CN112487534A - BIM technology-based method for analyzing net height of building - Google Patents
BIM technology-based method for analyzing net height of building Download PDFInfo
- Publication number
- CN112487534A CN112487534A CN202011379501.7A CN202011379501A CN112487534A CN 112487534 A CN112487534 A CN 112487534A CN 202011379501 A CN202011379501 A CN 202011379501A CN 112487534 A CN112487534 A CN 112487534A
- Authority
- CN
- China
- Prior art keywords
- building
- analysis
- height
- bim
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000005516 engineering process Methods 0.000 title claims abstract description 16
- 238000004458 analytical method Methods 0.000 claims abstract description 78
- 238000010276 construction Methods 0.000 claims abstract description 20
- 238000004364 calculation method Methods 0.000 claims abstract description 9
- 238000005457 optimization Methods 0.000 claims abstract description 3
- 238000007689 inspection Methods 0.000 claims description 6
- 238000001514 detection method Methods 0.000 claims description 5
- 238000013461 design Methods 0.000 abstract description 7
- 238000004088 simulation Methods 0.000 abstract description 4
- 238000012800 visualization Methods 0.000 abstract description 4
- 238000004904 shortening Methods 0.000 abstract description 2
- 230000010354 integration Effects 0.000 description 3
- 238000002372 labelling Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a method for analyzing the net height of a building based on a BIM technology, which comprises the following steps: establishing a three-dimensional BIM model of the building and the pipeline by using Autodesk Revit software; integrating the created three-dimensional BIM model in Autodesk Revit software, and importing the three-dimensional BIM model into Fuzor software; setting clear height analysis data in Fuzor software, and selecting an analysis area; and (4) carrying out net height analysis calculation by using Fuzor software to obtain an unreasonable position and generate a net height analysis report. The invention utilizes the visualization and the simulation of the BIM technology, combines with a clear height analysis module of Fuzor software, carries out clear height analysis on the building by setting clear height analysis parameters, automatically generates a clear height analysis report, finds the part which does not meet the clear height requirement function and the aesthetic requirement in advance, carries out deep optimization on pipelines, avoids the later design change, thereby shortening the construction period and saving the cost.
Description
Technical Field
The invention relates to the technical field of BIM, in particular to a method for analyzing net height of a building based on BIM technology.
Background
Along with the improvement of building comfort level, various inside pipelines of the building body are also more and more. At present, the net height can only be obtained through field manual measurement and calculation after a pipeline is installed, the field measurement and calculation workload is large, the efficiency is low, the accuracy is not high enough, and whether the net height is reasonable or not can not be judged in advance.
Disclosure of Invention
In order to solve the defects in the prior art, the invention provides a building clear height analysis method based on the BIM technology, which is suitable for the building clear height analysis method before construction, finds the clear height problem as soon as possible, optimizes the clear height to the maximum extent, avoids the later design change, shortens the construction period, saves the cost and ensures the improvement of the engineering management level.
The technical scheme adopted by the invention is as follows: a method for analyzing net height of a building based on BIM technology, comprising the steps of:
respectively creating three-dimensional BIM models of the building and the pipeline by using Autodesk Revit software;
integrating the created three-dimensional BIM model of the building and the pipeline in the Autodesk Revit software, and importing the three-dimensional BIM model into the Fuzor software;
setting clear height analysis data in the Fuzor software, and selecting an analysis area;
and performing clear height analysis calculation on the analysis area by using the Fuzor software according to the clear height analysis data to obtain a position which does not meet the clear height requirement, and generating a clear height analysis report.
As an embodiment of the method of the present invention, when creating the three-dimensional BIM models of the building and the pipeline, ID labeling is performed on each member in the three-dimensional BIM models of the building and the pipeline, respectively.
In an embodiment of the method according to the invention, when generating a clearance analysis report, a component ID that does not meet the clearance requirement is derived.
As an embodiment of the method of the present invention, the net height analysis report further includes a name of the component, a view corresponding to the component, an average clearance between the components, and a minimum clearance between the components.
As an embodiment of the method of the present invention, after the three-dimensional BIM model after integration is imported into the Fuzor software, a clearance analysis module in the Fuzor software is turned on, and the clearance analysis data is set and the analysis area is selected.
As an embodiment of the method of the present invention, the net height analysis data comprises:
an inspection height, wherein components with a clear height lower than the inspection height are defined as not meeting the clear height requirement;
an initial distance defined as a minimum detection distance;
a minimum threshold, defining that components with a net height below said minimum threshold are not detected.
As an embodiment of the method of the present invention, the method further comprises the steps of: and optimizing the three-dimensional BIM model of the pipeline according to the net height analysis report, updating the three-dimensional BIM model in the Fuzor software, performing net height analysis calculation again, and repeatedly circulating for many times until all pipeline components meet the net height requirement.
