CN111550048A - Accurate construction early warning method and positioning device thereof - Google Patents

Accurate construction early warning method and positioning device thereof Download PDF

Info

Publication number
CN111550048A
CN111550048A CN202010398558.5A CN202010398558A CN111550048A CN 111550048 A CN111550048 A CN 111550048A CN 202010398558 A CN202010398558 A CN 202010398558A CN 111550048 A CN111550048 A CN 111550048A
Authority
CN
China
Prior art keywords
early warning
positioning
construction
warning
positioning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010398558.5A
Other languages
Chinese (zh)
Inventor
贝晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010398558.5A priority Critical patent/CN111550048A/en
Publication of CN111550048A publication Critical patent/CN111550048A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B3/00Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor
    • B62B3/008Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor having more than two axes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/658Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing
    • E01F9/662Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing mounted on vehicles, e.g. service vehicles; Warning vehicles travelling along with road-maintenance, e.g. remotely controlled
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/13Receivers
    • G01S19/14Receivers specially adapted for specific applications
    • G01S19/17Emergency applications
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/42Determining position
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B5/00Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied
    • G08B5/22Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using electric transmission; using electromagnetic transmission
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/30Transforming light or analogous information into electric information
    • H04N5/33Transforming infrared radiation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/76Television signal recording

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Emergency Management (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Business, Economics & Management (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Hydrology & Water Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Electromagnetism (AREA)
  • Alarm Systems (AREA)

Abstract

The invention provides an accurate construction early warning positioning device which comprises a supporting base plate, a moisture-proof supporting rod, a moving wheel, a hand-push holding rod, an emergency water tank, a liquid discharge faucet, a positioning early warning control cabinet, a control screen, an image acquisition early warning device structure, a construction early warning protective belt structure convenient to fix, an energy-saving warning plate structure, a talkback pickup, a construction tool clamping seat, a storage battery, a cushion and an early warning host. The hand-push type portable building frame can be moved and used according to different construction sites under the action of the moving wheels and the hand-push holding rods, so that convenience is improved; under the action of the emergency water tank and the liquid discharge faucet, the emergency water tank plays a role in emergency; corresponding GPS locators are arranged on the constructors and the locating devices, so that the locating accuracy is improved, and the safety of the constructors and the safety of a construction site are ensured; under the action of the alarm and the infrared camera, real-time monitoring video recording is carried out on a construction site, information is fed back timely, and safety is improved.

