CN104537459A - BIM-based micro field system and method - Google Patents

BIM-based micro field system and method Download PDF

Info

Publication number
CN104537459A
CN104537459A CN201410728438.1A CN201410728438A CN104537459A CN 104537459 A CN104537459 A CN 104537459A CN 201410728438 A CN201410728438 A CN 201410728438A CN 104537459 A CN104537459 A CN 104537459A
Authority
CN
China
Prior art keywords
module
data
bim
processing module
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410728438.1A
Other languages
Chinese (zh)
Inventor
尹仕友
严国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai is with building Information technology company limited
State Grid (Shanghai) smart grid research & Development Investment Co., Ltd.
Original Assignee
Shanghai Is With Building Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Is With Building Information Technology Co Ltd filed Critical Shanghai Is With Building Information Technology Co Ltd
Priority to CN201410728438.1A priority Critical patent/CN104537459A/en
Publication of CN104537459A publication Critical patent/CN104537459A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model provides a building information modeling (BIM)-based micro field system and method. The system comprises: a data acquisition module, which is used for collecting and obtaining working condition data; a data processing module, which is used for carrying out processing on the data collected and obtained by the data acquisition module; a data output module, which is used for sending the data processed by the data processing module to a server; an area display module, which is used for displaying area information by using a BIM model; and a construction publishing module, which is used for prompting a construction position corresponding to the construction publishing information in a displayed area. The system and method have the following beneficial effects: firstly, the working condition occurring at the field can be exchanged and fed back timely; secondly, the processing flow the occurred working condition is fed back clearly; and thirdly, the working condition that has occurred can be localized easily and conveniently.