As an embodiment of the method of the present invention, the method further comprises the steps of: and optimizing a pipeline construction drawing according to the clear height analysis report.
As an embodiment of the method of the present invention, in creating a three-dimensional BIM model of a building and pipeline, the building and pipeline 1:1, model creation.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
(1) 1:1 modeling is adopted, and the BIM visualization is utilized to more intuitively display the components which do not meet the net height requirement;
(2) the position which does not meet the net height requirement is accurately positioned by utilizing the Fuzor software net height analysis function, so that the method is more scientific and reasonable;
(3) the clear height analysis report is automatically generated, the unreasonable position of the pipeline is found in advance, the pipeline construction drawing is optimized, and later-stage design change is avoided, so that the construction period is shortened, the cost is saved, and good social benefits are obtained while the construction level of a company is improved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a flow chart of the detailed operation steps of a method for building clearance analysis based on BIM technology.
Detailed Description
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it should be noted that, as the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, their indicated orientations or positional relationships are based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" as appearing herein are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The invention mainly solves the technical problem of providing a building clear height analysis method based on a BIM technology, which utilizes the BIM technology to simulate pre-construction through BIM, analyzes the clear height of an area with narrow space, dense pipelines or high clear height requirement, automatically generates a clear height analysis report, quickly and visually locates an unreasonable position, finds a part which does not meet the clear height requirement function and the aesthetic requirement in advance, deeply optimizes the pipelines, avoids the later design change, shortens the construction period and saves the cost.
The technical solution of the present invention will be described in detail with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1, a flow chart showing the specific operation steps of the method for analyzing the net height of a building based on the BIM technology of the present invention is shown, and the method for analyzing the net height of a building based on the BIM technology mainly comprises the following operation steps:
step S1: respectively creating three-dimensional BIM models of the building and the pipeline by using Autodesk Revit software;
step S2: integrating the created three-dimensional BIM model of the building and the pipeline in Autodesk Revit software, and importing the three-dimensional BIM model into Fuzor software;
step S3: setting clear height analysis data in Fuzor software, and selecting an analysis area;
step S4: and performing clear height analysis calculation on the analysis area by using the Fuzor software according to the clear height analysis data to obtain a position which does not meet the clear height requirement, and generating a clear height analysis report.
Further, in step S1, by respectively pouring the structure construction drawing and the pipeline construction drawing into the Autodesk review software, the Autodesk review software can be used to respectively draw a three-dimensional BIM model with a size equal to that of the original building and the original pipeline (i.e., 1: 1), so that the accuracy of an analysis object can be fully ensured, and the model clearance can be more visually displayed by using the BIM visualization.
Preferably, when creating the three-dimensional BIM model of the building and the pipeline, the three-dimensional model of the building and the pipeline is drawn in the coordinate system with the same base point position coordinates, so as to perform integration between models in different specialties in step S2, and the integration of models in different specialties using the Autodesk Revit software is the prior art and is not burdensome here. In addition, in modeling, each member in the three-dimensional BIM model of the building and the pipeline is respectively subjected to ID labeling. When the net height analysis report is generated at the later stage, the ID of the component which does not meet the net height requirement can be derived, and in addition, the net height analysis report can further comprise data such as the name of the component, the view corresponding to the component, the average clearance between the components and the minimum clearance between the components.
The Fuzor software comprises a plurality of functional blocks of VR, multi-person network cooperation, 4D construction simulation and 5D cost tracking. Navisthrocks, P6 or Microsoft schedules can be loaded directly into the Fuzor software, created in the Fuzor software, and machinery and workers can be added to simulate site placement and field logistics scenarios. And finally, 4D construction simulation and related BIM information can be checked in VR, so that management efficiency is improved, construction period is shortened, and cost is saved.
In addition, the real-time bidirectional synchronization with modeling software such as Revit, Archicad and the like is a unique breakthrough technology of Fuzor software, and the strong compatibility of the Fuzor software to a mainstream BIM model provides an integrated design environment for AEC professionals so as to realize the seamless docking of the workflow. Files with different formats such as Revit, Sketchup, FBX and the like are integrated in Fuzor software, then the complete project is viewed in 2D, 3D and VR modes, and the model is designed and optimized in Fuzor, so that high-quality design results are delivered finally.
Therefore, in step S2, the three-dimensional BIM model created by the Autodesk Revit software can be imported into the fuzr software by using the fuzr plug-in, which is a conventional technique and is not burdensome here.
After the three-dimensional BIM model which is integrated is imported into the Fuzor software, a free height analysis module carried in the Fuzor software is opened, a free height analysis command box appears, free height analysis data are set in the command box, and an analysis area is selected, wherein the free height analysis data comprise: an inspection height, wherein components with a clear height lower than the inspection height are defined as not meeting the clear height requirement; an initial distance defined as a minimum detection distance; a minimum threshold, defining that components with a net height below said minimum threshold are not detected.
Specifically, for example, 5m is input in a column of the checking height of the net height analysis command box, all the components with the net height lower than 5m in the selected analysis area are monitored, that is, the components do not meet the net height requirements, such as the floor height, the top layer pipeline height, the full-length vertical pipeline height and the like;
for another example, if 1.5m is entered in the column of the initial distance of the net height analysis command box, it is specified that net height monitoring is performed every 1.5m (horizontal) in the selected analysis area, so that the smaller the initial distance value, the finer the net height monitoring and the higher the accuracy.
Finally, referring to the minimum threshold, when 1m is input in the column of the minimum threshold of the net height analysis command box, it means that components with net heights lower than 1m are not monitored, because the components do not affect the overall net height, and the detection of the components can be ignored, so that the detection efficiency is improved.
After the input of the clear height analysis data and the analysis area in step S3 is completed, the software automatically calculates the clear height result by clicking the operation button on the Fuzor page, clicks the corresponding result, automatically switches the view to the corresponding component which does not meet the clear height requirement, gives the component ID, and generates the clear height analysis report.
After the clear height analysis report is obtained, unreasonable positions can be found in advance according to the report, the construction drawing of the structure or the pipeline is optimized, and construction is assisted. The Fuzor software and the Autodesk Revit software are linked, are modified in the Fuzor, and are correspondingly and automatically modified in the Revit, and the three-dimensional BIM model in the Fuzor software can be updated according to the three-dimensional BIM model of the structure or the pipeline which is reported by the clear height analysis, the clear height analysis calculation is carried out again, and the cycle is repeated for many times until all pipeline components meet the clear height requirement.
The invention utilizes the visualization and the simulation of the BIM technology, draws a three-dimensional informationized BIM model of the building and the pipeline before construction through the Autodesk Revit software, leads the model into the Fuzor software, utilizes the software clear height analysis module, analyzes the clear height of the building by setting clear height analysis parameters, automatically generates a clear height analysis report, finds the part which does not meet the clear height requirement function and the aesthetic requirement in advance, and carries out deep optimization on the pipeline, thereby avoiding the later design change, shortening the construction period and saving the cost.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; the modifications or substitutions do not cause the essence of the corresponding technical solutions to depart from the scope of the technical solutions of the embodiments of the present invention, and are all included in the scope of the present invention.
The techniques, shapes, and configurations not described in detail in the present invention are all known techniques.
Claims (9)
1. A method for analyzing the net height of a building based on BIM technology is characterized by comprising the following steps:
respectively creating three-dimensional BIM models of the building and the pipeline by using Autodesk Revit software;
integrating the created three-dimensional BIM model of the building and the pipeline in the Autodesk Revit software, and importing the three-dimensional BIM model into the Fuzor software;
setting clear height analysis data in the Fuzor software, and selecting an analysis area;
and performing clear height analysis calculation on the analysis area by using the Fuzor software according to the clear height analysis data to obtain a position which does not meet the clear height requirement, and generating a clear height analysis report.
2. The method for building clearance analysis based on BIM techniques of claim 1, wherein the ID labels are respectively given to each member in the three-dimensional BIM models of the building and the pipeline when the three-dimensional BIM models of the building and the pipeline are created.
3. The BIM technique based clearance analysis of buildings according to claim 2, wherein upon generating a clearance analysis report, a part ID that does not meet the clearance requirement is derived.
4. The BIM technique-based net height analysis method for buildings according to claim 3, wherein the net height analysis report further includes a component name, a view corresponding to the component, an average gap between components, and a minimum gap between components.
5. The method of claim 1, wherein after importing the integrated three-dimensional BIM model into Fuzor software, opening a net height analysis module in the Fuzor software, setting the net height analysis data, and selecting the analysis region.
6. The BIM-technology-based net height analysis method for buildings according to claim 1, wherein the net height analysis data comprises:
an inspection height, wherein components with a clear height lower than the inspection height are defined as not meeting the clear height requirement;
an initial distance defined as a minimum detection distance;
a minimum threshold, defining that components with a net height below said minimum threshold are not detected.
7. The method for analyzing the net height of a building based on the BIM technique as claimed in claim 1, further comprising the steps of: and updating the three-dimensional BIM in the Fuzor software according to the three-dimensional BIM of the net height analysis report optimization structure and the pipeline, performing net height analysis calculation again, and repeatedly circulating for many times until all pipeline components meet the net height requirement.
8. The method for analyzing the net height of a building based on the BIM technique as claimed in claim 1, further comprising the steps of: and optimizing a pipeline construction drawing or a structure construction drawing according to the clear height analysis report.
9. The method for building net height analysis based on BIM techniques of claim 1, wherein: in creating a three-dimensional BIM model of a building and pipeline, the building and pipeline 1:1, model creation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011379501.7A CN112487534A (en) | 2020-11-30 | 2020-11-30 | BIM technology-based method for analyzing net height of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011379501.7A CN112487534A (en) | 2020-11-30 | 2020-11-30 | BIM technology-based method for analyzing net height of building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112487534A true CN112487534A (en) | 2021-03-12 |
Family
ID=74937885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011379501.7A Pending CN112487534A (en) | 2020-11-30 | 2020-11-30 | BIM technology-based method for analyzing net height of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112487534A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113255031A (en) * | 2021-04-29 | 2021-08-13 | 上海大学 | Method and system for automatically generating building clear height cloud picture based on Revit platform |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867076A (en) * | 2012-07-05 | 2013-01-09 | 西安理工大学 | BIM (Building Information Modeling)-based metro comprehensive pipeline clearance detection method |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN108763750A (en) * | 2018-05-28 | 2018-11-06 | 广东天元建筑设计有限公司 | A kind of pipeline method based on BIM |
CN110765515A (en) * | 2019-09-27 | 2020-02-07 | 贵州百胜工程建设咨询有限公司 | BIM-based pipe heald optimization method |
CN110782523A (en) * | 2019-10-11 | 2020-02-11 | 上海建工五建集团有限公司 | BIM-based building model checking method and system |
-
2020
- 2020-11-30 CN CN202011379501.7A patent/CN112487534A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867076A (en) * | 2012-07-05 | 2013-01-09 | 西安理工大学 | BIM (Building Information Modeling)-based metro comprehensive pipeline clearance detection method |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN108763750A (en) * | 2018-05-28 | 2018-11-06 | 广东天元建筑设计有限公司 | A kind of pipeline method based on BIM |
CN110765515A (en) * | 2019-09-27 | 2020-02-07 | 贵州百胜工程建设咨询有限公司 | BIM-based pipe heald optimization method |
CN110782523A (en) * | 2019-10-11 | 2020-02-11 | 上海建工五建集团有限公司 | BIM-based building model checking method and system |
Non-Patent Citations (1)
Title |
---|
王会;: "BIM技术在某大型地下车库建设中的应用研究", 建筑施工, no. 08, pages 1534 - 1537 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113255031A (en) * | 2021-04-29 | 2021-08-13 | 上海大学 | Method and system for automatically generating building clear height cloud picture based on Revit platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109543233A (en) | A kind of electromechanical pipeline assembly construction method based on BIM technology | |
CN113360583B (en) | Construction progress visualization method based on BIM model and monitoring image comparison | |
CN107045526A (en) | A kind of pattern recognition method of electronics architectural working drawing | |
KR20180131471A (en) | Apparatus for integrated management of construction errors using 3d scanning with bim and method thereof | |
CN110210097B (en) | Metal roof optimized construction method based on BIM technology | |
US8155928B2 (en) | Method for generating data of plant construction simulation and system thereof | |
CN108875177B (en) | Method for creating inland waterway dredging graph under single beam measuring point based on BIM model | |
JP2010108321A (en) | Construction progress visualization system | |
CN111047685B (en) | Method for realizing power plant BIM model panoramic roaming | |
Choi et al. | Application of virtual assembly tools for improving product design | |
CN107220438B (en) | CAE mechanical simulation method based on BIM information model | |
CN111400899A (en) | Processing method, system and storage medium for cable laying modeling | |
KR102085271B1 (en) | Vitual Construction Simulation Method | |
CN108985471B (en) | Aircraft management system based on 3D lightweight model | |
CN110990914A (en) | BIM technology-based large boiler installation method | |
CN113610388A (en) | BIM-based prefabricated part design quality management method, device and equipment | |
CN112487534A (en) | BIM technology-based method for analyzing net height of building | |
CN114254422A (en) | Process optimization method, device, equipment and storage medium of building information model | |
CN112484695A (en) | Building indoor space clear height analysis method and device based on BIM model | |
KR20140073748A (en) | Featured based modeling system and method of traditional korean-style house | |
CN113204284A (en) | Virtual construction comprehensive pipeline installation and acceptance method based on BIM and MR technology | |
CN116956410A (en) | Three-dimensional automatic design method, device, medium and equipment for gallery bridge and bracket | |
JP3263769B2 (en) | Plant integrated CAE system | |
CN114418330A (en) | 4D-BIM technology-based comprehensive pipeline space-time analysis and risk prediction method | |
CN110222457B (en) | Construction method of existing structure and newly-built primary support structure with existing structure closely attached |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |