CN207115482U - Power engineering project quality in site receipt control system - Google Patents
Power engineering project quality in site receipt control system Download PDFInfo
- Publication number
- CN207115482U CN207115482U CN201720954842.XU CN201720954842U CN207115482U CN 207115482 U CN207115482 U CN 207115482U CN 201720954842 U CN201720954842 U CN 201720954842U CN 207115482 U CN207115482 U CN 207115482U
- Authority
- CN
- China
- Prior art keywords
- acceptance
- site
- quality
- mobile terminal
- background server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of power engineering project quality in site receipt control system.The system includes:Mobile terminal, background server and audit terminal.The utility model by original scene by filling in manual form, it is changed to the field operation of mobile terminal, eliminate the mistake for being close to afterwards and recalling and filling in, by the field operation of mobile terminal, field operation is really realized, eliminates " two skins " phenomenon, make capital construction field operation management and control in place, each link all performs according to standard, makes inspection record electronic, avoids altering, is stained;Checking process is left record, image document, accomplish there is mark to look into, be easy to trace.Many drawbacks existing for effectively solving existing capital construction field operation working method, reach the target of capital construction field operation " specification, efficient, Reduction of Students' Study Load ", it is ensured that safety, the construction for completing engineering project in high quality.
Description
Technical field
Project acceptance inspection technical field is the utility model is related to, more particularly to a kind of power engineering project quality in site checks and accepts pipe
Reason system.
Background technology
Electric power enterprise capital construction field management is related to more units, the employee of existing electric power enterprise internal system, also there is cooperation
The personnel of unit, capital construction quality in site examine work, are the most important things for being related to quality safety, but capital construction quality in site is examined
Shortcomings in terms of management and control with Field Force, during being mainly reflected in the construction of electricity power engineering construction project, field operation
Personnel carry out on-site data gathering by carrying paper form, complete filling in for form data, it is necessary to return to office's carry out table
Annex is made a report on or uploaded to the concentration of forms data, and such operating type has many drawbacks, mainly included:Unit of taking part in building's safety
Realize thin, system perform it is ineffective;Field operation becomes operation on the desk, " two skins " phenomenon be present, and operating personnel fills in list
Data, which are substantially, is making memoirs;Inspection record papery hand filling, easily there is situations such as altering, lossless.Scene peace
Entirely, quality management and control is related to standard, strong bar, code, specification are more, can not be inquired about, quoted in operation field.Field Force
ABC and basic skills are weak, and system, which performs, holds inaccuracy.
Utility model content
In order to solve problem of the prior art, the utility model embodiment provides a kind of power engineering project quality in site
Receipt control system.The technical scheme is as follows:
The utility model embodiment provides a kind of power engineering project quality in site receipt control system, including:
Mobile terminal, unified mass examination and evaluation criteria are preset with, for gathering item to be checked and accepted for on-site acceptance staff
Purpose quality in site data, and treat items for acceptance and carry out an acceptance inspection evaluation;
Background server, it is connected with the communication of mobile terminal, for storing the quality in site data that collect and corresponding
Evaluation result;
Audit terminal, communicated to connect with the background server, after checking that director's access is described for project quality
The checking and accepting implementation status stored in platform server, and feed back checking and accepting problem and corresponding item to the background server
Mesh reform advice;
The mobile terminal, it is whole to be additionally operable to checking and accepting problem and corresponding project of the reception from the background server
Change opinion, require to treat that items for acceptance makes corresponding rectification for on-site acceptance staff, and it is to be tested to background server feedback
The rectification situation of receipts project.
In the system that the utility model embodiment provides, the mobile terminal, including:For being adopted for on-site acceptance staff
Collection treat the photographing module of quality in site picture of items for acceptance, processing module and for the background server communication link
The communication module connect, the photographing module and the communication module are connected with the processing module.
In the system that the utility model embodiment provides, the mobile terminal, in addition to:For for on-site acceptance staff
Collection treat items for acceptance site operation unit personnel identity information identity-acquiring module, the identity-acquiring module with it is described
Processing module connects;
The background server, it is additionally operable to treat items for acceptance site operation unit people using the identity information to prestore, checking
The identity of member, and to the mobile terminal feedback validation result.
In the system that the utility model embodiment provides, the identity-acquiring module includes:For gathering item to be checked and accepted
The fingerprint collecting unit of mesh site operation unit personnel fingerprint, for gather treat items for acceptance site operation unit personnel identity card
The identity card identification unit of information, the fingerprint collecting unit and the identity card identification unit connect with the processing module
Connect.
In the system that the utility model embodiment provides, the inspection of quality and evaluation criteria, by unit in charge of construction's foundation
The schedule of project, according to work breakdown structure (WBS) (Work Breakdown Structure, referred to as " WBS ") branch, divide
Prepared by item engineering structure, and the examination & verification of project inspection unit uses.
The beneficial effect brought of technical scheme that the utility model embodiment provides is:
The utility model embodiment is changed to the field operation of mobile terminal, disappeared by filling in manual form by original scene
Recall the mistake filled in except being close to afterwards, be not in situations such as record is altered, be damaged, site safety, quality management and control are related to
Standard, strong bar, code, specification are more, in operation field can directly inquire about by mobile terminal, quote.Strong rush
Enter electric power enterprise capital construction scene and test the construction commented.The cost of communication is reduced, the efficiency of enterprise is improved, improves employee's
Satisfaction.Being tested for south electric network capital construction scene comments management work to provide valuable experience.And cause form data, check
Record is filled in by tablet personal computer scene, really realizes field operation, is eliminated " two skins " phenomenon, is made capital construction field operation management and control
In place, each link all performs according to standard;Make inspection record electronic, avoid altering, be stained;Make checking process leave record,
Image document, accomplish there is mark to look into, be easy to trace.Effectively solve many disadvantages existing for existing capital construction field operation working method
End, reach the target of capital construction field operation " specification, efficient, Reduction of Students' Study Load ", it is ensured that safety, complete building for engineering project in high quality
If.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model
Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings
Obtain other accompanying drawings.
Fig. 1 is that a kind of power engineering project quality in site receipt control system architecture that the utility model embodiment provides is shown
It is intended to;
Fig. 2 is a kind of structural representation for mobile terminal that the utility model embodiment provides;
Fig. 3 is a kind of structural representation for identity-acquiring module that the utility model embodiment provides.
Embodiment
It is new to this practicality below in conjunction with accompanying drawing to make the purpose of this utility model, technical scheme and advantage clearer
Type embodiment is described in further detail.
The present embodiment is to test to comment to solve traditional electric power enterprise capital construction to have " two skins " phenomenon, operation people in link
Member, which fills in form data and is substantially, is making memoirs;Inspection record papery hand filling, easily there are the feelings such as correction, lossless
Condition.Standard that site safety, quality management and control are related to, strong bar, code, specification are more, can not be inquired about, drawn in operation field
With Field Force's ABC and basic skills are weak, and system, which performs, holds the problems such as inaccurate, proposes the think of solved the problems, such as
Road.
Embodiment
The utility model embodiment provides a kind of power engineering project quality in site receipt control system, should referring to Fig. 1
System can include:Mobile terminal 100, background server 200, audit terminal 300.
Mobile terminal 100 (such as:Tablet personal computer, smart mobile phone etc.), unified mass examination and evaluation criteria are preset with, is used
In treating the quality in site data of items for acceptance for on-site acceptance staff's collection, and treat items for acceptance and carry out an acceptance inspection evaluation.
In the present embodiment, specifically, inspection of quality and evaluation criteria can be by humidometer of the unit in charge of construction according to project
Draw, prepared according to WBS branch, subdivisional work structure, and the examination & verification of project inspection unit uses.
In the present embodiment, before project kickoff, schedule of the unit in charge of construction according to project, according to WBS branch, divide
Item engineering structure establishment construction process branch, the quality acceptance standard of subdivisional work and the list of inspection of quality evaluation.
