CN108053150A - A kind of site operation personnel's intelligent management based on BIM - Google Patents
A kind of site operation personnel's intelligent management based on BIM Download PDFInfo
- Publication number
- CN108053150A CN108053150A CN201810019648.1A CN201810019648A CN108053150A CN 108053150 A CN108053150 A CN 108053150A CN 201810019648 A CN201810019648 A CN 201810019648A CN 108053150 A CN108053150 A CN 108053150A
- Authority
- CN
- China
- Prior art keywords
- bim
- site
- construction
- data
- number table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of site operation personnel's intelligent management based on BIM, including each job site personnel information unit, BIM standard data elements, enterprise servers and intelligent terminal;Each job site personnel information unit includes collection in worksite module and planning data module;The real data of construction site is uploaded in enterprise servers by collection in worksite module, and the planning data of construction site is uploaded in enterprise servers by planning data module.By the way that BIM technology and other information technology are combined, lot of essential factors in integrated building engineering management, such as information is collected, transmission and treatment technology, engineering factor manage system, monitoring identifying system, Internet technology, technology of Internet of things, finally realize that artificial rationalization scheme arrangement and dynamic adjust, target advance, actual progress can be compareed in time, human resource system's reason is searched, solves the problems such as manually short, more than needed, work post ratio is unreasonable, each construction surface personnel placement is unreasonable.
Description
Technical field
The invention belongs to construction administrative skill fields, and in particular to a kind of site operation personnel intelligence based on BIM
Management method.
Background technology
One engineering project, is not exclusively constructed and put into operation and uses, and rational economic effect is also realized in process of construction
Benefit and social benefit, this depends not only upon raw material, manpower, machinery, the input of fund, also be unable to do without to the reasonable of more than resource
Plan, allotment and dynamic adjust, and construction enterprises are intensive and information system management becomes more and more important.
Human resources are valuable sources in project construction, are to realize the key factor that engineering project is completed on schedule.But manpower
The reasonable arrangement of resource and the difficult point that dynamic adjustment is in project management always, especially large complicated project, due to constructor
Member arranges or plans improper, easily causes the work holdup or phenomenon of delaying work, affects the duration adversely or benefit is caused to be lost in.
The content of the invention
The present invention provides a kind of site operation personnel's intelligent management based on BIM, by BIM technology and other letters
Breath technology combines, the lot of essential factors in integrated building engineering management, such as information collection, transmission and treatment technology, engineering factor pipe
Reason system, monitoring identifying system, Internet technology, technology of Internet of things etc., finally realize artificial rationalization scheme arrangement and dynamic
Adjustment can compare target advance, actual progress in time, search human resource system's reason, solve manually short, more than needed, work post
The problems such as ratio is unreasonable, each construction surface personnel placement is unreasonable.
In order to solve the above technical problems, the technical solution adopted in the present invention is as follows:
A kind of site operation personnel's intelligent management based on BIM, including each job site personnel information unit, BIM standards
Data cell, enterprise servers and intelligent terminal;Each job site personnel information unit include collection in worksite module and
Planning data module;The real data of construction site is uploaded in enterprise servers by collection in worksite module, planning data module
The planning data of construction site is uploaded in enterprise servers.
The collection in worksite module, including RFID radio-frequency cards, card reader and item server, RFID radio-frequency cards are mounted on and apply
On the wearable device of worker person and the identity information of employee is stored with, card reader installation is used to gather RFID radio frequencies at the construction field (site)
Information in card, obtains construction personnel's information of construction site in real time, and the information collected is uploaded to project by network
Server, item server handle the information received, construction personnel's tables of data of construction site are obtained, including building site
Total construction number table, each teams and groups' number table, each work post number table and each working face number table;Treated by item server general now
Field data information is uploaded in enterprise servers.
Preferably, the card reader is fixed or portable card reader.Can also be Fingerprint Identification Unit or iris recognition device.Nothing
By being card reader or Fingerprint Identification Unit or iris recognition device is provided to the information of acquisition construction personnel.
