CN108389004A - A kind of engineering process dynamic cost managing and control system and method based on BIM technology - Google Patents

A kind of engineering process dynamic cost managing and control system and method based on BIM technology Download PDF

Info

Publication number
CN108389004A
CN108389004A CN201810220325.9A CN201810220325A CN108389004A CN 108389004 A CN108389004 A CN 108389004A CN 201810220325 A CN201810220325 A CN 201810220325A CN 108389004 A CN108389004 A CN 108389004A
Authority
CN
China
Prior art keywords
cost
information
supplier
data
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810220325.9A
Other languages
Chinese (zh)
Inventor
许广贺
陈统
邵颜
李志�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Architectural Design Research Institute Co Ltd
Original Assignee
Hangzhou Architectural Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Architectural Design Research Institute Co Ltd filed Critical Hangzhou Architectural Design Research Institute Co Ltd
Priority to CN201810220325.9A priority Critical patent/CN108389004A/en
Publication of CN108389004A publication Critical patent/CN108389004A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of engineering process dynamic cost managing and control system and method based on BIM technology, belong to project management system field, solve the problems, such as that cost accounting is difficult in existing construction project, its key points of the technical solution are that, include smart machine, WEB server, data memory module, the data analysis module being connected with each other using development of Mobile Internet technology, further include by data analysis module, wherein data analysis module filters out the pel example of material requested by using Filter Element Collector classes(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to the composition proportion information of respective material)Identical parameters and the identical material of pel are merged into output summary information, a kind of the engineering process dynamic cost managing and control system and method based on BIM technology of the present invention realizes calculating and analysis to material requested cost in building, is checked and management and control convenient for personnel are short-period.

