-26 2018-08-24 中船第九设计研究院工程有限公司 A kind of wisdom site safety management platform system framework

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姜杰,王宏伟: "互联网思维在通信工程建设管理中的应用和研究分析", 《数字通信世界》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110349679A (en) * 2019-05-23 2019-10-18 北京新研汇医药研发有限公司 A kind of clinical test resource statistics method, sponsor's selection method and system
CN110414791A (en) * 2019-06-28 2019-11-05 中国一冶集团有限公司 A kind of system and method for the distribution of electrical construction task and examination based on BIM
CN110216789B (en) * 2019-07-15 2021-03-26 瀚阳国际工程咨询有限公司 Intelligent control system of bridge segment prefabrication field
CN110216788A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of Intelligentized control method of bridge subsection precasting yard
CN110216789A (en) * 2019-07-15 2019-09-10 广州瀚阳工程咨询有限公司 A kind of intelligent control system of bridge subsection precasting yard
CN110216788B (en) * 2019-07-15 2021-03-30 瀚阳国际工程咨询有限公司 Intelligent control method for bridge segment prefabricating field
CN110472933A (en) * 2019-07-26 2019-11-19 中国能源建设集团广东省电力设计研究院有限公司 A kind of marketing programs managing and control system
CN111242409A (en) * 2019-12-20 2020-06-05 广东电网有限责任公司 Marketing construction data management and control platform
CN111550048A (en) * 2020-05-12 2020-08-18 贝晶晶 Accurate construction early warning method and positioning device thereof
CN111832937A (en) * 2020-07-10 2020-10-27 安徽明坦信息科技有限公司 Accurate control auxiliary system for capital construction project and implementation method
CN112163832A (en) * 2020-09-25 2021-01-01 中铁一局集团电务工程有限公司 Online security quality management method and device, mobile terminal and storage medium
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN113570327A (en) * 2021-07-06 2021-10-29 廖妹远 Construction supervision intelligent management system and supervision method

Similar Documents

Publication Publication Date Title
CN109165869A (en) A kind of construction managing and control system and management-control method
CN100583168C (en) Channel patrol checking management system
CN103281673B (en) A kind of business information Push Service system and method
CN201131037Y (en) Management system for polling base station
CN102446315B (en) A kind of wireless power consuming administrative system and management method
CN102088365B (en) Energy consumption collecting and energy-saving metering system of communication room
CN104980950A (en) Network optimization server, mobile device of realizing network optimization and system of realizing network optimization
CN107657522B (en) A kind of construction site labour and capital management method
CN105163318B (en) The smart frequency spectrum being classified based on radio environment map and user manages the network architecture
CN104951914A (en) Intelligent express processing method and intelligent express cloud system
CN109584390A (en) A kind of highway charging system based on micro services
CN107945304A (en) One kind visualization cruising inspection system and method
CN108376328A (en) A kind of networking overload remediation total management system and method
CN106157166A (en) Intelligent power supply gathers service system
CN101458276B (en) Electric quantity computation method and apparatus and electric meter controlling equipment
CN111294730A (en) Method and device for processing network problem complaint information
CN109784840A (en) A kind of construction survey automatic data collection processing method being associated with engineering structure task
CN106709644A (en) Remote inventory system and method for tool and die fixed assets
CN106600192A (en) Transportation management system and method based on Internet of things
CN103632522A (en) Mobile phone meter reading system
CN206195831U (en) Trench oil dispatch communication system
CN104851042A (en) Collection and check system for land use tax information
CN209728810U (en) Concrete quality tracing system
CN107563671A (en) A kind of enterprise's test and appraisal planning service system based on internet
CN109428733A (en) A kind of method and device orienting charge on traffic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190108