Confirm it is errorless after, report supervisor, owner project management department is audited.It can include newly-increased acceptance evaluation and divide, deletes
Test comment division, on apply for checking and examination comment division, examination & approval test comment division, rollback test comment division, selection individual works, select test comment table, deletion
Test and comment table etc..Inspection of quality and evaluation division module.Schedule of the unit in charge of construction according to project, by the big acceptance of work stage
Be decomposed into the acceptance criteria and receipt of different small milestone phases, it is determined that after report examination & verification as in phased acceptance
Hold.It ensure that realizing on time, by step for the examination of megastage.
In the present embodiment, unified inspection of quality and evaluation criteria can be pre-set on background server 200, for existing
Inspector downloads in the terminal, uses during project onsite acceptance.In actual applications, by receipt control department (example
Such as:Electric power parent company) unify issue inspection of quality and evaluation criteria storehouse, each point of provincial company and the foundation inspection of quality of office of districts and cities are with commenting
Determine java standard library to carry out an acceptance inspection.It is according to the source for carrying out quality examination and evaluation accordingly.And inquiry is provided and checks to test to comment and is boasted of one's bit of contribution
Energy.The inspection of quality includes with evaluation criteria storehouse:Engineering name, property, inspection unit, table number, job number etc..Inspection of quality
The standards system content tested and commented is provided with evaluation criteria library module, on-site acceptance staff directly can be adjusted from mobile terminal
With, directly see standard and points for attention in mobile terminal, provided than former artificial carrying file, what scene was browsed and compared
Method improves operating efficiency and accuracy.
Background server 200, communicated to connect with mobile terminal 100, for storing the quality in site data and phase that collect
The evaluation result answered.
In the present embodiment, owner project manager, capital construction portion supervisor, director's (i.e. project quality checks director) check often
Individual project quality is checked and accepted with evaluating execution and completed situation, and can be checked inspection of quality and evaluation implementation status in detail, be held
The problem of being found in row record and result and inspection.
In the present embodiment, specifically, background server 200, the project for being additionally operable to count on-site acceptance staff's upload show
Field quality product acceptance data, check that director consults acceptance evaluation statistical conditions for project quality.
In the present embodiment, project manager, capital construction portion supervisor, director check that each project quality checks and accepts problem rectification feelings
Condition, test and comment list number, test and comment implementation status.Content, which includes, checks acceptance evaluation statistics, export acceptance evaluation statistical conditions, export
Test and comment implementation status, check that problem rectifies and improves situation.Check that each project quality checks and accepts problem rectification situation, tests and comment list number, test
Comment implementation status.Content, which includes, checks that acceptance evaluation statistics, export acceptance evaluation statistical conditions, export are tested and comment implementation status, look into
See that problem rectifies and improves situation.Be advantageous to be counted and rectified and improved to entirely testing the performance situation commented.Improve the level of problem strick precaution.
Audit terminal 300 (such as desktop computer, notebook computer, tablet personal computer, smart mobile phone etc.), with background server
200 communication connections, for checking that director consults the checking and accepting stored in the background server and performs feelings for project quality
Condition, and feed back checking and accepting problem and corresponding project reform advice to background server 200.
In the present embodiment, acceptance inspection and evaluation and responsible institution personnel, each project is checked in audit terminal (such as computer)
Inspection of quality is performed with evaluation and completed situation, and can check inspection of quality in detail and evaluate implementation status, perform record
The problem of with being found in result and inspection.Also, will afterwards by the means of list the problem of mobile terminal and computer end and classification
Tracking mode, it is transformed into can inquiry in time in thing and solves.
Mobile terminal 100, it is additionally operable to receive checking and accepting problem and corresponding project rectification meaning from background server
See, require to treat that items for acceptance makes corresponding rectification for on-site acceptance staff, and items for acceptance is treated to the feedback of background server 200
Rectification situation.
Alternatively, can include referring to Fig. 2, mobile terminal 100:For treating items for acceptance for on-site acceptance staff's collection
Photographing module 101, processing module 102 and the communication mould for being communicated to connect with background server 200 of quality in site picture
Block 103, photographing module 101 and communication module 103 are connected with processing module 102.
