CN209295992U - Geological mapping instrument crane - Google Patents
Geological mapping instrument crane Download PDFInfo
- Publication number
- CN209295992U CN209295992U CN201920227156.1U CN201920227156U CN209295992U CN 209295992 U CN209295992 U CN 209295992U CN 201920227156 U CN201920227156 U CN 201920227156U CN 209295992 U CN209295992 U CN 209295992U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- connection
- controller
- instrument
- geological mapping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Arrangements For Transmission Of Measured Signals (AREA)
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of geological mapping instrument crane, belong to plotting board technical field, including pedestal, the top connection of pedestal has lifting device, lifting device includes bar supported on both sides, the inside of bar supported on both sides is equipped with lead screw, the top of lifting device is equipped with bracket, the top of bracket is equipped with lifting motor, lifting motor connects lead screw, the external connection of lead screw has connection placement rack, connection placement rack is for placing instrument of surveying and mapping, the lower section of pedestal is equipped with a screw propulsion rod, the lower section connection of screw propulsion rod has sampling head, driving motor is connected with above screw propulsion rod, the left and right sides below pedestal is equipped with support column, the top of support column is pierced by pedestal, the outside of pedestal is equipped with a controller, controller connects host computer by communication bus or wireless transport module and realizes data communication, it can be realized the liter of instrument of surveying and mapping Drop, facilitates operation, the data of measurement can be transmitted at the first time, solve the problem in the prior art.
Description
Technical field
The utility model relates to a kind of geological mapping instrument cranes, belong to plotting board technical field.
Background technique
Mapping is used for the planning and designing and administration of engineering construction;It needs to use instrument of surveying and mapping when mapping, it is existing
Instrument of surveying and mapping needs to be placed on frame body when in use in technology, and frame body in the prior art not can be carried out lifting, needs to go up and down
When need staff to replace frame body or to go up and down manually, when operation, is extremely inconvenient, and when mapping compares if it is in environment
The data of remote ground region measurement cannot be transmitted in time, be unfavorable for the promotion of working efficiency.
Utility model content
The purpose of this utility model is to provide a kind of geological mapping instrument cranes, can be realized the liter of instrument of surveying and mapping
Drop, facilitates operation, the data of measurement can be transmitted at the first time, solve the problem in the prior art.
The top connection of geological mapping instrument crane described in the utility model, including pedestal, pedestal has lifting device,
Lifting device includes bar supported on both sides, and the inside of bar supported on both sides is equipped with lead screw, and the top of lifting device is equipped with bracket, bracket
Top is equipped with lifting motor, and lifting motor connects lead screw, and the external connection of lead screw has connection placement rack, and connection placement rack is for putting
Instrument of surveying and mapping is set, the lower section of pedestal is equipped with a screw propulsion rod, and the lower section connection of screw propulsion rod has sampling head, screw propulsion rod
Top be connected with driving motor, driving motor is embedded in the base, and the left and right sides below pedestal is equipped with support column, support column
Top be pierced by pedestal, the outside of pedestal is equipped with a controller, and controller is externally connected to display, controller connection lifting
Motor and instrument of surveying and mapping, controller connect host computer by communication bus or wireless transport module and realize data communication.
When work, instrument of surveying and mapping is placed in connection placement rack, after placement, lead screw operating is driven by lifting motor,
To drive connection placement rack to be gone up and down, start to carry out mapping operations after lifting to suitable position, instrument of surveying and mapping passes through logical
Communication interface connects controller, and for the data transmission of measurement into controller, controller passes through communication bus or wireless transport module
Host computer is sent data to, realizes the remote transmission of data, facilitates recording and transmitting for data, improves the quality and effect of work
Rate;Meanwhile inevitably to be carried out in geological mapping geology sampling observation, by the screw propulsion rod below pedestal with
And sampling head can be sampled observation to geology, and more instrument and equipment is carried without staff.
