CN108959227A - A kind of self-defined report system and method based on B/S framework - Google Patents

A kind of self-defined report system and method based on B/S framework Download PDF

Info

Publication number
CN108959227A
CN108959227A CN201810764220.XA CN201810764220A CN108959227A CN 108959227 A CN108959227 A CN 108959227A CN 201810764220 A CN201810764220 A CN 201810764220A CN 108959227 A CN108959227 A CN 108959227A
Authority
CN
China
Prior art keywords
task
data
summarize
summarizes
report
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810764220.XA
Other languages
Chinese (zh)
Inventor
刘恩琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Inspur Cloud Computing Service Co Ltd
Original Assignee
Shandong Hui Trade Electronic Port Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hui Trade Electronic Port Co Ltd filed Critical Shandong Hui Trade Electronic Port Co Ltd
Priority to CN201810764220.XA priority Critical patent/CN108959227A/en
Publication of CN108959227A publication Critical patent/CN108959227A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a kind of self-defined report system and methods based on B/S framework, including metadata management module, define primary data information (pdi) to be treated;Data summarization module summarizes calculation method by formulating, summarizes to initial data;Template management module stores several report templates, and order creation corresponding report template according to demand, carrys out the data information that display data summarizing module summarizes.A kind of self-defined report system and method based on B/S framework compared with prior art, can greatly improve data summarization inquiry velocity, can also provide threshold value and the time excludes the advanced inquiries such as setting, practical, applied widely, easy to spread.

Description

A kind of self-defined report system and method based on B/S framework
Technical field
The present invention relates to computer application technology, specifically a kind of practical, making by oneself based on B/S framework Adopted reporting system and method.
Background technique
With the continuous development of Internet technology, more and more enterprise's selection cloud computings are to cope with ever-increasing calculating Demand.But along with the continuous expansion of cloud computing center scale, the equipment for needing to manage is more and more, and operation maintenance personnel needs daily Check a large amount of report data, research staff is also required to cover report tool according to different O&M demand overlapping development more, lead Plenty of time and manpower is caused to be wasted in above repeated construction.
In view of the situation, it is a kind of can adapt to a variety of report demands to need to develop, the Report technique that can customize, with Mitigate the development amount of traditional O&M report.
Summary of the invention
Technical assignment of the invention is place against the above deficiency, provides a kind of practical, making by oneself based on B/S framework Adopted reporting system and method.
The present invention provides a kind of self-defined report system based on B/S framework, including,
Metadata management module defines primary data information (pdi) to be treated;
Data summarization module summarizes calculation method by formulating, summarizes to initial data;
Template management module stores several report templates, and order creation corresponding report template according to demand, carrys out display data remittance The data information that total module summarizes.
Tables of data is configured in the metadata management module, which is the exclusive source of data, field, metadata Management module redefines the process of arrangement for carrying out redefining arrangement to field in tables of data are as follows: setting explanation of field Type, be arranged exhibition method, i.e., configuration report show device type, show field aggregate type, show network element up and down Grade relationship, while measurement unit and data source are set, summarize for follow-up data and report shows and uses.
In the data summarization module, it is configured with:
Summarize coordinates measurement unit, summarize direction for determination, this summarizes, and direction includes whether to summarize there are the time, network element converges Always;
Summarize task generation unit, the generation task that executes is triggered by timed task Quartz, reading summarizes routing table and obtains setting Summarize path, then sequentially generate that the corresponding time summarizes task and network element summarizes task;
Time collection unit is summarized for determining the data summarization period by minute, hour, day, week, the moon and/or year;
Low-level network element data is aggregated into high-level network element, simultaneously according to network element relationship between superior and subordinate by network element collection unit step by step Generating the corresponding time summarizes data;
Summarize task executing units, when it is present between when summarizing, summarized according to the summarized manner that time collection unit determines; When summarizing there are network element, then summarize according to the network element that network element collection unit is specified;Then in conjunction with template management module, will summarize Data afterwards are come out by specified template for displaying.
It is described summarize coordinates measurement unit determine summarize direction during, can configure according to former tables of data have field into What generation was new after row mathematical computations summarizes field, for report displaying, it may be assumed that association pass is established from existing metadata type System, the corresponding time summarize and network element summarize generate it is corresponding summarize tables of data, number is taken out in tables of data from summarizing when report is shown According to.
It is described to summarize in task executing units, summarize task by timed task Quartz and triggers execution, specific implementation procedure Are as follows: executing required for current point in time for task is taken out in access task library first, is appointed according to different establish of affiliated time granularity Business executing rule is as follows:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once;
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes failure Or be not carried out, current task is executed, no longer executes current task if the frequency of failure has been more than maximum times limitation, without departing from Task can continue to execute;
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that the time is executed, when reality starts Between, actual finish time, while corresponding data summary table is updated, Time To Failure and failure are recorded if task execution failure Number.
The process of report template is created in the template management module are as follows: configuration report shows which field, definition sequence And data screening, threshold value, switching chart and report mode are defined, export task is configured;Then the display data in report template Source, template name and the data field for needing to show.
A kind of self-defined report method based on B/S framework realizes process are as follows:
One, first by defining primary data information (pdi) to be treated by metadata management module;
Two, then data summarization module, setting summarize path, it is specified that data summarization flow direction, and what is additionally generated summarize word Section, generation summarize task and execute;
Three, creation corresponding report template is finally ordered according to demand by template management module, then display data summarizing module is converged Total data information.
In the step 2, task generates and executes to be triggered by timed task Quartz and executes:
1) read first summarize that routing table obtains setting summarize path, then sequentially generating the corresponding time summarizes task and net Member summarizes task;
