CN104680320A CN201510080464.2A CN201510080464A CN104680320A CN 104680320 A CN104680320 A CN 104680320A CN 201510080464 A CN201510080464 A CN 201510080464A CN 104680320 A CN104680320 A CN 104680320A
Authority
CN
China
Prior art keywords
bim model
operating mode
bim
information
smart machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510080464.2A
Other languages
Chinese (zh)
Inventor
尹仕友
严国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid (Shanghai) smart grid research & Development Investment Co., Ltd.
Original Assignee
Shanghai Is With Building Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Is With Building Information Technology Co Ltd filed Critical Shanghai Is With Building Information Technology Co Ltd
Priority to CN201510080464.2A priority Critical patent/CN104680320A/en
Publication of CN104680320A publication Critical patent/CN104680320A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a BIM (Building Information Modeling)-based project management system and method. The BIM-based project management system comprises a front-end intelligent device for transmitting a user command to a WEB server, the WEB server for synchronously updating data between the front-end intelligent device and a background database end, and the background database end for controlling a BIM and managing the data of BIM, working conditions and log. The invention has the following advantages: 1, the site problems can be found and corrected effectively, so as to reduce the rework possibility; 2, the site management personnel has no need to take a large number of drawings and other information, can complete all the work through one mobile device; 3, the handling progress of the site problems can be tracked effectively; 4, the constructability of the project can be understood intuitively; 5, the receiving, transmitting and processing of all the data can be performed in real time and can be completed within seconds according to the network status, and the response speed is high.

