CN105844336A - BIM-based property management system and method - Google Patents

BIM-based property management system and method Download PDF

Info

Publication number
CN105844336A
CN105844336A CN201610146765.5A CN201610146765A CN105844336A CN 105844336 A CN105844336 A CN 105844336A CN 201610146765 A CN201610146765 A CN 201610146765A CN 105844336 A CN105844336 A CN 105844336A
Authority
CN
China
Prior art keywords
information
model
handheld terminal
smart machine
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610146765.5A
Other languages
Chinese (zh)
Inventor
包胜
顾益斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Original Assignee
Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd filed Critical Hangzhou Ruixing Dongyu Engineering Consulting Co Ltd
Priority to CN201610146765.5A priority Critical patent/CN105844336A/en
Publication of CN105844336A publication Critical patent/CN105844336A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/163Real estate management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a BIM-based property management system and method. The system comprises a handheld intelligent device for transmitting a user instruction and device information to a network server; a device identification end for storing the device information; a sensor end for collecting device operation data and transmitting the device operation data to the network server; the network server for data interaction between the handheld intelligent device and a database end and data transmission between the sensor end and the database end; and the database end for storing and controlling a property management BIM and project drawings and managing the operation of the device. According to the invention, the property management method can be used for getting hold of all device operation conditions and facilitating the energy management; the device information and a relation between the upstream and the downstream can be grasped intuitively; device maintenance and repair staff can complete all the work using one mobile device without carrying a large amount of paper materials; and all data information is updated in real time, with a high response speed.

