CN110159252A - Data collection system and method - Google Patents
Data collection system and method Download PDFInfo
- Publication number
- CN110159252A CN110159252A CN201910483220.7A CN201910483220A CN110159252A CN 110159252 A CN110159252 A CN 110159252A CN 201910483220 A CN201910483220 A CN 201910483220A CN 110159252 A CN110159252 A CN 110159252A
- Authority
- CN
- China
- Prior art keywords
- data
- drilling
- soil sample
- information
- time interval
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000013480 data collection Methods 0.000 title claims abstract description 15
- 238000005553 drilling Methods 0.000 claims abstract description 184
- 239000002689 soil Substances 0.000 claims abstract description 112
- 238000010276 construction Methods 0.000 claims abstract description 55
- 230000002159 abnormal effect Effects 0.000 claims description 21
- 230000003993 interaction Effects 0.000 claims description 3
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 238000007726 management method Methods 0.000 abstract description 9
- 238000013523 data management Methods 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 4
- 239000004927 clay Substances 0.000 description 8
- 241001074085 Scophthalmus aquosus Species 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/002—Survey of boreholes or wells by visual inspection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Remote Sensing (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
This application discloses a kind of data collection system and methods.Wherein, the system includes: data acquisition equipment, for obtaining the first data, the second data and third data, and the first data, the second data and third data are sent to server, wherein, first data are the image data of construction site drilling, and the second data are the depth of drilling and the soil sample information of bore inner, and third data are the location information of drilling;Server is communicated with data acquisition equipment, carries out checking treatment for receiving the first data, the second data and third data, and to the first data, the second data and third data.Present application addresses enterprise engineering management at this stage, site supervision and professional technique data management disconnections, the technical issues of causing the intensivism of engineering management not high, expend a large amount of manpower and material resources.
Description
Technical field
This application involves engineering management fields, in particular to a kind of data collection system and method.
Background technique
At this stage, in enterprise engineering management, field operation construction data is generally by construction personnel by manual paper record, so
The field operation construction data of record is verified by the relevant technologies prospecting personnel again afterwards, the way to manage of this field operation construction data
It has the following problems:
1) due to record peopleware it is irregular, will lead to field operation construction data record it is lack of standardization;
2) exploratory techniques are separated with labor service, and it is big that difficulty is supervised in construction site, the authenticity of field operation construction data it is difficult to ensure that;
3) for remote job, nonlocal operation, the transmission of field operation construction data and processing are difficult;
4) by paper record field operation construction data, not only waste of resource but also it is unfavorable for data and saves and filing.
It disconnects for enterprise engineering management at this stage, site supervision and professional technique data management, leads to engineering management
The problem of intensivism is not high, expends a large amount of manpower and material resources, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the present application provides a kind of data collection system and method, at least to solve enterprise engineering pipe at this stage
Reason, site supervision and professional technique data management disconnect, and cause the intensivism of engineering management not high, expend a large amount of manpower and material resources
Technical problem.
According to the one aspect of the embodiment of the present application, a kind of data collection system is provided, comprising: data acquisition equipment,
For obtaining the first data, the second data and third data, and the first data, the second data and third data are sent to service
Device, wherein the first data are the image data of construction site drilling, and the second data are the depth of drilling and the soil sample of bore inner
Information, third data are the location information of drilling;Server is communicated with data acquisition equipment, for receiving the first data, second
Data and third data, and checking treatment is carried out to the first data, the second data and third data.
Optionally, server is for carrying out checking treatment to third data in the following manner: believing the position for comparing drilling
Breath and preset position information;If the corresponding coordinate of location information of drilling and the difference of the corresponding coordinate of preset position information are small
In the first preset threshold, determine that the location information of drilling is normal;If the corresponding coordinate of location information and predeterminated position of drilling
The difference of the corresponding coordinate of information is more than or equal to the first preset threshold, determines the positional information abnormity of drilling.
Optionally, server is also used to after the positional information abnormity for determining drilling, is sent and is notified to data acquisition equipment
Information.
Optionally, data acquisition equipment includes image capture module, and image capture module is used to acquire the first data,
In, it is labeled with that drill bit enters the first time of drilling and drill bit leaves the second time of drilling, drill bit in the image data of drilling
For realizing the operation for generating drilling.
Optionally, server is for carrying out checking treatment to the second data in the following manner: comparing the phase of the second data
Between adjacent the second time interval and preset time between the first time interval of acquisition time, first time and the second time twice
Every size determine the brill in the second data if first time interval and the second time interval are respectively less than prefixed time interval
Hole depth is abnormal data.
Optionally, server is also used to carry out checking treatment to the second data in the following manner: comparing the image of drilling
The color of soil sample in data, the soil sample are that drill bit leaves the pedotheque taken out of when drilling;If the color of soil sample belongs to same
The quantity of the consecutive image of kind colour system is more than or equal to the second preset threshold, determines that the soil sample information in the second data is doubtful
Abnormal data;Warning information is issued, prompts whether artificial judgment soil sample information is abnormal data.
Optionally, soil sample information includes at least one of: whether title, the color of soil sample, the soil sample of soil sample are plastic
Property soil sample.
Optionally, data acquisition equipment is used to obtain the first data and the second number of user's typing by human-computer interaction interface
According to, and the first data and the second data are stored to the local data base of data collection system;Described in being acquired by locating module
Third data.
According to the another aspect of the embodiment of the present application, a kind of collecting method is additionally provided, comprising: server receives number
The first data, the second data and the third data sent according to acquisition equipment, wherein the first data are the image of construction site drilling
Data, the second data are the depth of drilling and the soil sample information of bore inner, and third data are the location information of drilling;Server
Checking treatment is carried out to the first data, the second data and third data.
Optionally, server carries out checking treatment to the first data, the second data and third data, comprising: compares drilling
Location information and preset position information, if drilling the corresponding coordinate of location information and the corresponding coordinate of preset position information
Difference less than the first preset threshold, determine that the location information of drilling is normal;If drilling the corresponding coordinate of location information and
The difference of the corresponding coordinate of preset position information is more than or equal to the first preset threshold, determines the positional information abnormity of drilling;
Compare the first time interval of the adjacent acquisition time twice of the second data, first time and second when being second between case
Between interval and the size of prefixed time interval, if first time interval and the second time interval are respectively less than prefixed time interval,
Determine that the drilling depth in the second data is abnormal data, wherein be respectively at the first time the picture number to drill with the second time
The time of drilling is entered and left according to the drill bit of upper mark, drill bit is for realizing the operation for generating drilling;Compare the image of drilling
The color of soil sample in data, soil sample are that drill bit leaves the pedotheque taken out of when drilling;If the color of soil sample belongs to same
The quantity of the consecutive image of colour system is more than or equal to the second preset threshold, determines that the soil sample information in second data is doubtful
Like abnormal data;Warning information is issued, prompts whether soil sample information described in artificial judgment is abnormal data.
In the embodiment of the present application, a kind of data collection system is provided, which includes: that data acquisition is set
It is standby, for obtaining the first data, the second data and third data, and the first data, the second data and third data are sent to
Server, wherein the first data are the image data of construction site drilling, and the second data are the depth and bore inner of drilling
Soil sample information, third data are the location information of drilling;Server is communicated with data acquisition equipment, for receive the first data,
Second data and third data, and checking treatment is carried out to the first data, the second data and third data.It is acquired eventually by data
Field operation construction data is sent directly to server by end equipment, is then verified in server end to field operation construction data, from
And field operation construction data Digital Transmission is realized, by complete data chain, cost of human resources has been saved, has been improved
The technical effect of working efficiency, and then it is de- to solve enterprise engineering management at this stage, site supervision and professional technique data management
Section, the technical issues of causing the intensivism of engineering management not high, expend a large amount of manpower and material resources.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen
Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is the structure chart according to a kind of data collection system of the embodiment of the present application;
Fig. 2 is the flow chart according to a kind of collecting method of the embodiment of the present application.
Specific embodiment
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection
It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to
Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product
Or other step or units that equipment is intrinsic.
According to the embodiment of the present application, a kind of embodiment of data collection system is provided, it should be noted that in attached drawing
The step of process illustrates can execute in a computer system such as a set of computer executable instructions, although also,
Logical order is shown in flow chart, but in some cases, it can be to be different from shown by sequence execution herein or retouch
The step of stating.
Fig. 1 is according to a kind of structure chart of data collection system of the embodiment of the present application, as shown in Figure 1, the system includes:
Data acquisition equipment 10, for obtaining the first data, the second data and third data, and by the first data, second
Data and third data are sent to server, wherein the first data are the image data of construction site drilling, and the second data are to bore
The depth and bore inner soil sample information in hole, third data are the location information of drilling.
According to an optional embodiment of the application, soil sample information includes at least one of: the title of the soil sample,
Whether the color of the soil sample, the soil sample are plasticity soil sample.
According to an optional embodiment of the application, the image data of the corresponding drilling of above-mentioned first data, which refers to, to be applied
Construction image when work scene is using probing drilling, can recorde field operation drilling operation progress msg by the first data, is used to
Check the schedule of work on the spot.Second data include the depth of drilling and the soil sample information of bore inner, are bored using probing
The soil sample that drilling Shi Douhui takes some bore inners out of is left in probing when hole, and drilling depth is different, drills the matter for the soil sample taken out of
Ground is also different, for example, have clay soil sample, rubble soil sample, gravel soil sample etc., construction personnel (such as records different soil sample information
The soil sample information entered are as follows: clay soil sample yellowish-brown plasticity soil sample) it is input to data acquisition equipment 10, it should be noted that it can
Plasticity is used to characterize the viscosity of soil sample, for example, clay soil sample have can statue, rubble soil sample do not have plasticity, then by soil sample
Information is sent to server 12.After related technical personnel analyze soil sample information, associated construction is formulated according to soil sample information
Standard.Third data are the location information of drilling, refer to the position coordinates of drilling.
It is provided with communication module on data acquisition equipment 10, above-mentioned first data, the second data and third data are sent out
It send to server 12.
Server 12 is communicated with data acquisition equipment 10, for receiving the first data, the second data and third data, and
Checking treatment is carried out to the first data, the second data and third data.
According to an optional embodiment of the application, server 12 includes but is not limited to cloud server.
Field operation construction data is sent directly to server by data acquisition terminal equipment, it is then external in server end
Industry construction data is verified, to realize field operation construction data Digital Transmission, by complete data chain, is saved
Cost of human resources, the technical effect that improves work efficiency.
In some embodiments of the present application, server 12 is in the following manner carrying out at verification third data
Reason: compare the location information and preset position information of drilling;If the corresponding coordinate of location information and the predeterminated position letter of drilling
The difference for ceasing corresponding coordinate is less than preset threshold, determines that the location information of drilling is normal;If the location information of drilling is corresponding
Coordinate and the corresponding coordinate of preset position information difference be more than or equal to preset threshold, determine drilling location information it is different
Often.
According to an optional embodiment of the application, data acquisition equipment 10 includes locating module, passes through locating module
Acquire third data.
In some embodiments of the present application, be integrated with locating module in data acquisition equipment 10, locating module include but
It is not limited to Beidou positioning module, the coordinate data that data acquisition equipment 10 is drilled by Beidou positioning module acquisition, and is uploaded to
Server 12.Server 12 compare data acquisition equipment 10 upload drilling coordinate and preset position coordinates, if this two
The difference of a coordinate is less than preset threshold, determines the coordinate of the drilling uploaded without departing from design position preset value;If the two
Coordinate difference be more than or equal to the preset threshold, illustrate drilling actual coordinate deviate from design position preset value, then sentence
Breaking of rod hole is abnormal drilling, and project director is notified to carry out audit verification.
In another optional embodiment of the application, server 12 is also used in the positional information abnormity for determining drilling
Afterwards, notification information is sent to data acquisition equipment 10.
After determining and drilling exception, server 12 is given notice message to data acquisition equipment 10, reminds construction personnel couple
The position of drilling is adjusted.
According to an optional embodiment of the application, data acquisition equipment 10 includes image capture module, Image Acquisition
Module, for acquiring the first data, wherein be labeled with first time and drill bit that drill bit enters drilling in the image data of drilling
The second time of drilling is left, drill bit is for realizing the operation for generating drilling.
Data acquisition equipment 10 acquires the first data by picture recording module of taking pictures, and marks in the borehole image data of acquisition
Drill bit enters the time of drilling and drill bit leaves the time of drilling, for example, marking drill bit on a borehole image enters drilling
Time is 9:00, and the time for showing that drill bit leaves drilling on the image of another drilling is 9:05, i.e. drill bit is once drilled
Time be 5 minutes.
According to an optional embodiment of the application, server logical 12 is in the following manner carrying out the second data
Checking treatment: compare between first time interval, first time and the second time of the adjacent acquisition time twice of the second data
The second time interval and prefixed time interval size;If first time interval and the second time interval are respectively less than default
Between be spaced, determine that drilling depth in the second data is abnormal data.
After drill bit carries out a drilling operation according to the rules, construction personnel needs to adopt the depth information of drilling by data
Collection equipment 10 is uploaded to server 12, and server 12 is needed after the depth information for receiving drilling to the accurate qualitative of the information
It is verified.By comparing the drill bit recorded in the corresponding borehole image data of the first data enter drilling and leave drilling when
Between interval, the time interval of the adjacent depth data for receiving drilling twice and prefixed time interval size can determine whether to construct
Whether the depth data for the drilling that personnel upload is true.
For example, a total of 10 meters of depth of a drilling, the punching depth that drill bit carries out a drilling operation is 1 meter, consumption
When 5 minutes (prefixed time interval is set as 5 minutes), that is to say, that the drill bit recorded in borehole image data enter drilling and
The time interval for leaving drilling is 5 minutes, and the time interval of the adjacent depth data for receiving drilling twice should also be 5 points
Clock illustrates the drilling depth data exception that construction personnel uploads, i.e. constructor if the two time intervals are respectively less than 5 minutes
The depth data for the drilling that member uploads may be fraud data.It should be noted that the distance with drill bit away from earth's surface is bigger, bore
Head carries out 1 meter of bore operation time-consuming also can be longer, therefore prefixed time interval can be adjusted at any time with the progress of bore operation.
Drill bit is marked on borehole image to enter the time of drilling and leave the time of drilling, it can also be from side to drilling
The authenticity of depth data proved, for example, the depth data of drilling is fraud data, construction personnel be strictly be greater than it is pre-
If time interval just uploads, although at this point, the acquisition time interval for meeting the depth data of drilling is greater than prefixed time interval
Condition, but the time interval of the drill bit marked on borehole image time and the time for leaving drilling for entering drilling is unsatisfactory for
Greater than the condition of prefixed time interval, at this point, still thinking the drilling depth data exception of construction personnel's upload, i.e. construction personnel
The depth data of the drilling of upload may be fraud data.
The progress msg that not only can recorde field operation drilling operation by the image data of acquisition drilling, can also be to probing
Data are analyzed, and are monitored to the authenticity for the drilling data that construction personnel reports.
In some embodiments of the present application, server 12 is also used in the following manner carry out at verification the second data
Reason: comparing the color of soil sample in the image data of drilling, which is that drill bit leaves the pedotheque taken out of when drilling;If native
The quantity that the color of sample belongs to the consecutive image of same colour system is more than or equal to the second preset threshold, determines in the second data
Soil sample information be doubtful abnormal data;Warning information is issued, prompts whether artificial judgment soil sample information is abnormal data.
Since the color of the soil sample of differing texture is different, such as the color of clay soil sample and rubble soil sample is different
's;Even if the soil sample of identical quality, the distance apart from earth's surface is different, and water content is different in soil sample, causes soil sample color also different,
It therefore, can be by comparing the corresponding brill of the first data when whether the soil sample information for judging that construction personnel uploads is truthful data
The color of soil sample in the multiple images data in hole belongs to the same color if there is the color of soil sample in continuous multiple images data
System, illustrates that construction personnel may not drill actually, the soil sample information of upload may be fraud data;People is also needed at this time
Work further judges whether soil sample information is abnormal data.Above the same colour system includes multiple color, for example, yellow colour system
Include following color: isabelline, brown, yellowish-brown, yellow, dark yellow and light yellow.Construction can be verified by the step
The authenticity for the soil sample information that personnel upload.
In some embodiments of the present application, data acquisition equipment 10 is used to obtain user's typing by human-computer interaction interface
The first data and the second data, and the first data and the second data are stored to the local data base of data collection system;It is logical
It crosses locating module and acquires the third data.
The image data of drilling and the depth data of drilling are recorded by field operation construction personnel by interpersonal interactive interface manually
Enter data acquisition equipment 10, the location coordinate information of drilling is obtained automatically by 10 pairs of data acquisition equipment of locating module.
Fig. 2 be according to a kind of flow chart of collecting method of the embodiment of the present application, as shown in Fig. 2, this method comprises:
Step S202, server receive the first data, the second data and the third data that data acquisition equipment is sent,
In, the first data be construction site drilling image data, the second data be drill depth and bore inner soil sample information,
Third data are the location information of drilling.
According to an optional embodiment of the application, the image data of the corresponding drilling of above-mentioned first data, which refers to, to be applied
Construction image when work scene is using probing drilling, can recorde field operation drilling operation progress msg by the first data, is used to
Check the schedule of work on the spot.Second data are the depth and bore inner soil sample information of drilling, which includes
But it is not limited to the distance of quality and soil sample away from terrestrial reference of soil sample, probing is left drilling Shi Douhui and taken out of when drilling using probing
The soil sample of bore inner, drilling depth is different, and the quality for drilling the soil sample taken out of is also different, for example, having clay soil sample, gravelly soil
Sample, gravel soil sample etc., construction personnel is by different soil sample information (such as the soil sample information of typing are as follows: clay soil sample yellowish-brown can
Plasticity soil sample) it is input to data acquisition equipment 10, it should be noted that and plasticity is used to characterize the viscosity of soil sample, such as clay
Soil sample have can statue, rubble soil sample do not have plasticity, soil sample information is then sent to server 12.Related technical personnel
After analyzing soil sample information, associated construction standard is formulated according to soil sample information.Third data are the location information of drilling, are
Refer to the position coordinates of drilling.
Step S204, server carry out checking treatment to the first data, the second data and third data.
According to an optional embodiment of the application, step S204 is realized by the following method: comparing the position of drilling
Information and preset position information, if the difference of the corresponding coordinate of location information of drilling and the corresponding coordinate of preset position information
Less than the first preset threshold, determine that the location information of drilling is normal;If the corresponding coordinate of location information and the default position of drilling
The difference that confidence ceases corresponding coordinate is more than or equal to the first preset threshold, determines the positional information abnormity of drilling;Compare
The second time interval between the first time interval of the adjacent acquisition time twice of two data, first time and the second time with
The size of prefixed time interval determines second if first time interval and the second time interval are respectively less than prefixed time interval
Drilling depth in data is abnormal data, wherein is at the first time respectively to mark in the image data to drill with the second time
Drill bit enter and leave time of drilling, drill bit is for realizing the operation for generating drilling;Compare soil in the image data of drilling
The color of sample, soil sample are that drill bit leaves the pedotheque taken out of when drilling;If the color of soil sample belongs to the company of same colour system
The quantity of continuous image is more than or equal to the second preset threshold, determines that the soil sample information in second data is doubtful abnormal number
According to;Warning information is issued, prompts whether soil sample information described in artificial judgment is abnormal data.
The time that mark drill bit enters drilling in the borehole image data of acquisition leaves the time of drilling, example with drill bit
Such as, drill bit is marked on a borehole image and enters the time of drilling for 9:00, shows that drill bit leaves on the image of another drilling
The time of drilling is 9:05, i.e., the time that drill bit is once drilled is 5 minutes.
After drill bit carries out a drilling operation according to the rules, construction personnel needs to adopt the depth information of drilling by data
Collection equipment is uploaded to server, and server needs qualitative to carry out school to the accurate of the information after the depth information for receiving drilling
It tests.Enter between drilling and leaving the time of drilling by comparing the drill bit recorded in the corresponding borehole image data of the first data
It can determine whether construction personnel every the size of the, time interval of the adjacent depth data for receiving drilling twice and prefixed time interval
Whether the depth data of the drilling of upload is true.
For example, a total of 10 meters of depth of a drilling, the punching depth that drill bit carries out a drilling operation is 1 meter, consumption
When 5 minutes (prefixed time interval is set as 5 minutes), that is to say, that the drill bit recorded in borehole image data enter drilling and
The time interval for leaving drilling is 5 minutes, and the time interval of the adjacent depth data for receiving drilling twice should also be 5 points
Clock illustrates the drilling depth data exception that construction personnel uploads, i.e. constructor if the two time intervals are respectively less than 5 minutes
The depth data for the drilling that member uploads may be fraud data.It should be noted that the distance with drill bit away from earth's surface is bigger, bore
Head carry out 1 meter of bore operation time-consuming also can be longer, therefore prefixed time interval with bore idle job progress can adjust at any time.
Drill bit is marked on borehole image to enter the time of drilling and leave the time of drilling, it can also be from side to drilling
The authenticity of depth data proved, for example, the depth data of drilling is fraud data, construction personnel be strictly be greater than it is pre-
If time interval just uploads, although at this point, the acquisition time interval for meeting the depth data of drilling is greater than prefixed time interval
Condition, but the time interval of the drill bit marked on borehole image time and the time for leaving drilling for entering drilling is unsatisfactory for
Greater than the condition of prefixed time interval, at this point, still thinking the drilling depth data exception of construction personnel's upload, i.e. construction personnel
The depth data of the drilling of upload may be fraud data.
Since the color of the soil sample of differing texture is different, such as the color of clay soil sample and rubble soil sample is different
's;Even if the soil sample of identical quality, the distance apart from earth's surface is different, and water content difference causes soil sample color also different in soil sample,
It therefore, can be by comparing the corresponding brill of the first data when whether the soil sample information for judging that construction personnel uploads is truthful data
The color of soil sample in the multiple images data in hole belongs to the same color if there is the color of soil sample in continuous multiple images data
System, illustrates that construction personnel may not drill actually, the soil sample information of upload may be fraud data;People is also needed at this time
Work further judges whether soil sample information is abnormal data.Above the same colour system includes multiple color, for example, yellow colour system
Include following color: isabelline, brown, yellowish-brown, yellow, dark yellow and light yellow.Construction can be verified by the step
The authenticity for the soil sample information that personnel upload.
The progress msg that not only can recorde field operation drilling operation by the image data of acquisition drilling, can also be to probing
Data are analyzed, and are monitored to the authenticity for the drilling data that construction personnel reports.
By the above method, the chain of complete field operation construction data is established, cost of human resources has been saved, has improved
Working efficiency avoids error in data caused by manual record field operation construction data, while realizing the real-time storage of project data,
It haves laid a good foundation for business such as long term prospecting big data, cloud computings.Field operation construction data realizes that digitized record uploads,
The problem of being conducive to data to save and file, while avoiding paper records waste of resource.
It should be noted that the correlation that the preferred embodiment of embodiment illustrated in fig. 2 may refer to embodiment illustrated in fig. 1 is retouched
It states, details are not described herein again.
The embodiment of the present application also provides a kind of non-volatile memory medium, storage medium is for storing program, program fortune
Collecting method more than equipment execution when row where control storage medium.
Storage medium is used to store the program for executing following functions: server receives the first number that data acquisition equipment is sent
According to, the second data and third data, wherein the first data are the image data of construction site drilling, and the second data be to drill
The soil sample information of depth and bore inner, third data are the location information of drilling;Server to the first data, the second data and
Third data carry out checking treatment.
The embodiment of the present application also provides a kind of processor, processor is for running program, when program is run more than execution
Collecting method.
Processor is used to run the program for executing following functions: server receives the first number that data acquisition equipment is sent
According to, the second data and third data, wherein the first data are the image data of construction site drilling, and the second data be to drill
The soil sample information of depth and bore inner, third data are the location information of drilling;Server to the first data, the second data and
Third data carry out checking treatment.
Above-mentioned the embodiment of the present application serial number is for illustration only, does not represent the advantages or disadvantages of the embodiments.
In above-described embodiment of the application, all emphasizes particularly on different fields to the description of each embodiment, do not have in some embodiment
The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module
It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, the technical solution of the application is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the application whole or
Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code
Medium.
The above is only the preferred embodiment of the application, it is noted that for the ordinary skill people of the art
For member, under the premise of not departing from the application principle, several improvements and modifications can also be made, these improvements and modifications are also answered
It is considered as the protection scope of the application.
Claims (10)
1. a kind of data collection system characterized by comprising
Data acquisition equipment is counted for obtaining the first data, the second data and third data, and by first data, second
According to and third data be sent to server, wherein first data be construction site drilling image data, it is described second number
According to the soil sample information of depth and the bore inner for the drilling, the third data are the location information of the drilling;
The server is communicated with the data acquisition equipment, for receiving first data, the second data and third number
According to, and checking treatment is carried out to first data, the second data and third data.
2. system according to claim 1, which is characterized in that the server is used in the following manner to the third
Data carry out checking treatment:
Compare the location information and preset position information of the drilling;
If the difference of the corresponding coordinate of the location information of the drilling and the corresponding coordinate of the preset position information is less than
One preset threshold determines that the location information of the drilling is normal;
If the difference of the corresponding coordinate of the location information of the drilling and the corresponding coordinate of the preset position information be greater than or
Person is equal to first preset threshold, determines the positional information abnormity of the drilling.
3. system according to claim 2, which is characterized in that the server is also used in the position for determining the drilling
After Information abnormity, Xiang Suoshu data acquisition equipment sends notification information.
4. system according to claim 1, which is characterized in that the data acquisition equipment includes image capture module, institute
Image capture module is stated, for acquiring first data, wherein be labeled with drill bit in the image data of the drilling and enter institute
The first time and the drill bit of stating drilling leave the second time of the drilling, and the drill bit is for realizing the generation drilling
Operation.
5. system according to claim 4, which is characterized in that the server is used in the following manner to described second
Data carry out checking treatment:
When the first time interval that compares the adjacent acquisition time twice of second data, the first time are with described second
Between between the second time interval and prefixed time interval size;
If the first time interval and the second time interval are respectively less than the prefixed time interval, second data are determined
In drilling depth be abnormal data.
6. system according to claim 1, which is characterized in that the server is also used in the following manner to described
Two data carry out checking treatment:
The color of soil sample in the image data of the drilling is compared, the soil sample is that drill bit leaves the soil taken out of when the drilling
Sample;
If the quantity that the color of the soil sample belongs to the consecutive image of same colour system is more than or equal to the second preset threshold,
Determine that the soil sample information in second data is doubtful abnormal data;
Warning information is issued, prompts whether soil sample information described in artificial judgment is abnormal data.
7. system according to claim 1, which is characterized in that the soil sample information includes at least one of: the soil
Whether the title of sample, the color of the soil sample, the soil sample are plasticity soil sample.
8. system according to claim 1, which is characterized in that the data acquisition equipment is for passing through human-computer interaction interface
First data and the second data of user's typing are obtained, and first data and the second data are stored to the data
The local data base of acquisition system;The third data are acquired by locating module.
9. a kind of collecting method characterized by comprising
Server receives the first data, the second data and the third data that data acquisition equipment is sent, wherein first data
For the image data of construction site drilling, second data are the depth of the drilling and the soil sample letter of the bore inner
Breath, the third data are the location information of the drilling;
The server carries out checking treatment to first data, the second data and third data.
10. according to the method described in claim 9, it is characterized in that, the server to first data, the second data and
Third data carry out checking treatment, comprising:
Compare the location information and preset position information of the drilling, if the corresponding coordinate of the location information of the drilling and institute
The difference of the corresponding coordinate of preset position information is stated less than the first preset threshold, determines that the location information of the drilling is normal;Such as
The difference of the corresponding coordinate of the location information of drilling described in fruit and the corresponding coordinate of the preset position information is more than or equal to
First preset threshold, determines the positional information abnormity of the drilling;
Compare between first time interval, first time and the second time of the adjacent acquisition time twice of second data
The size of second time interval and prefixed time interval, if the first time interval and the second time interval are respectively less than described
Prefixed time interval determines that drilling depth in second data is abnormal data, wherein the first time and described the
Two times were respectively the time that the drill bit that marks enters and leaves the drilling in the image data of the drilling, and the drill bit is used
In the operation for realizing the generation drilling;
The color of soil sample in the image data of the drilling is compared, the soil sample drill bit is taken out of when leaving the drilling
Pedotheque;If it is default that the quantity that the color of the soil sample belongs to the consecutive image of same colour system is more than or equal to second
Threshold value determines that the soil sample information in second data is doubtful abnormal data;Warning information is issued, is prompted described in artificial judgment
Whether soil sample information is abnormal data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483220.7A CN110159252A (en) | 2019-06-04 | 2019-06-04 | Data collection system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910483220.7A CN110159252A (en) | 2019-06-04 | 2019-06-04 | Data collection system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110159252A true CN110159252A (en) | 2019-08-23 |
Family
ID=67627598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910483220.7A Pending CN110159252A (en) | 2019-06-04 | 2019-06-04 | Data collection system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110159252A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389202A (en) * | 2021-07-01 | 2021-09-14 | 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) | Device and method for preventing aligning deviation of pile foundation engineering reinforcement cage |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446214A (en) * | 2011-09-19 | 2012-05-09 | 北京城建勘测设计研究院有限责任公司 | Interior work data processing method used in engineering investigation and device adopting same |
CN102567526A (en) * | 2011-12-29 | 2012-07-11 | 国核电力规划设计研究院 | Method and system used for collecting and processing drilling information of geotechnical engineering |
CN202694126U (en) * | 2012-07-25 | 2013-01-23 | 南京工业大学 | Foundation pit engineering safety construction informationized monitoring system |
CN104616433A (en) * | 2015-02-04 | 2015-05-13 | 清华大学 | Real-time monitoring and early warning system for foundation pit engineering |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105117900A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress information acquisition method and device, and terminal equipment |
WO2017101606A1 (en) * | 2015-12-15 | 2017-06-22 | 北京奇虎科技有限公司 | System and method for collecting and analyzing data |
CN107341605A (en) * | 2017-07-03 | 2017-11-10 | 中冶集团武汉勘察研究院有限公司 | One kind prospecting field operation informationization monitoring and managing method and system |
CN107833448A (en) * | 2017-11-01 | 2018-03-23 | 中冶集团武汉勘察研究院有限公司 | A kind of Geotechnical Engineering rig locating and monitoring system and positioning and monitoring method |
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
-
2019
- 2019-06-04 CN CN201910483220.7A patent/CN110159252A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446214A (en) * | 2011-09-19 | 2012-05-09 | 北京城建勘测设计研究院有限责任公司 | Interior work data processing method used in engineering investigation and device adopting same |
CN102567526A (en) * | 2011-12-29 | 2012-07-11 | 国核电力规划设计研究院 | Method and system used for collecting and processing drilling information of geotechnical engineering |
CN202694126U (en) * | 2012-07-25 | 2013-01-23 | 南京工业大学 | Foundation pit engineering safety construction informationized monitoring system |
CN104616433A (en) * | 2015-02-04 | 2015-05-13 | 清华大学 | Real-time monitoring and early warning system for foundation pit engineering |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105117900A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress information acquisition method and device, and terminal equipment |
WO2017101606A1 (en) * | 2015-12-15 | 2017-06-22 | 北京奇虎科技有限公司 | System and method for collecting and analyzing data |
CN107341605A (en) * | 2017-07-03 | 2017-11-10 | 中冶集团武汉勘察研究院有限公司 | One kind prospecting field operation informationization monitoring and managing method and system |
CN107833448A (en) * | 2017-11-01 | 2018-03-23 | 中冶集团武汉勘察研究院有限公司 | A kind of Geotechnical Engineering rig locating and monitoring system and positioning and monitoring method |
CN108053150A (en) * | 2018-01-09 | 2018-05-18 | 中建七局安装工程有限公司 | A kind of site operation personnel's intelligent management based on BIM |
Non-Patent Citations (2)
Title |
---|
任治军等: "岩土工程勘察信息化处理的架构与实施", 《电力勘测设计》 * |
刘文彬等: "基于平板电脑的岩土工程勘察外业数据采集系统", 《岩土工程技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389202A (en) * | 2021-07-01 | 2021-09-14 | 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) | Device and method for preventing aligning deviation of pile foundation engineering reinforcement cage |
CN113389202B (en) * | 2021-07-01 | 2022-07-05 | 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) | Device and method for preventing aligning deviation of pile foundation engineering reinforcement cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104850945A (en) | Geological record acquisition system, and management and control method based on network and android system | |
CN109947068A (en) | A kind of field data acquisition system and method | |
KR102042629B1 (en) | Situational recognition system for construction site based vision and method, and method for productivity analysis of earthwork using it | |
CN109214784A (en) | A kind of method, client, server and the system of fire-fighting inspection management | |
CN109784438A (en) | A kind of bridge maintenance disease record, identification and treatment measures guidance method and system | |
US20220229200A1 (en) | Systems and methods for workflow to perform well logging operations tracking and efficiency assessment | |
CN107833448A (en) | A kind of Geotechnical Engineering rig locating and monitoring system and positioning and monitoring method | |
Boswell et al. | Rangeland monitoring using remote sensing: comparison of cover estimates from field measurements and image analysis. | |
Fransen et al. | A logistic regression model for predicting the upstream extent of fish occurrence based on geographical information systems data | |
CN110159252A (en) | Data collection system and method | |
Amadi et al. | Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism | |
MacDonald | Developing a monitoring project | |
Andersen et al. | Case History: Automated Drilling Performance Measurement of Crews and Drilling Equipment | |
Salehi et al. | Well site extraction from Landsat-5 TM imagery using an object-and pixel-based image analysis method | |
Gallaway et al. | Description of a simple electronic logbook designed to measure effort in the Gulf of Mexico shrimp fishery | |
CN109684276A (en) | A kind of vehicles while passing record system to work under weak net environment | |
Chasco et al. | Evaluating the accuracy and precision of multiple abundance estimators using state-space models: a case study for a threatened population of chinook salmon in Johnson Creek, Idaho | |
Sanasi et al. | Company data governance transformation to support the business evolution | |
CN107330103A (en) | A kind of Geotechnical Engineering drilling information collection and processing method and system | |
Sharma et al. | A survey of software reliability facto | |
Aristegui-Ezquibela et al. | Working Group on Nephrops Surveys (WGNEPS; Outputs From 2020) | |
CN116629710B (en) | Pre-post occupational capacity assessment method and system | |
US11668847B2 (en) | Generating synthetic geological formation images based on rock fragment images | |
CN108334618A (en) | Metrical information acquisition method, apparatus and system | |
O’Grady et al. | Assigning receptors to water-dependent assets. Submethodology M03 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190823 |
|
RJ01 | Rejection of invention patent application after publication |