Description

Accurate construction early warning method and positioning device thereof
Technical Field
The invention belongs to the technical field of construction safety early warning management, and particularly relates to an accurate construction early warning method and a positioning device thereof.
Background
At present, the production safety is the central importance in the construction link, and the core of the production safety is the safety of personnel. Under the economic large environment of urbanization development in China, the economy of the building industry becomes an important component of GDP in China, and has great influence on national economy in China to a certain extent, and the improvement of the whole social development and the income level of people economy are directly concerned. The construction industry has gained huge construction achievement, but the factor of being a tie is more and more concerned by people to a certain extent, and the factor is more and more attracting attention of people to the construction safety, and the factor is becoming the focus of common attention of the whole society. If the construction safety accident is not effectively controlled, the negative effects generated by the construction safety accident directly influence the healthy development of the whole construction industry. Any accident can be more or less, directly or indirectly manifested, and the early warning management work of the safety production in the building industry can be well done, so that the safety accident of the building production can be effectively guaranteed.
In addition, the Chinese patent publication No. CN107845236A discloses a construction operation safety protection early warning system based on real-time positioning, which comprises a positioning label with a relay and a positioning label on a construction operation site, wherein the positioning label with the relay sends the distances between the positioning label and a first base station, a second base station and a third base station to a communication base station, the positioning label sends the distances between the positioning label and the first base station, the second base station and the third base station to the communication base station, and the communication base station communicates with a comprehensive management display terminal and a positioning engine server and sends distance information. However, the existing construction early warning also has the problems that the construction early warning is inconvenient to move and use according to different construction positions, the warning early warning effect is poor and the operation method is too complicated.
In view of this, it is very necessary to provide an accurate construction early warning method and a positioning device thereof.
Disclosure of Invention
In order to solve the technical problems, the invention provides an accurate construction early warning method and a positioning device thereof, and aims to solve the problems that the existing construction early warning is inconvenient to move and use according to different construction positions, the warning early warning effect is poor and the operation method is complicated. An accurate construction early warning positioning device comprises a supporting base plate, a moisture-proof supporting rod, a moving wheel, a hand-push holding rod, an emergency water tank, a liquid discharge tap, a positioning early warning control cabinet, a control screen, an image acquisition early warning device structure, a construction warning protective belt structure convenient to fix, an energy-saving warning plate structure, a talkback pickup, a construction tool clamping seat, a storage battery, a cushion and an early warning host, wherein one end of the moisture-proof supporting rod is respectively bolted at four corners of the lower surface of the supporting base plate, and the other end of the moisture-proof supporting rod is connected with the moving wheel through bolts; the hand-push holding rod is connected to the middle position of the right side of the supporting base plate through a bolt; the emergency water tank is glued at the middle position of the left side of the upper surface of the supporting base plate; the liquid discharge tap is in threaded connection with the middle position of the lower part of the left side of the emergency water tank; the positioning early warning control cabinet is connected to the middle position of the upper part of the supporting base plate through a screw; the control screen is embedded in the middle of the upper part of the front surface of the positioning early warning control cabinet; the image collecting early warning device structure is arranged at the right side position of the upper part of the positioning early warning control cabinet; the construction warning protective belt structure convenient to fix is arranged at the upper position of the right side of the hand-push holding rod; the energy-saving warning board is arranged at the left side position of the upper part of the positioning early warning control cabinet; the talkback sound pick-up screw is connected to the left upper side of the front surface of the positioning early warning control cabinet; the construction tool clamping seat is connected to the lower surface of the supporting base plate through screws; the storage battery screw is connected to the left lower side inside the positioning early warning control cabinet; the cushion is glued at the outer side of the upper part of the supporting base plate; the early warning host machine is connected to the right lower side of the inside of the positioning early warning control cabinet through a screw.
Preferably, the image-collectable early warning device structure comprises an alarm, a mounting plate, a connecting sleeve, a supporting screw rod and an infrared camera, wherein the alarm is connected to the middle position of the upper part of the mounting plate through a screw; the connecting sleeve is sleeved at the lower part of the outer surface of the alarm; the supporting screw rod is embedded at the left side position of the upper part of the connecting sleeve; the infrared camera is connected to the upper end of the supporting screw in a shaft mode.
Preferably, the construction warning protective belt structure convenient to fix comprises a storage box, a self-contraction winding shaft, a warning pull belt, a connecting lug plate, a fixing through hole and a fixing hook, wherein the self-contraction winding shaft is embedded in the right side position inside the storage box; the warning pull belt is glued on the outer surface of the self-contraction winding shaft; the connecting ear plate is glued on the right side of the warning drawstring; the fixing through hole is formed in the right side position of the inner part of the connecting lug plate; the fixed hook is riveted on the right side of the connecting ear plate.
Preferably, the energy-saving warning board structure comprises a solar panel, a support rod and a liquid crystal early warning screen, wherein the solar panel is connected to the upper end of the support rod through a bolt; the liquid crystal early warning screen is connected with the support rod and the lower part of the inner side of the support rod through screws.