The planning data module, including with project aggregate scheduling and each corresponding manpower of subdivisional work schedule
Dispensing unit, the manapower allocation unit, including number table of always constructing, each subpackage troop number table, each professional number table and each
Work surface number table;Manapower allocation unit is intended to data and is uploaded to by item server in enterprise servers.
The BIM standard data elements, the artificial rating system to match including BIM models and with BIM models are manually fixed
Volume system obtains each standard construction number table according to BIM models, project aggregate scheduling and each subdivisional work schedule, and will
Standard construction number table is uploaded in enterprise servers;Enterprise servers apply obtained field data, planning data and standard
Worker's number is compared, and obtains output result form, and output result form is transmitted in intelligent terminal and is looked into for decision-maker
It sees.
The present invention combines BIM technology and other information technology, the lot of essential factors in integrated building engineering management, such as information
Collection, transmission and treatment technology, engineering factor management system, monitoring identifying system, Internet technology, technology of Internet of things etc., most
It realizes that artificial rationalization scheme arrangement and dynamic adjust eventually, target advance, actual progress can be compareed in time, search human resources system
System reason, solves the problems such as manually short, more than needed, work post ratio is unreasonable, each construction surface personnel placement is unreasonable.Present invention tool
There have to be efficient, quick, accurate, can carry out accuracy controlling to site operation number, accelerate construction progress, reduce cost, improve economical
The advantages of benefit.
Description of the drawings
It in order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the principle of the present invention block diagram.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of not making the creative labor
Embodiment belongs to the scope of protection of the invention.
As shown in Figure 1, a kind of site operation personnel's intelligent management based on BIM, believes including each job site personnel
Interest statement member, BIM standard data elements, enterprise servers and intelligent terminal;Each job site personnel information unit includes
Collection in worksite module and planning data module;The real data of construction site is uploaded to enterprise servers by collection in worksite module
Interior, the planning data of construction site is uploaded in enterprise servers by planning data module.
The collection in worksite module, including RFID radio-frequency cards, card reader and item server, RFID radio-frequency cards are mounted on and apply
On the wearable device of worker person and the identity information of employee is stored with, card reader installation is used to gather RFID radio frequencies at the construction field (site)
Information in card, obtains construction personnel's information of construction site in real time, and the information collected is uploaded to project by network
Server, item server handle the information received, construction personnel's tables of data of construction site are obtained, including building site
Total construction number table, each teams and groups' number table, each work post number table and each working face number table;Treated by item server general now
Field data information is uploaded in enterprise servers.
Preferably, the card reader is fixed or portable card reader.Can also be Fingerprint Identification Unit or iris recognition device.Nothing
By being card reader or Fingerprint Identification Unit or iris recognition device is provided to the information of acquisition construction personnel.
The planning data module, including with project aggregate scheduling and each corresponding manpower of subdivisional work schedule
Dispensing unit, the manapower allocation unit, including number table of always constructing, each subpackage troop number table, each professional number table and each
Work surface number table;Manapower allocation unit is intended to data and is uploaded to by item server in enterprise servers.
The BIM standard data elements, the artificial rating system to match including BIM models and with BIM models are manually fixed
Volume system obtains each standard construction number table according to BIM models, project aggregate scheduling and each subdivisional work schedule, and will
Standard construction number table is uploaded in enterprise servers;Enterprise servers apply obtained field data, planning data and standard
Worker's number is compared, and obtains output result form, and output result form is transmitted in intelligent terminal and is looked into for decision-maker
It sees.
The overall flow of the present invention is as follows:By job site personnel information unit, the live practice of construction personnel of statistics are collected
Information, and it is transmitted to item server.Specific practice is, on construction personnel's wearable device(Safety cap etc.), it is implanted into radio frequency
Chip(RFID), radio frequency chip typing employee's identity information, name, gender, date of birth, affiliated teams and groups, work post etc., it applies
Work in-site installation is fixed or portable card reader, Fingerprint Identification Unit, iris recognition device, real time monitoring read personal information, and
Classifying Sum, always construct including building site number, each labor service or teams and groups' number, each work post number, each working face number etc., and transmit
Enterprise servers are transmitted through the network to item server, then by item server.This data is live real data.
Project based on contract duration establishment project aggregate scheduling, then part-to-item project progress is worked out by aggregate scheduling
Plan, human resources planning etc., human resources planning should match with schedule, form sometime node, sometime
Section completes labour's number of a certain part-to-item project, a certain working face or integrated engineering.Tables of data is formed to input to project
Server, then it is transmitted through the network to enterprise servers.This data is project plan data.
Corporate HQ establishes BIM models, and model is mounted with cost software or quota labor's software, and and project schedule plan
Matching, is converted by analysis, output and the matched artificial data of project schedule plan, and is transmitted to enterprise servers.This data
On the basis of quota, reflect the normal data of completed amount under normal circumstances, therefore this data is known as normal data.
In enterprise servers using data analyzing and processing software, real data, planning data, normal data are analyzed
Comparison, provides report, decision-making is according to circumstances carried out by project, business manager:
Planning data is not matched that with normal data, reflects that plan is not rigorous, there are un-reasonable phenomenon, it is necessary to adjust meter
It draws;
Monitoring real data and planning data in real time, real data is less than planning data, then can cause to delay work causes progress to delay,
Real data is more than planning data, it is possible to cause the work holdup that benefit is caused to be lost in, can reminding decision-making personnel pay close attention to personnel in time and move
State adjusts.If progress lags, real data and planning data can be analyzed, reason is searched, rectifies a deviation in time.
And normal data is may be referred to, formulates human resources planning.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
With within principle, any modifications, equivalent replacements and improvements are made should all be included in the protection scope of the present invention god.
Claims (5)
1. a kind of site operation personnel's intelligent management based on BIM, it is characterised in that:Including each job site personnel information
Unit, BIM standard data elements, enterprise servers and intelligent terminal;Each job site personnel information unit includes existing
Field acquisition module and planning data module;The real data of construction site is uploaded in enterprise servers by collection in worksite module,
The planning data of construction site is uploaded in enterprise servers by planning data module;The BIM standard data elements, including
BIM models and the artificial rating system to match with BIM models, artificial rating system is according to BIM models, project aggregate scheduling
Each standard construction number table is obtained with each subdivisional work schedule, and standard construction number table is uploaded to enterprise servers
It is interior;Enterprise servers compare obtained field data, planning data and standard construction number, obtain output result report
Table, and output result form is transmitted in intelligent terminal and is checked for decision-maker.
2. site operation personnel's intelligent management according to claim 1 based on BIM, it is characterised in that:It is described existing
Field acquisition module, including RFID radio-frequency cards, card reader and item server, the wearing that RFID radio-frequency cards are mounted on construction personnel is set
Standby identity information that is upper and being stored with employee, card reader installation are real at the construction field (site) for gathering the information in RFID radio-frequency cards
When obtain construction personnel's information of construction site, and the information collected is uploaded to item server by network, project clothes
Business device handles the information received, obtains construction personnel's tables of data of construction site, number table of always constructing including building site,
Each teams and groups' number table, each work post number table and each working face number table;Item server will be in treated field data information
It reaches in enterprise servers.
3. site operation personnel's intelligent management according to claim 2 based on BIM, it is characterised in that:The reading
Card device is fixed or portable card reader.
4. site operation personnel's intelligent management according to claim 2 based on BIM, it is characterised in that:The reading
Card device is Fingerprint Identification Unit or iris recognition device.
5. site operation personnel's intelligent management according to claim 2 based on BIM, it is characterised in that:The meter
Draw data module, including with project aggregate scheduling and the corresponding manapower allocation unit of each subdivisional work schedule, it is described
Manapower allocation unit, including number table of always constructing, each subpackage troop number table, each professional number table and each work surface number table;
Manapower allocation unit is intended to data and is uploaded to by item server in enterprise servers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810019648.1A CN108053150A (en) | 2018-01-09 | 2018-01-09 | A kind of site operation personnel's intelligent management based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810019648.1A CN108053150A (en) | 2018-01-09 | 2018-01-09 | A kind of site operation personnel's intelligent management based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108053150A true CN108053150A (en) | 2018-05-18 |
Family
ID=62126100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810019648.1A Pending CN108053150A (en) | 2018-01-09 | 2018-01-09 | A kind of site operation personnel's intelligent management based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108053150A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108960360A (en) * | 2018-06-12 | 2018-12-07 | 浙江大境筑科技发展有限公司 | A kind of construction site task distribution system |
CN109409782A (en) * | 2018-11-23 | 2019-03-01 | 中建隧道建设有限公司 | High-rise working safe intelligent management system |
CN109816263A (en) * | 2019-02-01 | 2019-05-28 | 南通四建集团有限公司 | A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision |
CN110084527A (en) * | 2019-05-05 | 2019-08-02 | 广西路桥工程集团有限公司 | A kind of digitlization construction management system based on BIM model |
CN110159252A (en) * | 2019-06-04 | 2019-08-23 | 国网北京市电力公司 | Data collection system and method |
CN110288220A (en) * | 2019-06-19 | 2019-09-27 | 徐州工业职业技术学院 | A kind of construction management platform based on BIM |
CN110414791A (en) * | 2019-06-28 | 2019-11-05 | 中国一冶集团有限公司 | A kind of system and method for the distribution of electrical construction task and examination based on BIM |
CN110826981A (en) * | 2019-10-15 | 2020-02-21 | 国网江苏省电力有限公司 | Transmission tower construction progress control system and method based on Internet of things |
CN111915152A (en) * | 2020-07-10 | 2020-11-10 | 中铁第四勘察设计院集团有限公司 | Task allocation method and system applied to intelligent contact network construction site |
CN111967838A (en) * | 2020-07-16 | 2020-11-20 | 译筑信息科技(上海)有限公司 | Intelligent 4D plan management and control method based on BIM |
CN112101808A (en) * | 2020-09-22 | 2020-12-18 | 广东建采网科技有限公司 | Construction enterprise-based labor cost management and control multistage early warning method and system |
CN112884444A (en) * | 2021-03-10 | 2021-06-01 | 苏州思萃融合基建技术研究所有限公司 | Intelligent system for managing construction site personnel based on digital twin technology |
CN113222564A (en) * | 2021-06-09 | 2021-08-06 | 合肥优尔电子科技有限公司 | Progress management system and method based on BIM system |
CN113763040A (en) * | 2021-08-27 | 2021-12-07 | 中铁十八局集团有限公司 | House construction project construction quota measuring system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN106779447A (en) * | 2016-12-28 | 2017-05-31 | 南京建工集团有限公司 | Builder's intelligent management system and method for a kind of RFID of fusion BIM |
CN106845919A (en) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN107229697A (en) * | 2017-05-24 | 2017-10-03 | 辽宁工程技术大学 | A kind of building construction bid document generating method |
CN107330664A (en) * | 2016-05-12 | 2017-11-07 | 上海点贸信息技术有限公司 | A kind of intelligence based on Internet of Things builds management system |
-
2018
- 2018-01-09 CN CN201810019648.1A patent/CN108053150A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN107330664A (en) * | 2016-05-12 | 2017-11-07 | 上海点贸信息技术有限公司 | A kind of intelligence based on Internet of Things builds management system |
CN106845919A (en) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN106779447A (en) * | 2016-12-28 | 2017-05-31 | 南京建工集团有限公司 | Builder's intelligent management system and method for a kind of RFID of fusion BIM |
CN107229697A (en) * | 2017-05-24 | 2017-10-03 | 辽宁工程技术大学 | A kind of building construction bid document generating method |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108960360A (en) * | 2018-06-12 | 2018-12-07 | 浙江大境筑科技发展有限公司 | A kind of construction site task distribution system |
CN109409782A (en) * | 2018-11-23 | 2019-03-01 | 中建隧道建设有限公司 | High-rise working safe intelligent management system |