Description

A kind of Property Management System based on BIM and method
Technical field
The present invention relates to property management fields, in particular it relates to a kind of Property Management System based on BIM and method.
Background technology
BIM (Building Information Modeling), i.e. BIM, briefly refer to based on identical mark Accurate, it is possible to integrated relevant to construction-engineering project up to the lifecycle process of operation and maintenance stage from building design stage Information model.BIM model is the basis using every relevant information data of construction-engineering project as model, carries out building mould The foundation of type, and then realize the new ant algorithms of effectively management.It refer to by digital information analogue simulation building had true Real information, here, the intension of information is not only the visual information that geometry describes, and also comprises substantial amounts of non-geometry information, Such as the fire resistance rating of material, the heat transfer coefficient of material, the cost of component, procurement information etc..It practice, BIM is through number Word technology, sets up a Virtual Building in a computer, it is provided that a building single, the most consistent, that have logic is believed Breath storehouse.
Along with China's expanding economy, the equipment in building also becomes increasingly complex, and the requirement for estate management is also the highest, The drawback of tradition estate management is the most obvious.
(1) check and accept and the equipment Early postoperative management stage, owing to a variety of causes makes equipment list, product technology in the adapter of property equipment Data, equipment card, as-built drawing, system documentation, system valve location chart etc. fail to be improved foundation, or due to thing The flowing of industry management personnel, firsthand information leakage is very serious, and this brings difficulty certainly will to equipment management work in the future.
(2) property maintenance of equipment data disappearance: present property equipment maintenance record the most still uses paper list, and some sets Standby attendant, after having overhauled equipment, fills in overhaul of the equipments record the most in time or does not the most fill in record of examination at all. So, the data after obtaining maintenance of equipment of just having no way of, the later stage operating maintenance for these equipment brings difficulty.
(3) management of property equipment data uses archives of paper quality or Simple electronic archives, it is impossible to provide real time information equipment control universal Using hand-written label, this not only expends substantial amounts of manpower and the time copies, record, also easily causes mistake to write, fail to write Problem, and paper record list is easily lost and damages.Meanwhile, in the inquiry of equipment essential information, maintenance program and detection plan Determination, and during to the emergency processing of emergency, generally require the letter needed for finding from the drawing and document of a large amount of paperys Breath, it is impossible to quickly obtain the information about this equipment, thus do not reach the purpose of property equipment control.
(4) the estate management many employings papery equalization built now, often a facility damages and needs to pass maintenance mans' one hand work Lead repeatedly, cause maintenance efficiency low, the most easily produce potential safety hazard.
Summary of the invention
For the defect of existing estate management technology and modern estate management for the requirement of intelligent building, the present invention provides as follows Technical scheme: a kind of Property Management System based on BIM, this system includes handheld terminal smart machine, equipment identification end, sensing Device end, network service end and database side;
Handheld terminal smart machine, for reception and the control of BIM model data, the reading of facility information, and user instruction Send;
Equipment identification end, including RFID and Quick Response Code, for storage facilities information;
Sensor side, for the collection of equipment operation data;
Network service end, the data interaction between handheld terminal smart machine, sensor side and database side, including: hand-held Model data between end smart machine and database side synchronizes, and is sent to count to the facility information of handheld terminal smart machine by receiving According to storehouse end, the instruction that user is sent by handheld terminal smart machine is sent to database side, equipment fortune sensor side collected Battalion's data send to database side;
Database side, for storing estate management BIM model and according to the letter being accepted handheld terminal smart machine by network service end Breath updates BIM model;
Use between handheld terminal smart machine, network service end, database side development of Mobile Internet technology provide real-time upload and under Carry.
Further, described sensor side includes following device:
Sensor: be used for collecting power equipment electric current, voltage, consumption information, water conservancy equipment hydraulic pressure, flow rate information;
Wireless transmissions equipment: the equipment operation data collected for transmission sensor;
Data transmission device: utilize radio transmission apparatus to carry out reception and the transmission of data, the layout of radio transmission apparatus and building Space correlation, it is ensured that all standing of mobile transmission network;
Data encryption device: ensure the safety and stablization that data are transmitted together with database side.
Further, handheld terminal smart machine includes BIM model cootrol module, work order release module, equipment identification module and dimension Repair maintenance module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for Controlling model amplification, reduce, rotate, roam, height-width is measured and BIM mould The displaying of type;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Component display module, modules and the information of component and the display of attribute in model;
Model modification module, receives database side and updates the data of BIM model;
(2) described work order release module, including following submodule:
Component taking module, for shooting the image of damaged member;
Component locating module, positions in BIM model for component;
Work order is issued and receiver module, for work order being sent to database side and receiving the work order that database side is handled well;
Work order annotations module, for the annotation for damaged member;
