CN110414791A - A kind of system and method for the distribution of electrical construction task and examination based on BIM - Google Patents
A kind of system and method for the distribution of electrical construction task and examination based on BIM Download PDFInfo
- Publication number
- CN110414791A CN110414791A CN201910576999.7A CN201910576999A CN110414791A CN 110414791 A CN110414791 A CN 110414791A CN 201910576999 A CN201910576999 A CN 201910576999A CN 110414791 A CN110414791 A CN 110414791A
- Authority
- CN
- China
- Prior art keywords
- construction
- task
- construction personnel
- bim
- personnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 214
- 238000000034 method Methods 0.000 title claims abstract description 26
- 230000005540 biological transmission Effects 0.000 claims abstract description 8
- 238000012790 confirmation Methods 0.000 claims description 6
- 238000004870 electrical engineering Methods 0.000 claims description 6
- 230000008520 organization Effects 0.000 claims description 6
- 230000009897 systematic effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06398—Performance of employee with respect to a job function
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1091—Recording time for administrative or management purposes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/10—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The system and method for the invention discloses a kind of distribution of electrical construction task and examination based on BIM, and more particularly, to technical field of data transmission.Present system includes: BIM center module, generates construction task according to attendance record, construction task performance and cost of labor quota, and upload access control system;Construction area network module, the construction area network module make the network coverage of construction area entire area;Mobile terminal, downloads the construction task and construction task performance of access control system, and records the performance of same day task;Access control system, the performance of personage is transmitted to server on the day of obtaining the next attendance of construction personnel's working and construction personnel;Server, server storage construction personnel's attendance record and construction task performance.The present invention by record Field Force's attendance, task distribution and situations such as complete, to construction personnel monthly, season performance examines.
Description
Technical field
The present invention relates to technical field of data transmission, and more particularly, to a kind of electrical construction task based on BIM
The system and method for distribution and examination.
Background technique
Currently, with industrialization, the quickening of urbanization process, building field increasingly emphasizes the pipe of construction information process
Control, but at present on existing market for electric specialty installing engineering is few can be by BIM technology and task distribution, performance
The relevant information system of the functions such as examination fusion.
Under traditional mode, administrative staff are in size, the system point for carrying out mainly considering cabling when construction task distribution
Bit quantity, the experience of construction personnel, the subjective performance that task is distributed under such mode is stronger, and unreasonable task distribution can reduce
Allocation Efficiency, construction personnel lacks effective exchange and conmmunication between different processes, it is difficult to accomplish to be connected in time in work.Together
When site operation task assignment procedure lack the support of standardization platform, project manager is difficult to real-time tracking, causes
Project control low efficiency, difficulty are big, and management level is badly in need of reinforcing.
Summary of the invention
In view of the above-mentioned problems, the system of the distribution of electrical construction task and examination that the invention proposes a kind of based on BIM, packet
It includes:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction
Person number acquires construction personnel's information, for artificial quantity, unit price needed for each work of electric specialty, works out enterprises
Cost of labor quota, reading service device storage attendance record and construction task performance, according to attendance record, construction appoint
Performance of being engaged in and cost of labor quota generate construction task, and upload access control system;
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the finger of construction personnel is held in the mobile terminal typing
Line information binds construction personnel's information according to finger print information and construction personnel numbers, and downloads the construction task of access control system and applies
Work task performance, and record the performance of same day task;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, when working
Between when holding the construction personnel of mobile terminal and passing through access control system, the record working attendance of construction personnel's information is obtained, when next
Between when holding the construction personnel of mobile terminal and passing through access control system, obtain construction personnel and come off duty personage on the day of attendance and construction personnel
Performance be transmitted to server;
Server, server storage construction personnel's attendance record and construction task performance.
Optionally, mobile terminal is charged by DC24V direct current.
Optionally, the BIM center module builds electrical engineering project BIM construction model, according to construction organization humidometer
It draws, the corresponding model of construction task is carried out to component one fixation of generation of component division, each electric loop or required installation
The task ID code is attached to electrical systematic drawing corresponding part by task ID code, and by BIM model assembly and pinned task ID
Code is matched one by one with construction personnel's quota.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair
The construction task of completion carries out confirmation completion.
Optionally, mobile terminal, access control system and BIM center module pass through construction area network module wireless signal and clothes
Business device carries out data transmission.
The method of the present invention also provides a kind of distribution of electrical construction task and examination based on BIM, comprising:
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction by construction personnel
Personal information works out the cost of labor quota of enterprises for artificial quantity, unit price needed for each work of electric specialty,
The attendance record and construction task performance of reading service device storage, according to attendance record, construction task performance and people
Work quota generates construction task, and uploads access control system;
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound according to finger print information
Construction personnel's information and construction personnel's number, download the construction task and construction task performance of access control system, and record and work as
The performance of its task;
Access control system obtains the construction task and construction personnel's information of BIM center module, holds movement eventually when the work hours
When the construction personnel at end passes through access control system, the record working attendance of construction personnel's information is obtained, holds movement eventually when the quitting time
When the construction personnel at end passes through access control system, the performance of personage is passed on the day of obtaining the next attendance of construction personnel and construction personnel
Transport to server;
Server stores construction personnel's attendance record and construction task performance.
Optionally, mobile terminal is charged by DC24V direct current.
Optionally, the BIM center module builds electrical engineering project BIM construction model, according to construction organization humidometer
It draws, the corresponding model of construction task is carried out to component one fixation of generation of component division, each electric loop or required installation
The task ID code is attached to electrical systematic drawing corresponding part by task ID code, and by BIM model assembly and pinned task ID
Code is matched one by one with construction personnel's quota.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair
The construction task of completion carries out confirmation completion.
Optionally, mobile terminal, access control system and BIM center module pass through construction area network module wireless signal and clothes
Business device carries out data transmission.
The present invention manually matches BIM model component with code library and enterprise by norm, by task with ID code
Form be assigned to corresponding every mobile terminal.Situations such as by record Field Force's attendance, task distribution and completing, to applying
Worker person monthly, season performance examined, the present invention is more scientific, intuitive, has good grounds, and promotion project integrally manages water
It is flat.
The present invention can get information about current construction speed by BIM model color identifier, in the base of input progress msg
On plinth, it may also be used for meeting links up, coordinates, understands global working condition, and in terms of making next stage construction by this information
Draw, overcome the problems, such as under traditional approach progress msg feedback not in time, inaccuracy.
The present invention provides the platform of standardization for the distribution management of site operation task, and construction personnel passes through between different processes
Mobile terminal accessing system understands distributed task and upper procedure performance in time, and making can be more preferable between process
Linking, overcome construction personnel lack exchange and conmmunication the drawbacks of.
Business of the present invention is in approval process, and according to electric specialty process sequence, relevant operation can be on mobile terminals
It completes, this mode shortens examination & approval link, improves precision, overcomes Regional Champion's examination and approval work amount mistake under traditional approach
Greatly, inconvenient problem is linked up.
Detailed description of the invention
Fig. 1 is a kind of system construction drawing of the distribution of electrical construction task and examination based on BIM of the present invention;
Fig. 2 is a kind of method flow diagram of the distribution of electrical construction task and examination based on BIM of the present invention.
Specific embodiment
Exemplary embodiments of the present invention are introduced referring now to the drawings, however, the present invention can use many different shapes
Formula is implemented, and is not limited to the embodiment described herein, and to provide these embodiments be at large and fully disclose
The present invention, and the scope of the present invention is sufficiently conveyed to person of ordinary skill in the field.Show for what is be illustrated in the accompanying drawings
Term in example property embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements use identical attached
Icon note.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has person of ordinary skill in the field
It is common to understand meaning.Further it will be understood that with the term that usually used dictionary limits, should be understood as and its
The context of related fields has consistent meaning, and is not construed as Utopian or too formal meaning.
The system of the invention proposes a kind of distribution of electrical construction task and examination based on BIM, as shown in Figure 1, comprising:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction
Person number acquires construction personnel's information, for artificial quantity, unit price needed for each work of electric specialty, works out enterprises
Cost of labor quota, reading service device storage attendance record and construction task performance, according to attendance record, construction appoint
Performance of being engaged in and cost of labor quota generate construction task, and upload access control system;
The BIM center module is built electrical engineering project BIM construction model and will be applied according to construction organization schedule
The corresponding model of work task carries out component one pinned task ID generation of generation of component division, each electric loop or required installation
The task ID code is attached to electrical systematic drawing corresponding part by code, and by BIM model assembly and pinned task ID code with apply
Worker person's quota is matched one by one.
Optionally, task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code pair
The construction task of completion carries out confirmation completion.
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the finger of construction personnel is held in the mobile terminal typing
Line information binds construction personnel's information according to finger print information and construction personnel numbers, and downloads the construction task of access control system and applies
Work task performance, and the performance of same day task is recorded, mobile terminal is charged by DC24V direct current;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, when working
Between when holding the construction personnel of mobile terminal and passing through access control system, the record working attendance of construction personnel's information is obtained, when next
Between when holding the construction personnel of mobile terminal and passing through access control system, obtain construction personnel and come off duty personage on the day of attendance and construction personnel
Performance be transmitted to server;
Server, server storage construction personnel's attendance record and construction task performance.
Mobile terminal, access control system and BIM center module by construction area network module wireless signal and server into
The transmission of row data.
The method of the present invention also provides a kind of distribution of electrical construction task and examination based on BIM, as shown in Fig. 2, packet
It includes:
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction by construction personnel
Personal information works out the cost of labor quota of enterprises for artificial quantity, unit price needed for each work of electric specialty,
The attendance record and construction task performance of reading service device storage, according to attendance record, construction task performance and people
Work quota generates construction task, and uploads access control system;
BIM center module builds electrical engineering project BIM construction model, and according to construction organization schedule, construction is appointed
Be engaged in corresponding model carries out component division, and the component of each electric loop or required installation generates a pinned task ID code,
The task ID code is attached to electrical systematic drawing corresponding part, and by BIM model assembly and pinned task ID code and is constructed
Personnel cost quota is matched one by one.
Task ID code is issued to mobile terminal by BIM center module, and mobile terminal compares task ID code to completion
Construction task carries out confirmation completion.
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound according to finger print information
Construction personnel's information and construction personnel's number, download the construction task and construction task performance of access control system, and record and work as
The performance of its task, mobile terminal are charged by DC24V direct current.
Access control system obtains the construction task and construction personnel's information of BIM center module, holds movement eventually when the work hours
When the construction personnel at end passes through access control system, the record working attendance of construction personnel's information is obtained, holds movement eventually when the quitting time
When the construction personnel at end passes through access control system, the performance of personage is passed on the day of obtaining the next attendance of construction personnel and construction personnel
Transport to server;
Server stores construction personnel's attendance record and construction task performance.
Mobile terminal, access control system and BIM center module by construction area network module wireless signal and server into
The transmission of row data.
The present invention manually matches BIM model component with code library and enterprise by norm, by task with ID code
Form be assigned to corresponding every mobile terminal.Situations such as by record Field Force's attendance, task distribution and completing, to applying
Worker person monthly, season performance examined, the present invention is more scientific, intuitive, has good grounds, and promotion project integrally manages water
It is flat.
The present invention can get information about current construction speed by BIM model color identifier, in the base of input progress msg
On plinth, it may also be used for meeting links up, coordinates, understands global working condition, and in terms of making next stage construction by this information
Draw, overcome the problems, such as under traditional approach progress msg feedback not in time, inaccuracy.
The present invention provides the platform of standardization for the distribution management of site operation task, and construction personnel passes through between different processes
Mobile terminal accessing system understands distributed task and upper procedure performance in time, and making can be more preferable between process
Linking, overcome construction personnel lack exchange and conmmunication the drawbacks of.
Business of the present invention is in approval process, and according to electric specialty process sequence, relevant operation can be on mobile terminals
It completes, this mode shortens examination & approval link, improves precision, overcomes Regional Champion's examination and approval work amount mistake under traditional approach
Greatly, inconvenient problem is linked up.
Claims (10)
1. a kind of system of the distribution of electrical construction task and examination based on BIM, the system comprises:
BIM center module, construction personnel, which is numbered, in the BIM center module generates construction personnel's number and by construction personnel
Number acquisition construction personnel's information works out the people of enterprises for artificial quantity, unit price needed for each work of electric specialty
Work quota, the attendance record and construction task performance of the storage of reading service device are complete according to attendance record, construction task
Construction task is generated at situation and cost of labor quota, and uploads access control system;
Construction area network module, the construction area network module make the network coverage of construction area entire area;
Mobile terminal, the mobile terminal are held by construction personnel, and the fingerprint letter of construction personnel is held in the mobile terminal typing
Breath binds construction personnel's information according to finger print information and construction personnel numbers, and the construction task and construction for downloading access control system are appointed
Business performance, and record the performance of same day task;
Access control system, the access control system obtain the construction task and construction personnel's information of BIM center module, hold when the work hours
When thering is the construction personnel of mobile terminal to pass through access control system, the record working attendance of construction personnel's information is obtained, is held when the quitting time
When having the construction personnel of mobile terminal to pass through access control system, personage's is complete on the day of obtaining the next attendance of construction personnel and construction personnel
Server is transmitted at situation;
Server, server storage construction personnel's attendance record and construction task performance.
2. system according to claim 1, the mobile terminal is charged by DC24V direct current.
3. system according to claim 1, the BIM center module builds electrical engineering project BIM construction mould
The corresponding model of construction task is carried out component division, each electric loop or required peace according to construction organization schedule by type
The component of dress generates a pinned task ID code, and the task ID code is attached to electrical systematic drawing corresponding part, and by BIM
Model assembly is matched one by one with pinned task ID code with construction personnel's quota.
4. system according to claim 3, the task ID code is issued to mobile terminal by BIM center module, moves
Dynamic terminal control task ID code carries out confirmation completion to the construction task of completion.
5. system according to claim 1, the mobile terminal, access control system and BIM center module pass through construction area
Domain network module wireless signal carries out data transmission with server.
6. a kind of method of the distribution of electrical construction task and examination based on BIM, which comprises
Construction personnel, which is numbered, in BIM center module generates construction personnel's number and numbers acquisition construction personnel by construction personnel
Information is worked out the cost of labor quota of enterprises, is read for artificial quantity, unit price needed for each work of electric specialty
Server storage attendance record and construction task performance, according to attendance record, construction task performance and manually at
This quota generates construction task, and uploads access control system;
Construction area network module makes the network coverage of construction area entire area;
Mobile terminal issues that construction personnel holds and the finger print information of construction personnel is held in typing, is bound and is constructed according to finger print information
Personal information and construction personnel's number, download the construction task and construction task performance of access control system, and record the same day times
The performance of business;
Access control system obtains the construction task and construction personnel's information of BIM center module, holds mobile terminal when the work hours
When construction personnel passes through access control system, the record working attendance of construction personnel's information is obtained, holds mobile terminal when the quitting time
When construction personnel passes through access control system, the performance of personage is transmitted on the day of obtaining the next attendance of construction personnel and construction personnel
Server;
Server stores construction personnel's attendance record and construction task performance.
7. according to the method described in claim 6, the mobile terminal is charged by DC24V direct current.
8. according to the method described in claim 6, the BIM center module builds electrical engineering project BIM construction mould
The corresponding model of construction task is carried out component division, each electric loop or required peace according to construction organization schedule by type
The component of dress generates a pinned task ID code, and the task ID code is attached to electrical systematic drawing corresponding part, and by BIM
Model assembly is matched one by one with pinned task ID code with construction personnel's quota.
9. being moved according to the method described in claim 8, the task ID code is issued to mobile terminal by BIM center module
Dynamic terminal control task ID code carries out confirmation completion to the construction task of completion.
10. according to the method described in claim 6, the mobile terminal, access control system and BIM center module pass through construction area
Domain network module wireless signal carries out data transmission with server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910576999.7A CN110414791A (en) | 2019-06-28 | 2019-06-28 | A kind of system and method for the distribution of electrical construction task and examination based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910576999.7A CN110414791A (en) | 2019-06-28 | 2019-06-28 | A kind of system and method for the distribution of electrical construction task and examination based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110414791A true CN110414791A (en) | 2019-11-05 |
Family
ID=68358500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910576999.7A Pending CN110414791A (en) | 2019-06-28 | 2019-06-28 | A kind of system and method for the distribution of electrical construction task and examination based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110414791A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115457673A (en) * | 2022-10-10 | 2022-12-09 | 中国建设基础设施有限公司 | Labor attendance system based on BIM |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105701873A (en) * | 2016-03-18 | 2016-06-22 | 北京神器科技有限公司 | Non-contact type attendance check recording method and attendance check recording system |
CN105930973A (en) * | 2016-04-22 | 2016-09-07 | 广州硕品物联网科技有限公司 | BIM-based construction site griddization management system and control method thereof |
CN107368972A (en) * | 2017-07-25 | 2017-11-21 | 中建安装工程有限公司 | It is a kind of that work platform and its application method are sent based on BIM technology |
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
CN109165869A (en) * | 2018-09-14 | 2019-01-08 | 广东电网有限责任公司 | A kind of construction managing and control system and management-control method |
CN109522661A (en) * | 2018-11-23 | 2019-03-26 | 上海蓝色星球科技股份有限公司 | A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system |
-
2019
- 2019-06-28 CN CN201910576999.7A patent/CN110414791A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105701873A (en) * | 2016-03-18 | 2016-06-22 | 北京神器科技有限公司 | Non-contact type attendance check recording method and attendance check recording system |
CN105930973A (en) * | 2016-04-22 | 2016-09-07 | 广州硕品物联网科技有限公司 | BIM-based construction site griddization management system and control method thereof |
CN107368972A (en) * | 2017-07-25 | 2017-11-21 | 中建安装工程有限公司 | It is a kind of that work platform and its application method are sent based on BIM technology |
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
CN109165869A (en) * | 2018-09-14 | 2019-01-08 | 广东电网有限责任公司 | A kind of construction managing and control system and management-control method |
CN109522661A (en) * | 2018-11-23 | 2019-03-26 | 上海蓝色星球科技股份有限公司 | A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115457673A (en) * | 2022-10-10 | 2022-12-09 | 中国建设基础设施有限公司 | Labor attendance system based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8135611B2 (en) | System and method for managing asset installation and evaluation | |
CN106845919A (en) | Construction information collection processing method | |
WO2022094934A1 (en) | Site location-based system and method for management of engineering quality acceptance | |
CN106572000A (en) | WeChat official account platform-based construction site quality and safety management method | |
US20080172311A1 (en) | Mobile workforce management apparatus and method | |
CN108971807A (en) | A kind of site welding construction technology intelligent management control method and management system | |
CN105243440A (en) | Marketing mobile working platform based paperless office on-site working method | |
CN107067223A (en) | Construction information collection processing method | |
CN108229912A (en) | Completion of works acceptance method and storage medium | |
CN106251092A (en) | Field operation managing and control system based on operation template | |
US20040215701A1 (en) | Mobile contractor performance evaluation system and method | |
CN109409646A (en) | A kind of task management method and device and readable storage medium storing program for executing | |
CN108615080A (en) | A kind of power marketing service movement operation client | |
CN110414791A (en) | A kind of system and method for the distribution of electrical construction task and examination based on BIM | |
US20050120196A1 (en) | System for maintaining telecommunications networks | |
CN114374604A (en) | Intelligent home configuration method in offline mode, storage medium and system | |
CN109146410A (en) | A kind of multimedia advertising design platform | |
CN106851708A (en) | The multi-user test method and test system of a kind of LTE base station | |
CN103970536A (en) | Method and device for generating APP installation program | |
CN116824727A (en) | Mountain power station inspection method and system | |
KR101736323B1 (en) | Management supporting service providing server and system for sustainable golf event | |
Riyanto et al. | Building an Employee Attendance System in Company | |
CN114581032A (en) | Design plan tracking and visualization system based on cloud platform | |
Crowder et al. | Introduction to multidisciplinary requirement engineering (MDRE) | |
CN109246609A (en) | A kind of generation method and device of working trajectory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |
|
RJ01 | Rejection of invention patent application after publication |