In the present embodiment, on-site acceptance staff not only can be with collection site qualitative data, can be with collection site quality
Picture, the picture of each project typing in evaluation implementation procedure is tested is checked for project manager, capital construction portion supervisor, director, so
The truth of onsite acceptance can effectively be understood, and sufficiently record backup is left to consult record of acceptance later.Project manager,
Capital construction portion supervisor, director check the picture of each project typing in evaluation implementation procedure is tested.It was all text in the past to test the process commented
Word description, it is scrappy imperfect plus scattered explanation of taking pictures, archives.The setting of this module is by scattered, not system scene photo
Piece is classified, arranges, achieved.The effect displaying at scene is greatly improved, increases the trackability of event.For warp
The case and problem of allusion quotation, it can also accomplish to draw inferences about other cases from one instance by picture.Inspection of quality is improved to evaluate somebody's work the effect of work.
Alternatively, referring to Fig. 2, mobile terminal 100, in addition to:For treating that items for acceptance shows for on-site acceptance staff's collection
The identity-acquiring module 104 of the identity information of field unit in charge of construction personnel, identity-acquiring module 104 are connected with processing module 102.Move
The dynamic collection of terminal 100 can be uploaded to the background service after the identity information of items for acceptance site operation unit personnel
Device 200.
In the present embodiment, personnel's essential information, specialized information storehouse are established, identity is carried out to scene, unit in charge of construction personnel
Data Enter, revise, query function.Business rule:Personal information collection is carried out by mobile end equipment and uploads to service end.
Service end can be deleted and checked to personal information.The packet of collector contains:Name, identification card number, unit, data
Acquisition time, ID card information etc..
Background server 200, it is additionally operable to treat items for acceptance site operation unit personnel using the identity information to prestore, checking
Identity, and to the feedback validation result of mobile terminal 100.
In the present embodiment, before the quality in site data of items for acceptance are treated in collection, checking treats that items for acceptance scene is applied
The identity of work unit personnel, by personnel information management, collection in real time and typing upload, and efficiently solve Field Force's complexity,
It is unfavorable for the situation of management.
Further, can include referring to Fig. 3, identity-acquiring module 104:Items for acceptance site operation list is treated for gathering
The fingerprint collecting unit 114 of position personnel's fingerprint, for gathering treat the body of items for acceptance site operation unit personnel ID card information
Part card recognition unit 124, fingerprint collecting unit 114 and identity card identification unit 124 are connected with processing module 102.In this reality
Apply in example, the finger print information and ID card information of items for acceptance site operation unit personnel are treated in collection, and are uploaded to background service
In device 200, be advantageous to project site operation unit personnel management.
The utility model embodiment is changed to the field operation of mobile terminal, disappeared by filling in manual form by original scene
Recall the mistake filled in except being close to afterwards, be not in situations such as record is altered, be damaged, site safety, quality management and control are related to
Standard, strong bar, code, specification are more, in operation field can directly inquire about by mobile terminal, quote.Strong rush
Enter electric power enterprise capital construction scene and test the construction commented.The cost of communication is reduced, the efficiency of enterprise is improved, improves employee's
Satisfaction.Being tested for south electric network capital construction scene comments management work to provide valuable experience.And cause form data, check
Record is filled in by tablet personal computer scene, really realizes field operation, is eliminated " two skins " phenomenon, is made capital construction field operation management and control
In place, each link all performs according to standard;Make inspection record electronic, avoid altering, be stained;Make checking process leave record,
Image document, accomplish there is mark to look into, be easy to trace.Effectively solve many disadvantages existing for existing capital construction field operation working method
End, reach the target of capital construction field operation " specification, efficient, Reduction of Students' Study Load ", it is ensured that safety, complete building for engineering project in high quality
If.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model
Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in
Within the scope of shield.
Claims (5)
- A kind of 1. power engineering project quality in site receipt control system, it is characterised in that including:Mobile terminal (100), unified mass examination and evaluation criteria are preset with, for gathering item to be checked and accepted for on-site acceptance staff Purpose quality in site data, and treat items for acceptance and carry out an acceptance inspection evaluation;Background server (200), communicated to connect with the mobile terminal (100), for storing the quality in site data collected With corresponding evaluation result;Audit terminal (300), communicated to connect with the background server (200), for checking that director consults for project quality The checking and accepting implementation status of storage in the background server (200), and fed back to the background server (200) and check and accept work Make problem and corresponding project reform advice;The mobile terminal (100), it is additionally operable to receive checking and accepting problem from the background server (200) and corresponding Project reform advice, require to treat that items for acceptance makes corresponding rectification for on-site acceptance staff, and to the background server (200) feedback treats the rectification situation of items for acceptance.
