CN110288220A - A kind of construction management platform based on BIM - Google Patents
A kind of construction management platform based on BIM Download PDFInfo
- Publication number
- CN110288220A CN110288220A CN201910531758.0A CN201910531758A CN110288220A CN 110288220 A CN110288220 A CN 110288220A CN 201910531758 A CN201910531758 A CN 201910531758A CN 110288220 A CN110288220 A CN 110288220A
- Authority
- CN
- China
- Prior art keywords
- construction
- module
- personnel
- information
- connect
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 176
- 238000004458 analytical method Methods 0.000 claims abstract description 34
- 238000013461 design Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 claims description 7
- 238000009428 plumbing Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 claims description 6
- 238000005034 decoration Methods 0.000 claims description 5
- 238000011156 evaluation Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 37
- 238000007405 data analysis Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of construction management platform based on BIM, it is related to Building Information Model technical field, solve existing construction management there are the wasting of resources, construction period is longer the problems such as, its key points of the technical solution are that: including condition of construction input module, database, BIM model construction module, type analysis module, number determining module, difficulty analysis module, personal management module, personnel's determining module and user terminal;Condition of construction input module and BIM model construction module communicate to connect;BIM model construction module and database and type analysis module communicate to connect;Type analysis module and number determining module communicate to connect;Number determining module and difficulty analysis module communicate to connect;Difficulty analysis module and personnel's determining module communicate to connect;Personnel's determining module and personal management module;User terminal and personnel's determining module communicate to connect, and have coordinated management construction team, rationally utilize working sources, shorten the project construction period, improve the effect of worker's income.
Description
Technical field
The present invention relates to Building Information Model technical fields, more specifically, it relates to a kind of construction management based on BIM
Platform.
Background technique
Building Information Model, abbreviation BIM are the new tools of architecture, engineering science and civil engineering, it can help to realize
Integrated, the termination from the design of building, construction, operation up to building life cycle management of architecture information, various information are whole always
Together in a three-dimensional model information database, all parties such as design team, unit in charge of construction, installation fishery department and owner can
To be cooperated based on BIM, working efficiency is effectively improved, resource is saved, reduces cost, to realize sustainable development.
Currently, existing construction mainly includes that concrete construction, electrical equipment construction, plumbing construction and finishing are applied
Work, different construction types need corresponding construction team to construct;Existing construction Team Management is by artificially judging
Which construction team is operated, and is determined in construction period and construction personnel's quantity there are biggish error, is easily caused resource
The problems such as waste, construction period extend;In addition, generally construction team can simultaneously construct to multiple projects, to construction team
The unreasonable construction period for arranging not only to affect project, but also the income of construction worker can be reduced.
Therefore, how to design a kind of construction management platform based on BIM is that our technologies in the urgent need to address at present are asked
Topic.
Summary of the invention
The object of the present invention is to provide a kind of construction management platform based on BIM, with the different construction group of coordinated management
Team rationally utilizes working sources, shortens the construction period of project, improves the effect of construction personnel's income from work.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of construction pipe based on BIM
Platform, including condition of construction input module, database, BIM model construction module, type analysis module, number determining module,
Difficulty analysis module, personal management module, personnel's determining module and user terminal;
The condition of construction input module, with the BIM model construction module communicate to connect, for input construction into
Information is spent, and the Construction Schedule information is transmitted to the BIM model construction module;
The database stores construction design requirement data;
The BIM model construction module is communicated to connect with the database and the type analysis module, for according to institute
It states Construction Schedule information architecture, update BIM model, and obtained according to construction design requirement data analysis wait apply
Work information, and the information to be onstructed is transmitted to the type analysis module;
The type analysis module is communicated to connect with the number determining module, for according to built-in standard construction class
Type data analyze and determine the Specific construction type of the information to be onstructed, and by the Specific construction type and the letter to be onstructed
Breath is transmitted to the number determining module;
The number determining module is communicated to connect with the difficulty analysis module, for determining the information to be onstructed
Construction total amount, and be calculated according to the personal construction volume in the built-in unit time corresponding with the Specific construction type
Construction number needed for completing the construction total amount, and information to be onstructed described in the construction number is transmitted to the difficulty
Analysis module;
The difficulty analysis module is communicated to connect with personnel's determining module, obtains the letter to be onstructed for analyzing
The difficulty requirement of breath, and specific personnel demand situation is determined according to the construction number, and by the specific personnel demand feelings
Condition is transmitted to personnel's determining module;
The personal management module stores the personal information of all construction personnel;
Personnel's determining module is used for according to the specific personnel demand situation with the personal management module to institute
The hollow idler person of personal information is stated to be demarcated;
The user terminal is communicated to connect with personnel's determining module, for according to the calibration information to corresponding
Calibration personnel give notice.
