CN106600231A - Dynamic management system for infrastructure projects - Google Patents

Dynamic management system for infrastructure projects Download PDF

Info

Publication number
CN106600231A
CN106600231A CN201611166143.5A CN201611166143A CN106600231A CN 106600231 A CN106600231 A CN 106600231A CN 201611166143 A CN201611166143 A CN 201611166143A CN 106600231 A CN106600231 A CN 106600231A
Authority
CN
China
Prior art keywords
database
construction
data
server
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611166143.5A
Other languages
Chinese (zh)
Inventor
马韬韬
张子兆
孙丽婷
张红燕
陈轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201611166143.5A priority Critical patent/CN106600231A/en
Publication of CN106600231A publication Critical patent/CN106600231A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a dynamic management system for infrastructure projects. The system comprises a database server, a WEB management server, a mobile application server, at least one smart phone and at least one personal computer (PC) wherein the WEB management server and the mobile application server are located on the same cloud server and the smart phone and the PC are connected to the cloud server through Internet. The database of the database server comprises at least: a material order database, a financial database, a construction plan database, a construction progress database and a construction team state database. The number of the smart phone is bonded with a user and the smart phone is provided with a signing-in and signing-out module and a GPS positioning module that is bonded with the signing-in and signing-out module to input signing-in and signing-out data for the construction team state database of the database sever.