Description

A kind of engineering process dynamic cost managing and control system and method based on BIM technology
Technical field
The present invention relates to project management system and method, more particularly to it is a kind of based on BIM technology engineering process dynamic at This managing and control system and method.
Background technology
With economic fast development, the quantity and scale of engineering construction project increasingly increase, and it is low how to improve construction industry The loss that the management condition of effect, reduction mistake are brought has become the problem of every country is paid attention to.
For building cost field, in engineering project, cost can be effectively reduced by implementing project cost control, will Actual cost controls within objective cost, to obtain more profits.Forecasting of cost is the starting point of cost management, and China is current Building cost forecasting software be mainly budget class software, important booster action is played to cost budgeting, however due to skill The limitation of art and operating mode, existing cost budgeting flow and software are there is many problems, difficult one of cost accounting Main cause is exactly that data are huge, and construction involves lot of materials, and the price moment of each material changes, and each stage charging all needs The a large amount of calculating and analysis for wanting personnel, carry out short cycle(The moon, season)Cost analysis is more difficult, and therefore, there is also certain Room for improvement.
Invention content
The first object of the present invention is to provide a kind of engineering process dynamic cost managing and control system based on BIM technology, realizes Calculating and analysis to material requested cost in building are checked and management and control convenient for personnel are short-period.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of engineering process dynamic cost managing and control system based on BIM technology, including:
Smart machine, the user having permission can log in and input instruction, be controlled to BIM models according to the command information of input System, to carry out data management to BIM models and operating mode;
WEB server will be received from for carrying out data synchronization between smart machine, WEB server, data memory module The instruction of the instruction of smart machine and WEB server input is sent to data memory module;
Data memory module, for store and according to by WEB server reception smart machine and WEB server instruction with Update BIM models;
Data analysis module filters out the pel example of material requested by using Filter Element Collector classes (That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material at Distribution ratio information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module receives the summary information of data analysis module output to calculate the cost of material requested;
Letter is realized using development of Mobile Internet technology between smart machine, WEB server, data memory module, data analysis module The real-time upload of breath is downloaded.
Using the above scheme, it can be uploaded and be downloaded in real time using mobile Internet, the scene of capable of reacting in a short time Construction Condition, and stored by data memory module, the user only having permission, which could enter, to check and changes, and ensure that The safety and reliability of data, while by the cost of cost budgeting module calculating material requested, reducing personnel and calculating appearance Error, also saves calculating and the analysis time of personnel.
Preferably, the cost budgeting module includes:
Schedule of prices database corresponds to the quotation of different suppliers for storing each material;
Database update unit, the data information for timely updating in schedule of prices database, the deletion of listings data add Add, change and restores;
Comparing unit corresponds to the material that supplier supplies for comparing and analyzing the price variance between each supplier and calculate output Expect cost data.
Using the above scheme, the supplier of material requested is summarized by preservation for commodity price by schedule of prices database, And carry out the update of data in time by database update unit so that the calculated price of staff is accurate, finally by than Unit exports the supply of material material cost data of each supplier and is used so that personnel purchase.
Preferably, the comparing unit includes by the contract monitoring unit of contract information typing, comparing unit will be signed and be closed Same supplier's supply cost and the supplier's supply cost that do not sign a contract are compared export price different information.
Using the above scheme, it by the setting of contract monitoring unit, is closed by the supplier to have signed a contract and without signing Supply cost difference between same supplier is analyzed and exported to be used so that personnel purchase.
Preferably, the cost budgeting module further includes alarm unit, the alarm unit is by cheapest supply Quotient is marked, while interval time exports the price difference between the supplier and lowest price supplier of current contract signing It is different.
Using the above scheme, by the setting of alarm unit, be more clear analyze the supplier of current contract signing with And the price variance between lowest price supplier.
Preferably, the cost budgeting module can be connect by internet with data analysis module and summarize letter to receive Breath, or summary information is directed into cost budgeting module by way of importing fileinfo and carries out cost calculation.
Using the above scheme, summary information is received by way of internet connection, more simply, conveniently, by leading Entering the mode of fileinfo realizes the network that do not network and can also carry out the calculating and analysis of cost, more practical.
Preferably, the smart machine includes:
BIM model cootrol modules, can be used for controlling the displaying of BIM models, and amplification, diminution, rotation, section and display are therein each Structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device:It is modified to operating mode attribute information according to the work information of construction ground to update BIM model datas, Then by WEB server between smart machine, WEB server, data memory module synchronized update operating mode content.
Using the above scheme, it is modified more to operating mode attribute information according to the work information of construction ground by smart machine New BIM model datas easily facilitate the management and control of cost to realize the Construction Condition at the scene of reacting in a short time.
Preferably, the smart machine includes the password login list for carrying out system login for the input of password and account Member and for fingerprint input nucleus to carry out system login fingerprint log in unit.