Description

Based on project management system and the method for BIM
Technical field
The present invention relates to project management system and method, particularly, relate to the project management system based on BIM and method.
Background technology
BIM is the abbreviation of Building Information Modeling, is domesticly usually translated into BIM.Be a kind of building Life cycle information system management technology, there are visual, harmony, simulation, optimization and five large features of can publishing picture.BIM is a kind of brand-new architectural design, construction, management method, based on three-dimensional digital information technology, the data information in each stages such as planning, design, construction, operation is all included among 3D model, allowing the staff in any stage in the whole life cycle of buildings when using this model, effective, correct decision-making can be made according to accurately complete data.
Unity3D be one for creating the game of such as 3 D video, build the comprehensive authoring tools of the type interaction contents such as visual, realtime three dimensional animation.Unity is similar to Director, Blender, under Virtools or Torque Game Builder etc. utilizes its editing machine of software that mutual patterning development environment is primary manner to operate in Windows and Mac OS X, game can be issued to Windows, Wii, OSX or iOS platform.Also Unity web player plug-in unit publishing web page can be utilized to play, support the web page browsing of Mac and Windows.
Traditional construction project information management based on craft, at least existing defects in following 3:
(1) information transfer connection.The unit related to due to engineering management and department numerous, traditional method is as modes such as meeting, dispatches, and the efficiency that information is transmitted is very low, grasps in time multidate information and more seems very difficult.Most problem, first goes out in communication; Say from the general extent, owner to engineering project it is of concern that progress, investment, quality and contract, in fact, the communication problem of information that the most primary is.
(2) Information procession aspect.The associated schedule of engineering project, investment, quality, conjunction coordinates data, amount greatly and ceaselessly in change, manual operations is difficult to gather in time, makes to participate in each side and often feel to be difficult to hold.The document such as drawing, file, data of engineering, amount is large and generally preserve with the form of paper.Often along with the progress of engineering, a lot of valuable data does not just know where be dropped into, and some data participates in each side to own together and use, and therefore participant each side and descendant will do a large amount of repeated works, and the waste of resource is very serious.
(3) information use.Certainly lead to the information of magnanimity in construction work construct and manage process, and the situation of fighting separately certainly leads to information island, information can not be shared, oneself call consult also very inconvenient, inefficiency.
Summary of the invention
For defect of the prior art, the object of this invention is to provide a kind of project management system based on BIM, which solve following technical matters:
(1) what use development of Mobile Internet technology to realize engineering information uploads download in real time, can react site problems within the shortest time.
(2) information comprises word, voice, picture, video, describes problem more accurate.
(3) all data are all kept in BIM model database, and through encryption and backup, ensure that the safety and reliability of data.
(4) data access can open interface, shares to other Management System Data.
(5) BIM three-dimensional model solid show is adopted, more directly perceived than two-dimentional drawing.
According to the invention provides a kind of project management system based on BIM, comprise as lower device:
Front end smart machine, for receiving the user instruction of login user, and for controlling BIM model, and for managing project data (described project data can comprise the data of BIM model, operating mode, daily record);
WEB service end, for carrying out the synchronous of all or part of data between front end smart machine, WEB service end, background data base end, comprise: the user instruction being received from front end smart machine is sent to background data base end, the front-end information (described front-end information can comprise BIM model data, operating mode attribute information, log properties information, daily record progress msg) being received from front end smart machine is sent to background data base end;
Background data base end, for storing also according to the information updating BIM model by WEB service end receiving front-end smart machine;
What adopt development of Mobile Internet technology to realize information between front end smart machine, WEB service end, background data base end uploads download in real time.
According to a kind of project management system based on BIM provided by the invention, it is characterized in that, comprise as lower device:
Front end smart machine, for receiving the user instruction of login user, and for controlling BIM model, and for managing the data of BIM model, operating mode, daily record;
WEB service end, for carrying out the synchronous of all or part of data between front end smart machine, WEB service end, background data base end, comprise: the user instruction being received from front end smart machine is sent to background data base end, by being received from the BIM model data of front end smart machine, operating mode attribute information, log properties information, daily record progress msg send to background data base end; Background data base end, for storing also according to the information updating BIM model by WEB service end receiving front-end smart machine.
What adopt development of Mobile Internet technology to realize information between front end smart machine, WEB service end, background data base end uploads download in real time.
Preferably, front end smart machine comprises as lower device: BIM model cootrol module, work information administration module, project log information management module, progress control module;
Particularly:
(1) described BIM model cootrol module, comprises the device performing corresponding function as follows according to user instruction:
Model display operating means, for Controlling model amplification, reduce, the displaying of rotation process and BIM model;
Floor section indication device, represents for the section of floor in model;
Story height indication device: represent for the floor height of floor in model;
Build indication device: for the expression of each structure attribute of buildings in model;
Construction simulation display device: for the process completed according to buildings in the construction in structure attribute, dismounting time construction simulation;
Model modification device: for according to work information administration module to the amendment of operating mode attribute information and project log information management module to the amendment of log properties information, upgrade BIM model data;
(2) described work information administration module, comprises as lower device:
Newly-built operating mode management devices: for according to newly-built operating mode instruction, set up new operating mode, and the following attribute information of newly-built operating mode is set:
-operating mode type, wherein, operating mode type comprises safety, quality, environment;
-operating mode founder, wherein, will send the login user of the front end smart machine of newly-built operating mode instruction as operating mode founder;
-creation-time, wherein, the time that operating mode creates was as the criterion with the time of WEB service end;
-closing time, wherein, closing time, for recording the final date of operating mode process, if when this final date arrives when the operating mode situation of operating mode or new problem, then pushes reminder message and operating mode attribute information by WEB service end forward end intelligent platform;
-alarm interval, wherein, the interval time that alarm interval pushes for the reminder message recording adjacent twice warning;
-operating mode situation, wherein, operating mode situation comprises in new problem, process, has processed, closes this four situations;
-operating mode title, wherein, operating mode title is for recording the brief introduction of operating mode content;
-operating mode content, wherein, operating mode content is for recording the practical illustration of operating mode;
-operating mode annex, wherein, operating mode annex comprises picture, voice, video;
-association component, wherein, association component, for recording the component associated by operating mode, adopts bubble and highlighted display;
Operating mode comment management devices: for receiving the review information of foreground intelligent platform to operating mode, and review information is added in operating mode content, then by WEB service end synchronized update operating mode content between foreground intelligent platform, WEB service end, background data base end;
Operating mode replys management devices: for receiving the return information of foreground intelligent platform to operating mode review information, and return information is added in operating mode content, then by WEB service end synchronized update operating mode content between foreground intelligent platform, WEB service end, background data base end;
The pusher of work information: for will exceeding the cut-off date and the operating mode attribute information of operating mode in operating mode situation or new problem or process, is pushed to by WEB service end the front end smart machine that user instruction specifies;
(3) described project log information management module, comprises as lower device:
Newly-built log management apparatus, for according to newly-built log instruction, sets up new daily record, and arranges the following attribute information of newly-built daily record:
-log creation people, wherein, will send the login user of the front end smart machine of newly-built log instruction as log creation people;
-creation-time, wherein, the time of log creation was as the criterion with the time of WEB service end;
-log content, wherein, log content is for recording the practical illustration of daily record; Wherein, the practical illustration of daily record comprises the operating mode attribute information corresponding with daily record;
-daily record annex, wherein, daily record annex comprises picture, voice, video;
-association component, wherein, association component, for recording the component associated by daily record, adopts bubble and highlighted display;
Update log management devices, for the instruction according to schedule management apparatus, modifies to log content;
(4) described progress control module, comprises as lower device:
Effective data management device: for according to the date range in user instruction and specify daily record, search in described date range with the progress msg of specifying daily record to associate and show, wherein, the progress msg of described appointment daily record association comprises up-to-date operating mode situation, operating mode content and the operating mode annex in operating mode attribute information corresponding to this appointment daily record;
Progress and time difference indication device, for the progress of daily record and the expression of the time difference.
Preferably, background data base end comprise following any one or appoint multiple module;
Log management module: for creating the engineering project daily record in construction management, and by interrelated by component ID for the BIM model of engineering project daily record and three-dimensional visualization;
Weekly administration module: for filtering out the data item of this safety of renewal in week, quality, environmental form operating mode and daily record naturally week according to nature, and data item is associated with the BIM model of three-dimensional visualization by component ID; The engineering log such as gathered from terminal usage platform by each side personnel automatically generates weekly while being associated with the BIM model of three-dimensional visualization, compare to plan monthly simultaneously and analyze thus reasonably carry out weekly generation and management, what realize intelligent and robotization carries out engineering management;
Week planning management module: prepare work for the tissue according to engineering project, the plan of construction work is generated for week plan weekly according to timing node, and the item of information inside the plan week is associated with by component ID in the BIM model of three-dimensional visualization and is shown, wherein, described item of information shows in tag form, and described label uses different colours to distinguish the performance of corresponding informance item; So just can carry out clear contrast to the workload completed and do not complete to analyze on model and plan work next week simultaneously, reasonable place mat is done to the planned management of project work in future;
Monthly plan administration module: for the monthly plan in construction management being imported in the BIM model of three-dimensional visualization, and by the plan item in monthly plan by component ID and BIM model interrelated, thus carry out the management of monthly plan and compare with the data that onsite application personnel gather and analyze;
Monthly magazine administration module: for by the image data of monthly plan, BIM model and each side personnel by component ID auto-associating and displaying, automatically generate management monthly magazine; The engineering management event of the progress events occurred this month, security incident, quality thing, environment event, Yi Jiren, material, machine is carried out scientific and reasonable analysis and utilization and better prepared future;
Management of blueprint module: while carrying out engineering management at use BIM model, provides having access to and checking at any time to existing working drawing, and is associated with in the BIM model of three-dimensional visualization by drawing by component ID; Thus the files such as the circulation visa of the actual user persons such as management, owner and designer are included simultaneously and gathered and better shown and use.
Specification management module: for the existing engineering management specification used is imported in BIM model, the described engineering management specification used is included in actual design specifications, job specifications, acceptance specification, monitoring specification, the inspection criterion used in engineering management; Workmen is made to liberate both hands;
Quantities calculation administration module: for by personnel, material, machinery actual conditions and BIM model interaction, and realistic engineering net amount is provided to Practical Project amount, add that priori working experience data give coefficient conversion according to service condition again, thus each work unit is organized work under unified workload.
Preferably, front end smart machine and background data base end all adopt local cache mode to realize without the data transmit-receive under network;
Background data base end utilizes Unity3D to show BIM model, and in utilize Unity3D that the visual content of BIM model is distributed to front end smart machine by WEB service end.
Preferably, described background data base end comprises simplification BIM model and detailed BIM model;
Simplify BIM model to obtain by after detailed BIM model simplification, and real-time, interactive synchrodata;
The visual content being distributed to front end smart machine is the visual content simplifying BIM model, with the virtual interactive interface realizing front end smart machine and simplify between BIM model;
According to the updated by information by WEB service end receiving front-end smart machine is detailed BIM model, to realize front end smart machine and the information interaction in detail between BIM model.
Detailed BIM model is associated by component ID with simplification BIM model, and background data base forward end smart machine issues described simplification BIM model;
Detailed BIM model is simplified BIM model as follows:
Steps A: the BIM model as detailed BIM model is exported as the 2nd BIM model, and preserve the component color material information of component in a BIM model; Wherein, the configuration requirement of operation and display the 2nd BIM model is lower than the configuration requirement running and show a BIM model;
Step B: simplify the entity grid of the 2nd BIM model, and process boundary representation, obtains the 3rd BIM model;
Step C: the 3rd BIM model is played up according to point-line-surface information and described component color material information.
Preferably, a described BIM model is Revit release format, and described front end smart machine operating system is mobile phone operating system TOS.
Preferably, described step B comprises the steps:
Step is B.1: the maximum permission angle A increasing often pair of adjacent polygons face in the 2nd BIM model, and a polygon facet is merged in the adjacent polygons face that angle each other in the 2nd BIM model is less than described maximum permission angle; Increase the maximum permission angle B of often pair of adjacent segments in the 2nd BIM model, the adjacent segments that angle each other in the 2nd BIM model is less than described maximum permission angle B is merged into one article of line segment;
Step is B.2: to the maximum permission absolute error between the 2nd BIM model adjustment grid and entity solid, the component in a BIM model can not be lacked in the 2nd BIM model;
In step C, the polygon facet be combined and multiple components corresponding to the lines of merging, play up respectively according to respective component color material information respectively;
The form of the 2nd BIM model meets the operation of front end smart machine operating system and the 3D form of display requirement.
Preferably, described simplification BIM model by following any one or appoint a various ways to obtain by after detailed BIM model simplification:
-summit of causing model face number to exceed setting threshold value in detailed BIM model is removed;
-summit of causing moulded dimension to exceed setting threshold value in detailed BIM model is removed;
-submodel in detailed BIM model is rebuild;
-the race's example in detailed BIM model simplified and is replaced by MaxScript script;
-submodel of identical material in detailed BIM model is merged.According to a kind of project management method based on BIM provided by the invention, the described project management method based on BIM is the method utilizing the above-mentioned project management system based on BIM to perform.
Compared with prior art, the present invention has following beneficial effect:
1, in the present invention, site problems can Timeliness coverage rectifying and improving, and effectively reduces the possibility of doing over again.
2, in the present invention, site administrator is without the need to a large amount of drawing and other data, and a mobile device can complete all work.
3, the present invention effectively can follow the tracks of the process progress of site problems.
4, the present invention can understand project intuitively can application property.
5, all data transmit-receives, process adopt smart machine to process in real time, and fast response time, can complete according to network state within the several seconds.
Accompanying drawing explanation
By reading the detailed description done non-limiting example with reference to the following drawings, other features, objects and advantages of the present invention will become more obvious:
Fig. 1 is the structural representation of the project management system based on BIM provided by the invention.
Embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.Following examples will contribute to those skilled in the art and understand the present invention further, but not limit the present invention in any form.It should be pointed out that to those skilled in the art, without departing from the inventive concept of the premise, some distortion and improvement can also be made.These all belong to protection scope of the present invention.
According to a kind of project management system based on BIM provided by the invention, it is characterized in that, comprise as lower device:
Front end smart machine (comprising the Intelligent sliding moved ends such as MOBILE end, PAD end), for receiving the user instruction of login user, and generate BIM model data, operating mode attribute information, log properties information, daily record progress msg according to user instruction, and BIM model data, operating mode attribute information, log properties information, daily record progress msg are sent to background data base end by WEB service end;
WEB service end, for the user instruction being received from front end smart machine is sent to background data base end, and by being received from the BIM model data of front end smart machine, operating mode attribute information, log properties information, daily record progress msg send to background data base end;
Background data base end, for storing also according to comprising as lower device by the information updating BIM model front end smart machine of WEB service end receiving front-end smart machine: BIM model cootrol module, work information administration module, project log information management module, progress control module;
The function of described BIM model cootrol module is as follows:
1. model amplification, reduce, rotate.
2. the section of floor represents.
3. the floor height of floor represents.
4. the expression of each structure attribute in buildings.
5. the display of construction simulation.
The process that in whole construction, buildings completes is simulated according to the construction in component, dismounting time.
The function of described work information administration module is as follows:
1. newly-built operating mode
Operating mode type has safety, quality, environment;
The content of operating mode comprises:
Founder: the user of login
Creation-time: the time that this operating mode creates, is as the criterion with server time.
Closing time: the final date of this operating mode process, related personnel's PUSH message can be given when this date arrives when operating mode or new problem.Relevant personnel are arranged by BS, with item association.
Alarm interval: 0-24 (hour), the interval time of message push.
Operating mode situation: in new problem, process, processed, close.
Operating mode title: the brief introduction of operating mode content.
Operating mode content: the practical illustration of operating mode.
Operating mode annex: picture, voice, video
Association component: the component associated by this operating mode, adopts bubble and highlighted display.
2. operating mode is replied
3. operating mode comment
4. the propelling movement of work information
Propelling movement exceedes cut-off date also unsolved operating mode, and pushing object is that BS holds the related personnel specified.
The function of described project log information management module is as follows:
1. newly-built daily record
Log content comprises:
Founder: the user of login
Creation-time: the time that this operating mode creates, is as the criterion with server time.
Operating mode content: the practical illustration of operating mode.
Operating mode annex: picture, voice, video
Association component: the component associated by this operating mode, adopts bubble and highlighted display.
2. Update log
Can modify to log content in progress control.
The function of described progress control module is as follows:
1. valid data: the progress msg searching association according to the date range selected, as long as the plan of progress starts, terminates; Actual to start, namely the Close Date relevantly with the date of selection show as valid data.
2. the expression of progress and the time difference.
The function of described weekly administration module is as follows:
According to the data of naturally screening safety, quality, environment, project log week.
More specifically, provided by the invention based in the engineering information management backup system of BIM: all data use development of Mobile Internet technology to be saved in WEB service end, without the need to manual intervention, front end and backstage can be analyzed according to data and judge whether the duration reminds untreated safety, quality, environmental problem in predetermined period, in time; Adopt local buffer technology, can realize without the data transmit-receive under network; Use Unity3D mobile terminal, in detail BIM model, three-dimensional real-time, interactive combined technology to be on the leading domestic level, innovative technology comprises as follows:
1. BIM model simplification in detail
A. unnecessary summit in BIM model cathetus section is removed
B. to too in detail and the model that cannot simplify rebuild
C. race's example simplified and replaced by MaxScript script
D. identical material model is merged
E. two cover BIM interaction models are made
2.BIM model real-time, interactive
A. associated with database by BIM model component ID
B. simplification BIM model and detailed BIM model are mated
C. to detailed BIM model treatment information interaction
D. virtual interactive interface is carried out to simplification BIM model
Particularly, detailed BIM model is associated by component ID with simplification BIM model, and background data base forward end smart machine issues described simplification BIM model;
Detailed BIM model is simplified BIM model as follows:
Steps A: the BIM model as detailed BIM model is exported as the 2nd BIM model, and preserve the component color material information of component in a BIM model; Wherein, the configuration requirement of operation and display the 2nd BIM model is lower than the configuration requirement running and show a BIM model;
Step B: simplify the entity grid of the 2nd BIM model, and process boundary representation, obtains the 3rd BIM model;
Step C: the 3rd BIM model is played up according to point-line-surface information and described component color material information.
Preferably, a described BIM model is Revit release format, and described front end smart machine operating system is mobile phone operating system TOS.
Preferably, described step B comprises the steps:
Step is B.1: the maximum permission angle A increasing often pair of adjacent polygons face in the 2nd BIM model, and a polygon facet is merged in the adjacent polygons face that angle each other in the 2nd BIM model is less than described maximum permission angle; Increase the maximum permission angle B of often pair of adjacent segments in the 2nd BIM model, the adjacent segments that angle each other in the 2nd BIM model is less than described maximum permission angle B is merged into one article of line segment;
Step is B.2: to the maximum permission absolute error between the 2nd BIM model adjustment grid and entity solid, the component in a BIM model can not be lacked in the 2nd BIM model;
In step C, the polygon facet be combined and multiple components corresponding to the lines of merging, play up respectively according to respective component color material information respectively;
The form of the 2nd BIM model meets the operation of front end smart machine operating system and the 3D form of display requirement.
Preferably, described simplification BIM model by following any one or appoint a various ways to obtain by after detailed BIM model simplification:
-summit of causing model face number to exceed setting threshold value in detailed BIM model is removed;
-summit of causing moulded dimension to exceed setting threshold value in detailed BIM model is removed;
-submodel in detailed BIM model is rebuild;
-the race's example in detailed BIM model simplified and is replaced by MaxScript script;
-submodel of identical material in detailed BIM model is merged.
More refinement ground further, the present invention can based on 4 kinds of terminals (comprise MOBILE end, PAD end, WEB terminal, PC hold) framework:
MOBILE holds, and comprises ios and Android, and assisting of PAD end, mainly plays Mobile phone portable, extendible use crowd.For receiving the user instruction of login user, and for controlling BIM model, and for managing the data of BIM model, operating mode, daily record; MOBILE end comprises: BIM model cootrol module, work information administration module, project log information management module, progress control module;
PAD holds, for the collection of field data.Comprise floor data, progress data.PAD end comprises: personal management module, store keeping module, machine management module, operating mode administration module, project log information management module, daily paper administration module, weekly administration module, monthly magazine administration module, multi-specialized group of engineering and module, management of blueprint module, engineering discipline administration module, acceptance criteria module etc.
WEB terminal (BS), the foundation of user base data, the management of user profile, add up, and user carries out trace analysis for needing the state of management project to the data that PAD end gathers; WEB terminal (BS) comprises: project information module, personal information maintenance module, facility information maintenance module, product information maintenance module, Subscriber Information Module, data statistics module, operating mode module.
PC holds, and comprises: task layout module, Region dividing module, and engineering plans as a whole module.
The present invention adopts above-mentioned 4 kinds of terminal architecture, has following beneficial effect:
1) BIM management is expanded to the overall process of engineering management by current design information;
2) codes and standards of country and the codes and standards of enterprise are built in TOS platform, change management of engineering construction flow process by a series of program development
3) using BIM as a kind of carrier be enterprise engineering build building database, for future provides possibility based on the large data analysis of cloud.
4) what use development of Mobile Internet technology to realize engineering information uploads download in real time, can react site problems within the shortest time; The information transmitted between framework comprises word, voice, picture, video, describes problem more accurate; All data are all kept in BIM model database, and through encryption and backup, ensure that the safety and reliability of data; Data access can open interface, shares to other Management System Data; Adopt BIM three-dimensional model solid show, more directly perceived than two-dimentional drawing.
Above specific embodiments of the invention are described.It is to be appreciated that the present invention is not limited to above-mentioned particular implementation, those skilled in the art can make various distortion or amendment within the scope of the claims, and this does not affect flesh and blood of the present invention.

Claims (10)

1. based on a project management system of BIM, it is characterized in that, comprise as lower device:
Front end smart machine, for receiving the user instruction of login user, and for controlling BIM model, and for managing the data of BIM model, operating mode, daily record;
WEB service end, for carrying out the synchronous of all or part of data between front end smart machine, WEB service end, background data base end, comprise: the user instruction being received from front end smart machine is sent to background data base end, by being received from the BIM model data of front end smart machine, operating mode attribute information, log properties information, daily record progress msg send to background data base end;
Background data base end, for storing also according to the information updating BIM model by WEB service end receiving front-end smart machine;
What adopt development of Mobile Internet technology to realize information between front end smart machine, WEB service end, background data base end uploads download in real time.
2. based on a project management system of BIM, it is characterized in that, comprise as lower device:
Front end smart machine, for receiving the user instruction of login user, and for controlling BIM model, and for managing project data;
WEB service end, for carrying out the synchronous of all or part of data between front end smart machine, WEB service end, background data base end, comprise: the user instruction being received from front end smart machine is sent to background data base end, the front-end information being received from front end smart machine is sent to background data base end;
Background data base end, for storing also according to the information updating BIM model by WEB service end receiving front-end smart machine;
What adopt development of Mobile Internet technology to realize information between front end smart machine, WEB service end, background data base end uploads download in real time.
3. the project management system based on BIM according to claim 1 and 2, is characterized in that, front end smart machine comprises as lower device: BIM model cootrol module, work information administration module, project log information management module, progress control module;
Particularly:
(1) described BIM model cootrol module, comprises the device performing corresponding function as follows according to user instruction:
Model display operating means, for Controlling model amplification, reduce, the displaying of rotation process and BIM model;
Floor section indication device, represents for the section of floor in model;
Story height indication device: represent for the floor height of floor in model;
Build indication device: for the expression of each structure attribute of buildings in model;
Construction simulation display device: for the process completed according to buildings in the construction in structure attribute, dismounting time construction simulation;
Model modification device: for according to work information administration module to the amendment of operating mode attribute information and project log information management module to the amendment of log properties information, upgrade BIM model data;
(2) described work information administration module, comprises as lower device:
Newly-built operating mode management devices: for according to newly-built operating mode instruction, set up new operating mode, and the following attribute information of newly-built operating mode is set:
-operating mode type, wherein, operating mode type comprises safety, quality, environment;
-operating mode founder, wherein, will send the login user of the front end smart machine of newly-built operating mode instruction as operating mode founder;
-creation-time, wherein, the time that operating mode creates was as the criterion with the time of WEB service end;
-closing time, wherein, closing time, for recording the final date of operating mode process, if when this final date arrives when the operating mode situation of operating mode or new problem, then pushes reminder message and operating mode attribute information by WEB service end forward end intelligent platform;
-alarm interval, wherein, the interval time that alarm interval pushes for the reminder message recording adjacent twice warning;
-operating mode situation, wherein, operating mode situation comprises in new problem, process, has processed, closes this four situations;
-operating mode title, wherein, operating mode title is for recording the brief introduction of operating mode content;
-operating mode content, wherein, operating mode content is for recording the practical illustration of operating mode;
-operating mode annex, wherein, operating mode annex comprises picture, voice, video;
-association component, wherein, association component, for recording the component associated by operating mode, adopts bubble and highlighted display;
Operating mode comment management devices: for receiving the review information of foreground intelligent platform to operating mode, and review information is added in operating mode content, then by WEB service end synchronized update operating mode content between foreground intelligent platform, WEB service end, background data base end;
Operating mode replys management devices: for receiving the return information of foreground intelligent platform to operating mode review information, and return information is added in operating mode content, then by WEB service end synchronized update operating mode content between foreground intelligent platform, WEB service end, background data base end;
The pusher of work information: for will exceeding the cut-off date and the operating mode attribute information of operating mode in operating mode situation or new problem or process, is pushed to by WEB service end the front end smart machine that user instruction specifies;
(3) described project log information management module, comprises as lower device:
Newly-built log management apparatus, for according to newly-built log instruction, sets up new daily record, and arranges the following attribute information of newly-built daily record:
-log creation people, wherein, will send the login user of the front end smart machine of newly-built log instruction as log creation people;
-creation-time, wherein, the time of log creation was as the criterion with the time of WEB service end;
-log content, wherein, log content is for recording the practical illustration of daily record; Wherein, the practical illustration of daily record comprises the operating mode attribute information corresponding with daily record;
-daily record annex, wherein, daily record annex comprises picture, voice, video;
-association component, wherein, association component, for recording the component associated by daily record, adopts bubble and highlighted display;
Update log management devices, for the instruction according to schedule management apparatus, modifies to log content;
(4) described progress control module, comprises as lower device:
Effective data management device: for according to the date range in user instruction and specify daily record, search in described date range with the progress msg of specifying daily record to associate and show, wherein, the progress msg of described appointment daily record association comprises up-to-date operating mode situation, operating mode content and the operating mode annex in operating mode attribute information corresponding to this appointment daily record;
Progress and time difference indication device, for the progress of daily record and the expression of the time difference.
4. the project management system based on BIM according to claim 3, is characterized in that, background data base end comprise following any one or appoint multiple module;
Log management module: for creating the engineering project daily record in construction management, and by interrelated by component ID for the BIM model of engineering project daily record and three-dimensional visualization;
Weekly administration module: for filtering out the data item of this safety of renewal in week, quality, environmental form operating mode and daily record naturally week according to nature, and data item is associated with the BIM model of three-dimensional visualization by component ID; The engineering log such as gathered from terminal usage platform by each side personnel automatically generates weekly while being associated with the BIM model of three-dimensional visualization, compare to plan monthly simultaneously and analyze thus reasonably carry out weekly generation and management, what realize intelligent and robotization carries out engineering management;
Week planning management module: prepare work for the tissue according to engineering project, the plan of construction work is generated for week plan weekly according to timing node, and the item of information inside the plan week is associated with by component ID in the BIM model of three-dimensional visualization and is shown, wherein, described item of information shows in tag form, and described label uses different colours to distinguish the performance of corresponding informance item;
Monthly plan administration module: for the monthly plan in construction management being imported in the BIM model of three-dimensional visualization, and by the plan item in monthly plan by component ID and BIM model interrelated, thus carry out the management of monthly plan and compare with the data that onsite application personnel gather and analyze;
Monthly magazine administration module: for by the image data of monthly plan, BIM model and each side personnel by component ID auto-associating and displaying, automatically generate management monthly magazine; The engineering management event of the progress events occurred this month, security incident, quality thing, environment event, Yi Jiren, material, machine is carried out scientific and reasonable analysis and utilization and better prepared future;
Management of blueprint module: for providing having access to and checking at any time to existing working drawing, and drawing is associated with in the BIM model of three-dimensional visualization by component ID;
Specification management module: for the existing engineering management specification used is imported in BIM model, the described engineering management specification used is included in actual design specifications, job specifications, acceptance specification, monitoring specification, the inspection criterion used in engineering management;
Quantities calculation administration module: for by personnel, material, machinery actual conditions and BIM model interaction, and realistic engineering net amount is provided to Practical Project amount, add that priori working experience data give coefficient conversion according to service condition again, thus each work unit is organized work under unified workload.
5. the project management system based on BIM according to claim 4, is characterized in that, front end smart machine and background data base end all adopt local cache mode to realize without the data transmit-receive under network;
Background data base end utilizes Unity3D to show BIM model, and utilizes Unity3D that the visual content of BIM model is distributed to front end smart machine by WEB service end;
The data of BIM model are enciphered data and have data access open interface.
6. the project management system based on BIM according to claim 1 and 2, is characterized in that, described background data base end comprises simplification BIM model and detailed BIM model;
Simplify BIM model to obtain by after detailed BIM model simplification, and real-time, interactive synchrodata;
The visual content being distributed to front end smart machine is the visual content simplifying BIM model, with the virtual interactive interface realizing front end smart machine and simplify between BIM model;
According to the updated by information by WEB service end receiving front-end smart machine is detailed BIM model, to realize front end smart machine and the information interaction in detail between BIM model.
7. the project management system based on BIM according to claim 1 and 2, is characterized in that, detailed BIM model is simplified BIM model as follows:
Steps A: the BIM model as detailed BIM model is exported as the 2nd BIM model, and preserve the component color material information of component in a BIM model; Wherein, the configuration requirement of operation and display the 2nd BIM model is lower than the configuration requirement running and show a BIM model;
Step B: simplify the entity grid of the 2nd BIM model, and process boundary representation, obtains the 3rd BIM model;
Step C: the 3rd BIM model is played up according to point-line-surface information and described component color material information.
Preferably, a described BIM model is Revit release format, and described front end smart machine operating system is mobile phone operating system TOS.
8. the project management system based on BIM according to claim 7, is characterized in that, described step B comprises the steps:
Step is B.1: the maximum permission angle A increasing often pair of adjacent polygons face in the 2nd BIM model, and a polygon facet is merged in the adjacent polygons face that angle each other in the 2nd BIM model is less than described maximum permission angle; Increase the maximum permission angle B of often pair of adjacent segments in the 2nd BIM model, the adjacent segments that angle each other in the 2nd BIM model is less than described maximum permission angle B is merged into one article of line segment;
Step is B.2: to the maximum permission absolute error between the 2nd BIM model adjustment grid and entity solid, the component in a BIM model can not be lacked in the 2nd BIM model;
In step C, the polygon facet be combined and multiple components corresponding to the lines of merging, play up respectively according to respective component color material information respectively;
The form of the 2nd BIM model meets the operation of front end smart machine operating system and the 3D form of display requirement.
9. the project management system based on BIM according to claim 6, is characterized in that, described simplification BIM model passes through any one or a various ways as follows and obtains by after detailed BIM model simplification:
-summit of causing model face number to exceed setting threshold value in detailed BIM model is removed;
-summit of causing moulded dimension to exceed setting threshold value in detailed BIM model is removed;
-submodel in detailed BIM model is rebuild;
-the race's example in detailed BIM model simplified and is replaced by MaxScript script;
-submodel of identical material in detailed BIM model is merged.
10. based on a project management method of BIM, it is characterized in that, the described project management method based on BIM is the method utilizing the project management system based on BIM according to any one of claim 1 to 9 to perform.
CN201510080464.2A 2014-12-03 2015-02-13 BIM-based project management system and method Pending CN104680320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510080464.2A CN104680320A (en) 2014-12-03 2015-02-13 BIM-based project management system and method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410727678 2014-12-03
CN201410727678X 2014-12-03
CN201510080464.2A CN104680320A (en) 2014-12-03 2015-02-13 BIM-based project management system and method

Publications (1)

Publication Number Publication Date
CN104680320A true CN104680320A (en) 2015-06-03

Family

ID=53315328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510080464.2A Pending CN104680320A (en) 2014-12-03 2015-02-13 BIM-based project management system and method

Country Status (1)

Country Link
CN (1) CN104680320A (en)

Cited By (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105335558A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering circle establishment method and system on basis of BIM (building information modeling)
CN105354392A (en) * 2015-12-01 2016-02-24 百川伟业(天津)建筑科技股份有限公司 Building information modeling (BIM) family bank based content distribution system and device
CN105373876A (en) * 2015-08-26 2016-03-02 吕曼 Engineering model used in intelligent engineering construction project management system
CN105426972A (en) * 2015-10-28 2016-03-23 上海同筑信息科技有限公司 Engineering project intelligent operation management method and system based on BIM
CN105654243A (en) * 2015-12-31 2016-06-08 上海筑想信息科技股份有限公司 Orbital graph based project information automated processing system
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN105844336A (en) * 2016-03-15 2016-08-10 杭州睿兴栋宇工程咨询有限公司 BIM-based property management system and method
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN106157366A (en) * 2016-08-03 2016-11-23 上海同筑信息科技有限公司 Ultra-large scene based on BIM renders optimization method and system in mobile terminal
CN106228476A (en) * 2016-07-01 2016-12-14 杭州睿兴栋宇工程咨询有限公司 Property work order dispatch system based on BIM and send method
CN106354945A (en) * 2016-08-31 2017-01-25 天河大成建筑云科技(天津)有限公司 Device and method for dynamic association of two-dimensional and three-dimensional engineering data based on building information modeling lightweight
CN106485405A (en) * 2016-09-28 2017-03-08 燕山大学 A kind of building industry rural migrant worker's preferred administration method based on BIM
CN106475781A (en) * 2015-08-31 2017-03-08 上海宝冶集团有限公司 Automatization's method for prefabricating of metallurgical pipeline
CN106600231A (en) * 2016-12-14 2017-04-26 国网上海市电力公司 Dynamic management system for infrastructure projects
CN106647585A (en) * 2017-01-20 2017-05-10 深圳广田集团股份有限公司 Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet
CN106779620A (en) * 2016-12-30 2017-05-31 广州市凯思软件工程有限公司 Digitized Design Platform building method based on IPD systems
CN106779448A (en) * 2016-12-28 2017-05-31 南京建工集团有限公司 Construction equipment intelligent management apapratus and the intelligent management system of the device is set
CN106997511A (en) * 2017-04-05 2017-08-01 中铁四局集团有限公司 Railway beam course management system and railway beam a management method based on BIM technology
CN107103406A (en) * 2017-03-28 2017-08-29 国网山东省电力公司信息通信公司 A kind of supporting communication engineering entire process monitoring system of capital construction and its method
CN107133787A (en) * 2017-06-26 2017-09-05 山东奥联信息科技有限公司 Highway project management method and system
CN107145619A (en) * 2017-03-10 2017-09-08 宁波诺丁汉大学 Function plate design system based on the comprehensive integrated cloud platforms of BIM
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107357957A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project
CN107358401A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project
CN107516165A (en) * 2017-08-15 2017-12-26 南通市交通建设咨询监理有限公司 A kind of project supervision KXG based on BIM
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN107578466A (en) * 2017-09-04 2018-01-12 苏州英诺迈医学创新服务有限公司 A kind of medicine equipment methods of exhibiting and device
CN107666389A (en) * 2017-09-16 2018-02-06 杭州弼木建筑科技有限公司 A kind of structural strengthening model lightweight secrecy system based on BIM
CN107679310A (en) * 2017-09-26 2018-02-09 华北电力大学 The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology
CN107688881A (en) * 2016-08-03 2018-02-13 中国铁道科学研究院铁道建筑研究所 A kind of span bridge construction monitoring management system based on BIM technology
CN107846461A (en) * 2017-10-31 2018-03-27 广州市新誉工程咨询有限公司 File uploading method and management method and file designation method based on BIM models
CN108009758A (en) * 2018-01-09 2018-05-08 中建七局安装工程有限公司 A kind of site operation material intelligent management based on BIM
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108090610A (en) * 2017-12-14 2018-05-29 四川建筑职业技术学院 Orbit construction system based on BIM technology
CN108121704A (en) * 2016-11-28 2018-06-05 星际空间(天津)科技发展有限公司 A kind of three-dimensional final acceptance of construction system
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108389004A (en) * 2018-03-16 2018-08-10 杭州市建筑设计研究院有限公司 A kind of engineering process dynamic cost managing and control system and method based on BIM technology
CN108509653A (en) * 2018-04-18 2018-09-07 苏州智在云数据科技有限公司 A kind of BIM building WEB terminal visualization engine and its application method
CN108510181A (en) * 2018-03-28 2018-09-07 浙江泛华工程监理有限公司 A kind of project supervision inspection of quality actual measurement actual quantities method and its system
CN108536403A (en) * 2017-03-06 2018-09-14 无锡飞谱电子信息技术有限公司 A kind of visual two-dimentional and three-dimensional data analysis system
CN108560936A (en) * 2018-01-17 2018-09-21 江苏中南建设装饰有限公司 Curtain wall engineering construction unique encodings positioning system
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108920826A (en) * 2018-06-29 2018-11-30 华中科技大学 A method of community network is generated and analyzed from Building Information Model design process
CN109502441A (en) * 2018-12-14 2019-03-22 广东马上到网络科技有限公司 A kind of acceptance of lift detection method and system
CN109800445A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
CN110689614A (en) * 2019-09-20 2020-01-14 北京禹数技术有限公司 Method, medium, device and system for collecting device information based on electronic map
CN111311203A (en) * 2020-04-01 2020-06-19 陕西工业职业技术学院 BIM-based engineering progress control system
CN111562042A (en) * 2020-05-28 2020-08-21 关蕙 Safety information monitoring method and system in underground garage construction
CN112000036A (en) * 2020-08-14 2020-11-27 河南高建工程管理有限公司 Remote monitoring management system and method thereof
CN112487534A (en) * 2020-11-30 2021-03-12 中建八局轨道交通建设有限公司 BIM technology-based method for analyzing net height of building
CN112488879A (en) * 2020-12-02 2021-03-12 滨州学院 Intelligent construction site management system based on BIM model
CN112783131A (en) * 2021-01-08 2021-05-11 上海景事科技有限公司 Wisdom building site thing networking systems based on big data
CN113343342A (en) * 2021-07-07 2021-09-03 贵州百胜工程建设咨询有限公司 BIM technology-based construction engineering quantity analysis management method and system and computer storage medium
CN113656402A (en) * 2021-07-13 2021-11-16 广东省国际工程咨询有限公司 Engineering project full life cycle data recording and storing method and device based on BIM

