CN207517058U - A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing - Google Patents

A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing Download PDF

Info

Publication number
CN207517058U
CN207517058U CN201720857405.6U CN201720857405U CN207517058U CN 207517058 U CN207517058 U CN 207517058U CN 201720857405 U CN201720857405 U CN 201720857405U CN 207517058 U CN207517058 U CN 207517058U
Authority
CN
China
Prior art keywords
module
cloud computing
data
bim
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720857405.6U
Other languages
Chinese (zh)
Inventor
刘伟光
陈俊桦
吴雪峰
夏鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nangong Technology Group Co Ltd
Original Assignee
Jiangsu Nangong Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nangong Technology Group Co Ltd filed Critical Jiangsu Nangong Technology Group Co Ltd
Priority to CN201720857405.6U priority Critical patent/CN207517058U/en
Application granted granted Critical
Publication of CN207517058U publication Critical patent/CN207517058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of wisdom safety grade of architecture assessment systems based on BIM and cloud computing,Including collection in worksite module,The collection in worksite module output terminal is equipped with data analysis module,The data analysis module input terminal is equipped with front end acquisition module,The data analysis module output terminal is equipped with data reception module,The data reception module output terminal is equipped with cloud computing module,The cloud computing module input is equipped with technical indicator standard library module,The technical indicator java standard library module input is equipped with data update module,The utility model passes through this assessment system,Be conducive to facilitate acquisition construction site situation,Facilities and equipment information,Construction material information,With building structure information,It avoids faking,Cloud computing module is facilitated to detect underproof place,Pass through BIM model construction modules and color rendering module,Facilitate and clear and intuitive show data comparison information and building dangerous structure,Dangerous structure is changed, facility is provided.

Description

A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing
Technical field
The utility model is related to safety grade of architecture evaluation areas, more particularly to a kind of wisdom based on BIM and cloud computing Safety grade of architecture assessment system.
Background technology
BIM is the abbreviation of Building Information Model (Building Information Modeling), is with architectural engineering item Basis of the purpose items relevant information data as model, carries out the foundation of buildings model, is built by digital information analogue simulation Build real information possessed by object.It has information completeness, information relevance, consistency on messaging, visualization, harmony, mould Intend property, optimization property and eight big feature of figure can be gone out, at present, the country for structural quality assessment and points-scoring system had phase The standard of pass can refer to execution, but during execution standard, for construction material, building qualification, designing scheme and apply The work of work information summary analysis and evaluation still relies on manually, this causes evaluation process to be still not able to comply fully with standardization, It fakes serious, domestic jerry-built project is commonplace, and based on this present situation, construction quality evaluation work needs to realize full-automatic letter Breathization manages, and therefore, invention is a kind of to be solved the above problems based on BIM and the wisdom safety grade of architecture assessment system of cloud computing It is necessary.
Utility model content
The purpose of this utility model is to provide a kind of based on BIM and the wisdom safety grade of architecture of cloud computing assessment system System, to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical solution:It is a kind of to be built based on BIM and the wisdom of cloud computing Safe class assessment system is built, including collection in worksite module, the collection in worksite module output terminal is equipped with data analysis module, institute Data analysis module input terminal is stated equipped with front end acquisition module, the data analysis module output terminal is equipped with data reception module, The data reception module output terminal is equipped with cloud computing module, and the cloud computing module input is equipped with technical indicator java standard library mould Block, the technical indicator java standard library module input are equipped with data update module, and the cloud computing module output terminal is equipped with BIM moulds Type builds module, and the BIM model construction modules input terminal is equipped with color rendering module and output terminal and is sent out equipped with finish message Send module.
Preferably, the collection in worksite module is existing by unmanned plane camera shooting and three-dimensional laser scanner acquisition building and construction Field information.
Preferably, the front end acquisition module acquires the index letter of each flow by radio frequency identification and two-dimensional code scanning mode Cease data.
Preferably, the data analysis module includes building data information module, construction site analysis module, installations and facilities Analysis module and risk factors module.
Preferably, the collection in worksite module, data analysis module, data reception module, front end acquisition module, cloud computing Module, technical indicator standard library module, data update module, BIM model construction modules, color rendering module and finish message hair Module output terminal is sent to be equipped with information storage module.
The technique effect and advantage of the utility model:By this assessment system, be conducive to facilitate acquisition construction site situation, Facilities and equipment information, construction material information and building structure information, avoid faking, and cloud computing module are facilitated to detect unqualified Place, by BIM model construction modules and color rendering module, facilitate and clear and intuitive show data comparison information and build Dangerous structure is built, dangerous structure is changed, facility is provided, by being equipped with finish message sending module, be conducive to architectural evaluation knot Fruit, data and modification are sent to user, and user is allowed to check, are assessed again after facilitating modification.
Description of the drawings
Fig. 1 is the system structure diagram of the utility model.
In figure:1 collection in worksite module, 2 data analysis modules, 3 data reception modules, 4 front end acquisition modules, 5 cloud computings Module, 6 technical indicator standard library modules, 7 data update modules, 8 BIM model construction modules, 9 color rendering modules, 10 information Arrange sending module.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
The utility model provides as shown in Figure 1 a kind of assessed based on BIM and the wisdom safety grade of architecture of cloud computing System, including collection in worksite module 1,1 output terminal of collection in worksite module is equipped with data analysis module 2, the data analysis 2 input terminal of module is equipped with front end acquisition module 4, and 2 output terminal of data analysis module is equipped with data reception module 3, the number Cloud computing module 5 is equipped with according to 3 output terminal of receiving module, 5 input terminal of cloud computing module is equipped with technical indicator standard library module 6,6 input terminal of technical indicator standard library module is equipped with data update module 7, and 5 output terminal of cloud computing module is equipped with BIM Model construction module 8, it is whole equipped with information that 8 input terminal of BIM model construction modules is equipped with color rendering module 9 and output terminal Manage sending module 10.
The collection in worksite module 1 is believed by unmanned plane camera shooting and three-dimensional laser scanner acquisition building and construction site Breath, is conducive to the overall structure of three-dimensional laser scanner acquisition building, and unmanned plane camera shooting carries out construction site situation Camera shooting, is finally transferred to data analysis module 2, the front end acquisition module 4 is by penetrating by building structure, photo site and screen Frequency identification and two-dimensional code scanning mode acquire the indication information data of each flow, are conducive to facilitate acquisition construction material, the number Include building data information module, construction site analysis module, installations and facilities analysis module and risk factor point according to analysis module 2 Module is analysed, is conducive to the 1 collected building structure of collection in worksite module, photo site and screen and front end acquisition module 4 Collected construction material information carries out analysis and arrangement, obtains building specific data information, installations and facilities information, construction material Information and site operation violation information, the collection in worksite module 1, data analysis module 2, data reception module 3, front-end collection Module 4, cloud computing module 5, technical indicator standard library module 6, data update module 7, BIM model construction modules 8, color rendering Module 9 and 10 output terminal of finish message sending module are equipped with information storage module, are conducive to information storage module by entire information The information of acquisition and evaluation process stores, and conveniently checks and assessed again for the later stage providing data reference at any time.
This practicality operation principle:In use, collection in worksite module 1 is acquired by unmanned plane camera shooting and three-dimensional laser scanner Building and construction site information, three-dimensional laser scanner acquire the overall structure of building, and unmanned plane camera shooting shows construction Field situation is imaged, and building structure, photo site and screen finally are transferred to data analysis module 2, front end acquisition module 4 The indication information data of each flow are acquired by radio frequency identification and two-dimensional code scanning mode, facilitate acquisition construction material, data point It analyses module 2 and includes building data information module, construction site analysis module, installations and facilities analysis module and risk factors mould Block can collect the 1 collected building structure of collection in worksite module, photo site and screen and front end acquisition module 4 Construction material information carry out analysis and arrangement, obtain the specific data information of building, installations and facilities information, the information of construction material and Information after arrangement is sent to data reception module 3, data reception module 3 by site operation violation information, data analysis module 2 Send information to cloud computing module 5, the information of 5 similary reception technique criterion library module 6 of cloud computing module, by pair Than obtaining the difference of assessment building and technical indicator standard, being carried out by BIM model construction modules 8 to building and data difference Established model simultaneously passes through color rendering module 9 comparison is distinguished to data difference, and the risk factor in buildings model is facilitated to color in And facilitate the making of data difference table, finally by finish message sending module 10, be conducive to architectural evaluation result, number According to this and modification is sent to user, and user is allowed to change, and is assessed again after facilitating modification.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical solution recorded in foregoing embodiments or to which part technical characteristic Equivalent replacement is carried out, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing, including collection in worksite module(1), it is special Sign is:The collection in worksite module(1)Output terminal is equipped with data analysis module(2), the data analysis module(2)Input terminal Equipped with front end acquisition module(4), the data analysis module(2)Output terminal is equipped with data reception module(3), the data receiver Module(3)Output terminal is equipped with cloud computing module(5), the cloud computing module(5)Input terminal is equipped with technical indicator standard library module (6), the technical indicator standard library module(6)Input terminal is equipped with data update module(7), the cloud computing module(5)Output End is equipped with BIM model construction modules(8), the BIM model construction modules(8)Input terminal is equipped with color rendering module(9)And Output terminal is equipped with finish message sending module(10).
2. a kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing according to claim 1, feature It is:The collection in worksite module(1)Pass through unmanned plane camera shooting and three-dimensional laser scanner acquisition building and construction site information.
3. a kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing according to claim 1, feature It is:The front end acquisition module(4)The indication information data of each flow are acquired by radio frequency identification and two-dimensional code scanning mode.
4. a kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing according to claim 1, feature It is:The data analysis module(2)Including building data information module, construction site analysis module, installations and facilities analysis mould Block and risk factors module.
5. a kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing according to claim 1, feature It is:The collection in worksite module(1), data analysis module(2), data reception module(3), front end acquisition module(4), cloud meter Calculate module(5), technical indicator standard library module(6), data update module(7), BIM model construction modules(8), color rendering mould Block(9)With finish message sending module(10)Output terminal is equipped with information storage module.
CN201720857405.6U 2017-07-14 2017-07-14 A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing Active CN207517058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720857405.6U CN207517058U (en) 2017-07-14 2017-07-14 A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720857405.6U CN207517058U (en) 2017-07-14 2017-07-14 A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing

Publications (1)

Publication Number Publication Date
CN207517058U true CN207517058U (en) 2018-06-19

Family

ID=62532226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720857405.6U Active CN207517058U (en) 2017-07-14 2017-07-14 A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing

Country Status (1)

Country Link
CN (1) CN207517058U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272197A (en) * 2018-08-21 2019-01-25 吉林建筑大学 A kind of identification of dangerous source method based on building BIM model
CN109583099A (en) * 2018-12-04 2019-04-05 黄河水利职业技术学院 A kind of building data monitoring device based on BIM
CN110033183A (en) * 2019-04-04 2019-07-19 重庆工程职业技术学院 Architectural engineering service-specific terminal
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110210818A (en) * 2019-04-23 2019-09-06 万申科技股份有限公司 A kind of intelligent building full life cycle management method and system
CN110727986A (en) * 2019-10-15 2020-01-24 成都亮紫智能科技有限公司 BIM and weighted gray cloud clustering model-based ancient building maintenance model acquisition method
CN111629064A (en) * 2020-06-02 2020-09-04 郑州铁路职业技术学院 Building monitoring system based on BIM technology
CN111950895A (en) * 2020-08-11 2020-11-17 上海天华建筑设计有限公司 BIM-based assembly type building all-stage design and evaluation system
CN113065181A (en) * 2020-01-02 2021-07-02 中国移动通信集团设计院有限公司 Method and device for BIM (building information modeling) informatization processing of cloud resource pool
CN113435691A (en) * 2021-05-18 2021-09-24 华仁建设集团有限公司 BIM-based building quality standard evaluation method and system
CN115147408A (en) * 2022-08-30 2022-10-04 广东省有色工业建筑质量检测站有限公司 Intelligent detection and identification method for dangerous house
CN115326245A (en) * 2022-10-12 2022-11-11 珠海新迎创能源科技有限公司 Boiler pipeline stress monitoring system based on BIM cloud rendering

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272197B (en) * 2018-08-21 2021-03-23 吉林建筑大学 Danger source identification method based on building BIM model
CN109272197A (en) * 2018-08-21 2019-01-25 吉林建筑大学 A kind of identification of dangerous source method based on building BIM model
CN109583099A (en) * 2018-12-04 2019-04-05 黄河水利职业技术学院 A kind of building data monitoring device based on BIM
CN110033183A (en) * 2019-04-04 2019-07-19 重庆工程职业技术学院 Architectural engineering service-specific terminal
CN110033183B (en) * 2019-04-04 2021-06-25 重庆工程职业技术学院 Special service terminal for construction engineering
CN110210818A (en) * 2019-04-23 2019-09-06 万申科技股份有限公司 A kind of intelligent building full life cycle management method and system
CN110210818B (en) * 2019-04-23 2021-07-06 万申科技股份有限公司 Intelligent building full life cycle management method and system
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110727986A (en) * 2019-10-15 2020-01-24 成都亮紫智能科技有限公司 BIM and weighted gray cloud clustering model-based ancient building maintenance model acquisition method
CN113065181A (en) * 2020-01-02 2021-07-02 中国移动通信集团设计院有限公司 Method and device for BIM (building information modeling) informatization processing of cloud resource pool
CN113065181B (en) * 2020-01-02 2023-08-15 中国移动通信集团设计院有限公司 BIM (building information modeling) information processing method and device for cloud resource pool
CN111629064A (en) * 2020-06-02 2020-09-04 郑州铁路职业技术学院 Building monitoring system based on BIM technology
CN111629064B (en) * 2020-06-02 2023-06-02 郑州铁路职业技术学院 Building monitoring system based on BIM technology
CN111950895A (en) * 2020-08-11 2020-11-17 上海天华建筑设计有限公司 BIM-based assembly type building all-stage design and evaluation system
CN113435691A (en) * 2021-05-18 2021-09-24 华仁建设集团有限公司 BIM-based building quality standard evaluation method and system
CN113435691B (en) * 2021-05-18 2024-04-16 华仁建设集团有限公司 Building quality standard assessment method and system based on BIM
CN115147408A (en) * 2022-08-30 2022-10-04 广东省有色工业建筑质量检测站有限公司 Intelligent detection and identification method for dangerous house
CN115326245A (en) * 2022-10-12 2022-11-11 珠海新迎创能源科技有限公司 Boiler pipeline stress monitoring system based on BIM cloud rendering

Similar Documents

Publication Publication Date Title
CN207517058U (en) A kind of wisdom safety grade of architecture assessment system based on BIM and cloud computing
CN108052058B (en) Construction engineering site safety patrol transaction flow system based on Internet +'
CN104866952B (en) Three-dimensional digital management implementation method for hydropower station engineering project
CN104021586A (en) Air-ground integrated city ecological civilization managing system and method based on Beidou positioning
CN106595565A (en) BIM-based intelligent monitoring system
CN105844336A (en) BIM-based property management system and method
CN104680318A (en) BIM-based engineering personnel control system and method
CN111967077A (en) Engineering construction management digital platform based on BIM technology
CN103714434A (en) Chemical industry production site patrol system based on internet of things technology
CN113034692B (en) BIM-based underground pipe gallery data initialization method and system
CN108491649A (en) A kind of design method and processing equipment of wind power plant digital Platform
CN106980705A (en) Safety protection standard construction method based on BIM technology
CN106227730A (en) Power grid GIS data acquisition and recording system and collect and record method
CN112073900B (en) Positioning base station data stream processing method, device, equipment and computer readable medium
CN105844846A (en) Safety monitoring method, device and system based on Ibeacon technology
CN115049306A (en) Overall process engineering consultation management system
CN112053440A (en) Method for determining individualized model and communication device
CN110069509A (en) Complete period various dimensions intelligent temperature control information processing system and method
CN110232558A (en) Engineering project progress msg monitoring method
CN109299504A (en) A kind of wisdom Project Management System based on BIM platform
CN105117900A (en) Progress information acquisition method and device, and terminal equipment
CN108491530B (en) Space geographic information system
CN115442739B (en) Temporary communication processing method and device for subway construction, electronic equipment and medium
CN112328666A (en) Intelligent building supervision operation and maintenance system based on cloud platform technology
CN109829212A (en) A kind of Building Information Model generation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant