CN106600231A - Dynamic management system for infrastructure projects - Google Patents
Dynamic management system for infrastructure projects Download PDFInfo
- Publication number
- CN106600231A CN106600231A CN201611166143.5A CN201611166143A CN106600231A CN 106600231 A CN106600231 A CN 106600231A CN 201611166143 A CN201611166143 A CN 201611166143A CN 106600231 A CN106600231 A CN 106600231A
- Authority
- CN
- China
- Prior art keywords
- database
- construction
- data
- server
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a dynamic management system for infrastructure projects. The system comprises a database server, a WEB management server, a mobile application server, at least one smart phone and at least one personal computer (PC) wherein the WEB management server and the mobile application server are located on the same cloud server and the smart phone and the PC are connected to the cloud server through Internet. The database of the database server comprises at least: a material order database, a financial database, a construction plan database, a construction progress database and a construction team state database. The number of the smart phone is bonded with a user and the smart phone is provided with a signing-in and signing-out module and a GPS positioning module that is bonded with the signing-in and signing-out module to input signing-in and signing-out data for the construction team state database of the database sever.
Description
Technical field
The present invention relates to a kind of construction project dynamic management system of field of electricity construction.
Background technology
Current construction project management is all to safeguard electrical form by manual, and dialogue is linked up and carrys out synchronizing information.Construction
Person and manager be not generally in same physical space, therefore the construction party of construction project cannot be slapped as manager in real time
Goods and materials order data is held, while the data that manager cannot also grasp the state of construction team, construction party and manager cannot be same
Step, arranges construction plan, construction party to perform construction speed and bring difficulty to manager.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided a kind of construction project dynamic management system, its
Can guarantee that construction project data are updated by system Real-time and Dynamic, break away from it is manual safeguard data, and safeguard loaded down with trivial details in data procedures
Dialogue link up, mitigate maintenance workload, improve work efficiency.
A kind of technical scheme for realizing above-mentioned purpose is:A kind of construction project dynamic management system;Including database service
Device, WEB management servers, mobile application server, and at least one smart mobile phone and at least one PC, the data base
Server, the WEB management servers and the mobile application server are respectively positioned on same Cloud Server, the intelligent handss
Machine and the PC pass through Cloud Server described in Internet connection;
Data base in the database server at least includes:Goods and materials order database, financial database, construction plan
Data base, construction speed data base and construction team's slip condition database;
The number of the smart mobile phone is bound with user, the smart mobile phone be provided with register sign-out module and with it is described
The d GPS locating module that sign-out module of registering is bound, for the construction team's slip condition database input to the database server
Register and sign-out data.
Further, the smart mobile phone is additionally provided with senior authentication module and the thing with the senior authentication module binding
Money order data editor module, the senior authentication module after the checking of the mobile application server, order by the goods and materials
Goods and materials in goods and materials order database described in forms data editor module editor are received data.
Further, identical JICQ is respectively arranged with the smart mobile phone and the PC.
Further, the PC is provided with data and imports editor module, for the thing to the database server
Money order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database are imported
Data, and to importing the goods and materials order database, the financial database, the construction plan data base, it is described construct into
The data of degrees of data storehouse and construction team's slip condition database enter edlin.
Further, the data import editor module in the form of Exce l files, import data to described
Goods and materials order database described in financial database, the construction plan data base, the construction speed data base and the construction
Troop's slip condition database.
Further, the PC is provided with data statisticss display module, for transferring in the database server
Goods and materials order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database
In data counted, and statistical result is shown by graphic interface.
Also further, the PC is provided with safety management module, for by the WEB server, to management
After member is logged in from the PC, operate it is described according to storehouse import editor module and or the authority of the data statisticss display module enter
Row setting, the safety management module are additionally operable to by the mobile application server, user are logged in from the smart mobile phone
Afterwards, sign-out module of registering described in operation and or the authority of the goods and materials order data editor module set.
It is also further again, IP address or GPS location that the safety management module is logged according to the smart mobile phone
Information, sets to the authority of user.
It is also further, the goods and materials order database, the financial database, the construction plan data base, institute
State construction speed data base and construction team's slip condition database adopts MySQL database.