Using the above scheme, it is logged in such a way that password and account or fingerprint log in, the user having permission is It can enter and check and change, ensure that the safety and reliability of data.
The second object of the present invention is to provide a kind of engineering process dynamic cost management-control method based on BIM technology, realizes Calculating and analysis to material requested cost in building are checked and management and control convenient for personnel are short-period.
A kind of engineering process dynamic cost management-control method based on BIM technology, includes the following steps:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel Breath;
Step 4: receiving the summary information of data analysis module output by cost budgeting module and according to data summarization information meter The cost of the Suan Ge suppliers supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies The quotation difference of quotient is analyzed and the buying of material for personnel.
Using the above scheme, the displaying that BIM models are controlled by condition of construction, modifies to come more to operating mode attribute information New BIM model datas realize the Construction Condition at the scene of reacting in a short time, and calculate material requested by cost budgeting module Cost, reduction personnel calculate make a fault, also save calculating and the analysis time of personnel.
In conclusion the invention has the advantages that:
It can be uploaded and be downloaded in real time by using mobile Internet, the Construction Condition at the scene of capable of reacting in a short time, and logical It crosses data memory module to be stored, the user only having permission, which could enter, to check and change, and ensure that the safety of data And reliability, while by the cost of cost budgeting module calculating material requested, reduction personnel calculate and make a fault, also save The calculating of personnel and analysis time.
Description of the drawings
Fig. 1 is the system block diagram of Cost Management System in the present embodiment;
Fig. 2 is the modularization block diagram of smart machine in the present embodiment;
Fig. 3 is the modularization block diagram of cost budgeting module in the present embodiment.
In figure:1, smart machine;11, password login unit;12, fingerprint logs in unit;13, BIM model cootrols module; 14, model modification device;2, WEB server;3, data memory module;4, data analysis module;5, cost budgeting module;51、 Schedule of prices database;52, database update unit;53, comparing unit;54, alarm unit.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
A kind of engineering process dynamic cost managing and control system based on BIM technology disclosed in the present embodiment, in conjunction with Fig. 1 and Fig. 2 It is shown, including:
Smart machine 1, the user having permission can log in and input instruction, be carried out to BIM models according to the command information of input Control, to carry out data management to BIM models and operating mode;
WEB server 2 will connect for carrying out data synchronization between smart machine 1, WEB server 2, data memory module 3 It receives the instruction that instruction and WEB server 2 from smart machine 1 input and is sent to data memory module 3;
Data memory module 3, for storing and receiving smart machine 1 and the finger of WEB server 2 according to by WEB server 2 It enables to update BIM models;
Data analysis module 4 filters out the pel example of material requested by using Filter Element Collector classes (That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material at Distribution ratio information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module 5 receives the summary information of the output of data analysis module 4 to calculate the cost of material requested;
It is real using development of Mobile Internet technology between smart machine 1, WEB server 2, data memory module 3, data analysis module 4 The real-time upload of existing information is downloaded.
Wherein smart machine 1 can be the intelligent slidings moved end such as the ends mobile, the ends PAD, can facilitate the carrying of personnel, with When used everywhere in job location, and smart machine 1 includes:
Password login unit 11, the input for password and account carry out system login;
Fingerprint logs in unit 12, for fingerprint input nucleus to carrying out system login;
BIM model cootrols module 13, can be used for controlling the displaying of BIM models, and amplification, diminution, rotation, section and display are therein Each structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device 14:It is modified to operating mode attribute information according to the work information of construction ground to update BIM pattern numbers According to then by WEB server 2 between smart machine 1, WEB server 2, data memory module 3 in synchronized update operating mode Hold, all data are updated using development of Mobile Internet technology, do not need personnel in intermediate transit, reduce error and data are lost The risk of mistake.
As shown in figure 3, cost budgeting module 5 includes:
Schedule of prices database 51 corresponds to the quotation of different suppliers for storing each material;
Database update unit 52, the data information for timely updating in schedule of prices database 51, the deletion of listings data, Addition, modification and recovery;
Comparing unit 53, for comparing and analyzing the price variance between each supplier and calculate the corresponding supplier's supply of material of output Material cost data;Wherein comparing unit 53 includes that will sign the contract monitoring unit of contract information typing for comparing unit 53 The supplier's supply cost made a contract and the supplier's supply cost that do not sign a contract are compared export price different information;
Cheapest supplier is marked for alarm unit 54, alarm unit 54, while interval time exports current contract Price variance between the supplier and lowest price supplier of signing.
Cost budgeting module 5 can be connect by internet to receive summary information with data analysis module 4, or pass through importing Summary information is directed into cost budgeting module 5 and carries out cost calculation by the mode of fileinfo.
A kind of engineering process dynamic cost management-control method based on BIM technology, in conjunction with shown in Fig. 1 and Fig. 2, including walks as follows Suddenly:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel Breath, wherein summary information can be exported with the format of excel;
Step 4: receiving the summary information of the output of data analysis module 4 by cost budgeting module 5 and according to data summarization information Calculate the cost of each supplier's supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies The quotation difference of quotient is analyzed and the buying of material for personnel.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (8)

