CN109242263A - A kind of assembled architecture BIM module management system - Google Patents
A kind of assembled architecture BIM module management system Download PDFInfo
- Publication number
- CN109242263A CN109242263A CN201810924879.7A CN201810924879A CN109242263A CN 109242263 A CN109242263 A CN 109242263A CN 201810924879 A CN201810924879 A CN 201810924879A CN 109242263 A CN109242263 A CN 109242263A
- Authority
- CN
- China
- Prior art keywords
- module
- bim
- information
- unit
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003754 machining Methods 0.000 claims abstract description 35
- 238000010276 construction Methods 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims abstract description 19
- 230000008569 process Effects 0.000 claims abstract description 17
- 238000005265 energy consumption Methods 0.000 claims abstract description 14
- 238000012544 monitoring process Methods 0.000 claims abstract description 14
- 238000004519 manufacturing process Methods 0.000 claims abstract description 12
- 238000012545 processing Methods 0.000 claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000003860 storage Methods 0.000 claims abstract description 8
- 238000004891 communication Methods 0.000 claims abstract description 7
- 239000000428 dust Substances 0.000 claims description 18
- 238000012937 correction Methods 0.000 claims description 4
- 238000004064 recycling Methods 0.000 claims description 4
- 230000000052 comparative effect Effects 0.000 claims description 3
- 238000004088 simulation Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 17
- 230000002159 abnormal effect Effects 0.000 abstract description 3
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000005457 optimization Methods 0.000 abstract description 3
- 238000012423 maintenance Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000011900 installation process Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
- G06K17/0029—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Computer Networks & Wireless Communication (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to building fields, more particularly to a kind of assembled architecture BIM module management system, processing module includes process equipment unit, machining control unit and machining information acquiring unit, the data information that control management module is used to provide according to BIM module, machining information acquiring unit is used to obtain the machining information of process equipment unit, the data information that control management module is used to provide according to BIM module, installing mobile position-fixed module includes GPS positioning device, wireless communication apparatus, camera, storage device and display, the present invention is in the construction stage, make the production installation progress of administrative staff's quick obtaining scene component by the management system, cost, quality, the engineering informations such as safety, and it is effectively managed;In the O&M stage, it is sufficiently used for facility maintenance management, realizes energy dynamic monitoring, the historical data of record can be used as the basis of energy consumption analysis comparison, be adjusted optimization to abnormal energy consumption.
Description
Technical field
The present invention relates to building fields, and in particular to a kind of assembled architecture BIM module management system.
Background technique
Assembled architecture refers to the building built by prefabricated components by being reliably connected mode.There are two main for assembled architecture
Want feature: first feature is that the main member especially structural elements of composition building is prefabricated;Second feature is prefabricated
The connection type of component must be reliable.Classify by structural material, there is assembling type steel structure building, assembled steel reinforced concrete to build
It builds, structure with assembled lightweight steel building, assembled composite material building.This research refers mainly to assembled steel Reinforced Concrete Buildings, and
Building Information Model is a kind of multidimensional (three-dimensional space, four-dimensional time, five dimension costs, N-dimensional are more applied) integrated skill of model information
Art, can make construction project each participant (including responsible departments of the government, owner, design, construction, management, cost, operation pipe
Reason, project user etc.) it is generated from concept to letter can be operated in a model in the whole life cycle removed completely in project
Breath and operation model in the information, thus fundamentally change practitioner by lexigraphy form drawing carry out project construction and
The working method of operation management realizes construction project in Life cycle and improves working efficiency and quality and reduction fault
With the targets such as risk.
And assembled architecture in building course prefabricated components it is many kinds of, how by the processing of control member until
Fixing link, thus achieve the purpose that efficiently and accurately installation just seem increasingly important, in addition Building Information Model how with building
Production and operation carry out further combined be also the application needs further solve the problems, such as.
Summary of the invention
To solve problem of the prior art, the present invention provides a kind of assembled architecture BIM module management systems.
In order to achieve the above object, the invention adopts the following technical scheme: a kind of assembled architecture BIM module management system
System, the system include:
Processing module, processing module include process equipment unit, machining control unit and machining information acquiring unit, machining control
Unit and machining information acquiring unit are connect with process equipment cell data, and machining control unit is for controlling process equipment list
The processing operation of member, machining information acquiring unit are used to obtain the machining information of process equipment unit, machining information acquiring unit
It is connect with BIM module, the presupposed information that the machining information of component obtains component in the information and BIM module that module obtains is carried out
Compare, phase machining control unit issues signal if consistent, so that process equipment unit works normally, makes to add if inconsistent
Construction equipment unit stops working;
Management module is controlled, structure is written in the information of component by the data information that control management module is used to provide according to BIM module
Part RFID tag is placed in component RFID tag when mounting target member, is placed in component when mounting target member
RFID tag, BIM module are responsible for receiving the label ID information of RFID reader, go to execute data base querying work by id information
Make, send BIM module for the result of inquiry again later, the production that BIM module obtains component produces family, date of manufacture, size number
It is believed that ceasing and showing;
Mobile position-fixed module is installed, installation mobile position-fixed module includes GPS positioning device, is asked for sending positioning to GPS system
It seeks information and receives the GPS position information of GPS system return;BIM module obtains the positioning of construction personnel by GPS positioning device
Information;Wireless communication apparatus passes through BIM for sending BIM module for the received GPS position information of GPS terminal module
Module carries out the real-time location tracking of personnel GPS;Camera will shoot obtained picture number for shooting to construction member
The size comparison of component and the Comparative result and error of component installation are carried out according to BIM module is sent to by wireless communication apparatus
Correction, storage device, for storing the component data information of BIM system, component data information includes scantling information and peace
Holding position information;Display, for being connect with storage device and positioning device, for showing the location information and structure of mobile terminal
The BIM information of part.
The system further includes production site environment module, and production site environment module includes dust concentration detector and wind speed
Wind transducer, dust concentration detector are set to construction site wall top portion all around, dust concentration detector by route with
Inside server connection or construction, with real-time monitoring building yard dust concentration;
The wind speed wind direction sensor is for acquiring instantaneous wind speed, the wind speed and direction stress information caused by dust recycling and being transmitted to
BIM module;
The system further includes operation control module, and operation control module includes BIM building O&M unit, building facility energy consumption data
Unit and building automation unit, BIM building O&M unit are connect with building facility information data unit and building automation unit;
Then BIM builds O&M unit can be led to using three-dimensional laser scanner acquisition building and pipeline solid space point cloud data
It crosses data to be converted into, building facility energy consumption data module passes through the energy consumption data that arrives water level sensor, ammeter instrument to collect
Incoming BIM builds O&M unit.
The building automation module can click corresponding position by video monitoring camera and play in real time, be built using BIM
Build O&M module simulation adjustment monitor camera monitoring area.
Compared with prior art, advantageous effect of the invention is: in the construction stage, obtaining administrative staff quickly by the management system
The engineering informations such as the production installation progress of enchashment field component, cost, quality, safety, and effectively managed;In the O&M stage,
It is sufficiently used for facility maintenance management, realizes energy dynamic monitoring, the historical data of record can be used as the base of energy consumption analysis comparison
Plinth is adjusted optimization to abnormal energy consumption.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon.
Fig. 1 is structure of the invention block diagram.
Specific embodiment
The present invention is described in further details below by embodiment, embodiment is only used to illustrate the present invention, and unlimited
The scope of the present invention processed.
A kind of assembled architecture BIM module management system as shown in Figure 1, which includes that processing module includes process equipment
Unit, machining control unit and machining information acquiring unit, machining control unit and machining information acquiring unit are set with processing
Standby cell data connects, and machining control unit is used to control the processing operation of process equipment unit, and machining information acquiring unit is used
In the machining information for obtaining process equipment unit, machining information acquiring unit connect with BIM module, the machining information of component is obtained
The information that modulus block obtains is compared with the presupposed information of component in BIM module, and phase machining control unit issues if consistent
Signal, so that process equipment unit works normally;Process equipment unit is made to stop working if inconsistent.Control management module
Component RFID tag is written in the information of component by the data information for providing according to BIM module, and the information of component includes component
Machining information and component presupposed information, when mounting target member be placed in component RFID tag, in installation targets structure
It is placed in component RFID tag when part, each component of interior of building is all sticked into component RFID tag.Be conducive in this way
Component tracks the development of work, and BIM module is responsible for receiving the label ID information of RFID reader, goes to execute data by id information
Library inquiry work, sends BIM module for the result of inquiry again later, and the production that BIM module obtains component produces family, production date
Phase, dimension data information are simultaneously shown.In the storage period of component, patrol officer to label information expansion read work when
Wait, patrol officer to component carry out regularly check after, the information to database and label timely updated, will patrol
The result of inspection is detailed to be recorded, and facilitates make reference next time, and after the information in database is timely updated, thus
The information of the inquiry and Retrieval Component that can go deep into.Installing mobile position-fixed module includes GPS positioning device, is used for GPS system
It sends positioning request information and receives the GPS position information of GPS system return;BIM module is obtained by GPS positioning device and is constructed
The location information of personnel;Wireless communication apparatus, for sending BIM mould for the received GPS position information of GPS terminal module
Block carries out the real-time location tracking of personnel GPS by BIM module;Camera will be shot for shooting to construction member
To image data by wireless communication apparatus be sent to BIM module carry out component size comparison and component installation result pair
Than the correction with error, thus the installation process of standard construction personnel in time;Storage device, for storing the component of BIM system
Data information, component data information include scantling information and installation site information;Display, for storage device and calmly
Position device connection, for showing that the location information of mobile terminal and the BIM information of component, mobile position-fixed module can provide in real time
The operating path of each building station personnel, while personnel shoot photo by camera and BIM module carries out the size pair of component
Than the correction of the Comparative result and error installed with component, the deviation in installation process is found in time, while for site operation people
Member can also know the mount message of component by display.Production site environment module includes dust concentration detector and wind speed
Wind transducer, dust concentration detector are set to construction site wall top portion all around, dust concentration detector by route with
Inside server connection or construction, with real-time monitoring building yard dust concentration.Dust concentration detector uses ZY3400
Type, the wind speed wind direction sensor is for acquiring instantaneous wind speed, the wind speed and direction stress information caused by dust recycling and being transmitted to
BIM module;Wind-force has apparent influence to dust recycling, and when wind-force increases to 6-7 grades, building dust easily expands on a large scale
It dissipates, influences air quality.When this wind-force is more than preset value, warned automatically by the alarm speakers being set in place
Show, for stopping construction operation and being dusted by measures such as waterings.Operation control module include BIM building O&M unit,
Building facility energy consumption data unit and building automation unit, BIM build O&M unit and building facility information data unit and building
The connection of space Automatic Control Unit;BIM builds O&M unit can be using three-dimensional laser scanner acquisition building and pipeline solid space
Then point cloud data is converted by data, have the characteristics that high efficiency, high-precision.Building facility energy consumption data module is logical
It crosses the energy consumption data for arriving water level sensor, ammeter instrument to collect and is passed to BIM building O&M unit, realize energy dynamic monitoring,
The historical data of record can be used as the basis of energy consumption analysis comparison, be adjusted optimization to abnormal energy consumption.Building automation module
Corresponding position can be clicked by video monitoring camera to play in real time, taken the photograph using BIM building O&M module simulation adjustment monitoring
Camera monitoring area, adjustment layout prevent monitoring dead angle from generating.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint
What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc.
Imitate embodiment.But without departing from the technical solutions of the present invention, according to the technical essence of the invention to above embodiments institute
Any simple modification, equivalent variations and the remodeling made, still fall within the protection scope of technical solution of the present invention.
Claims (4)
1. a kind of assembled architecture BIM module management system, which is characterized in that the system includes:
Processing module, processing module include process equipment unit, machining control unit and machining information acquiring unit, machining control
Unit and machining information acquiring unit are connect with process equipment cell data, and machining control unit is for controlling process equipment list
The processing operation of member, machining information acquiring unit are used to obtain the machining information of process equipment unit, machining information acquiring unit
It is connect with BIM module, the presupposed information that the machining information of component obtains component in the information and BIM module that module obtains is carried out
Compare, phase machining control unit issues signal if consistent, so that process equipment unit works normally, makes to add if inconsistent
Construction equipment unit stops working;
Management module is controlled, structure is written in the information of component by the data information that control management module is used to provide according to BIM module
Part RFID tag is placed in component RFID tag when mounting target member, is placed in component when mounting target member
RFID tag, BIM module are responsible for receiving the label ID information of RFID reader, go to execute data base querying work by id information
Make, send BIM module for the result of inquiry again later, the production that BIM module obtains component produces family, date of manufacture, size number
It is believed that ceasing and showing;
Mobile position-fixed module is installed, installation mobile position-fixed module includes GPS positioning device, is asked for sending positioning to GPS system
It seeks information and receives the GPS position information of GPS system return;BIM module obtains the positioning of construction personnel by GPS positioning device
Information;Wireless communication apparatus passes through BIM for sending BIM module for the received GPS position information of GPS terminal module
Module carries out the real-time location tracking of personnel GPS;Camera will shoot obtained picture number for shooting to construction member
The size comparison of component and the Comparative result and error of component installation are carried out according to BIM module is sent to by wireless communication apparatus
Correction, storage device, for storing the component data information of BIM system, component data information includes scantling information and peace
Holding position information;Display, for being connect with storage device and positioning device, for showing the location information and structure of mobile terminal
The BIM information of part.
2. assembled architecture BIM module management system according to claim 1, it is characterised in that: the system further includes field
Ground module, place module include dust concentration detector and wind speed wind direction sensor, and dust concentration detector is set to construction field
Ground all around wall top portion, dust concentration detector by route connect with server or construction inside, built with real-time monitoring
Build place dust concentration;
The wind speed wind direction sensor is for acquiring instantaneous wind speed, the wind speed and direction stress information caused by dust recycling and being transmitted to
BIM module.
3. assembled architecture BIM module management system according to claim 1 or 2, it is characterised in that: the system further includes
Control module is runed, operation control module includes BIM building O&M unit, building facility energy consumption data unit and building automation list
Member, BIM building O&M unit are connect with building facility information data unit and building automation unit;BIM builds O&M unit can
To be then converted into, be built by data using three-dimensional laser scanner acquisition building and pipeline solid space point cloud data
It builds facility energy requirements data module and BIM building O&M list is passed to by the energy consumption data for arriving water level sensor, ammeter instrument to collect
Member.
4. assembled architecture BIM module management system according to claim 3, it is characterised in that: the building automation mould
Block can click corresponding position by video monitoring camera and play in real time, utilize BIM building O&M module simulation adjustment monitoring
Camera supervised region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810924879.7A CN109242263A (en) | 2018-08-14 | 2018-08-14 | A kind of assembled architecture BIM module management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810924879.7A CN109242263A (en) | 2018-08-14 | 2018-08-14 | A kind of assembled architecture BIM module management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109242263A true CN109242263A (en) | 2019-01-18 |
Family
ID=65071381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810924879.7A Pending CN109242263A (en) | 2018-08-14 | 2018-08-14 | A kind of assembled architecture BIM module management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109242263A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110113571A (en) * | 2019-05-07 | 2019-08-09 | 合肥芃明科技有限公司 | A kind of approaches to IM based on virtual reality and video fusion |
CN111321902A (en) * | 2020-02-26 | 2020-06-23 | 浙江锐博科技工程有限公司 | System and method for hoisting components on assembly building construction site |
CN111563521A (en) * | 2019-02-14 | 2020-08-21 | 埃森哲环球解决方案有限公司 | Site-specific anomaly detection |
CN112214861A (en) * | 2019-07-12 | 2021-01-12 | 莱芜职业技术学院 | Electromechanical system pipeline assembly system based on BIM |
CN112435143A (en) * | 2020-11-23 | 2021-03-02 | 温岭市第一建筑工程有限公司 | Building engineering construction optimization system based on BIM |
CN112634089A (en) * | 2020-12-30 | 2021-04-09 | 珠海大横琴科技发展有限公司 | Energy consumption processing method and device for property facility |
CN112734184A (en) * | 2020-12-30 | 2021-04-30 | 南通汉腾建筑科技有限公司 | Acceptance method and system for assembly type building |
CN113259628A (en) * | 2021-05-08 | 2021-08-13 | 广西艾科普高新技术有限公司 | BIM-based laboratory assembly building and method |
CN114140899A (en) * | 2021-12-20 | 2022-03-04 | 浙江交通职业技术学院 | Engineering inspection system and method based on artificial intelligence |
CN116489592A (en) * | 2023-05-26 | 2023-07-25 | 安徽江澜建设工程有限公司 | Assembled building construction monitored control system based on three-dimensional model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106600239A (en) * | 2016-12-28 | 2017-04-26 | 中建科技有限公司 | Assembly type building construction full process data cooperation management system based on BIM |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
CN108133430A (en) * | 2017-11-15 | 2018-06-08 | 中建三局第二建设工程有限责任公司 | The operation maintenance management method that personnel positioning is combined with BIM |
CN108363880A (en) * | 2018-02-28 | 2018-08-03 | 南通四建集团有限公司 | It is a kind of to be applied to construction, operation, the D-BIM methods for safeguarding integrated management |
-
2018
- 2018-08-14 CN CN201810924879.7A patent/CN109242263A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106600239A (en) * | 2016-12-28 | 2017-04-26 | 中建科技有限公司 | Assembly type building construction full process data cooperation management system based on BIM |
CN108133430A (en) * | 2017-11-15 | 2018-06-08 | 中建三局第二建设工程有限责任公司 | The operation maintenance management method that personnel positioning is combined with BIM |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
CN108363880A (en) * | 2018-02-28 | 2018-08-03 | 南通四建集团有限公司 | It is a kind of to be applied to construction, operation, the D-BIM methods for safeguarding integrated management |
Non-Patent Citations (1)
Title |
---|
郑一梅: "BIM在装配式建筑信息化管理中的应用研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111563521A (en) * | 2019-02-14 | 2020-08-21 | 埃森哲环球解决方案有限公司 | Site-specific anomaly detection |
CN111563521B (en) * | 2019-02-14 | 2023-10-17 | 埃森哲环球解决方案有限公司 | Site-specific anomaly detection |
CN110113571A (en) * | 2019-05-07 | 2019-08-09 | 合肥芃明科技有限公司 | A kind of approaches to IM based on virtual reality and video fusion |
CN112214861A (en) * | 2019-07-12 | 2021-01-12 | 莱芜职业技术学院 | Electromechanical system pipeline assembly system based on BIM |
CN111321902A (en) * | 2020-02-26 | 2020-06-23 | 浙江锐博科技工程有限公司 | System and method for hoisting components on assembly building construction site |
CN112435143A (en) * | 2020-11-23 | 2021-03-02 | 温岭市第一建筑工程有限公司 | Building engineering construction optimization system based on BIM |
CN112734184A (en) * | 2020-12-30 | 2021-04-30 | 南通汉腾建筑科技有限公司 | Acceptance method and system for assembly type building |
CN112734184B (en) * | 2020-12-30 | 2022-06-03 | 南通汉腾建筑科技有限公司 | Acceptance method and system for assembly type building |
CN112634089A (en) * | 2020-12-30 | 2021-04-09 | 珠海大横琴科技发展有限公司 | Energy consumption processing method and device for property facility |
CN113259628A (en) * | 2021-05-08 | 2021-08-13 | 广西艾科普高新技术有限公司 | BIM-based laboratory assembly building and method |
CN114140899A (en) * | 2021-12-20 | 2022-03-04 | 浙江交通职业技术学院 | Engineering inspection system and method based on artificial intelligence |
CN116489592A (en) * | 2023-05-26 | 2023-07-25 | 安徽江澜建设工程有限公司 | Assembled building construction monitored control system based on three-dimensional model |
CN116489592B (en) * | 2023-05-26 | 2024-01-26 | 安徽江澜建设工程有限公司 | Assembled building construction monitored control system based on three-dimensional model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109242263A (en) | A kind of assembled architecture BIM module management system | |
CN102307386B (en) | Indoor positioning monitoring system and method based on Zigbee wireless network | |
CN111242574A (en) | Intelligent site inspection management system and method based on GPS technology | |
CN107437153A (en) | Underground pipe gallery big data visualized O&M cloud platform | |
CN107240166A (en) | Point inspection terminal and its data processing method | |
CN108520342A (en) | Platform of internet of things management method based on BIM and its system | |
CN111246083B (en) | Real-time live broadcast system is patrolled and examined in 5G unmanned aerial vehicle building site | |
CN206775516U (en) | Computer room management system based on RFID label tag | |
CN107239868A (en) | End message processing method and processing device for security cruising inspection system | |
CN107240164A (en) | The data processing of security cruising inspection system and device | |
CN116298701B (en) | Power distribution network fault detection method and related device based on digital twin system | |
CN111260325A (en) | Bridge construction progress management system based on BIM | |
CN104392507A (en) | Intelligent line patrol monitoring system for urban gas pipe network | |
CN105761016A (en) | Bridge disease inspection management system and method | |
CN112272236A (en) | Routing inspection system and method based on BIM | |
CN103200390A (en) | Method for monitoring indoor object moving track | |
CN109660963A (en) | Shutdown system based on UWB | |
GB2586198A (en) | A monitoring and recording system | |
CN212659122U (en) | Intelligent water affair event scheduling management system based on three-dimensional visualization technology | |
CN109728540A (en) | A kind of power network line inspection management method | |
CN114663818B (en) | Airport operation core area monitoring and early warning system and method based on vision self-supervision learning | |
CN114926147A (en) | Intelligent lightweight management platform and method | |
CN114493138A (en) | Land-air integrated intelligent construction system and management method | |
CN107563529A (en) | A kind of electric power geography information operating system based on GPS and inertial positioning | |
CN115604317B (en) | Prompting system and method for industrial daily inspection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190118 |
|
RJ01 | Rejection of invention patent application after publication |