The connection placement rack includes shell, and the left and right sides in shell is equipped with limited post, is equipped in limited post flexible
The lower section of spring, shell is equipped at least row's damping spring;By the flexible of limited post and adjustable spring, can place different big
Small instrument of surveying and mapping.
The pedestal is equipped with a camera, and the outside of camera is equipped with mast-up, and camera is coupled by mast-up
On pedestal, camera connects controller;It can be monitored by camera.
The top of the shell is equipped with a connecting terminal, facilitates wiring.
The outside of the support column is socketed with spring, and the lower section of support column is equipped with universal wheel, and universal wheel is that side brake is universal
Wheel.
The communication bus includes RS232/RS485 communication bus, and wireless transport module is in WIFI/3G/4G module
It is one or more.
The controller uses STM32 type single-chip microcontroller.
The top of the pedestal is equipped with handle.
The utility model compared with prior art, has the following beneficial effects:
Geological mapping instrument crane described in the utility model, can be realized the lifting of instrument of surveying and mapping, facilitate operation, survey
The data of amount can be transmitted to host computer at the first time, realize the long-range management of data;Facilitate work in geological mapping simultaneously
Personnel are sampled detection, solve the problem in the prior art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram for coupling placement rack in the utility model embodiment
Fig. 3 is the circuit connection block diagram of controller in the utility model embodiment;
Fig. 4 is the circuit connection block diagram of the utility model embodiment medium-long range control system;
In figure: 1, lifting motor;2, bracket;3, instrument of surveying and mapping;4, couple placement rack;5, lead screw;6, bar supported on both sides;7,
Driving motor;8, pedestal;9, controller;10, universal wheel;11, sampling head;12, spring;13, support column;14, screw propulsion rod;
15, camera;16, handle;17, connecting terminal;18, shell;19, limited post;20, adjustable spring;21, damping spring.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and examples:
Embodiment 1:
As shown in Figs 1-4, geological mapping instrument crane described in the utility model, including pedestal 8, the top of pedestal 8
Connection has lifting device, and lifting device includes bar 6 supported on both sides, and the inside of bar 6 supported on both sides is equipped with lead screw 5, lifting device
Top is equipped with bracket 2, and the top of bracket 2 is equipped with lifting motor 1, and lifting motor 1 connects lead screw 5, and the external connection of lead screw 5 has connection
Placement rack 4 is connect, connection placement rack 4 is equipped with a screw propulsion rod 14, screw propulsion for placing instrument of surveying and mapping 3, the lower section of pedestal 8
The lower section connection of bar 14 has sampling head 11, and the top of screw propulsion rod 14 is connected with driving motor 7, and driving motor 7 is embedded in bottom
In seat 8, the left and right sides of 8 lower section of pedestal is equipped with support column 13, and the top of support column 13 is pierced by pedestal 8, and the outside of pedestal 8 is equipped with
One controller 9, the external connection display of controller 9, controller 9 connects lifting motor 1 and instrument of surveying and mapping 3, controller 9 pass through
Communication bus or wireless transport module connection host computer realize data communication.
In order to further illustrate above-described embodiment, coupling placement rack 4 includes shell 18, and the left and right sides in shell 18 is equipped with
Limited post 19, adjustable spring 20 is equipped in limited post 19, and the lower section of shell 18 is equipped at least row's damping spring 21.
In order to further illustrate above-described embodiment, pedestal 8 is equipped with a camera 15, and the outside of camera 15 is equipped with lifting
Frame, camera 15 are connected on pedestal 8 by mast-up, and camera 15 connects controller 9.
In order to further illustrate above-described embodiment, the top of shell 18 is equipped with a connecting terminal 17.
In order to further illustrate above-described embodiment, the outside of support column 13 is socketed with spring 12, and the lower section of support column 13 is set
There is universal wheel 10, universal wheel 10 is side brake universal wheel.
In order to further illustrate above-described embodiment, communication bus includes RS232/RS485 communication bus, wireless transport module
For one of WIFI/3G/4G module or a variety of.
In order to further illustrate above-described embodiment, controller 9 uses STM32 type single-chip microcontroller.
In order to further illustrate above-described embodiment, the top of pedestal 8 is equipped with handle 16.
The working principle of the present embodiment are as follows: when work, instrument of surveying and mapping 3 is placed in connection placement rack 4, after placement, is led to
Crossing lifting motor 1 drives lead screw 5 to operate, so that connection placement rack 4 be driven to be gone up and down, lifting to start behind suitable position into
Row mapping operations, instrument of surveying and mapping 3 connect controller 9 by communication interface, and the data transmission of measurement is into controller 9, controller 9
Host computer is sent data to by communication bus or wireless transport module, the remote transmission of data is realized, facilitates data
It records and transmits, improves the quality and efficiency of work.
Meanwhile the sampling observation of geology is inevitably carried out in geological mapping, it is pushed away by the spiral of 8 lower section of pedestal
It can be sampled observation to geology into bar 14 and sampling head 11, more instrument and equipment is carried without staff.Spiral
Pushing ram 14 is not in contact with the ground when not in use, positioned at the inside of support column 13;When mobile, support column 13 is played a supporting role, can
To be moved by universal wheel 10.
Controller 9 is in connection, by the way that corresponding instrument of surveying and mapping 3 to be connected on the communication interface of controller 9, for passing
The shorter environment of defeated distance, is connected to host computer by communication bus, can connect by RS232/RS485 communication bus more
A instrument of surveying and mapping 3 carries out transmission data;If transmission range is longer, sent data to using wireless transport module upper
Machine.
Using the geological mapping instrument crane of the embodiments of the present invention being described in conjunction with the accompanying above, can be realized
The lifting of instrument of surveying and mapping facilitates operation, the data of measurement can be transmitted at the first time, solves and occurs in the prior art
Problem.But the utility model is not limited to described embodiment, in the feelings for not departing from the principles of the present invention and spirit
These variation, modification, replacement and deformations for carrying out to embodiment are still fallen in the protection scope of the utility model under condition.
Claims (8)
1. a kind of geological mapping instrument crane, including pedestal (8), it is characterised in that: the top connection of the pedestal (8) has
Lifting device, lifting device include bar supported on both sides (6), and the inside of bar (6) supported on both sides is equipped with lead screw (5), lifting device
Top is equipped with bracket (2), and the top of bracket (2) is equipped with lifting motor (1), and lifting motor (1) connects lead screw (5), lead screw (5)
Outside connection has connection placement rack (4), and for placing instrument of surveying and mapping (3), the lower section of pedestal (8) is equipped with one for connection placement rack (4)
The lower section connection of screw propulsion rod (14), screw propulsion rod (14) has sampling head (11), the top connection of screw propulsion rod (14)
Having driving motor (7), driving motor (7) is embedded in pedestal (8), and the left and right sides below pedestal (8) is equipped with support column (13),
The top of support column (13) is pierced by pedestal (8), and the outside of pedestal (8) is equipped with a controller (9), the external connection of controller (9)
There is display, controller (9) connects lifting motor (1) and instrument of surveying and mapping (3), and controller (9) is by communication bus or wirelessly
Transmission module connects host computer and realizes data communication.
2. geological mapping instrument crane according to claim 1, it is characterised in that: connection placement rack (4) packet
It includes shell (18), the left and right sides in shell (18) is equipped with limited post (19), is equipped with adjustable spring (20) in limited post (19), outside
The lower section of shell (18) is equipped at least row's damping spring (21).
3. geological mapping instrument crane according to claim 1, it is characterised in that: the pedestal (8) is equipped with one
The outside of camera (15), camera (15) is equipped with mast-up, and camera (15) is connected on pedestal (8) by mast-up, is taken the photograph
As head (15) connection controller (9).
4. geological mapping instrument crane according to claim 2, it is characterised in that: set above the shell (18)
There are a connecting terminal (17).
5. geological mapping instrument crane according to claim 1, it is characterised in that: the outside of the support column (13)
It is socketed with spring (12), the lower section of support column (13) is equipped with universal wheel (10), and universal wheel (10) is side brake universal wheel.
6. geological mapping instrument crane according to claim 1, it is characterised in that: the communication bus includes
RS232/RS485 communication bus, wireless transport module are one of WIFI/3G/4G module or a variety of.
7. -6 any geological mapping instrument crane according to claim 1, it is characterised in that: the controller (9)
Using STM32 type single-chip microcontroller.
8. geological mapping instrument crane according to claim 1 or 3, it is characterised in that: the top of the pedestal (8)
Equipped with handle (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920227156.1U CN209295992U (en) | 2019-02-20 | 2019-02-20 | Geological mapping instrument crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920227156.1U CN209295992U (en) | 2019-02-20 | 2019-02-20 | Geological mapping instrument crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209295992U true CN209295992U (en) | 2019-08-23 |
Family
ID=67643260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920227156.1U Expired - Fee Related CN209295992U (en) | 2019-02-20 | 2019-02-20 | Geological mapping instrument crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209295992U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110702080A (en) * | 2019-10-24 | 2020-01-17 | 青海崇霖测绘科技有限公司 | Surveying instrument convenient to carry |
CN111220136A (en) * | 2020-02-18 | 2020-06-02 | 山东省物化探勘查院 | Supplementary mapping device of multi-functional city three-dimensional topography |
-
2019
- 2019-02-20 CN CN201920227156.1U patent/CN209295992U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110702080A (en) * | 2019-10-24 | 2020-01-17 | 青海崇霖测绘科技有限公司 | Surveying instrument convenient to carry |
CN111220136A (en) * | 2020-02-18 | 2020-06-02 | 山东省物化探勘查院 | Supplementary mapping device of multi-functional city three-dimensional topography |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102967628B (en) | Combined apparatus for soil sampling and moisture determination | |
CN209295992U (en) | Geological mapping instrument crane | |
CN205538903U (en) | Portable air monitoring device | |
CN209398452U (en) | A kind of coal mine safety monitoring device | |
CN206287133U (en) | It is a kind of can autonomous upper and lower elevator building inspecting robot | |
CN205212291U (en) | A robot for power equipment inspection of transformer substation | |
CN205861644U (en) | A kind of gardens atmosphere quality monitoring device | |
CN206190212U (en) | Boring external drilling rod angle monitoring devices in colliery | |
CN106839956A (en) | Crane girder web Local warping degree detection means | |
CN209514873U (en) | A kind of wisdom traffic inducible system information collecting device | |
CN110955202B (en) | Agricultural Internet of things collection device and use method | |
CN206944992U (en) | A kind of coal mine hydraulic supporting pose data acquisition device | |
CN207115202U (en) | A kind of electromechanical integration line leak detectors | |
CN206389467U (en) | A kind of self-travel type wireless video inspection device | |
CN215828192U (en) | Gantry crane remote control system | |
CN206007373U (en) | A kind of medical tower crane | |
CN205453060U (en) | Well detecting device | |
CN104393676A (en) | Online grounding line monitoring device | |
CN204941516U (en) | A kind of derrick lifting transfers monitoring system | |
CN204416975U (en) | There is the goliath of intelligent and safe controlling functions | |
CN207375641U (en) | A kind of monitoring device for suspension arm of crane frame | |
CN208156867U (en) | A kind of license plate recognition device | |
CN211729192U (en) | Liftable inspection robot | |
CN206293818U (en) | A kind of electric power overhaul electric power system | |
CN209067098U (en) | A kind of multifunctional intellectual drilling machine of underground space engineering method construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190823 Termination date: 20210220 |
|
CF01 | Termination of patent right due to non-payment of annual fee |