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels

Cited By (65)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373876A (en) * 2015-08-26 2016-03-02 吕曼 Engineering model used in intelligent engineering construction project management system
CN106475781A (en) * 2015-08-31 2017-03-08 上海宝冶集团有限公司 Automatization's method for prefabricating of metallurgical pipeline
CN105426972A (en) * 2015-10-28 2016-03-23 上海同筑信息科技有限公司 Engineering project intelligent operation management method and system based on BIM
CN105335558A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering circle establishment method and system on basis of BIM (building information modeling)
CN105354392A (en) * 2015-12-01 2016-02-24 百川伟业(天津)建筑科技股份有限公司 Building information modeling (BIM) family bank based content distribution system and device
CN105654243A (en) * 2015-12-31 2016-06-08 上海筑想信息科技股份有限公司 Orbital graph based project information automated processing system
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN105844336A (en) * 2016-03-15 2016-08-10 杭州睿兴栋宇工程咨询有限公司 BIM-based property management system and method
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN106228476A (en) * 2016-07-01 2016-12-14 杭州睿兴栋宇工程咨询有限公司 Property work order dispatch system based on BIM and send method
CN106157366A (en) * 2016-08-03 2016-11-23 上海同筑信息科技有限公司 Ultra-large scene based on BIM renders optimization method and system in mobile terminal
CN107688881A (en) * 2016-08-03 2018-02-13 中国铁道科学研究院铁道建筑研究所 A kind of span bridge construction monitoring management system based on BIM technology
CN106354945A (en) * 2016-08-31 2017-01-25 天河大成建筑云科技(天津)有限公司 Device and method for dynamic association of two-dimensional and three-dimensional engineering data based on building information modeling lightweight
CN106485405A (en) * 2016-09-28 2017-03-08 燕山大学 A kind of building industry rural migrant worker's preferred administration method based on BIM
CN108121704B (en) * 2016-11-28 2021-05-07 星际空间(天津)科技发展有限公司 Three-dimensional completion acceptance system
CN108121704A (en) * 2016-11-28 2018-06-05 星际空间(天津)科技发展有限公司 A kind of three-dimensional final acceptance of construction system
CN106600231A (en) * 2016-12-14 2017-04-26 国网上海市电力公司 Dynamic management system for infrastructure projects
CN106779448A (en) * 2016-12-28 2017-05-31 南京建工集团有限公司 Construction equipment intelligent management apapratus and the intelligent management system of the device is set
CN106779620A (en) * 2016-12-30 2017-05-31 广州市凯思软件工程有限公司 Digitized Design Platform building method based on IPD systems
CN106647585A (en) * 2017-01-20 2017-05-10 深圳广田集团股份有限公司 Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet
CN108536403A (en) * 2017-03-06 2018-09-14 无锡飞谱电子信息技术有限公司 A kind of visual two-dimentional and three-dimensional data analysis system
CN107145619A (en) * 2017-03-10 2017-09-08 宁波诺丁汉大学 Function plate design system based on the comprehensive integrated cloud platforms of BIM
CN107103406A (en) * 2017-03-28 2017-08-29 国网山东省电力公司信息通信公司 A kind of supporting communication engineering entire process monitoring system of capital construction and its method
CN106997511A (en) * 2017-04-05 2017-08-01 中铁四局集团有限公司 Railway beam course management system and railway beam a management method based on BIM technology
CN107358401A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project
CN107358401B (en) * 2017-06-09 2021-04-13 上海嘉实(集团)有限公司 Intelligent management system/method for building project, readable storage medium and terminal
CN107357957A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107133787B (en) * 2017-06-26 2023-10-27 山东奥联信息科技有限公司 Highway engineering management method and system
CN107133787A (en) * 2017-06-26 2017-09-05 山东奥联信息科技有限公司 Highway project management method and system
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models
CN107516165A (en) * 2017-08-15 2017-12-26 南通市交通建设咨询监理有限公司 A kind of project supervision KXG based on BIM
CN107578466A (en) * 2017-09-04 2018-01-12 苏州英诺迈医学创新服务有限公司 A kind of medicine equipment methods of exhibiting and device
CN107578466B (en) * 2017-09-04 2020-12-29 苏州英诺迈医学创新服务有限公司 Medical instrument display method and device
CN107666389A (en) * 2017-09-16 2018-02-06 杭州弼木建筑科技有限公司 A kind of structural strengthening model lightweight secrecy system based on BIM
CN107679310A (en) * 2017-09-26 2018-02-09 华北电力大学 The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology
CN107846461A (en) * 2017-10-31 2018-03-27 广州市新誉工程咨询有限公司 File uploading method and management method and file designation method based on BIM models
CN108090610A (en) * 2017-12-14 2018-05-29 四川建筑职业技术学院 Orbit construction system based on BIM technology
CN108009758A (en) * 2018-01-09 2018-05-08 中建七局安装工程有限公司 A kind of site operation material intelligent management based on BIM
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108009758B (en) * 2018-01-09 2022-04-15 中建七局安装工程有限公司 BIM-based intelligent management method for field construction materials
CN108560936B (en) * 2018-01-17 2020-07-28 江苏中南建设装饰有限公司 Unique coding positioning system for curtain wall engineering construction
CN108560936A (en) * 2018-01-17 2018-09-21 江苏中南建设装饰有限公司 Curtain wall engineering construction unique encodings positioning system
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108389004A (en) * 2018-03-16 2018-08-10 杭州市建筑设计研究院有限公司 A kind of engineering process dynamic cost managing and control system and method based on BIM technology
CN108510181B (en) * 2018-03-28 2021-06-18 浙江泛华工程咨询有限公司 Method and system for checking and actually measuring engineering supervision quality
CN108510181A (en) * 2018-03-28 2018-09-07 浙江泛华工程监理有限公司 A kind of project supervision inspection of quality actual measurement actual quantities method and its system
CN108509653A (en) * 2018-04-18 2018-09-07 苏州智在云数据科技有限公司 A kind of BIM building WEB terminal visualization engine and its application method
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108920826A (en) * 2018-06-29 2018-11-30 华中科技大学 A method of community network is generated and analyzed from Building Information Model design process
CN109800445A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN109502441A (en) * 2018-12-14 2019-03-22 广东马上到网络科技有限公司 A kind of acceptance of lift detection method and system
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
CN110689614A (en) * 2019-09-20 2020-01-14 北京禹数技术有限公司 Method, medium, device and system for collecting device information based on electronic map
CN110689614B (en) * 2019-09-20 2023-08-22 北京禹数技术有限公司 Electronic map-based equipment information collection method, medium, equipment and system
CN111311203A (en) * 2020-04-01 2020-06-19 陕西工业职业技术学院 BIM-based engineering progress control system
CN111311203B (en) * 2020-04-01 2023-08-22 陕西工业职业技术学院 Engineering progress management and control system based on BIM
CN111562042A (en) * 2020-05-28 2020-08-21 关蕙 Safety information monitoring method and system in underground garage construction
CN112000036A (en) * 2020-08-14 2020-11-27 河南高建工程管理有限公司 Remote monitoring management system and method thereof
CN112487534A (en) * 2020-11-30 2021-03-12 中建八局轨道交通建设有限公司 BIM technology-based method for analyzing net height of building
CN112488879A (en) * 2020-12-02 2021-03-12 滨州学院 Intelligent construction site management system based on BIM model
CN112783131A (en) * 2021-01-08 2021-05-11 上海景事科技有限公司 Wisdom building site thing networking systems based on big data
CN113343342A (en) * 2021-07-07 2021-09-03 贵州百胜工程建设咨询有限公司 BIM technology-based construction engineering quantity analysis management method and system and computer storage medium
CN113656402A (en) * 2021-07-13 2021-11-16 广东省国际工程咨询有限公司 Engineering project full life cycle data recording and storing method and device based on BIM

Similar Documents

Publication Publication Date Title
CN104680320A (en) BIM-based project management system and method
CN104766155B (en) The management method and system of engineering project element based on BIM
CN104504497B (en) BIM engineering information management system and method
LU501999A1 (en) Pumped storage power station comprehensive management method, platform and system, device and medium
CN102509330B (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN111369158A (en) BIM-based informatization quality management method and system
CN102750618B (en) A kind of comprehensive pipeline of metro construction aided management system and implementation method
CN106595565A (en) BIM-based intelligent monitoring system
CN109491735B (en) Integrated data generation and verification integrated monitoring human-computer interface configuration implementation method
CN108388711A (en) A kind of engineering design based on BIM and management system
CN103885788A (en) Dynamic WEB 3D virtual reality scene construction method and system based on model componentization
CN103473720A (en) Shield tunnel construction management system based on BIM
CN103530826A (en) BIM (Building Information Modeling)-based shield method tunnel construction management method
CN111967077A (en) Engineering construction management digital platform based on BIM technology
CN104866952A (en) Three-dimensional digital management implementation method for hydropower station engineering project
CN106780770B (en) Real community three-dimensional scene editing system based on PC (personal computer) terminal
CN114037097A (en) BIM model-based equipment operation and maintenance management method
CN105426972A (en) Engineering project intelligent operation management method and system based on BIM
CN102609985A (en) Three-dimensional power station graphic platform
CN111651818A (en) BIM model rapid change method
CN107145673A (en) A kind of combined simulation system and method
CN109784789A (en) Mine business cooperation job control method, device, system and storage medium
CN111666619A (en) BIM technology-based substation engineering implementation field digital management system
CN111035925B (en) Method and device for generating virtual traffic road network model in game and electronic device
CN109063223B (en) BIM model light weight method and device and BIM model processing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160118

Address after: 200093 Shanghai City, Yangpu District National Road No. 323 room 701-16

Applicant after: Shanghai is with building Information technology company limited

Applicant after: State Grid (Shanghai) smart grid research & Development Investment Co., Ltd.

Address before: 200093 Shanghai City, Yangpu District National Road No. 323 room 701-16

Applicant before: Shanghai is with building Information technology company limited

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication