CN112488879A - Intelligent construction site management system based on BIM model - Google Patents
Intelligent construction site management system based on BIM model Download PDFInfo
- Publication number
- CN112488879A CN112488879A CN202011392911.5A CN202011392911A CN112488879A CN 112488879 A CN112488879 A CN 112488879A CN 202011392911 A CN202011392911 A CN 202011392911A CN 112488879 A CN112488879 A CN 112488879A
- Authority
- CN
- China
- Prior art keywords
- construction
- building
- construction site
- bim
- site management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 121
- 238000000034 method Methods 0.000 claims abstract description 8
- 238000012544 monitoring process Methods 0.000 claims abstract description 8
- 238000007405 data analysis Methods 0.000 claims abstract description 7
- 238000004458 analytical method Methods 0.000 claims description 9
- 239000004566 building material Substances 0.000 claims description 7
- 238000013528 artificial neural network Methods 0.000 claims description 3
- 238000010835 comparative analysis Methods 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 2
- 230000000007 visual effect Effects 0.000 abstract description 3
- 230000000977 initiatory effect Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Health & Medical Sciences (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Mathematical Optimization (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the field of construction site management, in particular to an intelligent construction site management system based on a BIM (building information modeling), which comprises: the building information management system comprises a BIM model building module, a building site monitoring module, a building site management module and a deviation data analysis module, wherein the BIM model building module generates building site management rules corresponding to each construction node according to the construction lines after examination, then builds BIM building information models corresponding to each construction node according to the construction lines after examination and the building site management rules corresponding to the construction lines, the building site management module is used for generating building site state parameter sets corresponding to each construction node, and comparison results corresponding to all the parameters are generated through comparison with the BIM building information models. The invention realizes the visual intelligent management of the construction site, and can find the deviation and the dangerous factors existing in the construction process in time while improving the management efficiency of the construction site.
Description
Technical Field
The invention relates to the field of construction site management, in particular to an intelligent construction site management system based on a BIM (building information modeling).
Background
In the construction and construction process of the house building, the whole process of the construction and construction can be managed by reasonably applying the whole process management mode, and a guarantee is provided for the construction and construction of projects. However, in the building construction process, the related work types are wide, the nodes needing to be managed and monitored are numerous, and management needs to be carried out from multiple aspects such as personnel, materials, equipment, safety, progress, quality and the like.
In the prior art, management is generally performed in a manual mode, and although some management systems are also available at present, most of the management systems are independent systems; for example, personnel management and equipment monitoring are respectively performed on display and application management in two systems, and related personnel need to know about the whole project, and need to respectively operate and check a plurality of systems, so that centralized management cannot be performed, and further defects of inconvenience in use and low management efficiency are caused.
Disclosure of Invention
In order to solve the problems, the invention provides an intelligent construction site management system based on a BIM (building information modeling) model, which realizes visual intelligent management of a construction site, can improve the management efficiency of the construction site and can timely find out deviation and dangerous factors existing in the construction process.
In order to achieve the purpose, the invention adopts the technical scheme that:
a intelligent worksite management system based on BIM model comprises:
the BIM model building module is used for generating a construction site management rule corresponding to each construction node according to the approved construction line and then building a BIM building information model corresponding to each construction node according to the approved construction line and the corresponding construction site management rule;
the construction site monitoring module is used for monitoring construction progress of a construction site, working conditions of workers, working conditions of equipment, states of building materials and environment of the construction site;
the construction site management module is used for generating a construction site state parameter set corresponding to each construction node and generating a comparison result corresponding to each parameter through comparison with the BIM building information model;
and the deviation data analysis module is used for actively identifying deviation data, finding out the specific reasons of the deviation of each parameter and related responsible personnel information, and outputting corresponding construction site management adjustment measures according to the specific reasons of the deviation.
Further, the construction site management rules comprise worker condition management rules, equipment condition management rules, building material management rules and construction site environment management rules.
Furthermore, the construction site management module excavates corresponding parameter data in the BIM building information model one by one according to the construction site state parameter set corresponding to each construction node through a data excavation module, then runs a corresponding contrastive analysis model based on Hadoop to realize contrastive analysis of each parameter, and outputs a corresponding contrastive analysis result.
Further, the deviation data analysis module outputs corresponding deviation reasons and related responsible personnel information according to the deviation data based on a fuzzy neural network algorithm by identifying the deviation data existing in the comparison result corresponding to each parameter, and outputs corresponding construction site management adjustment measures based on the LSSVM.
Further, still include:
and the construction progress supervision module is used for realizing the comparison between the actual construction progress of the construction site and the planned construction progress loaded in the BIM building information model and outputting the corresponding construction progress deviation.
Further, still include:
and the early warning module is started when the comparative analysis result of the construction progress deviation/construction site state parameter set falls into a preset danger threshold, early warning is realized by automatically popping up a WeChat small program, and different short message templates are called by different danger thresholds.
Further, the BIM building information model corresponding to each construction node internally loads the corresponding construction site management rule.
The invention has the following beneficial effects:
the visual intelligent management of building site is realized, and the deviation and the risk factor existing in the construction process can be found in time while the management efficiency of the building site can be improved.
Drawings
Fig. 1 is a system block diagram of an intelligent worksite management system based on a BIM model according to an embodiment of the present invention.
Detailed Description
In order that the objects and advantages of the invention will be more clearly understood, the invention is further described in detail below with reference to examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1, an embodiment of the present invention provides a BIM model-based intelligent worksite management system, including:
the BIM model building module is used for generating a construction site management rule corresponding to each construction node according to the approved construction line and then building a BIM building information model corresponding to each construction node according to the approved construction line and the corresponding construction site management rule; the BIM building information model corresponding to each construction node internally loads corresponding construction site management rules;
the construction site monitoring module is used for monitoring construction progress of a construction site, working conditions of workers, working conditions of equipment, states of building materials and environment of the construction site; in this embodiment, the construction site construction progress, the working condition of workers, the working condition of equipment, the state of building materials and the collection of construction site environment data are achieved based on a camera and a sensor group, the construction site construction progress parameters are obtained by identifying a construction progress image set based on a Dssd _ initiation _ V4_ model, it is noted that the entry of each construction progress parameter needs verification by a corresponding project manager, and the Dssd _ initiation _ V4_ model is obtained by training a _ initiation _ V4_ model based on a project construction drawing and the construction progress parameters corresponding to the project construction drawing.
The construction site management module is used for generating a construction site state parameter set corresponding to each construction node and generating a comparison result corresponding to each parameter through comparison with the BIM building information model; in this embodiment, the construction site management module excavates corresponding parameter data in the BIM building information model one by one according to a construction site state parameter set corresponding to each construction node through the data mining module, and then runs a corresponding contrastive analysis model based on Hadoop to realize contrastive analysis of each parameter and output a corresponding contrastive analysis result.
The deviation data analysis module is used for actively identifying deviation data, finding out the specific reasons of deviation of each parameter and related responsible personnel information, and outputting corresponding construction site management adjustment measures according to the specific reasons of deviation;
and the construction progress supervision module is used for realizing the comparison between the actual construction progress of the construction site and the planned construction progress loaded in the BIM building information model and outputting the corresponding construction progress deviation.
The early warning module is started when the comparative analysis result of the construction progress deviation/construction site state parameter set falls into a preset danger threshold, early warning is realized by automatically popping up a WeChat small program, and different danger thresholds call different short message templates;
and the central processing module is used for coordinating the work of the modules.
In this embodiment, the site management rules include worker condition management rules, equipment condition management rules, building material management rules, and site environment management rules.
In this embodiment, the deviation data analysis module outputs a corresponding deviation reason and related responsible person information according to the deviation data based on a fuzzy neural network algorithm by identifying deviation data existing in the comparison result corresponding to each parameter, and outputs a corresponding construction site management adjustment measure based on an LSSVM.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be construed as the protection scope of the present invention.
Claims (7)
1. The utility model provides an wisdom building site management system based on BIM model which characterized in that: the method comprises the following steps:
the BIM model building module is used for generating a construction site management rule corresponding to each construction node according to the approved construction line and then building a BIM building information model corresponding to each construction node according to the approved construction line and the corresponding construction site management rule;
the construction site monitoring module is used for monitoring construction progress of a construction site, working conditions of workers, working conditions of equipment, states of building materials and environment of the construction site;
the construction site management module is used for generating a construction site state parameter set corresponding to each construction node and generating a comparison result corresponding to each parameter through comparison with the BIM building information model;
and the deviation data analysis module is used for actively identifying deviation data, finding out the specific reasons of the deviation of each parameter and related responsible personnel information, and outputting corresponding construction site management adjustment measures according to the specific reasons of the deviation.
2. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: the construction site management rules comprise worker working condition management rules, equipment working condition management rules, building material management rules and construction site environment management rules.
3. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: the construction site management module excavates corresponding parameter data in the BIM building information model one by one according to a construction site state parameter set corresponding to each construction node through a data excavation module, then runs a corresponding contrastive analysis model based on Hadoop to achieve contrastive analysis of each parameter, and outputs a corresponding contrastive analysis result.
4. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: the deviation data analysis module outputs corresponding deviation reasons and related responsible personnel information according to the deviation data based on a fuzzy neural network algorithm by identifying the deviation data existing in the comparison result corresponding to each parameter, and outputs corresponding construction site management adjustment measures based on an LSSVM.
5. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: further comprising:
and the construction progress supervision module is used for realizing the comparison between the actual construction progress of the construction site and the planned construction progress loaded in the BIM building information model and outputting the corresponding construction progress deviation.
6. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: further comprising:
and the early warning module is started when the comparative analysis result of the construction progress deviation/construction site state parameter set falls into a preset danger threshold, early warning is realized by automatically popping up a WeChat small program, and different short message templates are called by different danger thresholds.
7. The intelligent building site management system based on BIM model as claimed in claim 1, wherein: and the BIM building information model corresponding to each construction node internally loads the corresponding construction site management rule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011392911.5A CN112488879A (en) | 2020-12-02 | 2020-12-02 | Intelligent construction site management system based on BIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011392911.5A CN112488879A (en) | 2020-12-02 | 2020-12-02 | Intelligent construction site management system based on BIM model |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112488879A true CN112488879A (en) | 2021-03-12 |
Family
ID=74938860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011392911.5A Pending CN112488879A (en) | 2020-12-02 | 2020-12-02 | Intelligent construction site management system based on BIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112488879A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113191731A (en) * | 2021-04-30 | 2021-07-30 | 重庆天智慧启科技有限公司 | Intelligent building engineering management system based on BIM platform |
CN113408142A (en) * | 2021-07-06 | 2021-09-17 | 山东电力工程咨询院有限公司 | Intelligent construction site data management method and system |
CN113706112A (en) * | 2021-08-31 | 2021-11-26 | 亿赶科技(北京)有限公司 | Construction management method and system |
CN115249394A (en) * | 2021-12-31 | 2022-10-28 | 重庆工程职业技术学院 | Engineering construction device based on BIM |
CN115630771A (en) * | 2022-12-07 | 2023-01-20 | 广东邦盛北斗科技股份公司 | Big data analysis method and system applied to intelligent construction site |
CN116823064A (en) * | 2023-08-10 | 2023-09-29 | 广州世方建筑设计有限公司 | Building engineering quality monitoring system based on BIM technology |
CN117575549A (en) * | 2024-01-17 | 2024-02-20 | 四川成润智慧科技有限公司 | Intelligent building site order management method based on cloud platform |
CN117952479A (en) * | 2024-03-26 | 2024-04-30 | 广州珠江装修工程有限公司 | BIM-based interior decoration engineering supervision method and system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN108197802A (en) * | 2017-12-29 | 2018-06-22 | 湖南大学 | It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control |
CN111080260A (en) * | 2019-12-19 | 2020-04-28 | 巢湖学院 | Wisdom building site management platform |
CN111125808A (en) * | 2019-11-12 | 2020-05-08 | 万翼科技有限公司 | Intelligent construction site management model construction method and device |
CN111369226A (en) * | 2020-03-27 | 2020-07-03 | 陕西工业职业技术学院 | BIM-based project progress supervision system |
CN111507595A (en) * | 2020-04-08 | 2020-08-07 | 广州高新工程顾问有限公司 | Engineering project intelligent dynamic safety supervision system based on BIM |
CN111598734A (en) * | 2020-05-25 | 2020-08-28 | 中建三局第二建设工程有限责任公司 | Intelligent building site integrated management system of BIM and Internet of things |
CN111861358A (en) * | 2019-12-11 | 2020-10-30 | 安徽建筑大学 | Building information integration platform based on BIM technology |
-
2020
- 2020-12-02 CN CN202011392911.5A patent/CN112488879A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN108197802A (en) * | 2017-12-29 | 2018-06-22 | 湖南大学 | It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control |
CN111125808A (en) * | 2019-11-12 | 2020-05-08 | 万翼科技有限公司 | Intelligent construction site management model construction method and device |
CN111861358A (en) * | 2019-12-11 | 2020-10-30 | 安徽建筑大学 | Building information integration platform based on BIM technology |
CN111080260A (en) * | 2019-12-19 | 2020-04-28 | 巢湖学院 | Wisdom building site management platform |
CN111369226A (en) * | 2020-03-27 | 2020-07-03 | 陕西工业职业技术学院 | BIM-based project progress supervision system |
CN111507595A (en) * | 2020-04-08 | 2020-08-07 | 广州高新工程顾问有限公司 | Engineering project intelligent dynamic safety supervision system based on BIM |
CN111598734A (en) * | 2020-05-25 | 2020-08-28 | 中建三局第二建设工程有限责任公司 | Intelligent building site integrated management system of BIM and Internet of things |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113191731A (en) * | 2021-04-30 | 2021-07-30 | 重庆天智慧启科技有限公司 | Intelligent building engineering management system based on BIM platform |
CN113408142A (en) * | 2021-07-06 | 2021-09-17 | 山东电力工程咨询院有限公司 | Intelligent construction site data management method and system |
CN113706112A (en) * | 2021-08-31 | 2021-11-26 | 亿赶科技(北京)有限公司 | Construction management method and system |
CN115249394A (en) * | 2021-12-31 | 2022-10-28 | 重庆工程职业技术学院 | Engineering construction device based on BIM |
CN115630771A (en) * | 2022-12-07 | 2023-01-20 | 广东邦盛北斗科技股份公司 | Big data analysis method and system applied to intelligent construction site |
CN115630771B (en) * | 2022-12-07 | 2023-03-21 | 广东邦盛北斗科技股份公司 | Big data analysis method and system applied to intelligent construction site |
CN116823064A (en) * | 2023-08-10 | 2023-09-29 | 广州世方建筑设计有限公司 | Building engineering quality monitoring system based on BIM technology |
CN116823064B (en) * | 2023-08-10 | 2024-02-02 | 广州世方建筑设计有限公司 | Building engineering quality monitoring system based on BIM technology |
CN117575549A (en) * | 2024-01-17 | 2024-02-20 | 四川成润智慧科技有限公司 | Intelligent building site order management method based on cloud platform |
CN117952479A (en) * | 2024-03-26 | 2024-04-30 | 广州珠江装修工程有限公司 | BIM-based interior decoration engineering supervision method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112488879A (en) | Intelligent construction site management system based on BIM model | |
CN110910369A (en) | Production line supervision method and device and storage medium | |
Sobaszek et al. | Application of survival function in robust scheduling of production jobs | |
CN111667201A (en) | Information processing method and device for intelligent monitoring of industrial internet | |
CN113487140A (en) | Operation management platform and control method for intelligent construction equipment on building construction site | |
CN115660602A (en) | Software supervision system based on smart building site management cloud platform | |
CN116384704A (en) | Management method of engineering progress and cost management system | |
CN115860410A (en) | WeChat-based large civil engineering construction potential safety hazard management system | |
CN116844315A (en) | Artificial intelligent early warning method, system and storage medium | |
CN115375090A (en) | BIM technology-based construction safety and construction progress supervision system and method | |
CN117689119A (en) | Intelligent building site safety supervision method and system based on Internet of things | |
CN117557047A (en) | Power distribution equipment operation and maintenance optimization method and system based on deep reinforcement learning | |
CN108388873A (en) | A kind of supervisory systems of machine vision, method and client computer, storage medium | |
CN117273401A (en) | Emergency command method, system and storage medium based on case reasoning and simulation | |
CN111950935A (en) | Intelligent management method and device for safe construction | |
CN116739299A (en) | Task information processing method and system | |
CN113516383B (en) | Building construction safety control method and device | |
CN114500229B (en) | Network alarm positioning and analyzing method based on space-time information | |
CN114202724A (en) | Method and device applied to intelligent video monitoring of pipeline | |
CN108399389B (en) | Multi-machine monitoring system and method for machine vision, client, server and storage medium | |
CN114298467A (en) | Intelligent supervision system and method for civil aviation operation management automation system | |
Yue et al. | Application research of artificial intelligence technology in electric automation control | |
CN111476922A (en) | Method and device for judging arrival of power transmission line inspection personnel | |
CN114926155B (en) | Intelligent safety management platform and method for construction process of constructional engineering | |
CN116579748B (en) | Safety production management system based on wireless communication technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210312 |