Preferably, the moving wheel is a rubber universal wheel with a brake pad; the number of the moving wheels is four.
Preferably, the cushion specifically adopts rectangular silica gel pad.
Preferably, the connecting sleeve is a cylindrical silica gel sleeve; the support screw rod is specifically made of a flexible stainless steel pipe.
Preferably, the method for accurately early warning construction comprises a site positioning system terminal, a mobile phone and a computer system terminal.
Preferably, the on-site positioning system terminal comprises an image input module, a liquid crystal display updating module, a signal sending module, a GPS (global positioning system) positioner and an alarm module; the GPS positioner comprises a GPS positioner worn by construction personnel and a positioning module arranged on a positioning device.
Preferably, the mobile phone and computer system terminal comprises a mobile phone terminal and a computer system terminal; the mobile phone terminal and the computer system terminal both comprise an information receiving module, a remote positioning module and an emergency processing module.
Preferably, the mobile phone and the computer system terminal are electrically connected with the field positioning system terminal.
An accurate construction early warning method specifically comprises the following steps:
the method comprises the following steps: moving the precise construction early warning positioning device to a construction site;
step two: wearing a GPS locator by constructors;
step three: the terminal of the on-site positioning system is connected with a GPS positioner of a constructor;
step four: the on-site positioning system terminal is connected with the mobile phone and the computer system terminal;
step five: the work of the image early warning device can be collected;
step six: and (5) feedback monitoring of positioning information.
Preferably, in the first step, according to different construction positions, the hand-held holding rod moves the device to the use position under the action of the moving wheel, and the device is started through the control screen.
Preferably, in step two, the matched GPS locator is assigned to the constructor.
Preferably, in the third step, the on-site positioning system terminal is communicated with the GPS positioner of the constructor, so that the normal transmission of signals is ensured.
Preferably, in the fourth step, the on-site positioning system terminal is communicated with the mobile phone and the computer system terminal, so as to ensure normal transmission of signals.
Preferably, in the fifth step, the infrared camera is started to record and store the construction site conditions, and particularly when an accident occurs, the alarm is started to send an alarm, feed the alarm back to the liquid crystal early warning screen and transmit the alarm to the mobile phone and the computer system terminal.
Preferably, in the sixth step, the mobile phone and the computer system terminal are used to control the field positioning system terminal and communicate with each other through the talkback microphone.
Compared with the prior art, the invention has the beneficial effects that: the movable wheel and the hand-push holding rod can be moved for use according to different construction sites, so that the use convenience is improved; under the action of the emergency water tank and the liquid discharge faucet, the emergency water tank plays a role in emergency; corresponding GPS locators are arranged on the constructors and the locating devices, so that the locating accuracy is improved, and the safety of the constructors and the safety of a construction site are ensured; under the action of the alarm and the infrared camera, real-time monitoring video recording is carried out on a construction site, information is fed back in time, safety is improved, the operation method is simple and easy to use and operate, and the construction method is more beneficial to being mastered by constructors.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a schematic top view of the present invention.
Figure 3 is a bottom view of the support base plate of the present invention.
Fig. 4 is a schematic structural diagram of the image-capturing early warning device according to the present invention.
Fig. 5 is a schematic structural view of a construction warning protective belt structure convenient to fix according to the present invention.
Fig. 6 is a schematic structural diagram of an energy-saving warning plate structure according to the present invention.
Fig. 7 is a schematic diagram of an accurate construction early warning method of the present invention.
Fig. 8 is a schematic diagram of a field location system terminal of the present invention.
FIG. 9 is a diagram of a mobile phone and a computer system terminal according to the present invention.
Fig. 10 is a flowchart of a construction early warning method of the present invention.
In the figure:
1. a support bed plate; 2. a moisture-proof strut; 3. a moving wheel; 4. pushing the holding rod by hand; 5. an emergency water tank; 6. a drain tap; 7. positioning an early warning control cabinet; 8. a control screen; 9. the structure of the image early warning device can be collected; 91. an alarm; 92. mounting a plate; 93. connecting sleeves; 94. a support screw; 95. an infrared camera; 10. a construction warning protective belt structure convenient to fix; 101. a storage box; 102. a self-retracting winding shaft; 103. a warning drawstring; 104. connecting the ear plates; 105. a fixing through hole; 106. fixing the hook; 11. an energy-saving warning plate structure; 111. a solar panel; 112. a support bar; 113. a liquid crystal early warning screen; 12. an intercom sound pick-up; 13. a construction tool holder; 14. a storage battery; 15. a cushion; 16. and (5) early warning the host.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
example (b):
as shown in fig. 1 to 3, the invention provides an accurate construction early warning positioning device, which comprises a supporting base plate 1, a moisture-proof supporting rod 2, a moving wheel 3, a hand-push holding rod 4, an emergency water tank 5, a liquid discharge tap 6, a positioning early warning control cabinet 7, a control screen 8, an image collecting early warning device structure 9, a construction early warning protective belt structure 10 convenient to fix, an energy-saving early warning plate structure 11, a talkback pickup 12, a construction tool clamping seat 13, a storage battery 14, a cushion 15 and an early warning host computer 16, wherein one end of the moisture-proof supporting rod 2 is respectively bolted at four corners of the lower surface of the supporting base plate 1, and the other end of the moisture-proof supporting rod is connected with the; the hand-push holding rod 4 is connected to the middle position of the right side of the supporting base plate 1 through a bolt; the emergency water tank 5 is glued at the middle position of the left side of the upper surface of the supporting base plate 1; the liquid discharge tap 6 is in threaded connection with the middle position of the lower part of the left side of the emergency water tank 5; the positioning early warning control cabinet 7 is connected to the middle position of the upper part of the supporting base plate 1 through a screw; the control screen 8 is embedded in the middle of the upper part of the front surface of the positioning early warning control cabinet 7; the image collecting early warning device structure 9 is arranged at the right side position of the upper part of the positioning early warning control cabinet 7; the construction warning protective belt structure 10 convenient to fix is arranged at the upper position of the right side of the hand-push holding rod 4; the energy-saving warning plate structure 11 is arranged at the left side position of the upper part of the positioning early warning control cabinet 7; the talkback sound pick-up 12 is connected to the left upper side of the front surface of the positioning early warning control cabinet 7 through a screw; the construction tool clamping seat 13 is connected to the lower surface of the supporting base plate 1 through screws; the storage battery 14 is in screwed connection with the left lower side inside the positioning early warning control cabinet 7; the cushion 15 is glued at the outer side of the upper part of the supporting base plate 1; the early warning host computer 16 is connected with the right lower side position inside the positioning early warning control cabinet 7 through a screw.
As shown in fig. 4, in the above embodiment, in particular, the image-capturing early warning device structure 9 includes an alarm 91, a mounting plate 92, a connecting sleeve 93, a supporting screw 94 and an infrared camera 95, wherein the alarm 91 is screwed on the mounting plate 92 at an upper middle position; the connecting sleeve 93 is sleeved at the lower part of the outer surface of the alarm 91; the supporting screw 94 is embedded at the left side position of the upper part of the connecting sleeve 93; the infrared camera 95 is coupled to the upper end of the support screw 94.
As shown in fig. 5, in the above embodiment, specifically, the construction warning guard band structure 10 convenient to fix includes a storage box 101, a self-contraction winding shaft 102, a warning pulling band 103, a connecting ear plate 104, a fixing through hole 105 and a fixing hook 106, wherein the self-contraction winding shaft 102 is embedded at the right position inside the storage box 101; the warning drawstring 103 is glued on the outer surface of the self-contraction winding shaft 102; the connecting ear plate 104 is glued on the right side of the warning draw tape 103; the fixing through hole 105 is formed in the right side of the inner part of the connecting ear plate 104; the fixing hook 106 is riveted to the right side of the connecting ear plate 104.
As shown in fig. 6, in the above embodiment, specifically, the energy-saving warning plate structure 11 includes a solar panel 111, a support rod 112 and a liquid crystal warning panel 113, wherein the solar panel 111 is bolted to the upper end of the support rod 112; the liquid crystal early warning screen 113 is screwed on the support bar 112 and the lower part of the inner side of the support bar 112.
In the above embodiment, specifically, the moving wheel 3 specifically adopts a rubber universal wheel with a brake pad; the number of the moving wheels 3 is four.
In the above embodiment, specifically, the seat cushion 15 specifically adopts a rectangular silica gel cushion.
In the above embodiment, specifically, the connecting sleeve 93 specifically adopts a cylindrical silica gel sleeve; the support screw 94 is made of a flexible stainless steel tube.
As shown in fig. 7, in the above embodiment, specifically, the method for accurately performing construction early warning includes a field positioning system terminal, a mobile phone and a computer system terminal.
As shown in fig. 8, in the above embodiment, specifically, the on-site positioning system terminal includes an image input module, a liquid crystal display updating module, a signal sending module, a GPS locator and an alarm module; the GPS positioner comprises a GPS positioner worn by construction personnel and a positioning module arranged on a positioning device.
As shown in fig. 9, in the above embodiment, specifically, the mobile phone and the computer system terminal include a mobile phone terminal and a computer system terminal; the mobile phone terminal and the computer system terminal both comprise an information receiving module, a remote positioning module and an emergency processing module.
In the above embodiment, specifically, the mobile phone and the computer system terminal are electrically connected to the field positioning system terminal.
As shown in fig. 10, the accurate construction early warning method specifically comprises the following steps:
the method comprises the following steps: moving the precise construction early warning positioning device to a construction site;
step two: wearing a GPS locator by constructors;
step three: the terminal of the on-site positioning system is connected with a GPS positioner of a constructor;
step four: the on-site positioning system terminal is connected with the mobile phone and the computer system terminal;
step five: the work of the image early warning device can be collected;
step six: and (5) feedback monitoring of positioning information.
In the above embodiment, specifically, in the first step, depending on the construction position, the hand-held holding rod 4 moves the device to the use position by the moving wheel 3, and the device is activated by the operation panel 8.
In the above embodiment, specifically, in the second step, the matched GPS locator is allocated to the constructor.
In the above embodiment, specifically, in step three, the on-site positioning system terminal is communicated with the GPS locator of the constructor, so as to ensure normal transmission of signals.
In the above embodiment, specifically, in the fourth step, the on-site positioning system terminal is connected to the mobile phone and the computer system terminal, so as to ensure normal transmission of signals.
In the above embodiment, specifically, in the fifth step, the infrared camera 95 is started to record and store the construction site conditions, and particularly, when an accident occurs, the alarm 91 is started to send an alarm and feed the alarm back to the liquid crystal early warning screen 113, and the alarm is transmitted to the mobile phone and the computer system terminal.
In the above embodiment, specifically, in the sixth step, the mobile phone and the computer system terminal are used to control the field positioning system terminal and communicate with each other through the intercom microphone 12.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The accurate construction early warning method and the positioning device thereof are characterized by comprising a supporting base plate (1), a moisture-proof supporting rod (2), a movable wheel (3), a hand-push holding rod (4), an emergency water tank (5), a liquid discharge tap (6), a positioning early warning control cabinet (7), a control screen (8), an image acquisition early warning device structure (9), a construction early warning protective belt structure (10) convenient to fix, an energy-saving early warning plate structure (11), a talkback pickup (12), a construction tool clamping seat (13), a storage battery (14), a cushion (15) and an early warning host (16), wherein one end of the moisture-proof supporting rod (2) is respectively bolted at four corners of the lower surface of the supporting base plate (1), and the other end of the moisture-proof supporting rod is bolted with the movable wheel (3); the hand-push holding rod (4) is connected to the middle position of the right side of the supporting base plate (1) through a bolt; the emergency water tank (5) is glued at the middle position of the left side of the upper surface of the supporting base plate (1); the liquid discharge tap (6) is in threaded connection with the middle position of the lower part of the left side of the emergency water tank (5); the positioning early warning control cabinet (7) is connected to the middle position of the upper part of the supporting base plate (1) through a screw; the control screen (8) is embedded in the middle of the upper part of the front surface of the positioning early warning control cabinet (7); the image-collectable early warning device structure (9) is arranged at the right side position of the upper part of the positioning early warning control cabinet (7); the construction warning protective belt structure (10) convenient to fix is arranged at the upper part of the right side of the hand-push holding rod (4); the energy-saving warning plate structure (11) is arranged at the left side position of the upper part of the positioning early warning control cabinet (7); the talkback sound pick-up (12) is connected to the left upper side of the front surface of the positioning early warning control cabinet (7) through a screw; the construction tool clamping seat (13) is connected to the lower surface of the supporting base plate (1) through screws; the storage battery (14) is in screw connection with the left lower side inside the positioning early warning control cabinet (7); the cushion (15) is glued at the outer side of the upper part of the supporting base plate (1); the early warning host (16) is connected to the right lower side of the inside of the positioning early warning control cabinet (7) through screws.
2. The precise construction early warning and positioning device according to claim 1, wherein the image-collectable early warning device structure (9) comprises an alarm (91), a mounting plate (92), a connecting sleeve (93), a supporting screw rod (94) and an infrared camera (95), wherein the alarm (91) is screwed in the middle of the upper part of the mounting plate (92); the connecting sleeve (93) is sleeved at the lower part of the outer surface of the alarm (91); the supporting screw rod (94) is embedded at the left side position of the upper part of the connecting sleeve (93); the infrared camera (95) is coupled to the upper end of the support screw (94).
3. The precise construction early warning and positioning device according to claim 1, wherein the construction warning protective band structure (10) convenient to fix comprises a storage box (101), a self-contraction winding shaft (102), a warning pull band (103), a connecting lug plate (104), a fixing through hole (105) and a fixing hook (106), wherein the self-contraction winding shaft (102) is embedded in the right position inside the storage box (101); the warning draw tape (103) is glued on the outer surface of the self-contraction winding shaft (102); the connecting ear plate (104) is glued on the right side of the warning draw tape (103); the fixing through hole (105) is formed in the right side position inside the connecting lug plate (104); the fixed hook (106) is riveted at the right side of the connecting ear plate (104).
4. The precise construction early warning and positioning device according to claim 1, wherein the energy-saving warning plate structure (11) comprises a solar panel (111), a support rod (112) and a liquid crystal early warning screen (113), the solar panel (111) is bolted to the upper end of the support rod (112); the liquid crystal early warning screen (113) is connected with the support rod (112) and the lower part of the inner side of the support rod (112) through screws.
5. The precise construction early warning and positioning device as claimed in claim 1, wherein the moving wheel (3) is a rubber universal wheel with a brake pad; the number of the moving wheels (3) is four.
6. The accurate construction early warning and positioning device as claimed in claim 2, wherein the connecting sleeve (93) is a cylindrical silica gel sleeve; the supporting screw rod (94) is a flexible stainless steel pipe.
7. The precise construction early warning and positioning device according to claim 1, wherein the related systems of the precise construction early warning and positioning device comprise a site positioning system terminal and a mobile phone and computer system terminal.
8. The system for accurately early warning construction as claimed in claim 1, wherein the on-site positioning system terminal comprises an image input module, a liquid crystal display updating module, a signal sending module, a GPS locator and an alarm module; the GPS positioner comprises a GPS positioner worn by construction personnel and a positioning module arranged on a positioning device.
9. The system for accurately performing construction early warning as claimed in claim 1, wherein the mobile phone and computer system terminal comprises a mobile phone terminal and a computer system terminal; the mobile phone terminal and the computer system terminal both comprise an information receiving module, a remote positioning module and an emergency processing module.
10. The accurate construction early warning positioning device as claimed in claim 1, wherein the using method specifically comprises the following steps:
the method comprises the following steps: moving the precise construction early warning positioning device to a construction site;
step two: wearing a GPS locator by constructors;
step three: the terminal of the on-site positioning system is connected with a GPS positioner of a constructor;
step four: the on-site positioning system terminal is connected with the mobile phone and the computer system terminal;
step five: the work of the image early warning device can be collected;
step six: and (5) feedback monitoring of positioning information.
CN202010398558.5A 2020-05-12 2020-05-12 Accurate construction early warning method and positioning device thereof Pending CN111550048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010398558.5A CN111550048A (en) 2020-05-12 2020-05-12 Accurate construction early warning method and positioning device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010398558.5A CN111550048A (en) 2020-05-12 2020-05-12 Accurate construction early warning method and positioning device thereof

Publications (1)

Publication Number Publication Date
CN111550048A true CN111550048A (en) 2020-08-18

Family

ID=72001894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010398558.5A Pending CN111550048A (en) 2020-05-12 2020-05-12 Accurate construction early warning method and positioning device thereof

Country Status (1)

Country Link
CN (1) CN111550048A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114056591A (en) * 2021-11-17 2022-02-18 山东交通学院 Multifunctional unmanned aerial vehicle laying device for traffic construction supervision and management

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195254A (en) * 2013-02-21 2013-07-10 中国水电顾问集团成都勘测设计研究院 Automatic monitoring method of concrete casting vibrating blank layer
CN205172540U (en) * 2015-10-29 2016-04-20 长安大学 Antisludging agent charge device
CN106385563A (en) * 2016-10-12 2017-02-08 徐志勇 Real-time monitoring system of construction field
CN206829783U (en) * 2017-06-12 2018-01-02 金陵科技学院 A kind of construction site energy-saving type safety moving fence
CN207122182U (en) * 2017-07-28 2018-03-20 王士坡 A kind of construction protection fence for being used to build
CN207244491U (en) * 2017-08-09 2018-04-17 广西华南建设集团有限公司 A kind of municipal works road maintenance construction alarming device
CN207264418U (en) * 2017-09-27 2018-04-20 国网上海市电力公司 A kind of electric power tunnel management system based on Cloud Server and mobile terminal
TWM565380U (en) * 2018-05-17 2018-08-11 亞新工程顧問股份有限公司 Safety rope monitoring system
CN207938016U (en) * 2017-12-25 2018-10-02 保定市公路管理局 A kind of highway digitlization construction management device
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 Construction management and control system and management and control method
CN209011681U (en) * 2018-07-20 2019-06-21 中建八局第二建设有限公司 A kind of novel intelligent shield posts
CN110351527A (en) * 2019-07-25 2019-10-18 友谊国际工程咨询有限公司 The other robot system of standing of engineering construction intelligence
CN210047511U (en) * 2019-06-12 2020-02-11 湖南高速铁路职业技术学院 Novel mobile monitoring prompt device for building construction site management
CN210351370U (en) * 2020-01-02 2020-04-17 中铁十局集团有限公司 Monitoring alarm device for rapid mechanized flow construction organization under complex condition

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195254A (en) * 2013-02-21 2013-07-10 中国水电顾问集团成都勘测设计研究院 Automatic monitoring method of concrete casting vibrating blank layer
CN205172540U (en) * 2015-10-29 2016-04-20 长安大学 Antisludging agent charge device
CN106385563A (en) * 2016-10-12 2017-02-08 徐志勇 Real-time monitoring system of construction field
CN206829783U (en) * 2017-06-12 2018-01-02 金陵科技学院 A kind of construction site energy-saving type safety moving fence
CN207122182U (en) * 2017-07-28 2018-03-20 王士坡 A kind of construction protection fence for being used to build
CN207244491U (en) * 2017-08-09 2018-04-17 广西华南建设集团有限公司 A kind of municipal works road maintenance construction alarming device
CN207264418U (en) * 2017-09-27 2018-04-20 国网上海市电力公司 A kind of electric power tunnel management system based on Cloud Server and mobile terminal
CN207938016U (en) * 2017-12-25 2018-10-02 保定市公路管理局 A kind of highway digitlization construction management device
TWM565380U (en) * 2018-05-17 2018-08-11 亞新工程顧問股份有限公司 Safety rope monitoring system
CN209011681U (en) * 2018-07-20 2019-06-21 中建八局第二建设有限公司 A kind of novel intelligent shield posts
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 Construction management and control system and management and control method
CN210047511U (en) * 2019-06-12 2020-02-11 湖南高速铁路职业技术学院 Novel mobile monitoring prompt device for building construction site management
CN110351527A (en) * 2019-07-25 2019-10-18 友谊国际工程咨询有限公司 The other robot system of standing of engineering construction intelligence
CN210351370U (en) * 2020-01-02 2020-04-17 中铁十局集团有限公司 Monitoring alarm device for rapid mechanized flow construction organization under complex condition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114056591A (en) * 2021-11-17 2022-02-18 山东交通学院 Multifunctional unmanned aerial vehicle laying device for traffic construction supervision and management

Similar Documents

Publication Publication Date Title
CN202600767U (en) Supervision system for dangerous solid waste disposal
CN108519045A (en) A kind of Big Dipper precision deformation monitoring and early warning system
CN201342831Y (en) Automatic para-position printing machine
CN111615059A (en) Positioning equipment and system for monitoring information of building site personnel in real time
CN204925101U (en) Water quality monitoring device
CN111550048A (en) Accurate construction early warning method and positioning device thereof
CN203785636U (en) High-speed rail displacement automation detection system
CN205861644U (en) A kind of gardens atmosphere quality monitoring device
CN112590646A (en) Electric power overhaul work bench and overhaul vehicle
CN209295992U (en) Geological mapping instrument crane
CN203785999U (en) Combined fine air particulate matter monitoring platform
CN206623163U (en) A kind of circular knife machine
CN214279105U (en) Police affairs automatic alarm system based on face identification
CN206311936U (en) A kind of solar energy self-powered data acquisition device
CN205334179U (en) Railway signal machine room environmental monitoring system
CN201156748Y (en) Real-time monitoring alarm system
CN213241238U (en) Thing networking logistics monitored control system
CN203981376U (en) A kind of pick-up unit of being convenient to optical cable identification
CN208654334U (en) Urban waterlogging monitoring device based on Beidou
CN106550207A (en) A kind of real time data acquisition monitoring system in electric power system
CN112462741A (en) Unmanned agricultural machinery vehicle-trapping detection alarm system based on cloud platform
CN110996282A (en) Monitoring system based on Internet of things
CN209248283U (en) A kind of parking ground control system based on intelligent robot
CN220570607U (en) Emergency communication command desk
CN211979057U (en) Thunder and lightning early warning device along railway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200818