Further, the database server, the WEB management servers and the mobile application server are all connected with
Backup server.
Employ a kind of technical scheme of construction project dynamic management system of the present invention, including database server, WEB
Management server, mobile application server, and at least one smart mobile phone and at least one PC, the database service
Device, the WEB management servers and the mobile application server are respectively positioned on same Cloud Server, the smart mobile phone and
The PC passes through Cloud Server described in Internet connection;Data base in the database server at least includes:Goods and materials
Order database, financial database, construction plan data base, construction speed data base and construction team's slip condition database;It is described
The number of smart mobile phone is bound with user, the smart mobile phone be provided with register sign-out module and with the sign-out module of registering
The d GPS locating module of binding, for registering and sign-out number to construction team's slip condition database input of the database server
According to.Which has the technical effect that:Construction project data are updated by system Real-time and Dynamic, are broken away from and are safeguarded data by hand, and safeguard data
During loaded down with trivial details dialogue link up, mitigate maintenance workload, improve work efficiency.
Description of the drawings
Fig. 1 is a kind of network architecture diagram of construction project dynamic management system of the present invention.
Fig. 2 is the schematic diagram of smart mobile phone in a kind of construction project dynamic management system of the invention.
Fig. 3 is the schematic diagram of PC in a kind of construction project dynamic management system of the invention.
Specific embodiment
Fig. 1 is referred to, the present inventor is led to below in order to be able to preferably understand to technical scheme
Specifically embodiment is crossed, and combines accompanying drawing and be described in detail:
Fig. 1 is referred to, a kind of construction project dynamic management system of the present invention includes that database server 12, WEB is managed
Server 13, mobile application server 14, and at least one smart mobile phone 2 and at least one PC 3.Database server
12nd, WEB management servers 13, mobile application server 14 are respectively positioned on Cloud Server 1, and smart mobile phone 2 and PC 3 are by because of spy
Net connection Cloud Server 1.Cloud Server 1 is to rent, and with reduces cost, and can ensure stablizing for system.Smart mobile phone 2 can
Cloud Server 1 is accessed by wireless router or mobile network.PC 3 accesses Cloud Server 1 by router.
Wherein database server 12 is located at the data Layer on basis, and smart mobile phone 2 and PC 3 are respectively positioned on five-star business
Layer, WEB management servers 13 and mobile application server 14 are respectively positioned on the Business Logic of centre.
The data base of database server 12 at least includes:Goods and materials order database, financial database, construction plan data
Storehouse, construction speed data base and construction team's slip condition database.Goods and materials order database, financial database, construction plan data
Data in storehouse, construction speed data base and construction team's slip condition database are imported using Excel file, goods and materials order data
Storehouse, financial database, construction plan data base, construction speed data base and construction team's slip condition database are MySOL data
Storehouse.
The reason for using MySOL data bases is:MYSql data bases increase income freely, stable safety, and excellent performance takes hard
Part is few.
The number of smart mobile phone 2 is bound with user, and smart mobile phone 3 is provided with registers sign-out module 21 and sign-out module 21 of registering
The d GPS locating module 22 of binding, mobile application server 14 are confirming the user position of smart mobile phone 2 by d GPS locating module 22
Behind job location, sign-out module 21 of registering imports to construction team's slip condition database of the database server and registers and sign
Move back data.Certainly mobile application server 14 can also pass through wireless router or mobile focus confirms the user position of smart mobile phone 2
In job location.
Smart mobile phone 2 is additionally provided with senior authentication module 23 and is compiled with the goods and materials order data of the binding of senior authentication module 23
Module 24 is collected, the user of smart mobile phone 2 can be being moved after senior authentication module 23 obtains the checking of mobile application server 14
Under the support of dynamic application server 14, by goods and materials order data editor module 24, the goods and materials for editing database server 12 are ordered
Goods and materials in single database are received data.The manager of PC 3 can grasp the data of the goods and materials stock in construction party handss in real time
With the data of the goods and materials stock of construction management Fang Shouzhong, so as to manager replenish in time or in construction plan data base 12 update
Adjustment construction plan.