(3) described equipment identification module, including following submodule:
Quick Response Code identification module, the 2 D code information in scanning and identification means;
Electronic label identification module, the electronic labeling information on identification means;
(4) described maintenance maintenance module, including following submodule:
Maintenance modules, is used for inquiring about maintenance record, maintenance program, list maintenance;
Maintenance module, for inquiry maintenance record, record maintenance information, safeguards and reminds.
Further, equipment identification end includes RFID and Quick Response Code;
Described RFID is attached on the component of non-exposed, contains component relevant information;
Described Quick Response Code is attached to expose component surface, contains component relevant information.
Further, database side stores architectural design model and estate management model;
Described architectural design model refers to by revit architecture, revit structure, revit MEP, Tekla Software on Drawing, Contain building all materials, structure, locus, the 3D model of equipment installation information;
Described estate management model refer to architectural design model through Navisworks and the process of relevant Property Management Software, Material, the structural information of BIM is simplified, the model that equipment installation information is refined, with architectural design Model real-time, interactive synchrodata;
The data that sensor and handheld terminal smart machine are collected are synchronized on architectural design model;
Be sent to handheld terminal smart machine is estate management model, to realize the visualization of BIM model and handheld terminal intelligent terminal Alternately.
Further, architectural design model is converted into estate management model as follows in database side:
(1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract IFC Geological information in normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD's 3-D view engine regenerates physical model.
Described IFC normative document refers to the model data file of the use IFC standard derived by revit software;
Described IFC (Industry Foundation Classes data model, IFC) standard is a set of unrelated with BIM software platform Open data form, it is a data model based on object-oriented (Object Oriented) thought, use EXPESS language Speech describes architectural engineering information.EXPRESS is a kind of product data standardized data language;
(2) the Acbr function utilizing Autocad carries out three for the physical model rebuild in AutoCAD 3-D view engine Hexagonal lattice divides, and derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, genus Property data, are loaded onto surface model by attribute information.
(4) the estate management information of the component of surface model is refined, adds component information and equipment realtime running information, Generate property administrative model.
Further, database side real-time update synchronistic model information, specific as follows:
(1) sensor side sends equipment operation information to database side in real time, and operation information is decoded, adds by database side Close process, and send in real time to handheld terminal smart machine estate management model modification;
(2) handheld terminal smart machine transmission associated components transition information is to database side, and database side is according to handheld terminal smart machine Feedback, in real time model is modified, and generates new estate management mold sync to handheld terminal smart machine.
Further, work order information is processed by database side, specific as follows:
(1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is in a model Position, the image information of damaged member, the markup information of damaged member;
(2) work order application is audited and is processed by database side, becomes work order, by database side by the work order application of examination & verification Send to related personnel's handheld terminal smart machine and mobile phone;
(3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side.
A kind of property management method based on BIM, the method comprises the steps:
(1) revit architecture, revit structure, revit are utilized according to the existing cad building of building, structure, MEP drawing MEP, Tekla Software on Drawing BIM architectural design model;
(2) building element in building is added up and collection of data, place Quick Response Code on component, at non-exposed structure exposing Electronic tag is placed on part;
(3) mainly run and sensor is installed on facility;
(4) calculate space size and build mobile network, it is ensured that start all standing of network;
(5) it is estate management mould in database side by architectural design model conversation, specifically includes following sub-step:
(5.1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract Geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD 3-D view engine regenerate physical model.
(5.2) the Acbr function utilizing Autocad is carried out for the physical model rebuild in AutoCAD 3-D view engine Triangular grids, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, Attribute data, is loaded onto surface model by attribute information.
(5.4) the estate management information of the component of surface model is refined, add component information and equipment realtime running letter Breath, generates property administrative model.
(6) initial estate management model is stored to handheld terminal smart machine, and store corresponding maintenance above, safeguard letter Breath;
(7) utilize when component damage handheld terminal smart machine that Quick Response Code or the electronic tag of component are scanned, position structure Part position in a model, utilizes handheld terminal smart machine to shoot component damage information, generates work order application, and to work order application It is labeled;
(8) work order application is processed by database side, specifically includes following sub-step:
(8.1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is at model In position, the image information of damaged member, the markup information of damaged member;
(8.2) work order application is audited and is processed by database side, becomes work order, by data base by the work order application of examination & verification End sends to related personnel's handheld terminal smart machine and mobile phone;
(8.3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side;
(9) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(9.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry estate management model to around need tie up The component protected scans for, and scans the Quick Response Code on component and electronic tag, generate and safeguard and patrol after completing to safeguard and make an inspection tour work Depending on record;
(9.2) needs periodic maintenance equipment is carried out safeguarding prompting, carry when the date arrives the specified life of distance last maintenance Awake user carries out safeguarding until safeguarding and terminating;
(10) utilize handheld terminal smart machine to send component and change information, specific as follows:
(10.1) scanning component Quick Response Code or electronic tag align member position;
(10.2) describe the information of component change by image and word and send to database side;
(11) monitoring equipment realtime running situation, specific as follows:
(11.1) data base accepts and synchronizes installation fishery information to handheld terminal operating facilities, and related personnel is by handheld terminal intelligence Installation fishery information is monitored by equipment;
(11.2) send alarm and reminding related personnel when installation fishery information exceedes default threshold values to process;
(12) database side carries out real-time update according to the feedback of maintenance record and handheld terminal smart machine to estate management model And synchronizing information will be updated to handheld terminal smart machine.
The invention has the beneficial effects as follows: the most work of estate management building operation stage is the management to facility, along with intelligence That can build continues to bring out, and the ratio that the cost of facilities management accounts in facilities management is increasing.By BIM technology is used In facilities management system, make system comprise all of essential information of facility, it is possible to achieve Three-Dimensional Dynamic observe facility real-time State, so that facilities management personnel understand the behaviour in service of equipment, it is also possible to the state look-ahead equipment according to equipment will The fault occurred, thus just equipment is safeguarded before device fails, he reduces maintenance cost.
Accompanying drawing explanation
Fig. 1 is present invention Property Management System based on BIM structured flowchart;
Fig. 2 is that architectural design model is converted into the flow chart of estate management model in database side.
Detailed description of the invention
With specific embodiment, the present invention is described in further detail below in conjunction with the accompanying drawings.
As it is shown in figure 1, the present invention provide a kind of based on BIM Property Management System, this system include handheld terminal smart machine, Equipment identification end, sensor side, network service end and database side;Handheld terminal smart machine, network service end, database side Between use development of Mobile Internet technology provide real-time uploading and downloading.
One, handheld terminal smart machine, refers to for reception and the control of BIM model data, the reading of facility information, and user The transmission of order;Handheld terminal smart machine includes BIM model cootrol module, work order release module, equipment identification module and maintenance dimension Protect module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for Controlling model amplification, reduce, rotate, roam, height-width is measured and BIM mould The displaying of type;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Component display module, modules and the information of component and the display of attribute in model;
Model modification module, receives database side and updates the data of BIM model;
(2) described work order release module, including following submodule:
Component taking module, for shooting the image of damaged member;
Component locating module, positions in BIM model for component;
Work order is issued and receiver module, for work order being sent to database side and receiving the work order that database side is handled well;
Work order annotations module, for the annotation for damaged member;
(3) described equipment identification module, including following submodule:
Quick Response Code identification module, the 2 D code information in scanning and identification means;
Electronic label identification module, the electronic labeling information on identification means;
(4) described maintenance maintenance module, including following submodule:
Maintenance modules, is used for inquiring about maintenance record, maintenance program, list maintenance;
Maintenance module, for inquiry maintenance record, record maintenance information, safeguards and reminds.
Two, equipment identification end, including RFID and Quick Response Code, for storage facilities information;
Described RFID is attached on the component of non-exposed, contains component relevant information;
Described Quick Response Code is attached to expose component surface, contains component relevant information.
Three, sensor side, for the collection of equipment operation data, including following device:
Sensor: be used for collecting power equipment electric current, voltage, consumption information, water conservancy equipment hydraulic pressure, flow rate information;
Wireless transmissions equipment: the equipment operation data collected for transmission sensor;
Data transmission device: utilize radio transmission apparatus to carry out reception and the transmission of data, the layout of radio transmission apparatus and building Space correlation, it is ensured that all standing of mobile transmission network;
Data encryption device: ensure the safety and stablization that data are transmitted together with database side.
Four, network service end, the data interaction between handheld terminal smart machine, sensor side and database side, including: Model data between handheld terminal smart machine and database side synchronizes, and is sent by the facility information received to handheld terminal smart machine To database side, the instruction that user is sent by handheld terminal smart machine is sent to database side, by setting that sensor side is collected Standby operation data sends to database side;
Five, database side, is used for storing estate management BIM model and accepting handheld terminal smart machine according to by network service end Information updating BIM model;Database side stores architectural design model and estate management model;
Described architectural design model refers to by revit architecture, revit structure, revit MEP, Tekla Software on Drawing, Contain building all materials, structure, locus, the 3D model of equipment installation information;
Described estate management model refer to architectural design model through Navisworks and the process of relevant Property Management Software, Material, the structural information of BIM is simplified, the model that equipment installation information is refined, with architectural design Model real-time, interactive synchrodata;
The data that sensor and handheld terminal smart machine are collected are synchronized on architectural design model;
Be sent to handheld terminal smart machine is estate management model, to realize the visualization of BIM model and handheld terminal intelligent terminal Alternately.
As in figure 2 it is shown, architectural design model is converted into estate management model as follows in database side:
(1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract IFC Geological information in normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD's 3-D view engine regenerates physical model.
Described IFC normative document refers to the model data file of the use IFC standard derived by revit software;
Described IFC (Industry Foundation Classes data model, IFC) standard is a set of unrelated with BIM software platform Open data form, it is a data model based on object-oriented (Object Oriented) thought, use EXPESS language Speech describes architectural engineering information.EXPRESS is a kind of product data standardized data language;
(2) the Acbr function utilizing Autocad carries out three for the physical model rebuild in AutoCAD 3-D view engine Hexagonal lattice divides, and derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, genus Property data, are loaded onto surface model by attribute information.
(4) the estate management information of the component of surface model is refined, adds component information and equipment realtime running information, Generate property administrative model.
Database side real-time update synchronistic model information, specific as follows:
(1) sensor side sends equipment operation information to database side in real time, and operation information is decoded, adds by database side Close process, and send in real time to handheld terminal smart machine estate management model modification;
(2) handheld terminal smart machine transmission associated components transition information is to database side, and database side is according to handheld terminal smart machine Feedback, in real time model is modified, and generates new estate management mold sync to handheld terminal smart machine.
Work order information is processed by database side, specific as follows:
(1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is in a model Position, the image information of damaged member, the markup information of damaged member;
(2) work order application is audited and is processed by database side, becomes work order, by database side by the work order application of examination & verification Send to related personnel's handheld terminal smart machine and mobile phone;
(3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side.
A kind of based on BIM property management method that the present invention provides, the method comprises the steps:
(1) revit architecture, revit structure, revit are utilized according to the existing cad building of building, structure, MEP drawing MEP, Tekla Software on Drawing BIM architectural design model;
(2) building element in building is added up and collection of data, place Quick Response Code on component, at non-exposed structure exposing Electronic tag is placed on part;
(3) mainly run and sensor is installed on facility;
(4) calculate space size and build mobile network, it is ensured that start all standing of network;
(5) it is estate management mould in database side by architectural design model conversation, specifically includes following sub-step:
(5.1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract Geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD 3-D view engine regenerate physical model.
(5.2) the Acbr function utilizing Autocad is carried out for the physical model rebuild in AutoCAD 3-D view engine Triangular grids, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, Attribute data, is loaded onto surface model by attribute information.
(5.4) the estate management information of the component of surface model is refined, add component information and equipment realtime running letter Breath, generates property administrative model.
(6) initial estate management model is stored to handheld terminal smart machine, and store corresponding maintenance above, safeguard letter Breath;
(7) utilize when component damage handheld terminal smart machine that Quick Response Code or the electronic tag of component are scanned, position structure Part position in a model, utilizes handheld terminal smart machine to shoot component damage information, generates work order application, and to work order application It is labeled;
(8) work order application is processed by database side, specifically includes following sub-step:
(8.1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is at model In position, the image information of damaged member, the markup information of damaged member;
(8.2) work order application is audited and is processed by database side, becomes work order, by data base by the work order application of examination & verification End sends to related personnel's handheld terminal smart machine and mobile phone;
(8.3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side;
(9) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(9.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry estate management model to around need tie up The component protected scans for, and scans the Quick Response Code on component and electronic tag, generate and safeguard and patrol after completing to safeguard and make an inspection tour work Depending on record;
(9.2) needs periodic maintenance equipment is carried out safeguarding prompting, carry when the date arrives the specified life of distance last maintenance Awake user carries out safeguarding until safeguarding and terminating;
(10) utilize handheld terminal smart machine to send component and change information, specific as follows:
(10.1) scanning component Quick Response Code or electronic tag align member position;
(10.2) describe the information of component change by image and word and send to database side;
(11) monitoring equipment realtime running situation, specific as follows:
(11.1) data base accepts and synchronizes installation fishery information to handheld terminal operating facilities, and related personnel is by handheld terminal intelligence Installation fishery information is monitored by equipment;
(11.2) send alarm and reminding related personnel when installation fishery information exceedes default threshold values to process;
(12) database side carries out real-time update according to the feedback of maintenance record and handheld terminal smart machine to estate management model And synchronizing information will be updated to handheld terminal smart machine.

Claims (8)

1. a Property Management System based on BIM, it is characterised in that this system includes that handheld terminal smart machine, equipment are known Not Duan, sensor side, network service end and database side;
Handheld terminal smart machine, for reception and the control of BIM model data, the reading of facility information, and user instruction Send;
Equipment identification end, including RFID and Quick Response Code, for storage facilities information;
Sensor side, for the collection of equipment operation data;
Network service end, the data interaction between handheld terminal smart machine, sensor side and database side, including: hand-held Model data between end smart machine and database side synchronizes, and is sent to count to the facility information of handheld terminal smart machine by receiving According to storehouse end, the instruction that user is sent by handheld terminal smart machine is sent to database side, equipment fortune sensor side collected Battalion's data send to database side;
Database side, for storing estate management BIM model and according to the letter being accepted handheld terminal smart machine by network service end Breath updates BIM model;
Use between handheld terminal smart machine, network service end, database side development of Mobile Internet technology provide real-time upload and under Carry.
Property Management System based on BIM the most according to claim 1, it is characterised in that handheld terminal smart machine includes BIM model cootrol module, work order release module, equipment identification module and maintenance maintenance module;Concrete:
(1) described BIM model cootrol module, including following submodule:
Model display module, for Controlling model amplification, reduce, rotate, roam, height-width is measured and BIM mould The displaying of type;
2D drawing is shown and locating module, for showing all of relevant drawing and the 2D drawing location to 3D model;
Component display module, modules and the information of component and the display of attribute in model;
Model modification module, receives database side and updates the data of BIM model;
(2) described work order release module, including following submodule:
Component taking module, for shooting the image of damaged member;
Component locating module, positions in BIM model for component;
Work order is issued and receiver module, for work order being sent to database side and receiving the work order that database side is handled well;
Work order annotations module, for the annotation for damaged member;
(3) described equipment identification module, including following submodule:
Quick Response Code identification module, the 2 D code information in scanning and identification means;
Electronic label identification module, the electronic labeling information on identification means;
(4) described maintenance maintenance module, including following submodule:
Maintenance modules, is used for inquiring about maintenance record, maintenance program, list maintenance;
Maintenance module, for inquiry maintenance record, record maintenance information, safeguards and reminds.
Property Management System based on BIM the most according to claim 1, it is characterised in that equipment identification end includes RFID Electronic tag and Quick Response Code;
Described RFID is attached on the component of non-exposed, contains component relevant information;
Described Quick Response Code is attached to expose component surface, contains component relevant information.
Property Management System based on BIM the most according to claim 1, it is characterised in that database side stores building Design a model and estate management model;
Described architectural design model refers to by revit architecture, revit structure, revit MEP, Tekla Software on Drawing, Contain building all materials, structure, locus, the 3D model of equipment installation information;
Described estate management model refer to architectural design model through Navisworks and the process of relevant Property Management Software, Material, the structural information of BIM is simplified, the model that equipment installation information is refined, with architectural design Model real-time, interactive synchrodata;
The data that sensor and handheld terminal smart machine are collected are synchronized on architectural design model;
Be sent to handheld terminal smart machine is estate management model, to realize the visualization of BIM model and handheld terminal intelligent terminal Alternately.
Property Management System based on BIM the most according to claim 4, it is characterised in that architectural design model is in data Storehouse end is converted into estate management model as follows:
(1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract IFC Geological information in normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD's 3-D view engine regenerates physical model.
(2) the Acbr function utilizing Autocad carries out three for the physical model rebuild in AutoCAD 3-D view engine Hexagonal lattice divides, and derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, genus Property data, are loaded onto surface model by attribute information.
(4) the estate management information of the component of surface model is refined, adds component information and equipment realtime running information, Generate property administrative model.
Property Management System based on BIM the most according to claim 1, it is characterised in that database side real-time update is also Synchronistic model information, specific as follows:
(1) sensor side sends equipment operation information to database side in real time, and operation information is decoded, adds by database side Close process, and send in real time to handheld terminal smart machine estate management model modification;
(2) handheld terminal smart machine transmission associated components transition information is to database side, and database side is according to handheld terminal smart machine Feedback, in real time model is modified, and generates new estate management mold sync to handheld terminal smart machine.
Property Management System based on BIM the most according to claim 1, it is characterised in that database side is to work order information Process, specific as follows:
(1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is in a model Position, the image information of damaged member, the markup information of damaged member;
(2) work order application is audited and is processed by database side, becomes work order, by database side by the work order application of examination & verification Send to related personnel's handheld terminal smart machine and mobile phone;
(3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side.
8. a property management method based on BIM, it is characterised in that the method comprises the steps:
(1) revit architecture, revit structure, revit are utilized according to the existing cad building of building, structure, MEP drawing MEP, Tekla Software on Drawing BIM architectural design model;
(2) building element in building is added up and collection of data, place Quick Response Code on component, at non-exposed structure exposing Electronic tag is placed on part;
(3) mainly run and sensor is installed on facility;
(4) calculate space size and build mobile network, it is ensured that start all standing of network;
(5) it is estate management mould in database side by architectural design model conversation, specifically includes following sub-step:
(5.1) derive the IFC normative document of architectural design model, use the resolver of official to resolve IFC normative document.Extract Geological information in IFC normative document, geological information includes geometry information and geometric operation information, utilizes AutoCAD 3-D view engine regenerate physical model.
(5.2) the Acbr function utilizing Autocad is carried out for the physical model rebuild in AutoCAD 3-D view engine Triangular grids, derives vertex of a triangle coordinate information, utilizes triangular coordinate information to regenerate surface model.
(5.3) attribute information in IFC normative document is processed, only retain the material relevant to surface model, color, Attribute data, is loaded onto surface model by attribute information.
(5.4) the estate management information of the component of surface model is refined, add component information and equipment realtime running letter Breath, generates property administrative model.
(6) initial estate management model is stored to handheld terminal smart machine, and store corresponding maintenance above, safeguard letter Breath;
(7) utilize when component damage handheld terminal smart machine that Quick Response Code or the electronic tag of component are scanned, position structure Part position in a model, utilizes handheld terminal smart machine to shoot component damage information, generates work order application, and to work order application It is labeled;
(8) work order application is processed by database side, specifically includes following sub-step:
(8.1) each handheld terminal smart machine is authorized to issue work order application, and described work order application includes that damaged member is at model In position, the image information of damaged member, the markup information of damaged member;
(8.2) work order application is audited and is processed by database side, becomes work order, by data base by the work order application of examination & verification End sends to related personnel's handheld terminal smart machine and mobile phone;
(8.3) result of each work order is fed back and is become maintenance record and is synchronized to handheld terminal smart machine by database side;
(9) handheld terminal smart machine is utilized to carry out regular maintenance and make an inspection tour work, specific as follows:
(9.1) carry out regular maintenance and make an inspection tour time utilize handheld terminal smart machine to carry estate management model to around need tie up The component protected scans for, and scans the Quick Response Code on component and electronic tag, generate and safeguard and patrol after completing to safeguard and make an inspection tour work Depending on record;
(9.2) needs periodic maintenance equipment is carried out safeguarding prompting, carry when the date arrives the specified life of distance last maintenance Awake user carries out safeguarding until safeguarding and terminating;
(10) utilize handheld terminal smart machine to send component and change information, specific as follows:
(10.1) scanning component Quick Response Code or electronic tag align member position;
(10.2) describe the information of component change by image and word and send to database side;
(11) monitoring equipment realtime running situation, specific as follows:
(11.1) data base accepts and synchronizes installation fishery information to handheld terminal operating facilities, and related personnel is by handheld terminal intelligence Installation fishery information is monitored by equipment;
(11.2) send alarm and reminding related personnel when installation fishery information exceedes default threshold values to process;
(12) database side carries out real-time update according to the feedback of maintenance record and handheld terminal smart machine to estate management model And synchronizing information will be updated to handheld terminal smart machine.
CN201610146765.5A 2016-03-15 2016-03-15 BIM-based property management system and method Pending CN105844336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610146765.5A CN105844336A (en) 2016-03-15 2016-03-15 BIM-based property management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610146765.5A CN105844336A (en) 2016-03-15 2016-03-15 BIM-based property management system and method