1. a kind of engineering process dynamic cost managing and control system based on BIM technology, it is characterized in that:Including:
Smart machine(1), the user having permission can log in and input instruction, according to the command information of input to BIM models into Row control, to carry out data management to BIM models and operating mode;
WEB server(2), for smart machine(1), WEB server(2), data memory module(3)Between carry out data it is same Step, will be received from smart machine(1)Instruction and WEB server(2)The instruction of input is sent to data memory module(3);
Data memory module(3), pass through WEB server for storing simultaneously basis(2)Receive smart machine(1)And WEB service Device(2)Instruction to update BIM models;
Data analysis module(4), the pel reality of material requested is filtered out by using Filter Element Collector classes Example(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material Composition proportion information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module(5), receive data analysis module(4)The summary information of output is to calculate the cost of material requested;
Smart machine(1), WEB server(2), data memory module(3), data analysis module(4)Between use mobile interchange Network technology realizes that the real-time upload of information is downloaded.
2. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that: The cost budgeting module(5)Including:
Schedule of prices database(51), the quotation of different suppliers is corresponded to for storing each material;
Database update unit(52), for the schedule of prices database that timely updates(51)Interior data information, listings data It deletes, addition, change and restore;
Comparing unit(53), for comparing and analyzing the price variance between each supplier and calculate the corresponding supplier's supply of material of output Material cost data.
3. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 2, it is characterized in that: The comparing unit(53)Include by the contract monitoring unit of contract information typing, comparing unit(53)The supplier that will be signed a contract Supply cost and the supplier's supply cost that do not sign a contract are compared export price different information.
4. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 3, it is characterized in that: The cost budgeting module(5)It further include alarm unit(54), the alarm unit(54)Cheapest supplier is carried out Label, at the same interval time export the price variance between the supplier and lowest price supplier of current contract signing.
5. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 2, it is characterized in that: The cost budgeting module(5)It can be with data analysis module(4)It is connected by internet to receive summary information, or passes through importing Summary information is directed into cost budgeting module by the mode of fileinfo(5)Carry out cost calculation.
6. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that: The smart machine(1)Including:
BIM model cootrol modules(13), can be used for controlling the displaying of BIM models, amplification, diminution, rotation, section and display are wherein Each structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device(14):It is modified to operating mode attribute information according to the work information of construction ground to update BIM models Then data pass through WEB server(2)In smart machine(1), WEB server(2), data memory module(3)Between it is synchronous more New operating mode content.
7. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that: The smart machine(1)It include the password login unit that system login is carried out for the input of password and account(11)With for referring to Line input nucleus logs in unit to the fingerprint for carrying out system login(12).
8. a kind of engineering process dynamic cost management-control method based on BIM technology, it is characterized in that:Include the following steps:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel Breath;
Step 4: passing through cost budgeting module(5)Receive data analysis module(4)The summary information of output and according to data summarization Information calculates the cost of each supplier's supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies The quotation difference of quotient is analyzed and the buying of material for personnel.
CN201810220325.9A 2018-03-16 2018-03-16 A kind of engineering process dynamic cost managing and control system and method based on BIM technology Pending CN108389004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810220325.9A CN108389004A (en) 2018-03-16 2018-03-16 A kind of engineering process dynamic cost managing and control system and method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810220325.9A CN108389004A (en) 2018-03-16 2018-03-16 A kind of engineering process dynamic cost managing and control system and method based on BIM technology

Publications (1)

Publication Number Publication Date
CN108389004A true CN108389004A (en) 2018-08-10

Family

ID=63066612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810220325.9A Pending CN108389004A (en) 2018-03-16 2018-03-16 A kind of engineering process dynamic cost managing and control system and method based on BIM technology

Country Status (1)

Country Link
CN (1) CN108389004A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214858A (en) * 2018-08-17 2019-01-15 上海海智在线网络科技有限公司 A kind of components 3D drawing is intelligently verified prices system and method
CN109871257A (en) * 2019-02-19 2019-06-11 广州视源电子科技股份有限公司 A kind of page elements display methods, device and equipment
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111506997A (en) * 2020-04-15 2020-08-07 国网福建省电力有限公司漳州供电公司 Power engineering quantity calculation method based on BIM
CN112380661A (en) * 2020-12-04 2021-02-19 升维科技有限公司 Building management pipeline arrangement optimization system based on BIM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278268A1 (en) * 2013-03-15 2014-09-18 Iti- Innovative Technology Inc. Method for mapping elements of a construction project
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM
CN106934540A (en) * 2017-03-07 2017-07-07 西安理工大学 A kind of architecture engineering material cost budgeting method based on Revit
CN107133386A (en) * 2017-04-10 2017-09-05 东易日盛家居装饰集团股份有限公司 A kind of fitment material for family consumption inventory generation method and system based on BIM softwares
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278268A1 (en) * 2013-03-15 2014-09-18 Iti- Innovative Technology Inc. Method for mapping elements of a construction project
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM
CN106934540A (en) * 2017-03-07 2017-07-07 西安理工大学 A kind of architecture engineering material cost budgeting method based on Revit
CN107133386A (en) * 2017-04-10 2017-09-05 东易日盛家居装饰集团股份有限公司 A kind of fitment material for family consumption inventory generation method and system based on BIM softwares
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵占军: ""BIM技术在施工阶段的成本控制管理"", 《建筑技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214858A (en) * 2018-08-17 2019-01-15 上海海智在线网络科技有限公司 A kind of components 3D drawing is intelligently verified prices system and method
CN109871257A (en) * 2019-02-19 2019-06-11 广州视源电子科技股份有限公司 A kind of page elements display methods, device and equipment
CN109871257B (en) * 2019-02-19 2023-02-17 广州视源电子科技股份有限公司 Page element display method, device and equipment
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111428965B (en) * 2020-02-27 2023-11-03 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111506997A (en) * 2020-04-15 2020-08-07 国网福建省电力有限公司漳州供电公司 Power engineering quantity calculation method based on BIM
CN112380661A (en) * 2020-12-04 2021-02-19 升维科技有限公司 Building management pipeline arrangement optimization system based on BIM

Similar Documents

Publication Publication Date Title
CN108389004A (en) A kind of engineering process dynamic cost managing and control system and method based on BIM technology
JP6511120B2 (en) Product development management system and method
CN202093536U (en) Intelligent routing inspection system for substation equipment
CN103164754A (en) Method and manufacturing execution system (MES) framework for production management and control process of clothing industry
CN106202401A (en) A kind of insulator Life cycle information management platform and method thereof
CN104040583A (en) Dynamic tagging to create logical models and optimize caching in energy management systems
CN108280122A (en) The contract management system of configurable contract template
CN103456202A (en) Analogue simulation device based on plane test flight training and system thereof
CN103489078A (en) Intelligent charging and battery-swapping service network asset life-cycle management method based on RFID
CN101540014A (en) Information system for applying radio frequency identification to facility and equipment maintenance and management and method thereof
CN107229791A (en) Cost of construction metering method and device
CN107967522A (en) A kind of power grid technological transformation overhaul engineering Cost Management System and its control method
CN114970176B (en) Virtual simulation method and device for electric power operation, computer equipment and storage medium
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN108364123A (en) A kind of construction machinery managing device based on BIM technology
CN105701220B (en) A kind of intra-enterprise business data system and processing method
CN108959227A (en) A kind of self-defined report system and method based on B/S framework
CN112990886A (en) Aviation industry data management display system based on mobile phone terminal
CN102866985B (en) For data formatter and the method for on-line analysing processing system
CN104765348A (en) Energy amount measuring system
CN116796950A (en) Online review system and method for power distribution network project capable of being researched
CN107423035A (en) A kind of software development process product data management system
CN103247087A (en) City distribution network graphical intelligent anti-misoperation system and method of system
CN115293798A (en) Method and system for budget management of expropriation project based on BIM + GIS
CN115438812A (en) Life-saving management method and device for power transmission equipment, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810

RJ01 Rejection of invention patent application after publication