2) summarize task and execution is triggered by timed task Quartz, access task library first is taken out and executed required for current point in time Task, according to the difference of affiliated time granularity establish task execution rule it is as follows:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once;
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes failure Or be not carried out, execute current task;Current task is no longer executed if the frequency of failure has been more than maximum times limitation, without departing from Task can continue to execute;
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that the time is executed, when reality starts Between, actual finish time, while updating corresponding data summary table;Time To Failure and failure are recorded if task execution failure Number.
A kind of self-defined report system and method based on B/S framework of the invention, has the advantage that
1) a variety of O&M scenarios are suitable for, can be adjusted at any time according to demand, flexible configuration, and support that data summarize automatically from Report management system is defined, the workload of traditional report exploitation can be greatly decreased, exempts operation maintenance personnel and artificial calculate is needed to summarize The work of data improves maintenance work efficiency.
2) demand, which need not carry out overlapping development, to be shown to different reports, only need to carry out in systems relevant configuration can obtain To required report style, the workload of the fixed report of exploitation tradition is greatly decreased, improves working efficiency.
3) summarized using data staging, the mechanism periodically summarized, tradition report when can effectively avoid the inquiry of big time span Waiting time is too long or even the appearance of database deadlocks situation.Report rendering can be completed in one minute.
4) summarized manner is flexible and changeable.The fixed report of tradition can only often take single-pathway to take calculate mean value to summarize mould Formula needs to re-start exploitation if demand change, time-consuming and laborious.This self-defined report system is using the configurable mould summarized Formula, data summarization path is configurable, and summarizing calculation can also be configured, and really realize customized summarize.
5) custom formula is supported to summarize.It can be obtained as needed according to having the self-editing aggregation formulas of field on summarizing path It is used to the new field that summarizes for inquiry.Traditional report does not support this mode then.
6) it supports according to condition to cross filter data.For there are the data that network element summarizes, report displayed page can be according to having matched The network element relationship between superior and subordinate set is associated search, quickly checks father/sub- network element state where abnormal network element.
7) data mining is supported.For the configured metadata for summarizing path, time and net can be carried out when showing report Brill and lower brill in data on first two paths.Report practicability is greatly improved, it is practical, it is applied widely, it is easy to push away Extensively.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Attached drawing 1 is each function structure chart of self-defined report system of the present invention.
Attached drawing 2 is whole realization block diagram of the invention.
Attached drawing 3 is data summarization flow chart of the present invention.
Attached drawing 4 is that the present invention summarizes task schedule flow chart.
Attached drawing 5 is that the present invention summarizes task product process figure.
Attached drawing 6 is to summarize task execution flow chart.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in attached drawing 1, Fig. 2, the present invention provides a kind of self-defined report system based on B/S framework, including,
Metadata management module defines primary data information (pdi) to be treated;
Data summarization module summarizes calculation method by formulating, summarizes to initial data;
Template management module stores several report templates, and order creation corresponding report template according to demand, carrys out display data remittance The data information that total module summarizes.
Tables of data is configured in the metadata management module, which is the exclusive source of data, field, metadata Management module redefines the process of arrangement for carrying out redefining arrangement to field in tables of data are as follows: setting explanation of field Type, be arranged exhibition method, i.e., configuration report show device type, show field aggregate type, show network element up and down Grade relationship, while measurement unit and data source are set, summarize for follow-up data and report shows and uses.
In the data summarization module, it is configured with:
Summarize coordinates measurement unit, summarize direction for determination, this summarizes, and direction includes whether to summarize there are the time, network element converges Always;
Summarize task generation unit, the generation task that executes is triggered by timed task Quartz, reading summarizes routing table and obtains setting Summarize path, then sequentially generate that the corresponding time summarizes task and network element summarizes task;
Time collection unit is summarized for determining the data summarization period by minute, hour, day, week, the moon and/or year;
Low-level network element data is aggregated into high-level network element, simultaneously according to network element relationship between superior and subordinate by network element collection unit step by step Generating the corresponding time summarizes data;
Summarize task executing units, when it is present between when summarizing, summarized according to the summarized manner that time collection unit determines; When summarizing there are network element, then summarize according to the network element that network element collection unit is specified;Then in conjunction with template management module, will summarize Data afterwards are come out by specified template for displaying.
As shown in attached drawing 3-6, it is described summarize coordinates measurement unit determine summarize direction during, can configure according to former number According to table have field generate after mathematical computations it is new summarize field, for report displaying, it may be assumed that from existing metadata type In establish incidence relation, the corresponding time summarize and network element summarize generate it is corresponding summarize tables of data, from total amount when report is shown According to taking out data in table.
It is described to summarize in task executing units, summarize task by timed task Quartz and triggers execution, specific implementation procedure Are as follows: executing required for current point in time for task is taken out in access task library first, is appointed according to different establish of affiliated time granularity Business executing rule is as follows:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once;
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes failure Or be not carried out, current task is executed, no longer executes current task if the frequency of failure has been more than maximum times limitation, without departing from Task can continue to execute;
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that the time is executed, when reality starts Between, actual finish time, while corresponding data summary table is updated, Time To Failure and failure are recorded if task execution failure Number.
The process of report template is created in the template management module are as follows: configuration report shows which field, definition sequence And data screening, threshold value, switching chart and report mode are defined, export task is configured;Then the display data in report template Source, template name and the data field for needing to show.
As shown in attached drawing 1- Fig. 6, a kind of self-defined report method based on B/S framework realizes process are as follows:
One, first by defining primary data information (pdi) to be treated by metadata management module;
Two, then data summarization module, setting summarize path, it is specified that data summarization flow direction, and what is additionally generated summarize word Section, generation summarize task and execute;
Three, creation corresponding report template is finally ordered according to demand by template management module, then display data summarizing module is converged Total data information.
Above-mentioned steps, which refer to, summarizes data flow by summarizing path definition, is counted in advance by Quartz timed task According to summarizing.Data summarization inquiry velocity can be greatly improved in this way, and can also provide threshold value and time excludes that setting etc. is advanced to look into It askes.
Described is that incidence relation is established from existing metadata type by summarizing path definition data flow, right Summarize between seasonable and network element summarize generate it is corresponding summarize tables of data, when report is shown from summarize taken out in tables of data data without It is to recalculate.
Described carries out data summarization by Quartz timed task in advance, is by timed task Quartz first according to remittance Total path generation summarizes task, and then basis summarizes task execution and summarizes, and summarized results is deposited to corresponding and summarizes tables of data, together Shi Gengxin execution status of task.
Further, the specific implementation process of the method for the present invention are as follows:
1) metadata acquisition.
By the configuration data table in metadata management module, field is redefined, including setting field is told a story Exhibition method is arranged in type, and setting measurement unit and data source etc. summarize for follow-up data and report shows and uses.Tables of data It is the exclusive source of data, field is also derived from tables of data.
2) data summarization.
Be arranged summarize path, it is specified that data summarization flow direction, and what is additionally generated summarize field.Summarizing routing information will Storage is saved to be used for timed task.It is as shown in Figure 4 to summarize task schedule process.Configuration completes to summarize path simultaneously in database Middle generation is corresponding to summarize tables of data.
3) summarize task generation.
Task is generated to be triggered by timed task Quartz and be executed.First read summarize routing table obtain setting summarize road Diameter, then sequentially generates that the corresponding time summarizes task and network element summarizes task, as shown in Figure 5.
4) summarize task execution.
Summarize task and execution is triggered by timed task Quartz, task execution flow chart is as shown in Figure 6.Task is accessed first Executing required for current point in time for task is taken out in library, and it is as follows to establish task execution rule according to the difference of affiliated time granularity:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once.
It is as shown in Figure 3 specifically to summarize flow chart.
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes Failure is not carried out, and executes current task.Current task is no longer executed if the frequency of failure has been more than maximum times limitation, not Exceeding for task can continue to execute.
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that executes the time, actually starts Time, actual finish time, while updating corresponding data summary table.Time To Failure and mistake are recorded if task execution failure Lose number.
5) template uses and report is shown.
Report template is configured in template management function, the data source including displaying, template name, the number for needing to show According to field etc..Report can carry out time range setting according to selected by user when showing, the date excludes, data permission filtering etc..
Above-mentioned specific embodiment is only specific case of the invention, and scope of patent protection of the invention includes but is not limited to Above-mentioned specific embodiment, any claim for meeting the self-defined report system and method for the invention based on B/S framework The appropriate change or replacement that the those of ordinary skill of book and any technical field does it, should all fall into of the invention Scope of patent protection.

Claims (8)

1. a kind of self-defined report system based on B/S framework, which is characterized in that including,
Metadata management module defines primary data information (pdi) to be treated;
Data summarization module summarizes calculation method by formulating, summarizes to initial data;
Template management module stores several report templates, and order creation corresponding report template according to demand, carrys out display data remittance The data information that total module summarizes.
2. a kind of self-defined report system based on B/S framework according to claim 1, which is characterized in that the member number According to tables of data is configured in management module, which is the exclusive source of data, field, and metadata management module is used for logarithm It carries out redefining arrangement according to field in table, redefines the process of arrangement are as follows: displaying side is arranged in setting explanation of field type The aggregate type of device type, displaying field that formula, i.e. configuration report are shown, the relationship between superior and subordinate for showing network element, are arranged simultaneously Measurement unit and data source, summarize for follow-up data and report shows and uses.
3. a kind of self-defined report system based on B/S framework according to claim 1, which is characterized in that the data In summarizing module, it is configured with:
Summarize coordinates measurement unit, summarize direction for determination, this summarizes, and direction includes whether to summarize there are the time, network element converges Always;
Summarize task generation unit, the generation task that executes is triggered by timed task Quartz, reading summarizes routing table and obtains setting Summarize path, then sequentially generate that the corresponding time summarizes task and network element summarizes task;
Time collection unit is summarized for determining the data summarization period by minute, hour, day, week, the moon and/or year;
Low-level network element data is aggregated into high-level network element, simultaneously according to network element relationship between superior and subordinate by network element collection unit step by step Generating the corresponding time summarizes data;
Summarize task executing units, when it is present between when summarizing, summarized according to the summarized manner that time collection unit determines; When summarizing there are network element, then summarize according to the network element that network element collection unit is specified;Then in conjunction with template management module, will summarize Data afterwards are come out by specified template for displaying.
4. a kind of self-defined report system based on B/S framework according to claim 3, which is characterized in that described to summarize During the determination of coordinates measurement unit summarizes direction, it can configure and be generated after having field progress mathematical computations according to former tables of data New summarizes field, for report displaying, it may be assumed that establish incidence relation from existing metadata type, the corresponding time summarize and Network element summarize generate it is corresponding summarize tables of data, data are taken out in tables of data from summarizing when report is shown.
5. a kind of self-defined report system based on B/S framework according to claim 3, which is characterized in that described to summarize In task executing units, summarize task by timed task Quartz and trigger execution, specific implementation procedure are as follows: access task library first Executing required for current point in time for task is taken out, it is as follows to establish task execution rule according to the difference of affiliated time granularity:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once;
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes failure Or be not carried out, current task is executed, no longer executes current task if the frequency of failure has been more than maximum times limitation, without departing from Task can continue to execute;
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that the time is executed, when reality starts Between, actual finish time, while corresponding data summary table is updated, Time To Failure and failure are recorded if task execution failure Number.
6. -5 any a kind of self-defined report system based on B/S framework according to claim 1, which is characterized in that institute State the process that report template is created in template management module are as follows: configuration report shows which field, definition sequence and data screening, Threshold value, switching chart and report mode are defined, export task is configured;Then display data source, template name in report template The data field for claiming and needing to show.
7. a kind of self-defined report method based on B/S framework, which is characterized in that based on it is above-mentioned it is a kind of based on B/S framework from Reporting system is defined, realizes process are as follows:
One, first by defining primary data information (pdi) to be treated by metadata management module;
Two, then data summarization module, setting summarize path, it is specified that data summarization flow direction, and what is additionally generated summarize word Section, generation summarize task and execute;
Three, creation corresponding report template is finally ordered according to demand by template management module, then display data summarizing module is converged Total data information.
8. a kind of self-defined report method based on B/S framework according to claim 7, which is characterized in that the step In two, task generates and executes to be triggered by timed task Quartz and executes:
1) read first summarize that routing table obtains setting summarize path, then sequentially generating the corresponding time summarizes task and net Member summarizes task;
2) summarize task and execution is triggered by timed task Quartz, access task library first is taken out and executed required for current point in time Task, according to the difference of affiliated time granularity establish task execution rule it is as follows:
Half an hour summarizes task and is configured to execute once for every five minutes;
Hour summarizes task and is configured to execute once for every ten minutes;
It summarizes task and is configured to execute per hour once;
Summarize task week to be configured to execute daily once;
Summarizing task the moon is once per week;
Summarizing task year is monthly to execute once;
Task execution flag bit is first judged before task execution, current task is skipped if successful execution, if last time executes failure Or be not carried out, execute current task;Current task is no longer executed if the frequency of failure has been more than maximum times limitation, without departing from Task can continue to execute;
Task execution finishes update task record, including execution status of task flag bit, it is contemplated that the time is executed, when reality starts Between, actual finish time, while updating corresponding data summary table;Time To Failure and failure are recorded if task execution failure Number.
CN201810764220.XA 2018-07-12 2018-07-12 A kind of self-defined report system and method based on B/S framework Pending CN108959227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810764220.XA CN108959227A (en) 2018-07-12 2018-07-12 A kind of self-defined report system and method based on B/S framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810764220.XA CN108959227A (en) 2018-07-12 2018-07-12 A kind of self-defined report system and method based on B/S framework

Publications (1)

Publication Number Publication Date
CN108959227A true CN108959227A (en) 2018-12-07

Family

ID=64482969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810764220.XA Pending CN108959227A (en) 2018-07-12 2018-07-12 A kind of self-defined report system and method based on B/S framework

Country Status (1)

Country Link
CN (1) CN108959227A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110502514A (en) * 2019-08-15 2019-11-26 中国平安财产保险股份有限公司 Collecting method, device, equipment and computer readable storage medium
CN112632090A (en) * 2020-12-11 2021-04-09 福建升腾资讯有限公司 Method, device, equipment and medium for optimizing performance of amoeba system accounting report
CN113779941A (en) * 2021-09-08 2021-12-10 无锡艾布斯智能科技发展有限公司 Configurable dynamic report generation device, system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101159968A (en) * 2007-11-19 2008-04-09 河北全通通信有限公司 GSM mobile network extension calculating method
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN103207783A (en) * 2013-03-02 2013-07-17 赵宝生 Software development engine system based on browser/server mode and building method thereof
CN104462166A (en) * 2014-08-28 2015-03-25 大唐移动通信设备有限公司 Report generation method and system
CN105320690A (en) * 2014-07-30 2016-02-10 北京中海纪元数字技术发展股份有限公司 Metadata based rapid statistic form generation method and system
CN107256247A (en) * 2017-06-07 2017-10-17 九次方大数据信息集团有限公司 Big data data administering method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN101159968A (en) * 2007-11-19 2008-04-09 河北全通通信有限公司 GSM mobile network extension calculating method
CN103207783A (en) * 2013-03-02 2013-07-17 赵宝生 Software development engine system based on browser/server mode and building method thereof
CN105320690A (en) * 2014-07-30 2016-02-10 北京中海纪元数字技术发展股份有限公司 Metadata based rapid statistic form generation method and system
CN104462166A (en) * 2014-08-28 2015-03-25 大唐移动通信设备有限公司 Report generation method and system
CN107256247A (en) * 2017-06-07 2017-10-17 九次方大数据信息集团有限公司 Big data data administering method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110502514A (en) * 2019-08-15 2019-11-26 中国平安财产保险股份有限公司 Collecting method, device, equipment and computer readable storage medium
CN110502514B (en) * 2019-08-15 2023-06-27 中国平安财产保险股份有限公司 Data acquisition method, device, equipment and computer readable storage medium
CN112632090A (en) * 2020-12-11 2021-04-09 福建升腾资讯有限公司 Method, device, equipment and medium for optimizing performance of amoeba system accounting report
CN113779941A (en) * 2021-09-08 2021-12-10 无锡艾布斯智能科技发展有限公司 Configurable dynamic report generation device, system and method
CN113779941B (en) * 2021-09-08 2023-07-25 无锡艾布斯智能科技发展有限公司 Configurable dynamic report generation device, system and method

Similar Documents

Publication Publication Date Title
US20230049931A1 (en) Method of training machine learning models for making simulated estimations
US11307770B2 (en) Capacity forecasting based on capacity policies and transactions
US20030225563A1 (en) Capacity planning
US9459980B1 (en) Varying cluster sizes in a predictive test load while testing a productive system
CN111008197A (en) Data center design method for power marketing service system
US20160048785A1 (en) A computer implemented system and method for project controls
CN108959227A (en) A kind of self-defined report system and method based on B/S framework
CN107608862A (en) Monitoring alarm method, monitoring alarm device and computer-readable recording medium
CN106874066A (en) A kind of virtual machine migration method and device, electronic equipment
US20150271030A1 (en) Methods and systems for detection of data anomalies
Gladkov et al. Development of Requirements for AIS Aimed at Controlling High Turnover
US12045214B2 (en) Database validation and repair tool
CN106909566A (en) A kind of Data Modeling Method and equipment
US20150120370A1 (en) Advanced planning in a rapidly changing high technology electronics and computer industry through massively parallel processing of data using a distributed computing environment
CN110209730A (en) Change synchronous method, device, computer equipment and the computer storage medium of data
CN107729448A (en) A kind of data handling system based on data warehouse
CN106408271A (en) Method and device for monitoring project
CN108389004A (en) A kind of engineering process dynamic cost managing and control system and method based on BIM technology
Setiawan Architecture of human resource management system at universities
CN110414926A (en) Account management method, device and computer readable storage medium
CN115730900A (en) Project data processing method and device, computer equipment and storage medium
JP7272873B2 (en) PLANNING SUPPORT DEVICE AND PLANNING SUPPORT METHOD
CN107704620A (en) A kind of method, apparatus of file administration, equipment and storage medium
El-Anwar et al. Innovative linear formulation for transportation reconstruction planning
CN106779439A (en) A kind of task distribution method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190307

Address after: Room 411, 238, Jiangchang Third Road, Zhabei District, Shanghai, 200436

Applicant after: SHANGHAI INSPUR CLOUD CALCULATING SERVICE CO.,LTD.

Address before: 250100 S06 Floor, No. 1036 Tidal Road, Jinan High-tech Zone, Shandong Province

Applicant before: SHANDONG HUIMAO ELECTRONIC PORT Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207