CN109409782B (en) * | 2018-11-23 | 2024-04-19 | 中建隧道建设有限公司 | Intelligent management system for safety of high-altitude operation |
CN109816263A (en) * | 2019-02-01 | 2019-05-28 | 南通四建集团有限公司 | A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision |
CN110084527B (en) * | 2019-05-05 | 2022-05-31 | 广西路桥工程集团有限公司 | Digital construction management system based on BIM model |
CN110084527A (en) * | 2019-05-05 | 2019-08-02 | 广西路桥工程集团有限公司 | A kind of digitlization construction management system based on BIM model |
CN110159252A (en) * | 2019-06-04 | 2019-08-23 | 国网北京市电力公司 | Data collection system and method |
CN110288220A (en) * | 2019-06-19 | 2019-09-27 | 徐州工业职业技术学院 | A kind of construction management platform based on BIM |
CN110414791A (en) * | 2019-06-28 | 2019-11-05 | 中国一冶集团有限公司 | A kind of system and method for the distribution of electrical construction task and examination based on BIM |
CN110826981A (en) * | 2019-10-15 | 2020-02-21 | 国网江苏省电力有限公司 | Transmission tower construction progress control system and method based on Internet of things |
CN111915152A (en) * | 2020-07-10 | 2020-11-10 | 中铁第四勘察设计院集团有限公司 | Task allocation method and system applied to intelligent contact network construction site |
CN111915152B (en) * | 2020-07-10 | 2022-10-18 | 中铁第四勘察设计院集团有限公司 | Task allocation method and system applied to intelligent contact network construction site |
CN111967838A (en) * | 2020-07-16 | 2020-11-20 | 译筑信息科技(上海)有限公司 | Intelligent 4D plan management and control method based on BIM |
CN112101808A (en) * | 2020-09-22 | 2020-12-18 | 广东建采网科技有限公司 | Construction enterprise-based labor cost management and control multistage early warning method and system |
CN112884444A (en) * | 2021-03-10 | 2021-06-01 | 苏州思萃融合基建技术研究所有限公司 | Intelligent system for managing construction site personnel based on digital twin technology |
CN112884444B (en) * | 2021-03-10 | 2023-07-18 | 苏州思萃融合基建技术研究所有限公司 | Intelligent system for managing construction site personnel based on digital twin technology |
CN113222564A (en) * | 2021-06-09 | 2021-08-06 | 合肥优尔电子科技有限公司 | Progress management system and method based on BIM system |
CN113763040A (en) * | 2021-08-27 | 2021-12-07 | 中铁十八局集团有限公司 | House construction project construction quota measuring system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108053150A (en) | A kind of site operation personnel's intelligent management based on BIM | |
CN107665419B (en) | Labor service real-name management system of intelligent building site management and control platform of national power grid | |
CN106447814A (en) | Method for checking attendance automatically through robot | |
CN108009758A (en) | A kind of site operation material intelligent management based on BIM | |
Ragab et al. | HRSPCA: Hybrid recommender system for predicting college admission | |
CN107067355A (en) | A kind of government affairs service system based on internet | |
CN104463297A (en) | Asset two-dimensional code identification application method and device structure | |
CN102156907A (en) | Quality inspection method for QA system | |
CN109360134A (en) | A kind of government affairs service system Internet-based | |
CN109635006A (en) | Social security business association rule digging and recommendation apparatus and method based on Apriori | |
CN110196943A (en) | A kind of position intelligent recommendation system, method and its system | |
CN109165337A (en) | A kind of method and system of knowledge based map construction bidding field association analysis | |
CN115619134A (en) | Technician platform construction method and system based on engineering service | |
CN105447631A (en) | Subway engineering tri-network intelligent control system and method thereof | |
CN111626788A (en) | Engineering cost management system | |
CN107169642A (en) | A kind of quality inspection service integration management system | |
CN114240639A (en) | Case collection prompting and case dividing method, device, equipment and storage medium | |
CN110009300A (en) | A kind of worker's information management system and its management method | |
CN106600142A (en) | Information management technology system based on modern manufacturing industry productivity balance | |
CN102722790A (en) | Human resource service system | |
CN109829637A (en) | A kind of medical services performance assessment system | |
CN109360291A (en) | A kind of construction machinery equipment inspection service system | |
CN109960231A (en) | A kind of production management system and its method based on Internet of Things | |
CN107203847A (en) | A kind of flow nodes Efficiency Statistics method for OA system subscriber terminals | |
CN113822645A (en) | Interview management system, equipment and computer medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180518 |