Publications (1)

Publication Number Publication Date
CN105844336A true CN105844336A (en) 2016-08-10

Family

ID=56588114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610146765.5A Pending CN105844336A (en) 2016-03-15 2016-03-15 BIM-based property management system and method

Country Status (1)

Country Link
CN (1) CN105844336A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106777751A (en) * 2016-12-30 2017-05-31 译筑信息科技(上海)有限公司 Architecture information processing method and processing device
CN107464284A (en) * 2017-08-26 2017-12-12 济南万维数字传媒有限公司 Three-dimensional visualization property information management system based on mobile terminal
CN107491592A (en) * 2017-07-21 2017-12-19 浙江华云电力工程设计咨询有限公司 A kind of power equipment model for equipment full life cycle management with multidimensional property
CN107967375A (en) * 2016-10-25 2018-04-27 福建省建筑设计研究院有限公司 Empty body based on BIM checks verification system with entity
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108427811A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of PC components Life cycle tracking, apparatus and system
CN108428031A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of method and device of the status inquiry based on assembled architecture
CN108491936A (en) * 2018-03-08 2018-09-04 上海同岩土木工程科技股份有限公司 Subway Facilities equipment operation management system based on BIM and method
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108897969A (en) * 2018-07-12 2018-11-27 椭圆方程(深圳)信息技术有限公司 A method of the facility maintenance Automatic dispatching based on BIM
CN109343594A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of application method based on BIM Intelligent dehumidifying system in underground distribution room
CN109558047A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 Property based on BIM light weighed model reports method, apparatus and terminal device for repairment
CN109784511A (en) * 2019-01-25 2019-05-21 四川长虹电器股份有限公司 Product repairing data traceability method and system
CN109917978A (en) * 2019-01-25 2019-06-21 深圳市华阳国际工程设计股份有限公司 Annotation counterpart member display methods, device and storage device based on BIM model
CN109978388A (en) * 2019-03-28 2019-07-05 上海荷福人工智能科技(集团)有限公司 A kind of building management system and method based on artificial intelligence
CN110264090A (en) * 2019-06-24 2019-09-20 国网河北省电力有限公司沧州供电分公司 A kind of property asset management system
CN110580567A (en) * 2019-07-12 2019-12-17 中航物业管理有限公司 Intelligent property mobile operation management method
CN110689614A (en) * 2019-09-20 2020-01-14 北京禹数技术有限公司 Method, medium, device and system for collecting device information based on electronic map
CN111815288A (en) * 2020-07-16 2020-10-23 包头市浩阳软件科技有限公司 Smart community property management system
CN113505499A (en) * 2021-09-10 2021-10-15 江西武大扬帆科技有限公司 Hydraulic engineering building full life cycle management system based on BIM and big data analysis

