CN207264446U - A kind of Bridge construction monitoring system - Google Patents
A kind of Bridge construction monitoring system Download PDFInfo
- Publication number
- CN207264446U CN207264446U CN201720590108.XU CN201720590108U CN207264446U CN 207264446 U CN207264446 U CN 207264446U CN 201720590108 U CN201720590108 U CN 201720590108U CN 207264446 U CN207264446 U CN 207264446U
- Authority
- CN
- China
- Prior art keywords
- construction
- bridge
- quick response
- response code
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
It the utility model is related to Bridge construction monitoring system, including two-dimension code generator, server, expected construction information generation unit, the real-time collecting unit of construction information, construction site interactive terminal, construction monitoring management terminal and public access terminal;The Quick Response Code for the information generation different rights that two-dimension code generator is inputted according to expected construction information generation unit, the real-time collecting unit of construction information, server storage is output to by Quick Response Code;Server receives and stores bridge expection and realtime construction information, and expected and realtime construction information is associated with different rights Quick Response Code;Three Terminal Types access server to check bridge construction information by scanning Quick Response Code corresponding with its authority.The utility model come construction model of building bridge, while uses Quick Response Code hierarchy management technology using BIM technology, and the service of differentiation is presented after different rights personnel barcode scanning, improves bridge construction management efficiency, promotes bridge construction quality lifting.
Description
Technical field:
It the utility model is related to bridge construction implementation management field, and in particular to Bridge construction monitoring system.
Background technology:
Current BIM (Building Information Model) technologies have obtained more and more extensive attention and hair in China's engineering construction field
Exhibition, it is integrated with the various relevant informations of engineering project in a manner of digitized, it includes the completeness of engineering information, uniformity
And relevance is expected to fundamentally solve the letter between each stage application system such as project planning, design, construction and maintenance management
Breath there are problems that tomography this, the lifecycle management of engineering project is realized, so as to greatly improve engineering construction and maintenance
Efficiency and quality.
But at present due to all kinds of reasons (BIM typical problems, software limiting in itself, existing engineering system etc.), BIM
Technology is especially also applied far away, used at this stage in engineering construction field on a large scale in the infrastructure such as bridge field
Actual benefit caused by BIM technology yet reaches far away industry expection, especially live a line technology personnel and construction worker,
Generally BIM technology is not known about, how important BIM information is effectively passed to them, helps their lifting construction quality, drops
How about the BIM technology for containing immense value, is applied to the construction of actual science of bridge building by low operating risk under existence conditions
During management, the level and benefit of science of bridge building sector application BIM are improved conscientiously, this is all pendulum in science of bridge building working people
Member, a major issue especially in face of technical staff.
The content of the invention:
In order to solve the problems of prior art, the utility model provides a kind of Bridge construction monitoring system, this is
System improves overall bridge construction quality and benefits, reduces construction risk, has easy for installation, easy to operate, economic height
The characteristics of effect.
The utility model bridge construction management system adopts the following technical scheme that:A kind of Bridge construction monitoring system, including
Two-dimension code generator, server, expected construction information generation unit, the real-time collecting unit of construction information, construction site interaction are eventually
End, construction monitoring management terminal and public access terminal;Two-dimension code generator is single with server, expected construction information generation respectively
The real-time collecting unit connection of member, construction information, it is defeated according to expected construction information generation unit, the real-time collecting unit institute of construction information
The Quick Response Code of the information generation different rights entered, and the Quick Response Code generated is output in server and is stored;Server
The bridge for receiving and storing expected construction information generation unit input is expected construction information, and the real-time collecting unit of construction information
The bridge realtime construction information of input, and bridge is expected construction information, bridge realtime construction information and two-dimension code generator institute
The Quick Response Code of the different rights of generation is associated;The Quick Response Code is using physical tag form or electronic tag form for construction
Live interactive terminal, construction monitoring management terminal and public access terminal scanning, construction site interactive terminal, construction monitoring management
Terminal and public access terminal access server to check bridge construction information by scanning Quick Response Code corresponding with its authority.
The construction site interactive terminal is mobile terminal or computer, and construction monitoring management terminal is mobile terminal or meter
Calculation machine, public access terminal are mobile terminal.The mobile terminal is mobile phone or IPAD.
It is whole that the Quick Response Code of the different rights includes ordinary two dimensional code, interaction Quick Response Code and monitoring Quick Response Code, public access
End accesses server by scanning ordinary two dimensional code, and construction site interactive terminal accesses server by scanning interaction Quick Response Code,
Scanning monitoring Quick Response Code accesses server after construction monitoring management terminal input password.
As can be known from the above technical solutions, the utility model takes full advantage of BIM in terms of bridge is expected construction information generation
Software is built bridge construction model, and carries out construction simulation so as to construction personnel's recognitive engineering weight difficult point and potential risk resource, then
Carry out corresponding construction optimization;It is (such as bridge construction engineering weight difficult point, latent that bridge is expected construction information using planar bar code technology
In risk source, important engineering information), the every terms of information of bridge construction process decomposed and encoded, generate respective two-dimensional code thing
Label and electronic tag are managed, is stored in the own server or private clound/publicly-owned Cloud Server of bridge construction project, different rights
After personnel's (being divided into the general public, a line technology personnel and construction worker, project manager) carry out barcode scanning, i.e., different visits
Ask terminal, the BIM construction management informations of variantization can be read, built so that BIM technology preferably is served bridge
And if administrative staff, the quality and benefits of bridge construction management is lifted with this, promotes the practical implementation of BIM technology, drop
Low bridge beam construction risk.
Brief description of the drawings:
Fig. 1 is the Bridge construction monitoring system architecture diagram in the utility model embodiment;
Fig. 2 is the flow chart of the Bridge construction monitoring process in the utility model embodiment.
Embodiment:
The utility model is described in further detail with reference to embodiment and attached drawing, but the implementation of the utility model
Mode not limited to this.
Embodiment
Such as Fig. 1, the present embodiment Bridge construction monitoring system includes two-dimension code generator, server, expected construction information life
Into unit, the real-time collecting unit of construction information, construction site interactive terminal, construction monitoring management terminal and public access terminal.
Two-dimension code generator is connected with server, expected construction information generation unit, the real-time collecting unit of construction information respectively, according to pre-
The information that phase construction information generation unit, the real-time collecting unit of construction information are inputted generates corresponding Quick Response Code, wherein two dimension
Code can use physical tag form, can also use electronic tag form, and the Quick Response Code generated is output to server
In stored.The bridge that server receives and stores expected construction information generation unit input is expected construction information, Yi Jishi
The bridge realtime construction information of work real time information sampling unit input, and bridge is expected construction information, bridge realtime construction letter
Cease the respective two-dimensional code generated with two-dimension code generator to be associated, so that side of the user by terminal scanning Quick Response Code
Formula, can check corresponding bridge construction information, you can check (the important construction of such as bridge construction engineering of expected construction information
Process, construction point, potential risk resource, important engineering information, points for attention etc.), it can also check current construction information (such as
Duration progress (normal, delay or advanced), people, machine, the service condition etc. of material).
It is expected that construction information generation unit is by establishing bridge construction model, to bridge construction organization scheme and main apply
Work process is simulated, to obtain the expection construction information of bridge;The present embodiment establishes bridge construction mould using BIM technology
Type, simulates bridge construction organization scheme and main working procedure.
The real-time collecting unit of construction information, for by the core construction information of main construction node time instance, such as the duration into
Exhibition situation (normal, delay or advanced), people, machine, the service condition etc. of material are exported after collecting arrangement with word, diagrammatic form.Apply
Work real time information sampling unit can use computer, or the mobile terminal such as mobile phone, IPAD to realize.
For the utility model fully by Quick Response Code hierarchy management technology, two-dimension code generator can accordingly generate 3 classes difference
The Quick Response Code of authority, to improve differentiated service to different rights personnel:For public access terminal, ordinary two dimensional code is generated,
Ordinary two dimensional code can be posted in the position (such as bridge construction scene entrance or enclose on wall) being easily seen, and the public is not required to
Want password directly to access server by wechat or APP barcode scannings, obtain the bridges such as essential information and the time of completion of bridge
The introductory information of beam, the public can also go out periphery traffic the noise appeared in bridge construction process, building waste, construction
The problems such as capable influence, is fed back in server by ordinary two dimensional code;For construction site interactive terminal, interaction two dimension is generated
Code, interaction Quick Response Code can be puted up at the construction field (site), and operating personnel equally accesses clothes without cryptoAPI by wechat or APP barcode scannings
Business device, grasps the expection construction information and realtime construction information of bridge, such as important working procedure, Construction Points, pay attention to thing
, potential construction operation is dangerous, current construction speed, materials situation etc., so as to be conducive to construction efficiency and construction quality
Lifting;For construction monitoring management terminal, generation monitoring Quick Response Code, related bridge management personnel need password could barcode scanning access
Server, browses to the core information of bridge construction project, such as engineering current construction situation, construction safety situation, duration, matter
Amount, engineering funds service condition etc..
In the present embodiment, the main flow of Bridge construction monitoring process comprises the following steps referring to Fig. 2:
1st, according to Bridge Design data, bridge construction BIM models are established with reference to site operation requirement;
According to Bridge Design drawing, bridge construction BIM models are established with CATIA softwares.Since the center line of bridge is three
Dimension curve, component also have many irregular shapes, and under Integrated comparative, CATIA softwares can preferably be competent at the work.Computer
Hardware configuration recommend to select tetra- core above processors of I7, more than 16G memories, 2G or more independent display card.
2nd, bridge construction organization scheme and main working procedure are simulated and optimized using BIM softwares, obtain bridge
Beam is expected construction information;
Of BIM models has just been divided when factor is in modeling according to the organization scheme, working procedure, construction machinery at scene
Granularity, and working procedure simulation and optimization are carried out with up to the DELMIA softwares of Suo Pingtai, due to be with same platform, can be direct
The BIM models established using step 1.
3rd, according to the bridge construction modeling scheme after optimization, main construction weight difficult point and important risk source are identified;
According to construction simulation scheme, manually the dangerous matter sources, emphasis and the difficult point that are likely to occur in work progress are identified,
Arrangement and method for construction is adjusted at the same time, dangerous matter sources are identified, and is supplied to construction party, it is taken in the construction process suitable
When safe precaution measure.
4th, bridge is expected construction information (the heavy difficult point and risk source of such as construction work) with word, figure using BIM technology
The mode of table and video decomposes, stores and encode;By bridge realtime construction information, the core construction of such as main construction node time instance
Information, such as duration progress (normal, delay or advanced), after people, machine, the service condition etc. of material collect arrangement, with word,
The form output of chart;
It is difficult that the construction part that expresses clearly, working procedure make of BIM models and DELMIA softwares by engineering two dimension drawing
The construction simulation video gone out is expressed, and corresponds to relevant Quick Response Code, allows site operation personnel can be by scanning two dimension
Code reaches acquisition intuitively information, and such as site operation personnel can be more preferable equipped with the mobile equipment effects of IPAD.
5th, using two-dimension code generator, according to the content in step 4, the Quick Response Code of corresponding authority, i.e. ordinary two dimensional are generated
Code, interaction Quick Response Code and monitoring Quick Response Code;
6th, the bridge of step 4 is expected construction information and bridge realtime construction information, and the Quick Response Code that step 5 is generated
Store in server or the privately owned Cloud Server of public cloud that bridge construction project is had by oneself;
7th, all kinds of Quick Response Codes in server are carried out with Classification Management, relevant operation personnel can pass through server background two dimension
Code system and corresponding terminal, realize Quick Response Code editor, logging template, user right, information inquiry, barcode scanning statistics, construction prison
The functions such as control, it is specific as follows:
To the general public, by the data make comprising the introductory information of bridge into corresponding ordinary two dimensional code physical tag simultaneously
Be affixed on above the fold, the public without password can by after wechat or Quick Response Code APP barcode scannings to the essential information of bridge and
Time of completion etc. has a basic understanding and understanding, while the public also can be to the noise, airborne dust, building rubbish that occur in work progress
During the problems such as rubbish is fed back and uploaded onto the server by corresponding Quick Response Code, correlation engineering responsible person can at any time browse and check
The feedback opinion of the public;
For bridge technology personnel and a line construction worker, the intuitive of BIM technology, harmony and virtual will be given full play to
The technical advantages such as property, the information such as the heavy difficult point in bridge construction process and risk source with BIM technology be fabricated to corresponding word,
Chart and video content, and be converted into corresponding interactive Quick Response Code physical tag and be affixed on engineering site above the fold, operating personnel
Important working procedure, Construction Points and note that equally can be by wechat or Quick Response Code APP barcode scannings to bridge without password
Meaning item, potential construction operation danger etc. are well understood by and recognize, so as to be conducive to construction efficiency and construction quality
Lifting;
For the violation operation appeared in construction or construction problem, related technical personnel and construction personnel can also lead to
Cross barcode scanning to record site problems in a manner of chart, word and video and upload onto the server in time, server receiving
Automatically corresponding monitoring Quick Response Code is fabricated to after upload information and related science of bridge building administrative staff hand is sent to type of alarm
In machine, targetedly handled to do in time;
For leader and science of bridge building administrative staff, the monitoring two-dimensional code electronic label after server making is encrypted will
The important bridge construction informations such as engineering current construction situation, construction safety situation, duration, quality, engineering funds service condition push away
Leader and supervisor of construction's mobile phone terminal are sent to, and it is close to send in the form of short message or mail etc. corresponding Quick Response Code barcode scanning at the same time
Code, only can just browse to the core information of bridge project after password is inputted.