Description

Based on micro-fielded system and the method for BIM
Technical field
The present invention relates to micro-scene, particularly, relate to the micro-fielded system based on BIM and method.
Background technology
BIM is the abbreviation of Building Information Modeling, is domesticly usually translated into BIM.Be a kind of building Life cycle information system management technology, there are visual, harmony, simulation, optimization and five large features of can publishing picture.BIM is a kind of brand-new architectural design, construction, management method, based on three-dimensional digital information technology, the data information in each stages such as planning, design, construction, operation is all included among 3D model, allowing the staff in any stage in the whole life cycle of buildings when using this model, effective, correct decision-making can be made according to accurately complete data.
The present invention is the application based on iOS platform, and iOS is the Mobile operating system developed by Apple.This system is announced in the Macworld conference of Apple early than on January 9th, 2007, and be that design uses to iPhone at first, cover was used on the products such as iPod touch, iPad and Apple TV successively afterwards.IOS is the same with the Mac OS X operating system of apple, and therefore it belong to the commercial operating systems of class Unix equally also based on Darwin.
Traditional Management of engineering schedule mode, its ladder of management, theory, instrument are more single, cannot carry out record feedback timely, and subproblem may be omitted in the communication process of both sides for the problem found in construction, in the course of time, the delayed of progress is caused.Management difficulty is comparatively large simultaneously, and cost is also comparatively high.
Summary of the invention
For defect of the prior art, the object of this invention is to provide a kind of micro-fielded system based on BIM and method.The technical problem to be solved in the present invention be embodied in following some:
1) micro-scene is with BIM model for carrier, by also in the building site hypostazation of construction, can feed back the place of the generation of ging wrong, discovery time, particular content and finder clearly.Particularly, in the present invention, issue the information of construction in selected region after, the region that BIM model is corresponding will there will be the expression of prompting, and such user open-and-shutly can see the place that problem occurs, and corresponds to the position of construction site subsequently.
2) micro-scene is by the communication with server, also can carry out corresponding process to the state of found problem, can be more quick, the progress of the problem that more simple and clear tracking finds.
3) micro-scene is based on network communication conventional in daily life, as long as in the place having network, can get the message feedback from engineering site anywhere or anytime, have very strong instantaneity,
4) micro-in-site installation is on mobile phone, is convenient to user and carries, and can break away from too fat to move document information record, the problem occurred before navigating to fast and easily when finding in the past occurred problem.By the present invention, for the region wishing to check can be selected, operating modes all in this region is screened, and provide the function of search to be used for searching problem to locate.
According to a kind of micro-fielded system based on BIM provided by the invention, comprise as lower module:
Data acquisition module, it obtains for carrying out collection to floor data;
Data processing module, it processes for collecting to data acquisition module the data obtained;
Data outputting module, it is for sending to server by the data after data processing module process;
Region display module, it is for carrying out display area information with BIM model;
Construction release module, it is in BIM model, points out the construction location that construction releases news correspondence in institute's display area;
Wherein, described data processing module, comprises as lower module:
The processing module of BIM model data, it is for being divided into fritter feedback areas information by BIM model;
The processing module of operating mode type, it is classified for the problem occurred for site operation;
The screening module of construction problem, it is for screening site operation problem occurring;
The processing module of personal information, it is for the treatment of the information of project personnel.
Preferably, described data acquisition module, comprises as lower module:
Camera model, it is for carrying out picture collection to working-yard situation;
Recording module, it is for carrying out audio collection to working-yard situation;
Character module, it is for the word of editing specification working-yard situation;
Described data outputting module, comprises as lower module:
Server com-munication module, it is for communicating with server;
Flow process labeling module, it is for marking workflow to floor data, and wherein, described workflow comprises new problem state, solves state, solves state, closed state.。
Preferably, the processing module of described BIM model data, it is for collecting the data obtained by data acquisition module, according to set membership arrangement hierarchical relationship, sequence changes into tree structure, according to hierarchical relationship, BIM model is divided into various level fritter, and by tree structure, the region in the BIM model corresponding with fritter is fed back;
The processing module of operating mode type, it is for adding the category attribute of classification for the problem that site operation occurs according to the instruction of user;
The screening module of construction problem, its for select according to user region, category attribute, key word, site operation problem occurring is screened;
The processing module of personal information, it is for the treatment of the information of project personnel.
According to the management method at a kind of micro-scene based on BIM provided by the invention, it is the above-mentioned method realized based on micro-fielded system of BIM.
Compared with prior art, the present invention has following beneficial effect:
1, interaction feedback is timely carried out to the operating mode that scene occurs.
2, feed back the treatment scheme of the operating mode occurred clearly.Need after operating mode to be processed can with " new problem ", " solving ", " solving " and " closed " four kinds of different icons to mark this operating mode workflow positioned at present, then issue reply by whom make him enter corresponding flow process by replying to understand in the particular content of operating mode.
3, easily the operating mode once occurred is located easily.
Accompanying drawing explanation
By reading the detailed description done non-limiting example with reference to the following drawings, other features, objects and advantages of the present invention will become more obvious:
Fig. 1 is the structural representation of system provided by the present invention.
Fig. 2 is data flow diagram
Embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.Following examples will contribute to those skilled in the art and understand the present invention further, but not limit the present invention in any form.It should be pointed out that to those skilled in the art, without departing from the inventive concept of the premise, some distortion and improvement can also be made.These all belong to protection scope of the present invention.
Micro-fielded system based on BIM provided by the invention, comprises as lower module:
Data acquisition module, the collection of the data (i.e. floor data) of its problem occurred for working-yard or progress obtains;
Data processing module, it is for the statement to the data after collection;
Data outputting module, it is for sending to server by the data after process.
Wherein:
Data acquisition module comprises as lower module:
Camera model: it is for the picture collection to working-yard situation;
Recording module: it is for the audio collection to working-yard situation;
Character module: it is for the text description collection to working-yard situation.
Data processing module comprises as lower module:
The processing module of BIM model data: it is for being divided into fritter feedback areas information by model.Particularly, the processing module of BIM model data to receive all data of model by server from data acquisition module after, will arrange the hierarchical relationship between them according to the set membership in the data received, sequence changes into tree structure, feeds back;
The processing module of operating mode type: it is for the classification for site operation problem.After the processing module of operating mode type receives data by server, for adding the category attribute of classification for the problem that site operation occurs according to the instruction of user;
The screening module of construction problem: it is for the screening of site operation problem occurring.First be screen by region, will show the operating mode of corresponding region after selection, be then screen by type, will show the operating mode of the corresponding types under this region after selection, be thirdly key word screening, the operating mode containing this key word in the corresponding types under this region after input, will be shown;
The processing module of personal information: it is for the treatment of the information of project personnel.
Data outputting module comprises as lower module:
Intra-system communication module: it is for needed for internal system data communication;
Server com-munication module: it is for needed for the communication between server and client;
Flow process labeling module, it is for marking workflow to floor data, and wherein, described workflow comprises new problem state, solves state, solves state, closed state.
Above specific embodiments of the invention are described.It is to be appreciated that the present invention is not limited to above-mentioned particular implementation, those skilled in the art can make various distortion or amendment within the scope of the claims, and this does not affect flesh and blood of the present invention.

Claims (4)

1. based on a micro-fielded system of BIM, it is characterized in that, comprise as lower module:
Data acquisition module, it obtains for carrying out collection to floor data;
Data processing module, it processes for collecting to data acquisition module the data obtained;
Data outputting module, it is for sending to server by the data after data processing module process;
Region display module, it is for carrying out display area information with BIM model;
Construction release module, it is in BIM model, points out the construction location that construction releases news correspondence in institute's display area;
Wherein, described data processing module, comprises as lower module:
The processing module of BIM model data, it is for being divided into fritter feedback areas information by BIM model;
The processing module of operating mode type, it is classified for the problem occurred for site operation;
The screening module of construction problem, it is for screening site operation problem occurring;
The processing module of personal information, it is for the treatment of the information of project personnel.
2. the micro-fielded system based on BIM according to claim 1, is characterized in that,
Described data acquisition module, comprises as lower module:
Camera model, it is for carrying out picture collection to working-yard situation;
Recording module, it is for carrying out audio collection to working-yard situation;
Character module, it is for the word of editing specification working-yard situation;
Described data outputting module, comprises as lower module:
Server com-munication module, it is for communicating with server;
Flow process labeling module, it is for marking workflow to floor data, and wherein, described workflow comprises new problem state, solves state, solves state, closed state.
3. the micro-fielded system based on BIM according to claim 1, is characterized in that,
The processing module of described BIM model data, it is for collecting the data obtained by data acquisition module, according to set membership arrangement hierarchical relationship, sequence changes into tree structure, according to hierarchical relationship, BIM model is divided into various level fritter, and by tree structure, the region in the BIM model corresponding with fritter is fed back;
The processing module of operating mode type, it is for adding the category attribute of classification for the problem that site operation occurs according to the instruction of user;
The screening module of construction problem, its for select according to user region, category attribute, key word, site operation problem occurring is screened;
The processing module of personal information, it is for the treatment of the information of project personnel.
4. based on the management method at micro-scene of BIM, it is characterized in that, it is the method realized based on micro-fielded system of BIM according to any one of claims 1 to 3.
CN201410728438.1A 2014-12-03 2014-12-03 BIM-based micro field system and method Pending CN104537459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410728438.1A CN104537459A (en) 2014-12-03 2014-12-03 BIM-based micro field system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410728438.1A CN104537459A (en) 2014-12-03 2014-12-03 BIM-based micro field system and method

Publications (1)

Publication Number Publication Date
CN104537459A true CN104537459A (en) 2015-04-22

Family

ID=52852978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410728438.1A Pending CN104537459A (en) 2014-12-03 2014-12-03 BIM-based micro field system and method

Country Status (1)

Country Link
CN (1) CN104537459A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512963A (en) * 2015-11-27 2016-04-20 张品晶 University campus restoration system based on BIM
CN106896749A (en) * 2017-03-10 2017-06-27 中铁四局集团有限公司 construction management client based on BIM technology
CN106991214A (en) * 2017-03-10 2017-07-28 中铁四局集团有限公司 The informatization management method of high speed railway prefabricating Liang Chang based on BIM
CN107025516A (en) * 2017-03-10 2017-08-08 中铁四局集团有限公司 The KXG of high speed railway prefabricating Liang Chang based on BIM
CN107784484A (en) * 2017-10-19 2018-03-09 毕埃慕(上海)建筑数据技术股份有限公司 Model and flow hooking method and device
CN111401829A (en) * 2020-03-02 2020-07-10 广州晟能电子科技有限公司 Building intelligent park management system based on BIM technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102884532A (en) * 2010-03-09 2013-01-16 欧特克公司 Systems and methods for construction field management and operations with building information modeling
CN103329150A (en) * 2011-01-25 2013-09-25 蒂凡尼·何塞·布朗 Construction trade building information management system, software and method
US20130339078A1 (en) * 2012-06-18 2013-12-19 Coaxis, Inc. System and method linking building information modeling and enterprise resource planning
CN104077653A (en) * 2014-06-25 2014-10-01 上海市建筑科学研究院(集团)有限公司 Building construction supervision method based on BIM

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102884532A (en) * 2010-03-09 2013-01-16 欧特克公司 Systems and methods for construction field management and operations with building information modeling
CN103329150A (en) * 2011-01-25 2013-09-25 蒂凡尼·何塞·布朗 Construction trade building information management system, software and method
US20130339078A1 (en) * 2012-06-18 2013-12-19 Coaxis, Inc. System and method linking building information modeling and enterprise resource planning
CN104077653A (en) * 2014-06-25 2014-10-01 上海市建筑科学研究院(集团)有限公司 Building construction supervision method based on BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张康照: "基于BIM实时模型的施工进度监测系统研究", 《中国硕士学位论文全文数据库 工程科技II辑(月刊)》 *
张建平等: "基于BIM的工程项目管理系统及其应用", 《土木建筑工程信息技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512963A (en) * 2015-11-27 2016-04-20 张品晶 University campus restoration system based on BIM
CN106896749A (en) * 2017-03-10 2017-06-27 中铁四局集团有限公司 construction management client based on BIM technology
CN106991214A (en) * 2017-03-10 2017-07-28 中铁四局集团有限公司 The informatization management method of high speed railway prefabricating Liang Chang based on BIM
CN107025516A (en) * 2017-03-10 2017-08-08 中铁四局集团有限公司 The KXG of high speed railway prefabricating Liang Chang based on BIM
CN107784484A (en) * 2017-10-19 2018-03-09 毕埃慕(上海)建筑数据技术股份有限公司 Model and flow hooking method and device
CN111401829A (en) * 2020-03-02 2020-07-10 广州晟能电子科技有限公司 Building intelligent park management system based on BIM technology

Similar Documents

Publication Publication Date Title
CN104537459A (en) BIM-based micro field system and method
Whitlock et al. Designing for mobile and immersive visual analytics in the field
CN105893423A (en) Video recommendation method and system, terminal and server
CN104008128A (en) Automatic case information generating and displaying method
CN105808681B (en) Published information viewing method and system based on electronic map and mobile positioning
KR102156440B1 (en) Apparatus and method for generating visual annotation based on visual language
CN104268154A (en) Recommended information providing method and device
US20140380191A1 (en) Method and apparatus for design review collaboration across multiple platforms
CN109462736B (en) Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling
CN104680588A (en) BIM-based event marking method and system
CN103942272A (en) Image search method and device
CN105100165A (en) Network service recommendation method and device
CN104182444A (en) News searching method and device
CN111158924B (en) Content sharing method and device, electronic equipment and readable storage medium
CN105915434A (en) Email processing method and equipment
CN104331496A (en) Photo sharing method and device
Mooney et al. Who are the contributors to OpenStreetMap and what do they do
CN105988679A (en) Information presentation method and device and user equipment
Sultan et al. The Last Journey. II. SMACC—Subhalo Mass-loss Analysis Using Core Catalogs
CN104537598A (en) Seismic focus environment analysis and interaction system
Muñoz Cristóbal et al. Toward multimodal analytics in ubiquitous learning environments
Isa et al. SmartKADASTER: Observing beyond traditional cadastre capabilities for Malaysia
Funayama et al. Disaster mitigation support system using Twitter and GIS
CN113095785B (en) Business expansion business platform
CN107291834A (en) A kind of data inputting method based on code-reading, equipment and terminal

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160118

Address after: 200093 Shanghai City, Yangpu District National Road No. 323 room 701-16

Applicant after: Shanghai is with building Information technology company limited

Applicant after: State Grid (Shanghai) smart grid research & Development Investment Co., Ltd.

Address before: 200093 Shanghai City, Yangpu District National Road No. 323 room 701-16

Applicant before: Shanghai is with building Information technology company limited

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150422