CN110414791A - A kind of system and method for the distribution of electrical construction task and examination based on BIM - Google Patents

A kind of system and method for the distribution of electrical construction task and examination based on BIM Download PDF

Info

Publication number
CN110414791A
CN110414791A CN201910576999.7A CN201910576999A CN110414791A CN 110414791 A CN110414791 A CN 110414791A CN 201910576999 A CN201910576999 A CN 201910576999A CN 110414791 A CN110414791 A CN 110414791A
Authority
CN
China
Prior art keywords
construction
task
construction personnel
bim
personnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910576999.7A
Other languages
Chinese (zh)
Inventor
李锐
刘梅莉
尹传斌
韩琪
曾一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910576999.7A priority Critical patent/CN110414791A/en
Publication of CN110414791A publication Critical patent/CN110414791A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The system and method for the invention discloses a kind of distribution of electrical construction task and examination based on BIM, and more particularly, to technical field of data transmission.Present system includes: BIM center module, generates construction task according to attendance record, construction task performance and cost of labor quota, and upload access control system;Construction area network module, the construction area network module make the network coverage of construction area entire area;Mobile terminal, downloads the construction task and construction task performance of access control system, and records the performance of same day task;Access control system, the performance of personage is transmitted to server on the day of obtaining the next attendance of construction personnel's working and construction personnel;Server, server storage construction personnel's attendance record and construction task performance.The present invention by record Field Force's attendance, task distribution and situations such as complete, to construction personnel monthly, season performance examines.

Description

A kind of system and method for the distribution of electrical construction task and examination based on BIM
Technical field
The present invention relates to technical field of data transmission, and more particularly, to a kind of electrical construction task based on BIM The system and method for distribution and examination.
Background technique
Currently, with industrialization, the quickening of urbanization process, building field increasingly emphasizes the pipe of construction information process Control, but at present on existing market for electric specialty installing engineering is few can be by BIM technology and task distribution, performance The relevant information system of the functions such as examination fusion.
Under traditional mode, administrative staff are in size, the system point for carrying out mainly considering cabling when construction task distribution Bit quantity, the experience of construction personnel, the subjective performance that task is distributed under such mode is stronger, and unreasonable task distribution can reduce Allocation Efficiency, construction personnel lacks effective exchange and conmmunication between different processes, it is difficult to accomplish to be connected in time in work.Together When site operation task assignment procedure lack the support of standardization platform, project manager is difficult to real-time tracking, causes Project control low efficiency, difficulty are big, and management level is badly in need of reinforcing.
Summary of the invention
In view of the above-mentioned problems, the system of the distribution of electrical construction task and examination that the invention proposes a kind of based on BIM, packet It includes:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction Person number acquires construction personnel's information, for artificial quantity, unit price needed for each work of electric specialty, works out enterprises Cost of labor quota, reading service device storage attendance record and construction task performance, according to attendance record, construction appoint Performance of being engaged in and cost of labor quota generate construction task, and upload access control system;
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the finger of construction personnel is held in the mobile terminal typing Line information binds construction personnel's information according to finger print information and construction personnel numbers, and downloads the construction task of access control system and applies Work task performance, and record the performance of same day task;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, when working Between when holding the construction personnel of mobile terminal and passing through access control system, the record working attendance of construction personnel's information is obtained, when next Between when holding the construction personnel of mobile terminal and passing through access control system, obtain construction personnel and come off duty personage on the day of attendance and construction personnel Performance be transmitted to server;
Server, server storage construction personnel's attendance record and construction task performance.
Optionally, mobile terminal is charged by DC24V direct current.
Optionally, the BIM center module builds electrical engineering project BIM construction model, according to construction organization humidometer It draws, the corresponding model of construction task is carried out to component one fixation of generation of component division, each electric loop or required installation The task ID code is attached to electrical systematic drawing corresponding part by task ID code, and by BIM model assembly and pinned task ID Code is matched one by one with construction personnel's quota.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair The construction task of completion carries out confirmation completion.
Optionally, mobile terminal, access control system and BIM center module pass through construction area network module wireless signal and clothes Business device carries out data transmission.
The method of the present invention also provides a kind of distribution of electrical construction task and examination based on BIM, comprising:
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction by construction personnel Personal information works out the cost of labor quota of enterprises for artificial quantity, unit price needed for each work of electric specialty, The attendance record and construction task performance of reading service device storage, according to attendance record, construction task performance and people Work quota generates construction task, and uploads access control system;
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound according to finger print information Construction personnel's information and construction personnel's number, download the construction task and construction task performance of access control system, and record and work as The performance of its task;
Access control system obtains the construction task and construction personnel's information of BIM center module, holds movement eventually when the work hours When the construction personnel at end passes through access control system, the record working attendance of construction personnel's information is obtained, holds movement eventually when the quitting time When the construction personnel at end passes through access control system, the performance of personage is passed on the day of obtaining the next attendance of construction personnel and construction personnel Transport to server;
Server stores construction personnel's attendance record and construction task performance.
Optionally, mobile terminal is charged by DC24V direct current.
Optionally, the BIM center module builds electrical engineering project BIM construction model, according to construction organization humidometer It draws, the corresponding model of construction task is carried out to component one fixation of generation of component division, each electric loop or required installation The task ID code is attached to electrical systematic drawing corresponding part by task ID code, and by BIM model assembly and pinned task ID Code is matched one by one with construction personnel's quota.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair The construction task of completion carries out confirmation completion.
Optionally, mobile terminal, access control system and BIM center module pass through construction area network module wireless signal and clothes Business device carries out data transmission.
The present invention manually matches BIM model component with code library and enterprise by norm, by task with ID code Form be assigned to corresponding every mobile terminal.Situations such as by record Field Force's attendance, task distribution and completing, to applying Worker person monthly, season performance examined, the present invention is more scientific, intuitive, has good grounds, and promotion project integrally manages water It is flat.
The present invention can get information about current construction speed by BIM model color identifier, in the base of input progress msg On plinth, it may also be used for meeting links up, coordinates, understands global working condition, and in terms of making next stage construction by this information Draw, overcome the problems, such as under traditional approach progress msg feedback not in time, inaccuracy.
The present invention provides the platform of standardization for the distribution management of site operation task, and construction personnel passes through between different processes Mobile terminal accessing system understands distributed task and upper procedure performance in time, and making can be more preferable between process Linking, overcome construction personnel lack exchange and conmmunication the drawbacks of.
Business of the present invention is in approval process, and according to electric specialty process sequence, relevant operation can be on mobile terminals It completes, this mode shortens examination & approval link, improves precision, overcomes Regional Champion's examination and approval work amount mistake under traditional approach Greatly, inconvenient problem is linked up.
Detailed description of the invention
Fig. 1 is a kind of system construction drawing of the distribution of electrical construction task and examination based on BIM of the present invention;
Fig. 2 is a kind of method flow diagram of the distribution of electrical construction task and examination based on BIM of the present invention.
Specific embodiment
Exemplary embodiments of the present invention are introduced referring now to the drawings, however, the present invention can use many different shapes Formula is implemented, and is not limited to the embodiment described herein, and to provide these embodiments be at large and fully disclose The present invention, and the scope of the present invention is sufficiently conveyed to person of ordinary skill in the field.Show for what is be illustrated in the accompanying drawings Term in example property embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements use identical attached Icon note.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has person of ordinary skill in the field It is common to understand meaning.Further it will be understood that with the term that usually used dictionary limits, should be understood as and its The context of related fields has consistent meaning, and is not construed as Utopian or too formal meaning.
The system of the invention proposes a kind of distribution of electrical construction task and examination based on BIM, as shown in Figure 1, comprising:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction Person number acquires construction personnel's information, for artificial quantity, unit price needed for each work of electric specialty, works out enterprises Cost of labor quota, reading service device storage attendance record and construction task performance, according to attendance record, construction appoint Performance of being engaged in and cost of labor quota generate construction task, and upload access control system;
The BIM center module is built electrical engineering project BIM construction model and will be applied according to construction organization schedule The corresponding model of work task carries out component one pinned task ID generation of generation of component division, each electric loop or required installation The task ID code is attached to electrical systematic drawing corresponding part by code, and by BIM model assembly and pinned task ID code with apply Worker person's quota is matched one by one.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair The construction task of completion carries out confirmation completion.
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the finger of construction personnel is held in the mobile terminal typing Line information binds construction personnel's information according to finger print information and construction personnel numbers, and downloads the construction task of access control system and applies Work task performance, and the performance of same day task is recorded, mobile terminal is charged by DC24V direct current;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, when working Between when holding the construction personnel of mobile terminal and passing through access control system, the record working attendance of construction personnel's information is obtained, when next Between when holding the construction personnel of mobile terminal and passing through access control system, obtain construction personnel and come off duty personage on the day of attendance and construction personnel Performance be transmitted to server;
Server, server storage construction personnel's attendance record and construction task performance.
Mobile terminal, access control system and BIM center module by construction area network module wireless signal and server into The transmission of row data.
The method of the present invention also provides a kind of distribution of electrical construction task and examination based on BIM, as shown in Fig. 2, packet It includes:
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction by construction personnel Personal information works out the cost of labor quota of enterprises for artificial quantity, unit price needed for each work of electric specialty, The attendance record and construction task performance of reading service device storage, according to attendance record, construction task performance and people Work quota generates construction task, and uploads access control system;
BIM center module builds electrical engineering project BIM construction model, and according to construction organization schedule, construction is appointed Be engaged in corresponding model carries out component division, and the component of each electric loop or required installation generates a pinned task ID code, The task ID code is attached to electrical systematic drawing corresponding part, and by BIM model assembly and pinned task ID code and is constructed Personnel cost quota is matched one by one.
Task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code to completion Construction task carries out confirmation completion.
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound according to finger print information Construction personnel's information and construction personnel's number, download the construction task and construction task performance of access control system, and record and work as The performance of its task, mobile terminal are charged by DC24V direct current.
Access control system obtains the construction task and construction personnel's information of BIM center module, holds movement eventually when the work hours When the construction personnel at end passes through access control system, the record working attendance of construction personnel's information is obtained, holds movement eventually when the quitting time When the construction personnel at end passes through access control system, the performance of personage is passed on the day of obtaining the next attendance of construction personnel and construction personnel Transport to server;
Server stores construction personnel's attendance record and construction task performance.
Mobile terminal, access control system and BIM center module by construction area network module wireless signal and server into The transmission of row data.
The present invention manually matches BIM model component with code library and enterprise by norm, by task with ID code Form be assigned to corresponding every mobile terminal.Situations such as by record Field Force's attendance, task distribution and completing, to applying Worker person monthly, season performance examined, the present invention is more scientific, intuitive, has good grounds, and promotion project integrally manages water It is flat.
The present invention can get information about current construction speed by BIM model color identifier, in the base of input progress msg On plinth, it may also be used for meeting links up, coordinates, understands global working condition, and in terms of making next stage construction by this information Draw, overcome the problems, such as under traditional approach progress msg feedback not in time, inaccuracy.
The present invention provides the platform of standardization for the distribution management of site operation task, and construction personnel passes through between different processes Mobile terminal accessing system understands distributed task and upper procedure performance in time, and making can be more preferable between process Linking, overcome construction personnel lack exchange and conmmunication the drawbacks of.
Business of the present invention is in approval process, and according to electric specialty process sequence, relevant operation can be on mobile terminals It completes, this mode shortens examination & approval link, improves precision, overcomes Regional Champion's examination and approval work amount mistake under traditional approach Greatly, inconvenient problem is linked up.

Claims (10)

1. a kind of system of the distribution of electrical construction task and examination based on BIM, the system comprises:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction personnel Number acquisition construction personnel's information works out the people of enterprises for artificial quantity, unit price needed for each work of electric specialty Work quota, the attendance record and construction task performance of the storage of reading service device are complete according to attendance record, construction task Construction task is generated at situation and cost of labor quota, and uploads access control system;
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the fingerprint letter of construction personnel is held in the mobile terminal typing Breath binds construction personnel's information according to finger print information and construction personnel numbers, and the construction task and construction for downloading access control system are appointed Business performance, and record the performance of same day task;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, hold when the work hours When thering is the construction personnel of mobile terminal to pass through access control system, the record working attendance of construction personnel's information is obtained, is held when the quitting time When having the construction personnel of mobile terminal to pass through access control system, personage's is complete on the day of obtaining the next attendance of construction personnel and construction personnel Server is transmitted at situation;
Server, server storage construction personnel's attendance record and construction task performance.
2. system according to claim 1, the mobile terminal is charged by DC24V direct current.
3. system according to claim 1, the BIM center module builds electrical engineering project BIM construction mould The corresponding model of construction task is carried out component division, each electric loop or required peace according to construction organization schedule by type The component of dress generates a pinned task ID code, and the task ID code is attached to electrical systematic drawing corresponding part, and by BIM Model assembly is matched one by one with pinned task ID code with construction personnel's quota.
4. system according to claim 3, the task ID code is issued to mobile terminal by BIM center module, moves Dynamic terminal control task ID code carries out confirmation completion to the construction task of completion.
5. system according to claim 1, the mobile terminal, access control system and BIM center module pass through construction area Domain network module wireless signal carries out data transmission with server.
6. a kind of method of the distribution of electrical construction task and examination based on BIM, which comprises
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction personnel by construction personnel Information is worked out the cost of labor quota of enterprises, is read for artificial quantity, unit price needed for each work of electric specialty Server storage attendance record and construction task performance, according to attendance record, construction task performance and manually at This quota generates construction task, and uploads access control system;
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound and is constructed according to finger print information Personal information and construction personnel's number, download the construction task and construction task performance of access control system, and record the same day times The performance of business;
Access control system obtains the construction task and construction personnel's information of BIM center module, holds mobile terminal when the work hours When construction personnel passes through access control system, the record working attendance of construction personnel's information is obtained, holds mobile terminal when the quitting time When construction personnel passes through access control system, the performance of personage is transmitted on the day of obtaining the next attendance of construction personnel and construction personnel Server;
Server stores construction personnel's attendance record and construction task performance.
7. according to the method described in claim 6, the mobile terminal is charged by DC24V direct current.
8. according to the method described in claim 6, the BIM center module builds electrical engineering project BIM construction mould The corresponding model of construction task is carried out component division, each electric loop or required peace according to construction organization schedule by type The component of dress generates a pinned task ID code, and the task ID code is attached to electrical systematic drawing corresponding part, and by BIM Model assembly is matched one by one with pinned task ID code with construction personnel's quota.
9. being moved according to the method described in claim 8, the task ID code is issued to mobile terminal by BIM center module Dynamic terminal control task ID code carries out confirmation completion to the construction task of completion.
10. according to the method described in claim 6, the mobile terminal, access control system and BIM center module pass through construction area Domain network module wireless signal carries out data transmission with server.
CN201910576999.7A 2019-06-28 2019-06-28 A kind of system and method for the distribution of electrical construction task and examination based on BIM Pending CN110414791A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910576999.7A CN110414791A (en) 2019-06-28 2019-06-28 A kind of system and method for the distribution of electrical construction task and examination based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910576999.7A CN110414791A (en) 2019-06-28 2019-06-28 A kind of system and method for the distribution of electrical construction task and examination based on BIM

Publications (1)

Publication Number Publication Date
CN110414791A true CN110414791A (en) 2019-11-05

Family

ID=68358500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910576999.7A Pending CN110414791A (en) 2019-06-28 2019-06-28 A kind of system and method for the distribution of electrical construction task and examination based on BIM

Country Status (1)

Country Link
CN (1) CN110414791A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115457673A (en) * 2022-10-10 2022-12-09 中国建设基础设施有限公司 Labor attendance system based on BIM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105701873A (en) * 2016-03-18 2016-06-22 北京神器科技有限公司 Non-contact type attendance check recording method and attendance check recording system
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN107368972A (en) * 2017-07-25 2017-11-21 中建安装工程有限公司 It is a kind of that work platform and its application method are sent based on BIM technology
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109522661A (en) * 2018-11-23 2019-03-26 上海蓝色星球科技股份有限公司 A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105701873A (en) * 2016-03-18 2016-06-22 北京神器科技有限公司 Non-contact type attendance check recording method and attendance check recording system
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN107368972A (en) * 2017-07-25 2017-11-21 中建安装工程有限公司 It is a kind of that work platform and its application method are sent based on BIM technology
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN109165869A (en) * 2018-09-14 2019-01-08 广东电网有限责任公司 A kind of construction managing and control system and management-control method
CN109522661A (en) * 2018-11-23 2019-03-26 上海蓝色星球科技股份有限公司 A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115457673A (en) * 2022-10-10 2022-12-09 中国建设基础设施有限公司 Labor attendance system based on BIM

Similar Documents

Publication Publication Date Title
US8135611B2 (en) System and method for managing asset installation and evaluation
CN106845919A (en) Construction information collection processing method
WO2022094934A1 (en) Site location-based system and method for management of engineering quality acceptance
CN106572000A (en) WeChat official account platform-based construction site quality and safety management method
US20080172311A1 (en) Mobile workforce management apparatus and method
CN108971807A (en) A kind of site welding construction technology intelligent management control method and management system
CN105243440A (en) Marketing mobile working platform based paperless office on-site working method
CN107067223A (en) Construction information collection processing method
CN108229912A (en) Completion of works acceptance method and storage medium
CN106251092A (en) Field operation managing and control system based on operation template
US20040215701A1 (en) Mobile contractor performance evaluation system and method
CN109409646A (en) A kind of task management method and device and readable storage medium storing program for executing
CN108615080A (en) A kind of power marketing service movement operation client
CN110414791A (en) A kind of system and method for the distribution of electrical construction task and examination based on BIM
US20050120196A1 (en) System for maintaining telecommunications networks
CN114374604A (en) Intelligent home configuration method in offline mode, storage medium and system
CN109146410A (en) A kind of multimedia advertising design platform
CN106851708A (en) The multi-user test method and test system of a kind of LTE base station
CN103970536A (en) Method and device for generating APP installation program
CN116824727A (en) Mountain power station inspection method and system
KR101736323B1 (en) Management supporting service providing server and system for sustainable golf event
Riyanto et al. Building an Employee Attendance System in Company
CN114581032A (en) Design plan tracking and visualization system based on cloud platform
Crowder et al. Introduction to multidisciplinary requirement engineering (MDRE)
CN109246609A (en) A kind of generation method and device of working trajectory

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191105

RJ01 Rejection of invention patent application after publication