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201303338Y (en) * 2008-06-02 2009-09-02 东莞市影石软件开发有限公司 Mobile property management system based on wireless communication technology
CN102158556A (en) * 2011-04-08 2011-08-17 南京邮电大学 Method for implementing intelligent property management system in Internet of things environment
US8271321B1 (en) * 2000-06-05 2012-09-18 Buildinglink.com, LLC Apparatus and method for providing building management information
CN103246951A (en) * 2012-12-11 2013-08-14 中建三局第一建设工程有限责任公司 Intelligent electromechanical equipment management system and method based on BIM (building information modeling)
CN104504497A (en) * 2014-12-03 2015-04-08 上海同筑信息科技有限公司 BIM engineering information management system and method
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN204645310U (en) * 2015-05-14 2015-09-16 黄晓冬 Intelligent precast wall body system
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8271321B1 (en) * 2000-06-05 2012-09-18 Buildinglink.com, LLC Apparatus and method for providing building management information
CN201303338Y (en) * 2008-06-02 2009-09-02 东莞市影石软件开发有限公司 Mobile property management system based on wireless communication technology
CN102158556A (en) * 2011-04-08 2011-08-17 南京邮电大学 Method for implementing intelligent property management system in Internet of things environment
CN103246951A (en) * 2012-12-11 2013-08-14 中建三局第一建设工程有限责任公司 Intelligent electromechanical equipment management system and method based on BIM (building information modeling)
CN104504497A (en) * 2014-12-03 2015-04-08 上海同筑信息科技有限公司 BIM engineering information management system and method
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN204645310U (en) * 2015-05-14 2015-09-16 黄晓冬 Intelligent precast wall body system
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107967375A (en) * 2016-10-25 2018-04-27 福建省建筑设计研究院有限公司 Empty body based on BIM checks verification system with entity
CN106777751A (en) * 2016-12-30 2017-05-31 译筑信息科技(上海)有限公司 Architecture information processing method and processing device
CN107491592A (en) * 2017-07-21 2017-12-19 浙江华云电力工程设计咨询有限公司 A kind of power equipment model for equipment full life cycle management with multidimensional property
CN108427811A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of PC components Life cycle tracking, apparatus and system
CN108428031A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of method and device of the status inquiry based on assembled architecture
CN107464284A (en) * 2017-08-26 2017-12-12 济南万维数字传媒有限公司 Three-dimensional visualization property information management system based on mobile terminal
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108491936A (en) * 2018-03-08 2018-09-04 上海同岩土木工程科技股份有限公司 Subway Facilities equipment operation management system based on BIM and method
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN108874340A (en) * 2018-06-13 2018-11-23 深圳市智汇幕墙科技有限公司 A kind of visualization building curtain wall management method and device
CN108897969A (en) * 2018-07-12 2018-11-27 椭圆方程(深圳)信息技术有限公司 A method of the facility maintenance Automatic dispatching based on BIM
CN109558047A (en) * 2018-09-20 2019-04-02 中建科技有限公司深圳分公司 Property based on BIM light weighed model reports method, apparatus and terminal device for repairment
CN109343594A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of application method based on BIM Intelligent dehumidifying system in underground distribution room
CN109784511A (en) * 2019-01-25 2019-05-21 四川长虹电器股份有限公司 Product repairing data traceability method and system
CN109917978A (en) * 2019-01-25 2019-06-21 深圳市华阳国际工程设计股份有限公司 Annotation counterpart member display methods, device and storage device based on BIM model
CN109917978B (en) * 2019-01-25 2021-09-28 深圳市华阳国际工程设计股份有限公司 BiM model-based annotation corresponding component display method and device and storage device
CN109978388A (en) * 2019-03-28 2019-07-05 上海荷福人工智能科技(集团)有限公司 A kind of building management system and method based on artificial intelligence
CN110264090A (en) * 2019-06-24 2019-09-20 国网河北省电力有限公司沧州供电分公司 A kind of property asset management system
CN110580567A (en) * 2019-07-12 2019-12-17 中航物业管理有限公司 Intelligent property mobile operation management method
CN110689614A (en) * 2019-09-20 2020-01-14 北京禹数技术有限公司 Method, medium, device and system for collecting device information based on electronic map
CN110689614B (en) * 2019-09-20 2023-08-22 北京禹数技术有限公司 Electronic map-based equipment information collection method, medium, equipment and system
CN111815288A (en) * 2020-07-16 2020-10-23 包头市浩阳软件科技有限公司 Smart community property management system
CN111815288B (en) * 2020-07-16 2023-10-03 内蒙古浩阳云软件科技有限公司 Intelligent community property management system
CN113505499A (en) * 2021-09-10 2021-10-15 江西武大扬帆科技有限公司 Hydraulic engineering building full life cycle management system based on BIM and big data analysis

Similar Documents

Publication Publication Date Title
CN105844336A (en) BIM-based property management system and method
CN109978388A (en) A kind of building management system and method based on artificial intelligence
CN105825335A (en) BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN103530826B (en) BIM (Building Information Modeling)-based shield method tunnel construction management method
CN207517058U (en) A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing
CN105225040A (en) Based on the preparation of construction material overall process method for tracing of Internet of Things
CN106777751A (en) Architecture information processing method and processing device
CN104317855A (en) Metering producing real-time monitoring method based on real-time database
CN106228476A (en) Property work order dispatch system based on BIM and send method
CN110210628A (en) A kind of automation equipment intelligence O&M upkeep operation method of augmented reality
Ahmed et al. A brief discussion on augmented reality and virtual reality in construction industry
Ma et al. Visualization of component status information of prefabricated concrete building based on building information modeling and radio frequency identification: a case study in China
CN104484909A (en) Method and device for routing inspection point determination, interaction method and interaction device
CN105930985A (en) BIM model-based port equipment inspection system
CN109242263A (en) A kind of assembled architecture BIM module management system
CN102426525A (en) Panoramic modeling method of multi-application system
CN113034692B (en) BIM-based underground pipe gallery data initialization method and system
CN109447286A (en) A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things
CN108985471B (en) Aircraft management system based on 3D lightweight model
CN106407580B (en) Rule detection romote controlled locking method based on script
CN110276124A (en) A kind of digitlization examines the information extracting method of mathematical model
CN104007703B (en) System and method is realized in communication between a kind of product virtual parts and actual parts
CN105260855A (en) Steel bar skeleton production quality management method of shield segment
CN112687022A (en) Intelligent building inspection method and system based on video
Salem et al. BIM and VR/AR technologies: From project development to lifecycle asset management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160810