Simultaneously be respectively arranged with identical JICQ, such as wechat on smart mobile phone 2 and PC 3, so as to manager and
The adjustment of Shi Tongzhi construction party construction plans or the prompting of construction speed.
PC 3 is provided with data and imports editor module 31, and data import editor module 31 in WEB management servers 13
Support under, to the goods and materials order database of database server 12, financial database, construction plan data base, construction speed
Data base and construction team's slip condition database import data, while can also be described to having been introduced into the goods and materials order database
The number of financial database, the construction plan data base, the construction speed data base and construction team's slip condition database
According to edlin is entered, such as delete, increase, modification record increases or deletes a certain field, or change specific data, to ensure
Manager and the synchronization of construction party data.
PC 3 is provided with data statisticss display module 32, described for, under the support of WEB management servers 13, transferring
Goods and materials order database in database server 12, financial database, construction plan data base, construction speed data base and Shi
Data in 5 slip condition database of crew are counted, and statistical result are shown by graphic interface.Applied
Crew's state information statistics with show, goods and materials receive situation statistics with show, finance spend money situation statistics with show, project process
Plan node statistics and displaying, and the contrast displaying of construction plan and construction speed.Show by both artistic and practical, friendly directly perceived
Chinese Graphic interface carry out, take into full account the custom of staff, facilitate easy to learn, easily operated, it is ensured that most functions one
Key is reached.The manifestation mode of information is more directly perceived, in hgher efficiency.
PC 3 is provided with safety management module 33, for by WEB server 13, to manager from after the login of PC 13,
Goods and materials order database to database server 12, financial database, construction plan data base, construction speed data base and Shi
The authority that data in 5 slip condition database of crew are imported, edited or transferred carries out multilamellar setting, safety management module 33
It is additionally operable to by mobile application server 14, to user from after the login of smart mobile phone 2, operates the authority of sign-out module 21 of registering,
The GPS location information registered, or the IP address of wireless router, or the IP address of mobile network is allowed to be defined, also
Smart mobile phone 2 is defined by the user that senior authentication module 23 obtains the checking of mobile application server 13.
Thus, safety management module 33 has following function:
Its exterior safety:The authority of the manager logged in by the user to logging in from smart mobile phone 2 and from PC 3
The mandate of multi-layer is carried out, multi-level security protection is realized, relatively independent security mechanism is established, outside is effectively prevented
Unauthorized access.
Internal system safety:While ensureing that its exterior is safe, system also ensures that the legal use of authorized user.
A kind of database server 12, WEB management servers 13, Mobile solution clothes in the construction project dynamic management system of the present invention
Business device 14, smart mobile phone 2 and PC 3 are respectively provided with fault tolerance, including bomp, reason investigation, and can be automatically or by people
Work is operated, and makes the system recovery of error to normal condition.Safety management module 33 also provides strict operational control and access control
System.
A kind of construction project dynamic management system of the present invention is by PC 3, mobile application server 14 and WEB management
Server 13 is constructed outside the ability for resisting illegal invasion, is additionally provided with backup server 10,10 simultaneous connection of backup server
According to storehouse server 12, mobile application server 14, WEB management servers 13.Backup server 10 may be located at Cloud Server 1
On, it is independently of Cloud Server 1.
Therefore, physically, a kind of construction project dynamic management system of the invention ensures that there is no possible single-point event
Barrier, it is possible to provide the backup of data.Data in database server 12, mobile application server 14, WEB management servers 13 are fixed
Phase automatic or manual is backuped on backup server 10, can be managed in database server 12, mobile application server 14, WEB
Backup Data is refunded when data corruption, loss in reason server 13, realize certain data recovery, be easy to system
Safeguard.
A kind of construction project dynamic management system of the present invention, can reduce the workload of current project sites management;
Realize the work attendance statistics management of construction team;Realize that engineering site goods and materials situation data of receiving upgrade in time statistics;Realize project
Finance are spent money situation, project process Statistic Analysis;Receive situation, engineering of project goods and materials is carried out using data analysis technique to enter
Degree situation, finance are spent money Statistic Analysis, provide information service for project management person;Network technology is used fully, it is real
Interconnection, information sharing on existing network, improve the efficiency and level of work.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention,
And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above
Change, modification will all fall in the range of claims of the present invention.
Claims (10)
1. a kind of construction project dynamic management system;It is characterized in that:Including database server, WEB management servers, movement
Application server, and at least one smart mobile phone and at least one PC, the database server, WEB management clothes
Business device and the mobile application server are respectively positioned on same Cloud Server, the smart mobile phone and the PC pass through because
Special net connects the Cloud Server;
Data base in the database server at least includes:Goods and materials order database, financial database, construction plan data
Storehouse, construction speed data base and construction team's slip condition database;
The number of the smart mobile phone is bound with user, and the smart mobile phone is provided with to register and sign-out module and is registered with described
The d GPS locating module of sign-out module binding, for registering to construction team's slip condition database input of the database server
With sign-out data.
2. a kind of construction project dynamic management system according to claim 1, it is characterised in that:The smart mobile phone also sets
There are senior authentication module and the goods and materials order data editor module with the senior authentication module binding, the senior certification mould
Block after the checking of the mobile application server, goods and materials order data described in the goods and materials order data editor module editor
Goods and materials in storehouse are received data.
3. a kind of construction project dynamic management system according to claim 2, it is characterised in that:The smart mobile phone and institute
State.
4. a kind of construction project dynamic management system according to claim 2, it is characterised in that:The PC is provided with number
According to editor module is imported, for the goods and materials order database to the database server, financial database, construction plan data
Storehouse, construction speed data base and construction team's slip condition database import data, and to importing the goods and materials order database, it is described
The number of financial database, the construction plan data base, the construction speed data base and construction team's slip condition database
According to entering edlin.
5. a kind of construction project dynamic management system according to claim 4, it is characterised in that:The data import editor
Module in the form of Excel file is imported data to the goods and materials order database, the financial database, described is applied
Work plan database, the construction speed data base and construction team's slip condition database.
6. a kind of construction project dynamic management system according to claim 4, it is characterised in that:It is characterized in that:It is described
PC is provided with data statisticss display module, for transferring the goods and materials order database in the database server, financial number
Counted according to the data in storehouse, construction plan data base, construction speed data base and construction team's slip condition database, and passed through
Graphic interface is shown to statistical result.
7. a kind of construction project dynamic management system according to claim 6, it is characterised in that:The PC is provided with peace
Full management module, for by the WEB server, to manager from after PC login, operates described importing according to storehouse to compile
Volume module and or the authority of the data statisticss display module set, the safety management module is additionally operable to by described
Mobile application server, to user from the smart mobile phone login after, operation described in register sign-out module and or the goods and materials order
The authority of forms data editor module is set.
8. a kind of construction project dynamic management system according to claim 7, it is characterised in that:The safety management module
The IP address logged according to the smart mobile phone or GPS location information, set to the authority of user.
9. a kind of construction project dynamic management system according to claim 6, it is characterised in that:The goods and materials order data
Storehouse, the financial database, the construction plan data base, the construction speed data base and construction team's status data
Storehouse adopts MySQL database.
10. a kind of construction project dynamic management system according to claim 1, it is characterised in that the database service
Device, the WEB management servers and the mobile application server are all connected with backup server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611166143.5A CN106600231A (en) | 2016-12-14 | 2016-12-14 | Dynamic management system for infrastructure projects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611166143.5A CN106600231A (en) | 2016-12-14 | 2016-12-14 | Dynamic management system for infrastructure projects |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106600231A true CN106600231A (en) | 2017-04-26 |
Family
ID=58801883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611166143.5A Pending CN106600231A (en) | 2016-12-14 | 2016-12-14 | Dynamic management system for infrastructure projects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106600231A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108470049A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project management system based on instrument board |
CN108470048A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project data display systems based on instrument board |
CN108876287A (en) * | 2018-05-29 | 2018-11-23 | 杭州众软信息技术有限公司 | data management system based on BIM |
CN111784310A (en) * | 2020-08-04 | 2020-10-16 | 国网江苏省电力有限公司南通供电分公司 | Management system for informatization electric power engineering administration project and working method thereof |
CN112561363A (en) * | 2020-12-22 | 2021-03-26 | 深圳市九州建设技术股份有限公司 | Engineering supervision method, system, terminal and storage medium based on artificial intelligence |
CN112734393A (en) * | 2021-01-18 | 2021-04-30 | 宁波送变电建设有限公司永耀科技分公司 | Intelligent management platform for corporate enterprise and external administration unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551882A (en) * | 2008-12-31 | 2009-10-07 | 东莞市天新企业管理咨询有限公司 | Engineering management monitoring system and method |
CN103942744A (en) * | 2013-01-23 | 2014-07-23 | 成都勤智数码科技股份有限公司 | Operation personnel management method and system based on mobile phone GPS positioning |
CN103942654A (en) * | 2014-04-30 | 2014-07-23 | 国家电网公司 | Electric power engineering quality supervision and management platform |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
-
2016
- 2016-12-14 CN CN201611166143.5A patent/CN106600231A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551882A (en) * | 2008-12-31 | 2009-10-07 | 东莞市天新企业管理咨询有限公司 | Engineering management monitoring system and method |
CN103942744A (en) * | 2013-01-23 | 2014-07-23 | 成都勤智数码科技股份有限公司 | Operation personnel management method and system based on mobile phone GPS positioning |
CN103942654A (en) * | 2014-04-30 | 2014-07-23 | 国家电网公司 | Electric power engineering quality supervision and management platform |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108470049A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project management system based on instrument board |
CN108470048A (en) * | 2018-03-09 | 2018-08-31 | 国网上海市电力公司 | A kind of construction project data display systems based on instrument board |
CN108876287A (en) * | 2018-05-29 | 2018-11-23 | 杭州众软信息技术有限公司 | data management system based on BIM |
CN111784310A (en) * | 2020-08-04 | 2020-10-16 | 国网江苏省电力有限公司南通供电分公司 | Management system for informatization electric power engineering administration project and working method thereof |
CN112561363A (en) * | 2020-12-22 | 2021-03-26 | 深圳市九州建设技术股份有限公司 | Engineering supervision method, system, terminal and storage medium based on artificial intelligence |
CN112734393A (en) * | 2021-01-18 | 2021-04-30 | 宁波送变电建设有限公司永耀科技分公司 | Intelligent management platform for corporate enterprise and external administration unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106600231A (en) | Dynamic management system for infrastructure projects | |
CN103441986B (en) | Data resource security control method in thin client mode | |
CN104184735B (en) | Power marketing mobile application security guard system | |
CN103795745B (en) | The monitoring method and system of a kind of intelligent mobile terminal | |
CN109831327A (en) | IMS full service network based on big data analysis monitors intelligent operation support system | |
Nowak et al. | Verticals in 5G MEC-use cases and security challenges | |
CN109670768A (en) | Right management method, device, platform and the readable storage medium storing program for executing in multi-service domain | |
CN101520831B (en) | Safe terminal system and terminal safety method | |
CN102479413B (en) | Network invoicing system and method thereof | |
CN110957025A (en) | Medical health information safety management system | |
CN103442354B (en) | A kind of movable police terminal security managing and control system | |
CN107579998A (en) | Personal data center and digital identification authentication method based on block chain, digital identity and intelligent contract | |
CN104063756A (en) | Electric power utilization information remote control system | |
CN106789875A (en) | A kind of block chain service unit, block chain service system and its communication means | |
CN107111696A (en) | Security and authority framework in multi-tenant computing system | |
CN101610502B (en) | Method for mobile information integration based on different business systems of mobile application portal | |
CN103023993A (en) | Enterprise information system based on cloud computing | |
CN103067344A (en) | Non-invasive method and equipment for automatically issuing safety regulations in cloud environment | |
CN102307114A (en) | Management method of network | |
CN106097027A (en) | Tax control disk remote invoicing system and implementation method thereof | |
CN103475727A (en) | Database auditing method based on bridged mode | |
CN104580081A (en) | Integrated SSO (single sign on) system | |
CN105320522A (en) | Service-oriented architecture based XBRL application platform | |
CN103020542A (en) | Technology for storing secret information for global data center | |
CN103065104B (en) | Movable storage device and the supervisory system formed thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170426 |