The important value of BIM has been effectively passed to bridge construction and custodian by the utility model by way of Quick Response Code
In member's hand, it is particularly advantageous to the understanding and application of a line technology personnel and construction worker to BIM, and a line engineers and technicians
Operating efficiency and quality are directly related to the safety and quality of overall bridge, thus the utility model is advantageous to BIM technology
Landing application in actual science of bridge building.
Above-described embodiment is the preferable embodiment of the utility model, but the embodiment of the utility model and from above-mentioned
The limitation of embodiment, the change made under other any Spirit Essences and principle without departing from the utility model, modify, replace
Generation, combination, simplify, and is included in other engineering construction fields (such as house, tunnel, station, roadbed, dam, harbour, airport)
Used similar scheme, should be equivalent substitute mode, is included within the scope of protection of the utility model.
Claims (8)
1. a kind of Bridge construction monitoring system, it is characterised in that including two-dimension code generator, server, expected construction information life
Into unit, the real-time collecting unit of construction information, construction site interactive terminal, construction monitoring management terminal and public access terminal;
Two-dimension code generator is connected with server, expected construction information generation unit, the real-time collecting unit of construction information respectively, according to pre-
The Quick Response Code for the information generation different rights that phase construction information generation unit, the real-time collecting unit of construction information are inputted, and will
The Quick Response Code generated, which is output in server, to be stored;Server receives and stores expected construction information generation unit input
Bridge be expected construction information, and the bridge realtime construction information of construction information real-time collecting unit input, it is and bridge is pre-
The Quick Response Code for the different rights that phase construction information, bridge realtime construction information are generated with two-dimension code generator is associated;Institute
State Quick Response Code and construction site interactive terminal, construction monitoring management terminal and public affairs are supplied using physical tag form or electronic tag form
Crowd accesses terminal scanning, and construction site interactive terminal, construction monitoring management terminal and public access terminal are weighed by scanning with it
Limit corresponding Quick Response Code and access server to check bridge construction information.
2. Bridge construction monitoring system according to claim 1, it is characterised in that the construction site interactive terminal is shifting
Dynamic terminal or computer, construction monitoring management terminal are mobile terminal or computer, and public access terminal is mobile terminal.
3. Bridge construction monitoring system according to claim 2, it is characterised in that the mobile terminal for mobile phone or
IPAD。
4. Bridge construction monitoring system according to claim 1, it is characterised in that the real-time collecting unit of construction information
For the core construction information for node time instance of constructing to be carried out after collecting arrangement, exported with word, diagrammatic form.
5. the Bridge construction monitoring system according to claim 1 or 4, it is characterised in that the construction information gathers in real time
Unit is realized using computer or mobile terminal.
6. Bridge construction monitoring system according to claim 1, it is characterised in that the Quick Response Code of the different rights includes
Ordinary two dimensional code, interaction Quick Response Code and monitoring Quick Response Code, public access terminal access server by scanning ordinary two dimensional code, apply
Work scene interactive terminal accesses server by scanning interaction Quick Response Code, and monitoring is scanned after construction monitoring management terminal input password
Quick Response Code accesses server.
7. Bridge construction monitoring system according to claim 6, it is characterised in that the ordinary two dimensional code and interaction two dimension
Code uses physical tag form, and ordinary two dimensional code is posted in bridge construction scene entrance or encloses on wall, interaction Quick Response Code
Put up at the construction field (site).
8. Bridge construction monitoring system according to claim 1, it is characterised in that the server is bridge construction project
Own server, privately owned Cloud Server or publicly-owned Cloud Server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720590108.XU CN207264446U (en) | 2017-05-24 | 2017-05-24 | A kind of Bridge construction monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720590108.XU CN207264446U (en) | 2017-05-24 | 2017-05-24 | A kind of Bridge construction monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207264446U true CN207264446U (en) | 2018-04-20 |
Family
ID=61915163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720590108.XU Active CN207264446U (en) | 2017-05-24 | 2017-05-24 | A kind of Bridge construction monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207264446U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110243408A (en) * | 2019-06-04 | 2019-09-17 | 中国神华能源股份有限公司神朔铁路分公司 | Apparatus monitoring method, device, equipment and the storage medium of bridge monitoring system |
CN110750688A (en) * | 2019-10-25 | 2020-02-04 | 重庆交通大学 | Bridge full life cycle BIM model information base construction method based on two-dimensional EBS coding |
CN111866097A (en) * | 2020-07-03 | 2020-10-30 | 熊猫智慧水务有限公司 | Intelligent device-based scanned data aggregation method |
CN115479594A (en) * | 2022-10-13 | 2022-12-16 | 中交一公局第七工程有限公司 | Bridge pier perpendicularity detection method and system based on BIM and three-dimensional scanning and application |
-
2017
- 2017-05-24 CN CN201720590108.XU patent/CN207264446U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110243408A (en) * | 2019-06-04 | 2019-09-17 | 中国神华能源股份有限公司神朔铁路分公司 | Apparatus monitoring method, device, equipment and the storage medium of bridge monitoring system |
CN110243408B (en) * | 2019-06-04 | 2022-05-31 | 中国神华能源股份有限公司神朔铁路分公司 | Equipment monitoring method, device, equipment and storage medium of bridge monitoring system |
CN110750688A (en) * | 2019-10-25 | 2020-02-04 | 重庆交通大学 | Bridge full life cycle BIM model information base construction method based on two-dimensional EBS coding |
CN111866097A (en) * | 2020-07-03 | 2020-10-30 | 熊猫智慧水务有限公司 | Intelligent device-based scanned data aggregation method |
CN115479594A (en) * | 2022-10-13 | 2022-12-16 | 中交一公局第七工程有限公司 | Bridge pier perpendicularity detection method and system based on BIM and three-dimensional scanning and application |
CN115479594B (en) * | 2022-10-13 | 2023-09-19 | 中交一公局第七工程有限公司 | BIM and three-dimensional scanning-based bridge pier perpendicularity detection method, system and application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107194588A (en) | A kind of bridge construction management system and method based on Quick Response Code and BIM technology | |
CN207264446U (en) | A kind of Bridge construction monitoring system | |
Ding et al. | Using nD technology to develop an integrated construction management system for city rail transit construction | |
CN104835085B (en) | Tourism runs supervision and safety emergency management interlinked command plateform system | |
Harrison et al. | Foundations for smarter cities | |
CN105843182B (en) | A kind of power scheduling accident prediction system and method based on OMS | |
CN203165006U (en) | Engineering project management system | |
CN110083119A (en) | A kind of the visual power system machine room monitoring system and method twin based on number | |
CN109447481A (en) | A kind of live cost monitoring system and method based on threedimensional model | |
CN105023086A (en) | Digital city management data sharing system based on cloud calculation | |
CN107798466A (en) | A kind of Urban Operation administrative center system | |
CN105652830A (en) | Bridge monitoring system based on BIM | |
CN107871204A (en) | A kind of Urban Operation centric system architecture and engineering system | |
CN109460834A (en) | Build operation management system and its management method | |
CN103136101A (en) | Software automated testing unified operation platform | |
CN104134121A (en) | Method for achieving visualization of power grid information system business data | |
CN113626914A (en) | Engineering project management method, device and system based on digital twins | |
CN104008218A (en) | Electric power engineering three-dimensional integrated design platform | |
CN109558412A (en) | The data growing method and device of assembled architecture construct platform | |
CN109840684A (en) | Management method, equipment, system and the storage medium of architecture information | |
CN109447390A (en) | The task management system of airport emergency management and rescue | |
CN106452887A (en) | Electric power communication system visual display system based on diagram-model-data integration | |
CN110019435A (en) | Data processing method and system based on assembled architecture platform | |
CN113704567A (en) | Internet of things data management method and device, Internet of things data resource pool and equipment | |
CN109559070A (en) | The equipment production information management method and device of assembled architecture platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 518000, No. 3333, Central Road, Shenzhen, Guangdong, Nanshan District Patentee after: CHINA RAILWAY CONSTRUCTION & INVESTMENT GROUP Co.,Ltd. Patentee after: Hanyang International Engineering Consulting Co., Ltd Address before: 518000, No. 3333, Central Road, Shenzhen, Guangdong, Nanshan District Patentee before: CHINA RAILWAY CONSTRUCTION & INVESTMENT GROUP Co.,Ltd. Patentee before: Guangzhou Hanyang Engineering Consulting Co.,Ltd. |