By using above-mentioned technical proposal, reasonable arrangement specific construction personnel timely according to information to be onstructed, convenient for same
When the multiple construction team of coordinated management reduce the idle situation of construction team when to multiple project managements and occur, rationally utilize
Construction worker's resource shortens the construction period of project, improves construction personnel's income from work.
The present invention is further arranged to: the personal management module includes concrete construction unit, electrical construction unit, water
Warm construction cell and decoration construction unit;The concrete construction unit, electrical construction unit, plumbing construction unit and finishing are applied
Work order member is equipped at least one industrial grade unit, the skill between different technologies level cells in the same construction cell
Art requires different.
By using above-mentioned technical proposal, convenient for being required according to construction difficulty, the corresponding technical staff of reasonable arrangement,
Reduce construction hidden danger odds.
The present invention is further arranged to: further including HR resume management system and assessment module;The HR resume management system
Store the biographic information of construction personnel;The assessment module, with the HR resume management system and the personal management module
Communication connection, for carrying out classification, technology to construction personnel corresponding in the HR resume management system according to the biographic information
Difficulty is divided, and by corresponding construction personnel statistics in corresponding industrial grade unit.
By using above-mentioned technical proposal, convenient for carrying out classifying rationally to construction personnel, reduce the investment of construction at
This.
The present invention is further arranged to: the personal management module communication link is connected to Leave Management module, Leave Management mould
Block is used to the construction personnel's status indication having a holiday be state of having a holiday.
By using above-mentioned technical proposal, the reliability of calibration personnel normal work is enhanced, it is ensured that construction speed
It operates normally.
The present invention is further arranged to: personnel's determining module communication link is connected to wage and salary administration module, the wages pipe
Module is managed to be used to count corresponding construction personnel's wages according to the specific personnel demand situation.
By using above-mentioned technical proposal, so that the statistics salary of construction personnel is easy to operate.
In conclusion the invention has the following advantages: timely, reasonable arrangement is specifically constructed according to information to be onstructed
Personnel when to multiple project managements, reduce the idle situation hair of construction team convenient for the multiple construction team of coordinated management simultaneously
It is raw, construction worker's resource is rationally utilized, the construction period of project is shortened, improves construction personnel's income from work;Convenient for basis
Construction difficulty requirement, the corresponding technical staff of reasonable arrangement reduce construction hidden danger odds;Convenient for construction personnel
Classifying rationally is carried out, the input cost of construction is reduced.
Detailed description of the invention
Fig. 1 is the block architecture diagram in the embodiment of the present invention.
In figure: 1, condition of construction input module;11, BIM model construction module;12, database;13, type analysis module;
14, number determining module;15, difficulty analysis module;16, personnel's determining module;17, user terminal;2, personal management module;
21, concrete construction unit;22, electrical construction unit;23, plumbing construction unit;24, decoration construction unit;3, HR resume pipe
Reason system;31, assessment module;4, Leave Management module;5, wage and salary administration module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment: a kind of construction management platform based on BIM, as shown in Figure 1, including condition of construction input module 1, data
Library 12, BIM model construction module 11, type analysis module 13, number determining module 14, difficulty analysis module 15, personal management
Module 2, personnel's determining module 16 and user terminal 17.
Condition of construction input module 1 and BIM model construction module 11 communicate to connect, for inputting Construction Schedule letter
Breath, and Construction Schedule information is transmitted to BIM model construction module 11.Database 12 stores construction design requirement
Data.BIM model construction module 11 and database 12 and type analysis module 13 communicate to connect, for according to Construction Schedule
Information architecture updates BIM model, and obtains information to be onstructed according to the analysis of construction design requirement data, and will be wait apply
Work information is transmitted to type analysis module 13.Type analysis module 13 and number determining module 14 communicate to connect, in
The standard construction type data set analyze and determine the Specific construction type of information to be onstructed, and by Specific construction type and to be onstructed
Information is transmitted to number determining module 14.Number determining module 14 and difficulty analysis module 15 communicate to connect, for determining wait apply
The construction total amount of work information, and calculated according to the personal construction volume in the built-in unit time corresponding with Specific construction type
Construction number needed for obtaining completion construction total amount, and the number of constructing information to be onstructed is transmitted to difficulty analysis module 15.
Difficulty analysis module 15 and personnel's determining module 16 communicate to connect, for analyzing the difficulty requirement for obtaining information to be onstructed, and root
Specific personnel demand situation is determined according to construction number, and specific personnel demand situation is transmitted to personnel's determining module 16.People
Member's management module 2 stores the personal information of all construction personnel.Personnel's determining module 16 and personal management module 2 are used for root
The hollow idler person of personal information is demarcated according to specific personnel demand situation.User terminal 17 is communicated with personnel's determining module 16
Connection, for being given notice according to calibration information to corresponding calibration personnel.It is timely according to information to be onstructed, reasonable arrangement is specific
Construction personnel when to multiple project managements, it is idle to reduce construction team convenient for the multiple construction team of coordinated management simultaneously
It happens, rationally utilizes construction worker's resource, shorten the construction period of project, improve construction personnel's income from work.
Personal management module 2 includes concrete construction unit 21, electrical construction unit 22, plumbing construction unit 23 and finishing
Construction cell 24.Concrete construction unit 21, electrical construction unit 22, plumbing construction unit 23 and decoration construction unit 24 are all provided with
There is at least one industrial grade unit, the technical requirements between the different technologies level cells in same construction cell are different.?
In the present embodiment, each construction cell is set there are three industrial grade unit, convenient for being required according to construction difficulty, is rationally pacified
Corresponding technical staff is arranged, construction hidden danger odds is reduced.
Construction management platform further includes HR resume management system 3 and assessment module 31.HR resume management system 3, which stores, to be applied
The biographic information of worker person.Assessment module 31 and HR resume management system 3 and personal management module 2 communicate to connect, and are used for basis
Biographic information carries out classification to construction personnel corresponding in HR resume management system 3, technical difficulty is divided, and will accordingly be constructed
Demographic, convenient for carrying out classifying rationally to construction personnel, reduces the investment of construction in corresponding industrial grade unit
Cost.
2 communication link of personal management module is connected to Leave Management module 4, and Leave Management module 4 is used for the constructor that will be had a holiday
Member's status indication is state of having a holiday, and enhances the reliability of calibration personnel normal work, it is ensured that the normal operation of construction speed.
16 communication link of personnel's determining module is connected to wage and salary administration module 5, and wage and salary administration module 5 is used for according to specific personnel's need
Condition of pleading counts corresponding construction personnel's wages, so that the statistics salary of construction personnel is easy to operate.
Working principle:, reasonable arrangement specific construction personnel timely according to information to be onstructed is more convenient for coordinated management simultaneously
A construction team is reduced the idle situation of construction team and occurred, rationally provided using construction worker when to multiple project managements
Source shortens the construction period of project, improves construction personnel's income from work.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (5)
1. a kind of construction management platform based on BIM, it is characterized in that: include condition of construction input module (1), database (12),
BIM model construction module (11), type analysis module (13), number determining module (14), difficulty analysis module (15), Ren Yuanguan
Manage module (2), personnel's determining module (16) and user terminal (17);
The condition of construction input module (1) communicates to connect with the BIM model construction module (11), applies for inputting building
Work progress msg, and the Construction Schedule information is transmitted to the BIM model construction module (11);
The database (12), stores construction design requirement data;
The BIM model construction module (11) communicates to connect with the database (12) and the type analysis module (13), uses
According to the Construction Schedule information architecture, update BIM model, and according to the construction design requirement data analyze
It obtains information to be onstructed, and the information to be onstructed is transmitted to the type analysis module (13);
The type analysis module (13) communicates to connect with the number determining module (14), for being applied according to built-in standard
Work categorical data analyzes and determines the Specific construction type of the information to be onstructed, and by the Specific construction type and described wait apply
Work information is transmitted to the number determining module (14);
The number determining module (14) communicates to connect with the difficulty analysis module (15), for determining the letter to be onstructed
The construction total amount of breath, and calculated according to the personal construction volume in the built-in unit time corresponding with the Specific construction type
Obtain construction number needed for completing the construction total amount, and described in information to be onstructed described in the construction number is transmitted to
Difficulty analysis module (15);
The difficulty analysis module (15) communicates to connect with personnel's determining module (16), obtains for analysis described wait apply
The difficulty requirement of work information, and specific personnel demand situation is determined according to the construction number, and the specific personnel are needed
Condition of pleading is transmitted to personnel's determining module (16);
The personal management module (2), stores the personal information of all construction personnel;
Personnel's determining module (16) is used for the personal management module (2) according to the specific personnel demand situation pair
The hollow idler person of personal information is demarcated;
The user terminal (17) communicates to connect with personnel's determining module (16), for according to the calibration information to phase
The calibration personnel answered give notice.
2. a kind of construction management platform based on BIM according to claim 1, it is characterized in that: the personal management module
It (2) include concrete construction unit (21), electrical construction unit (22), plumbing construction unit (23) and decoration construction unit
(24);The concrete construction unit (21), electrical construction unit (22), plumbing construction unit (23) and decoration construction unit
(24) at least one industrial grade unit, the technology between different technologies level cells in the same construction cell are equipped with
It is required that different.
3. a kind of construction management platform based on BIM according to claim 2, it is characterized in that: further including HR resume management
System (3) and assessment module (31);The HR resume management system (3) stores the biographic information of construction personnel;The evaluation
Module (31) is communicated to connect with the HR resume management system (3) and the personal management module (2), for according to the letter
It goes through information to divide construction personnel corresponding in the HR resume management system (3) progress classification, technical difficulty, and will be corresponding
Construction personnel counts in corresponding industrial grade unit.
4. a kind of construction management platform based on BIM according to claim 1, it is characterized in that: the personal management module
(2) communication link is connected to Leave Management module (4), and Leave Management module (4) is used to the construction personnel's status indication having a holiday be to stop
False state.
5. a kind of construction management platform based on BIM according to claim 1, it is characterized in that: personnel's determining module
(16) communication link is connected to wage and salary administration module (5), and the wage and salary administration module (5) is used for according to the specific personnel demand situation
Count corresponding construction personnel's wages.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910531758.0A CN110288220A (en) | 2019-06-19 | 2019-06-19 | A kind of construction management platform based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910531758.0A CN110288220A (en) | 2019-06-19 | 2019-06-19 | A kind of construction management platform based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110288220A true CN110288220A (en) | 2019-09-27 |
Family
ID=68004302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910531758.0A Pending CN110288220A (en) | 2019-06-19 | 2019-06-19 | A kind of construction management platform based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110288220A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113128961A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform |
CN115796563A (en) * | 2023-02-10 | 2023-03-14 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
-
2019
- 2019-06-19 CN CN201910531758.0A patent/CN110288220A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113128961A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform |
CN113128961B (en) * | 2021-04-16 | 2022-03-11 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform system |
CN115796563A (en) * | 2023-02-10 | 2023-03-14 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
CN115796563B (en) * | 2023-02-10 | 2023-04-11 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021056791A1 (en) | Smart management platform for integrated construction and maintenance of rail transport engineering, and method | |
CN108846639B (en) | BIM technology-based design construction pricing management method | |
KR101106220B1 (en) | System for environmental load assessment during life cycle of building | |
CN103440600A (en) | BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model | |
CN202948475U (en) | Information management system of construction material | |
CN102096849A (en) | Flow management design method based on network program | |
CN110288220A (en) | A kind of construction management platform based on BIM | |
CN103400228A (en) | Method for creating post engineering information model for railway and urban railway traffic station | |
CN112488654A (en) | Integrated intelligent cooperation method and device for electric power material design | |
WO2013019298A1 (en) | A city lifecycle management system | |
CN104408573A (en) | Heterogeneous business process integration method based on business patterns | |
CN108427802A (en) | A kind of Deepen Design technique drawing generating method and device based on BIM | |
CN116562802A (en) | Intelligent construction application platform of track traffic based on BIM | |
CN107292473A (en) | The online estimating and examining system of planning feasibility study business and method based on process optimization | |
CN111810144A (en) | Shale gas well engineering intelligent scheduling method and system | |
CN106815719A (en) | The design and implementation methods of manufacturing enterprise's flexibility ERP system visual development platform | |
CN114707216A (en) | Architectural decoration engineering management system based on BIM technology | |
CN114037403A (en) | Method for efficiently sharing and managing light BIM data | |
CN104036127B (en) | Area of computer aided emergency system and method based on prediction scheme | |
CN113807573A (en) | Construction prediction analysis method and system based on data management and three-dimensional search | |
CN103488649B (en) | A kind of method that architectural model is converted to emulation component | |
CN111708598A (en) | BIM digital collaborative management system | |
CN106169118A (en) | Power marketing industry expands negative inventory management application process | |
CN101673364A (en) | Industrial and commercial trademark authorization electronic management system | |
Phin et al. | Urban Transport Institutions and Governance and Integrated Land Use and Transport, Hanoi, Viet Nam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190927 |
|
RJ01 | Rejection of invention patent application after publication |