- 2. system according to claim 1, it is characterised in that the mobile terminal (100) includes:For for onsite acceptance Personnel's collection treat the photographing module (101) of quality in site picture of items for acceptance, processing module (102) and for it is described The communication module (103) of background server (200) communication connection, the photographing module (101) and the communication module (103) are equal It is connected with the processing module (102).
- 3. system according to claim 2, it is characterised in that the mobile terminal (100), in addition to:For for scene The identity-acquiring module (104) of the identity information of items for acceptance site operation unit personnel, the identity are treated in inspector's collection Acquisition module (104) is connected with the processing module (102);The background server (200), it is additionally operable to treat items for acceptance site operation unit people using the identity information to prestore, checking The identity of member, and to the mobile terminal feedback validation result.
- 4. system according to claim 3, it is characterised in that the identity-acquiring module (104) includes:Treated for gathering The fingerprint collecting unit (114) of items for acceptance site operation unit personnel fingerprint, for gather treat items for acceptance site operation list The identity card identification unit (124) of position personnel identity card information, the fingerprint collecting unit (114) and the identity card identification list First (124) are connected with the processing module (102).
- 5. system according to claim 1, it is characterised in that the inspection of quality and evaluation criteria, by unit in charge of construction according to According to the schedule of project, prepared according to WBS branch, subdivisional work structure, and the examination & verification of project inspection unit uses.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720954842.XU CN207115482U (en) | 2017-08-01 | 2017-08-01 | Power engineering project quality in site receipt control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720954842.XU CN207115482U (en) | 2017-08-01 | 2017-08-01 | Power engineering project quality in site receipt control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207115482U true CN207115482U (en) | 2018-03-16 |
Family
ID=61579870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720954842.XU Active CN207115482U (en) | 2017-08-01 | 2017-08-01 | Power engineering project quality in site receipt control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207115482U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165869A (en) * | 2018-09-14 | 2019-01-08 | 广东电网有限责任公司 | A kind of construction managing and control system and management-control method |
CN109523230A (en) * | 2018-10-30 | 2019-03-26 | 深圳供电局有限公司 | A kind of high pressure industry expands live final acceptance of construction method, system, electronic equipment and medium |
CN109711796A (en) * | 2018-11-15 | 2019-05-03 | 国网河南省电力公司郑州供电公司 | Acquisition method is checked and accepted in power transformation based on five drift models |
CN109767101A (en) * | 2018-12-29 | 2019-05-17 | 福建华闽通达信息技术有限公司 | For inspection lot inspection of quality record table management method and computer equipment in engineering |
CN110991832A (en) * | 2019-11-20 | 2020-04-10 | 国网上海市电力公司 | High-voltage user field power consumption information acquisition system based on Internet + |
CN111259791A (en) * | 2020-01-15 | 2020-06-09 | 大亚湾核电运营管理有限责任公司 | Nuclear power station material acceptance method and device, computer equipment and storage medium |
CN112000036A (en) * | 2020-08-14 | 2020-11-27 | 河南高建工程管理有限公司 | Remote monitoring management system and method thereof |
CN112163832A (en) * | 2020-09-25 | 2021-01-01 | 中铁一局集团电务工程有限公司 | Online security quality management method and device, mobile terminal and storage medium |
CN112233250A (en) * | 2020-09-23 | 2021-01-15 | 云南电网有限责任公司昆明供电局 | Technical safety management and control system and method based on VR |
CN112348476A (en) * | 2020-11-12 | 2021-02-09 | 中建水务环保有限公司 | On-duty management method, electronic device, storage medium and system |
CN112862242A (en) * | 2020-12-30 | 2021-05-28 | 国网湖北省电力有限公司检修公司 | A production overall process acceptance tool for transformer substation capital construction engineering |
-
2017