Description

A kind of construction project dynamic management system
Technical field
The present invention relates to a kind of construction project dynamic management system of field of electricity construction.
Background technology
Current construction project management is all to safeguard electrical form by manual, and dialogue is linked up and carrys out synchronizing information.Construction Person and manager be not generally in same physical space, therefore the construction party of construction project cannot be slapped as manager in real time Goods and materials order data is held, while the data that manager cannot also grasp the state of construction team, construction party and manager cannot be same Step, arranges construction plan, construction party to perform construction speed and bring difficulty to manager.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided a kind of construction project dynamic management system, its Can guarantee that construction project data are updated by system Real-time and Dynamic, break away from it is manual safeguard data, and safeguard loaded down with trivial details in data procedures Dialogue link up, mitigate maintenance workload, improve work efficiency.
A kind of technical scheme for realizing above-mentioned purpose is:A kind of construction project dynamic management system;Including database service Device, WEB management servers, mobile application server, and at least one smart mobile phone and at least one PC, the data base Server, the WEB management servers and the mobile application server are respectively positioned on same Cloud Server, the intelligent handss Machine and the PC pass through Cloud Server described in Internet connection;
Data base in the database server at least includes:Goods and materials order database, financial database, construction plan Data base, construction speed data base and construction team's slip condition database;
The number of the smart mobile phone is bound with user, the smart mobile phone be provided with register sign-out module and with it is described The d GPS locating module that sign-out module of registering is bound, for the construction team's slip condition database input to the database server Register and sign-out data.
Further, the smart mobile phone is additionally provided with senior authentication module and the thing with the senior authentication module binding Money order data editor module, the senior authentication module after the checking of the mobile application server, order by the goods and materials Goods and materials in goods and materials order database described in forms data editor module editor are received data.
Further, identical JICQ is respectively arranged with the smart mobile phone and the PC.
Further, the PC is provided with data and imports editor module, for the thing to the database server Money order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database are imported Data, and to importing the goods and materials order database, the financial database, the construction plan data base, it is described construct into The data of degrees of data storehouse and construction team's slip condition database enter edlin.
Further, the data import editor module in the form of Exce l files, import data to described Goods and materials order database described in financial database, the construction plan data base, the construction speed data base and the construction Troop's slip condition database.
Further, the PC is provided with data statisticss display module, for transferring in the database server Goods and materials order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database In data counted, and statistical result is shown by graphic interface.
Also further, the PC is provided with safety management module, for by the WEB server, to management After member is logged in from the PC, operate it is described according to storehouse import editor module and or the authority of the data statisticss display module enter Row setting, the safety management module are additionally operable to by the mobile application server, user are logged in from the smart mobile phone Afterwards, sign-out module of registering described in operation and or the authority of the goods and materials order data editor module set.
It is also further again, IP address or GPS location that the safety management module is logged according to the smart mobile phone Information, sets to the authority of user.
It is also further, the goods and materials order database, the financial database, the construction plan data base, institute State construction speed data base and construction team's slip condition database adopts MySQL database.
Further, the database server, the WEB management servers and the mobile application server are all connected with Backup server.
Employ a kind of technical scheme of construction project dynamic management system of the present invention, including database server, WEB Management server, mobile application server, and at least one smart mobile phone and at least one PC, the database service Device, the WEB management servers and the mobile application server are respectively positioned on same Cloud Server, the smart mobile phone and The PC passes through Cloud Server described in Internet connection;Data base in the database server at least includes:Goods and materials Order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database;It is described The number of smart mobile phone is bound with user, the smart mobile phone be provided with register sign-out module and with the sign-out module of registering The d GPS locating module of binding, for registering and sign-out number to construction team's slip condition database input of the database server According to.Which has the technical effect that:Construction project data are updated by system Real-time and Dynamic, are broken away from and are safeguarded data by hand, and safeguard data During loaded down with trivial details dialogue link up, mitigate maintenance workload, improve work efficiency.
Description of the drawings
Fig. 1 is a kind of network architecture diagram of construction project dynamic management system of the present invention.
Fig. 2 is the schematic diagram of smart mobile phone in a kind of construction project dynamic management system of the invention.
Fig. 3 is the schematic diagram of PC in a kind of construction project dynamic management system of the invention.
Specific embodiment
Fig. 1 is referred to, the present inventor is led to below in order to be able to preferably understand to technical scheme Specifically embodiment is crossed, and combines accompanying drawing and be described in detail:
Fig. 1 is referred to, a kind of construction project dynamic management system of the present invention includes that database server 12, WEB is managed Server 13, mobile application server 14, and at least one smart mobile phone 2 and at least one PC 3.Database server 12nd, WEB management servers 13, mobile application server 14 are respectively positioned on Cloud Server 1, and smart mobile phone 2 and PC 3 are by because of spy Net connection Cloud Server 1.Cloud Server 1 is to rent, and with reduces cost, and can ensure stablizing for system.Smart mobile phone 2 can Cloud Server 1 is accessed by wireless router or mobile network.PC 3 accesses Cloud Server 1 by router.
Wherein database server 12 is located at the data Layer on basis, and smart mobile phone 2 and PC 3 are respectively positioned on five-star business Layer, WEB management servers 13 and mobile application server 14 are respectively positioned on the Business Logic of centre.
The data base of database server 12 at least includes:Goods and materials order database, financial database, construction plan data Storehouse, construction speed data base and construction team's slip condition database.Goods and materials order database, financial database, construction plan data Data in storehouse, construction speed data base and construction team's slip condition database are imported using Excel file, goods and materials order data Storehouse, financial database, construction plan data base, construction speed data base and construction team's slip condition database are MySOL data Storehouse.
The reason for using MySOL data bases is:MYSql data bases increase income freely, stable safety, and excellent performance takes hard Part is few.
The number of smart mobile phone 2 is bound with user, and smart mobile phone 3 is provided with registers sign-out module 21 and sign-out module 21 of registering The d GPS locating module 22 of binding, mobile application server 14 are confirming the user position of smart mobile phone 2 by d GPS locating module 22 Behind job location, sign-out module 21 of registering imports to construction team's slip condition database of the database server and registers and sign Move back data.Certainly mobile application server 14 can also pass through wireless router or mobile focus confirms the user position of smart mobile phone 2 In job location.
Smart mobile phone 2 is additionally provided with senior authentication module 23 and is compiled with the goods and materials order data of the binding of senior authentication module 23 Module 24 is collected, the user of smart mobile phone 2 can be being moved after senior authentication module 23 obtains the checking of mobile application server 14 Under the support of dynamic application server 14, by goods and materials order data editor module 24, the goods and materials for editing database server 12 are ordered Goods and materials in single database are received data.The manager of PC 3 can grasp the data of the goods and materials stock in construction party handss in real time With the data of the goods and materials stock of construction management Fang Shouzhong, so as to manager replenish in time or in construction plan data base 12 update Adjustment construction plan.
Simultaneously be respectively arranged with identical JICQ, such as wechat on smart mobile phone 2 and PC 3, so as to manager and The adjustment of Shi Tongzhi construction party construction plans or the prompting of construction speed.
PC 3 is provided with data and imports editor module 31, and data import editor module 31 in WEB management servers 13 Support under, to the goods and materials order database of database server 12, financial database, construction plan data base, construction speed Data base and construction team's slip condition database import data, while can also be described to having been introduced into the goods and materials order database The number of financial database, the construction plan data base, the construction speed data base and construction team's slip condition database According to edlin is entered, such as delete, increase, modification record increases or deletes a certain field, or change specific data, to ensure Manager and the synchronization of construction party data.
PC 3 is provided with data statisticss display module 32, described for, under the support of WEB management servers 13, transferring Goods and materials order database in database server 12, financial database, construction plan data base, construction speed data base and Shi Data in 5 slip condition database of crew are counted, and statistical result are shown by graphic interface.Applied Crew's state information statistics with show, goods and materials receive situation statistics with show, finance spend money situation statistics with show, project process Plan node statistics and displaying, and the contrast displaying of construction plan and construction speed.Show by both artistic and practical, friendly directly perceived Chinese Graphic interface carry out, take into full account the custom of staff, facilitate easy to learn, easily operated, it is ensured that most functions one Key is reached.The manifestation mode of information is more directly perceived, in hgher efficiency.
PC 3 is provided with safety management module 33, for by WEB server 13, to manager from after the login of PC 13, Goods and materials order database to database server 12, financial database, construction plan data base, construction speed data base and Shi The authority that data in 5 slip condition database of crew are imported, edited or transferred carries out multilamellar setting, safety management module 33 It is additionally operable to by mobile application server 14, to user from after the login of smart mobile phone 2, operates the authority of sign-out module 21 of registering, The GPS location information registered, or the IP address of wireless router, or the IP address of mobile network is allowed to be defined, also Smart mobile phone 2 is defined by the user that senior authentication module 23 obtains the checking of mobile application server 13.
Thus, safety management module 33 has following function:
Its exterior safety:The authority of the manager logged in by the user to logging in from smart mobile phone 2 and from PC 3 The mandate of multi-layer is carried out, multi-level security protection is realized, relatively independent security mechanism is established, outside is effectively prevented Unauthorized access.
Internal system safety:While ensureing that its exterior is safe, system also ensures that the legal use of authorized user. A kind of database server 12, WEB management servers 13, Mobile solution clothes in the construction project dynamic management system of the present invention Business device 14, smart mobile phone 2 and PC 3 are respectively provided with fault tolerance, including bomp, reason investigation, and can be automatically or by people Work is operated, and makes the system recovery of error to normal condition.Safety management module 33 also provides strict operational control and access control System.
A kind of construction project dynamic management system of the present invention is by PC 3, mobile application server 14 and WEB management Server 13 is constructed outside the ability for resisting illegal invasion, is additionally provided with backup server 10,10 simultaneous connection of backup server According to storehouse server 12, mobile application server 14, WEB management servers 13.Backup server 10 may be located at Cloud Server 1 On, it is independently of Cloud Server 1.
Therefore, physically, a kind of construction project dynamic management system of the invention ensures that there is no possible single-point event Barrier, it is possible to provide the backup of data.Data in database server 12, mobile application server 14, WEB management servers 13 are fixed Phase automatic or manual is backuped on backup server 10, can be managed in database server 12, mobile application server 14, WEB Backup Data is refunded when data corruption, loss in reason server 13, realize certain data recovery, be easy to system Safeguard.
A kind of construction project dynamic management system of the present invention, can reduce the workload of current project sites management; Realize the work attendance statistics management of construction team;Realize that engineering site goods and materials situation data of receiving upgrade in time statistics;Realize project Finance are spent money situation, project process Statistic Analysis;Receive situation, engineering of project goods and materials is carried out using data analysis technique to enter Degree situation, finance are spent money Statistic Analysis, provide information service for project management person;Network technology is used fully, it is real Interconnection, information sharing on existing network, improve the efficiency and level of work.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention, And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above Change, modification will all fall in the range of claims of the present invention.

Claims (10)

1. a kind of construction project dynamic management system;It is characterized in that:Including database server, WEB management servers, movement Application server, and at least one smart mobile phone and at least one PC, the database server, WEB management clothes Business device and the mobile application server are respectively positioned on same Cloud Server, the smart mobile phone and the PC pass through because Special net connects the Cloud Server;
Data base in the database server at least includes:Goods and materials order database, financial database, construction plan data Storehouse, construction speed data base and construction team's slip condition database;
The number of the smart mobile phone is bound with user, and the smart mobile phone is provided with to register and sign-out module and is registered with described The d GPS locating module of sign-out module binding, for registering to construction team's slip condition database input of the database server With sign-out data.
2. a kind of construction project dynamic management system according to claim 1, it is characterised in that:The smart mobile phone also sets There are senior authentication module and the goods and materials order data editor module with the senior authentication module binding, the senior certification mould Block after the checking of the mobile application server, goods and materials order data described in the goods and materials order data editor module editor Goods and materials in storehouse are received data.
3. a kind of construction project dynamic management system according to claim 2, it is characterised in that:The smart mobile phone and institute State.
4. a kind of construction project dynamic management system according to claim 2, it is characterised in that:The PC is provided with number According to editor module is imported, for the goods and materials order database to the database server, financial database, construction plan data Storehouse, construction speed data base and construction team's slip condition database import data, and to importing the goods and materials order database, it is described The number of financial database, the construction plan data base, the construction speed data base and construction team's slip condition database According to entering edlin.
5. a kind of construction project dynamic management system according to claim 4, it is characterised in that:The data import editor Module in the form of Excel file is imported data to the goods and materials order database, the financial database, described is applied Work plan database, the construction speed data base and construction team's slip condition database.
6. a kind of construction project dynamic management system according to claim 4, it is characterised in that:It is characterized in that:It is described PC is provided with data statisticss display module, for transferring the goods and materials order database in the database server, financial number Counted according to the data in storehouse, construction plan data base, construction speed data base and construction team's slip condition database, and passed through Graphic interface is shown to statistical result.
7. a kind of construction project dynamic management system according to claim 6, it is characterised in that:The PC is provided with peace Full management module, for by the WEB server, to manager from after PC login, operates described importing according to storehouse to compile Volume module and or the authority of the data statisticss display module set, the safety management module is additionally operable to by described Mobile application server, to user from the smart mobile phone login after, operation described in register sign-out module and or the goods and materials order The authority of forms data editor module is set.
8. a kind of construction project dynamic management system according to claim 7, it is characterised in that:The safety management module The IP address logged according to the smart mobile phone or GPS location information, set to the authority of user.
9. a kind of construction project dynamic management system according to claim 6, it is characterised in that:The goods and materials order data Storehouse, the financial database, the construction plan data base, the construction speed data base and construction team's status data Storehouse adopts MySQL database.
10. a kind of construction project dynamic management system according to claim 1, it is characterised in that the database service Device, the WEB management servers and the mobile application server are all connected with backup server.
CN201611166143.5A 2016-12-14 2016-12-14 Dynamic management system for infrastructure projects Pending CN106600231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611166143.5A CN106600231A (en) 2016-12-14 2016-12-14 Dynamic management system for infrastructure projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611166143.5A CN106600231A (en) 2016-12-14 2016-12-14 Dynamic management system for infrastructure projects

Publications (1)

Publication Number Publication Date
CN106600231A true CN106600231A (en) 2017-04-26

Family

ID=58801883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611166143.5A Pending CN106600231A (en) 2016-12-14 2016-12-14 Dynamic management system for infrastructure projects

Country Status (1)

Country Link
CN (1) CN106600231A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470049A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project management system based on instrument board
CN108470048A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project data display systems based on instrument board
CN108876287A (en) * 2018-05-29 2018-11-23 杭州众软信息技术有限公司 data management system based on BIM
CN111784310A (en) * 2020-08-04 2020-10-16 国网江苏省电力有限公司南通供电分公司 Management system for informatization electric power engineering administration project and working method thereof
CN112561363A (en) * 2020-12-22 2021-03-26 深圳市九州建设技术股份有限公司 Engineering supervision method, system, terminal and storage medium based on artificial intelligence
CN112734393A (en) * 2021-01-18 2021-04-30 宁波送变电建设有限公司永耀科技分公司 Intelligent management platform for corporate enterprise and external administration unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN103942744A (en) * 2013-01-23 2014-07-23 成都勤智数码科技股份有限公司 Operation personnel management method and system based on mobile phone GPS positioning
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN103942744A (en) * 2013-01-23 2014-07-23 成都勤智数码科技股份有限公司 Operation personnel management method and system based on mobile phone GPS positioning
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470049A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project management system based on instrument board
CN108470048A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project data display systems based on instrument board
CN108876287A (en) * 2018-05-29 2018-11-23 杭州众软信息技术有限公司 data management system based on BIM
CN111784310A (en) * 2020-08-04 2020-10-16 国网江苏省电力有限公司南通供电分公司 Management system for informatization electric power engineering administration project and working method thereof
CN112561363A (en) * 2020-12-22 2021-03-26 深圳市九州建设技术股份有限公司 Engineering supervision method, system, terminal and storage medium based on artificial intelligence
CN112734393A (en) * 2021-01-18 2021-04-30 宁波送变电建设有限公司永耀科技分公司 Intelligent management platform for corporate enterprise and external administration unit

Similar Documents

Publication Publication Date Title
CN106600231A (en) Dynamic management system for infrastructure projects
CN103441986B (en) Data resource security control method in thin client mode
CN104184735B (en) Power marketing mobile application security guard system
CN103795745B (en) The monitoring method and system of a kind of intelligent mobile terminal
CN109831327A (en) IMS full service network based on big data analysis monitors intelligent operation support system
Nowak et al. Verticals in 5G MEC-use cases and security challenges
CN109670768A (en) Right management method, device, platform and the readable storage medium storing program for executing in multi-service domain
CN101520831B (en) Safe terminal system and terminal safety method
CN102479413B (en) Network invoicing system and method thereof
CN110957025A (en) Medical health information safety management system
CN103442354B (en) A kind of movable police terminal security managing and control system
CN107579998A (en) Personal data center and digital identification authentication method based on block chain, digital identity and intelligent contract
CN104063756A (en) Electric power utilization information remote control system
CN106789875A (en) A kind of block chain service unit, block chain service system and its communication means
CN107111696A (en) Security and authority framework in multi-tenant computing system
CN101610502B (en) Method for mobile information integration based on different business systems of mobile application portal
CN103023993A (en) Enterprise information system based on cloud computing
CN103067344A (en) Non-invasive method and equipment for automatically issuing safety regulations in cloud environment
CN102307114A (en) Management method of network
CN106097027A (en) Tax control disk remote invoicing system and implementation method thereof
CN103475727A (en) Database auditing method based on bridged mode
CN104580081A (en) Integrated SSO (single sign on) system
CN105320522A (en) Service-oriented architecture based XBRL application platform
CN103020542A (en) Technology for storing secret information for global data center
CN103065104B (en) Movable storage device and the supervisory system formed thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170426