- 2017-08-01 CN CN201720954842.XU patent/CN207115482U/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165869A (en) * | 2018-09-14 | 2019-01-08 | 广东电网有限责任公司 | A kind of construction managing and control system and management-control method |
CN109523230A (en) * | 2018-10-30 | 2019-03-26 | 深圳供电局有限公司 | A kind of high pressure industry expands live final acceptance of construction method, system, electronic equipment and medium |
CN109711796A (en) * | 2018-11-15 | 2019-05-03 | 国网河南省电力公司郑州供电公司 | Acquisition method is checked and accepted in power transformation based on five drift models |
CN109767101A (en) * | 2018-12-29 | 2019-05-17 | 福建华闽通达信息技术有限公司 | For inspection lot inspection of quality record table management method and computer equipment in engineering |
CN110991832A (en) * | 2019-11-20 | 2020-04-10 | 国网上海市电力公司 | High-voltage user field power consumption information acquisition system based on Internet + |
CN111259791A (en) * | 2020-01-15 | 2020-06-09 | 大亚湾核电运营管理有限责任公司 | Nuclear power station material acceptance method and device, computer equipment and storage medium |
CN111259791B (en) * | 2020-01-15 | 2023-09-08 | 大亚湾核电运营管理有限责任公司 | Nuclear power station material acceptance method and device, computer equipment and storage medium |
CN112000036A (en) * | 2020-08-14 | 2020-11-27 | 河南高建工程管理有限公司 | Remote monitoring management system and method thereof |
CN112233250A (en) * | 2020-09-23 | 2021-01-15 | 云南电网有限责任公司昆明供电局 | Technical safety management and control system and method based on VR |
CN112163832A (en) * | 2020-09-25 | 2021-01-01 | 中铁一局集团电务工程有限公司 | Online security quality management method and device, mobile terminal and storage medium |
CN112348476A (en) * | 2020-11-12 | 2021-02-09 | 中建水务环保有限公司 | On-duty management method, electronic device, storage medium and system |
CN112862242A (en) * | 2020-12-30 | 2021-05-28 | 国网湖北省电力有限公司检修公司 | A production overall process acceptance tool for transformer substation capital construction engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207115482U (en) | Power engineering project quality in site receipt control system | |
CN109325724A (en) | Power engineering project quality in site receipt control method and system | |
CN105139128A (en) | Remote accounting processing method and system | |
KR102108979B1 (en) | Total solution platform system for managing law business | |
CN110287200B (en) | Account checking method, account checking system, computer equipment and storage medium | |
CN104408050A (en) | Online automatic interpretation system and method of test data | |
CN105448067A (en) | Electric power collection and management system | |
CN105930961A (en) | Appraisal management method and device | |
CN106127608A (en) | Method for electrically is done on a kind of power marketing line | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN112801777B (en) | Automatic processing method, system, electronic equipment and storage medium for bank letter | |
CN109903180A (en) | A kind of substation secondary peace arranges Information Management System | |
CN114202755A (en) | Transaction background authenticity auditing method and system based on OCR (optical character recognition) and NLP (non-line segment) technologies | |
CN109271410A (en) | Extracting method, device and the computer readable storage medium of bank receipt | |
CN110490559A (en) | A kind of mobile law enforcement inspection method, device, system and server | |
CN105740471A (en) | Intelligent method for dynamically querying paper collection states | |
CN114511296A (en) | High-standard farmland construction project management platform | |
CN114493249A (en) | Road construction full-period management method, system, terminal and storage medium for road engineering supervision | |
CN108960758A (en) | Architectural engineering process control management system | |
CN104216986A (en) | Device and method for improving data query efficiency through pre-operation according to data update period | |
CN105809504A (en) | Application store system for constructing rapid storage data | |
CN115907673A (en) | Supply chain system | |
CN105719206A (en) | Higher-education teaching resource configuration and analysis system | |
CN106651559A (en) | Method for automatically generating financial data through terminal submission | |
CN112053218A (en) | Bill management system, bill management method, computer device, and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |