- CN107341605A CN107341605A CN201710532027.9A CN201710532027A CN107341605A CN 107341605 A CN107341605 A CN 107341605A CN 201710532027 A CN201710532027 A CN 201710532027A CN 107341605 A CN107341605 A CN 107341605A
- Authority
- CN
- China
- Prior art keywords
- information
- drilling
- mobile phone
- phone terminal
- drill hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M1/00—Substation equipment, e.g. for use by subscribers
- H04M1/72—Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
- H04M1/724—User interfaces specially adapted for cordless or mobile telephones
- H04M1/72403—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality
- H04M1/72406—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by software upgrading or downloading
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M1/00—Substation equipment, e.g. for use by subscribers
- H04M1/72—Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
- H04M1/724—User interfaces specially adapted for cordless or mobile telephones
- H04M1/72403—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality
- H04M1/72409—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories
- H04M1/72412—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories using two-way short-range wireless interfaces
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M1/00—Substation equipment, e.g. for use by subscribers
- H04M1/72—Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
- H04M1/724—User interfaces specially adapted for cordless or mobile telephones
- H04M1/72403—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality
- H04M1/72409—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories
- H04M1/72415—User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories for remote control of appliances
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N23/00—Cameras or camera modules comprising electronic image sensors; Control thereof
- H04N23/60—Control of cameras or camera modules
- H04N23/66—Remote control of cameras or camera parts, e.g. by remote control devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Abstract
The present invention provides a kind of prospecting field operation informationization monitoring and managing method and system, comprises the following steps, drilling design information transfer to mobile phone terminal;The drilling design information that the technical staff of mobile phone terminal sends over according to client carries out the arrangement of rig;The installation and debugging of on-site monitoring equipment;Information is edited and recorded in record rig position and probing in real time;Participant's real-time text or speech exchange are linked up.Drill hole information uploads, and after examination, is transferred to server;Drill hole information in the client call service device and information to calling is handled, analyzed, and abnormal information is alarmed and warning message is sent to mobile phone terminal;The technical staff of mobile phone terminal is verified drilling according to the warning message received, to scene, and administrative staff can check scene at any time, more efficiently, targetedly management and control scene, reduces phenomenon of practising fraud to a certain extent.Site administrator's quantity can be reduced simultaneously, human cost is saved for enterprise.
Description
Technical field
The present invention relates to geotechnical engineering investigation field, is especially a kind of prospecting field operation informationization monitoring and managing method and system.
Background technology
Prospecting is used as the essential part of engineering construction, walks before design and construction, the direct shadow of quality of its achievement
The level of design is rung, so as to influence the quality of engineering and cost.Surveying unit can find labor service subpackage after prospecting project is undertaken
Unit carries out probing field process.But labor service personnel quality is uneven, in the project implementation process, not all can strictly press
Drilled according to prospective design standard, some problems often occur, such as drill footage is not in place, soil sample is played tricks, the work holdup of slowing down
Phenomenon.Traditional regulatory measure is mainly that technical staff carries out other station or selective examination to drill site, smaller in project scale, is bored
When machine is nearer apart, problem can obtain certain alleviation.But when place scope is larger, when rig is apart from each other, technical staff is very
Hardly possible takes into account more bench drill machines in a short time.To solve this phenomenon, surveying unit generally requires to send technical staff, causes manpower
Cost increases.Meanwhile handle drilling data and often lag behind probing, when pinpointing the problems because probing terminates to cause to be difficult to what is made up
Problem, so as to influence investigaton quality.With the development of internet, Internet of Things, information-based means are also more and more, by the technology
Can largely solve the drawbacks of highlighting applied to prospecting scene.
The content of the invention
The present invention seeks to solve the deficiency of existing management means, there is provided one kind prospecting field operation informationization monitoring and managing method and
System, administrative staff can check scene at any time by the monitoring function of the system, more efficiently, targetedly management and control show
, phenomenon of practising fraud is reduced to a certain extent.Simultaneously site administrator's quantity can be reduced, for enterprise save manpower into
This.
Technical scheme:One kind prospecting field operation informationization monitoring and managing method, comprises the following steps,
Drilling design information transfer is to mobile phone terminal:The drilling for needing to carry out to prospecting scene carries out parameter designing, and passes through
Drilling design information is sent to mobile phone terminal by client;
The arrangement of rig:The drilling design information that the technical staff of mobile phone terminal sends over according to client carries out rig
Arrangement;
The installation and debugging of on-site monitoring equipment:After rig is marched into the arena, the installation and debugging of equipment are monitored to it, in hand
The machine terminal-pair rig is numbered and relevant information typing and transmitted to server, and after debugging is errorless, rig is devoted oneself to work;
Record drill hole of drilling machine information in real time:Record drill hole of drilling machine information in real time by on-site monitoring equipment;
Exchange in real time:To drilling change, the exchange of field conditions information real-time communication, the very first time grasps scene;
Drill hole information is transferred to server:The drill hole of drilling machine information transfer that on-site monitoring equipment records in real time is entered to server
Row storage;
The processing of information:Drill hole information in the client call service device and information to calling is handled, analyzed, and
Abnormal information is alarmed and warning message is sent to mobile phone terminal;
Warning message feeds back:The technical staff of mobile phone terminal is carried out according to the warning message received to scene to drilling
Verify.
The drilling design information includes bore position, drilling kind, drilling depth, stratum drilling time, tests and take
Sample technical requirements.
The on-site monitoring equipment records drill hole of drilling machine information in real time includes drilling time, rig residence time, mobile road
Footpath, drilling soil layer information, experiment and sample intelligence.
The drill hole of drilling machine information that the client records according to on-site monitoring equipment in real time calculates, when design drilling time,
Information alert is carried out when error between drilling time and rig residence time three is more than 30%.
One kind prospecting field operation informationization supervisory systems, including on-site monitoring equipment, mobile phone terminal, client and data
Storehouse, the on-site monitoring equipment monitor the live drill hole of drilling machine information of prospecting and enter drill hole of drilling machine information transfer to server in real time
The storage of row information data, on-site monitoring equipment are connected with mobile phone terminal and client communication, pass through mobile phone terminal and client
On-site monitoring equipment can be controlled, mobile phone terminal and client are connected with server communication, just to the letter in server
Breath is called.
The on-site monitoring equipment includes supply unit, supply unit connection cam device, GPS positioning device, wireless
Communication unit, voice call unit and RAM card are simultaneously its power supply, cam device connection radio communication unit and interior
Card is deposited, cam device is imaged to drilling site and stores in RAM card and be transferred to by radio communication unit in real time
In server, mobile phone terminal controls cam device to be adjusted camera camera site by radio communication unit, described
GPS positioning device positions the positional information of on-site monitoring equipment and by positional information storage to RAM card and by wireless in real time
Communication unit is transferred in server, and the on-site monitoring equipment can also carry out language by voice call unit and mobile phone terminal
Sound is conversed, and the radio communication unit also carries out communication with client and is connected, and client is controlled by radio communication unit and imaged
Head device is adjusted to camera camera site.
The on-site monitoring equipment also includes information interchange module, and described information AC module is by means of power, institute
State information interchange module communication is carried out by radio communication unit with mobile phone terminal and be connected, realize to drilling change, field conditions
Information real-time communication exchanges.
The client includes the data call unit for invoking server drill hole information, and data call unit will call
Drill hole information be sent to data preparation unit and arranged, the drill hole information after arrangement is sent to data by data preparation unit
Computing unit, Data Computation Unit are calculated the drill hole information after arrangement and result of calculation are input into information alert list
Member, information alert unit choose whether to send warning message to mobile phone terminal according to result of calculation.
The technique effect of the present invention:
(1) the system is applied through in prospecting engineering whole life cycle, there is provided a kind of relatively to have certain deterrent force
Monitoring means, administrative staff can check scene at any time by the monitoring function of the system, more efficiently, targetedly management and control
Scene, phenomenon of practising fraud is reduced to a certain extent.Simultaneously site administrator's quantity can be reduced, for enterprise save manpower into
This.
(2) index bed has been formulated place, while situation about being likely to occur outside index bed is provided, has taken the note of standardization
Record mode, avoid it is different edit and record disunity of the personnel to stratigraphic description, and paper record writing it is unclear, the feelings such as be stained, lose
Condition, cause investigation result STRATIGRAPHIC DIVISION inaccurate.Mitigate the writing task amount for the personnel that edit and record simultaneously, make it there is the more time to be used for
Judgement to core.
(3) function of being exchanged by system, participant can understand the state at scene in time, can be with the very first time to existing
Field problem is handled, and is avoided information transfer time lag from producing and is delayed work, influences the duration.
(4) data can be carried out in time with real-time Transmission to backstage, indoor technical staff after formation information is edited and recorded
Finishing analysis, find when stratum has a question field technician can be notified to verify the drilling, avoid traditional approach paper
After matter is submitted, data processing hysteresis is difficult to check.
Brief description of the drawings
Fig. 1 is supervisory systems overall structure diagram of the present invention;
Fig. 2 is on-site monitoring equipment structural representation of the present invention;
Fig. 3 is client terminal structure schematic diagram of the present invention;
Fig. 4 is monitoring and managing method flow chart of the present invention.
Label represents respectively in figure:1- on-site monitoring equipments, 2- mobile phone terminals, 3- clients, 4- databases, 10- power supplys
Device, 11- cam devices, 12- RAM cards, 13-GPS positioners, 14- radio communication units, 15- voice call units,
30- data call units, 31- data preparation units, 32- Data Computation Units, 33- information alert units.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings:
As shown in figure 1, a kind of prospecting field operation informationization supervisory systems, including on-site monitoring equipment 1, mobile phone terminal 2, client
End 3 and database 4, the on-site monitoring equipment 1 monitoring in real time reconnoitre live drill hole of drilling machine information and by drill hole of drilling machine information
The storage that server 4 carries out information data is transferred to, on-site monitoring equipment 1 communicates to connect with mobile phone terminal 2 and client 3, leads to
Crossing mobile phone terminal 2 and client 3 can be controlled to on-site monitoring equipment 1, and mobile phone terminal 2 and client 3 are led to server 4
Letter connection, is just called to the information in server 4.
As shown in Fig. 2 the on-site monitoring equipment 1 includes supply unit 10, supply unit 10 connect cam device 11,
GPS positioning device 13, radio communication unit 14, voice call unit 15 and RAM card 12 are simultaneously powered for it, the camera
Device 11 connects 14 yuan of wireless telecommunications list and RAM card 12, and cam device 11 is imaged and stored to drilling site in real time
It is transferred in RAM card 12 and by radio communication unit 12 in server 4, mobile phone terminal 2 is controlled by radio communication unit 12
Cam device 11 is adjusted to camera camera site, and the GPS positioning device 13 positions on-site monitoring equipment 1 in real time
Positional information will be simultaneously transferred in server 4 in positional information storage to RAM card 12 and by radio communication unit 14, described
On-site monitoring equipment 1 can also carry out voice call, the radio communication unit by voice call unit 15 and mobile phone terminal 2
14 also carry out communication with client 3 is connected, and client 3 controls cam device 11 to clap camera by radio communication unit 14
Act as regent to put and be adjusted.
The on-site monitoring equipment also includes information interchange module, and described information AC module is by means of power, institute
State information interchange module communication is carried out by radio communication unit with mobile phone terminal and be connected, realize to drilling change, field conditions
Information real-time communication exchanges.
As shown in figure 3, the client 3 includes the data call unit 30 for the drill hole information of invoking server 4, data
The drill hole information of calling is sent to data preparation unit 31 and arranged by call unit 30, after data preparation unit 31 will arrange
Drill hole information be sent to Data Computation Unit 32, Data Computation Unit 32 is calculated the drill hole information after arrangement and will meter
Calculate result and be input to information alert unit 33, information alert unit 33 chooses whether to send to mobile phone terminal 2 according to result of calculation
Warning message.
As shown in figure 4, a kind of prospecting field operation informationization monitoring and managing method, comprises the following steps,
Drilling design information transfer is to mobile phone terminal:The drilling for needing to carry out to prospecting scene carries out parameter designing, and passes through
Drilling design information is sent to mobile phone terminal by client;
The arrangement of rig:The drilling design information that the technical staff of mobile phone terminal sends over according to client carries out rig
Arrangement;
The installation and debugging of on-site monitoring equipment:After rig is marched into the arena, the installation and debugging of equipment are monitored to it, in hand
The machine terminal-pair rig is numbered and relevant information typing and transmitted to server, and after debugging is errorless, rig is devoted oneself to work;
Record drill hole of drilling machine information in real time:Record drill hole of drilling machine information in real time by on-site monitoring equipment;
Exchange in real time:To drilling change, the exchange of field conditions information real-time communication, the very first time grasps scene;
Drill hole information is transferred to server:The drill hole of drilling machine information transfer that on-site monitoring equipment records in real time is entered to server
Row storage;
The processing of information:Drill hole information in the client call service device and information to calling is handled, analyzed, and
Abnormal information is alarmed and warning message is sent to mobile phone terminal;
Warning message feeds back:The technical staff of mobile phone terminal is carried out according to the warning message received to scene to drilling
Verify.
The drilling design information includes bore position, drilling kind, drilling depth, drilling time, experiment and sampling skill
Art requirement.
The on-site monitoring equipment records drill hole of drilling machine information in real time includes drilling time, rig residence time, mobile road
Footpath, drilling soil layer information, experiment and sample intelligence.
The drill hole of drilling machine information that the client records according to on-site monitoring equipment in real time calculates, when design drilling time,
Information alert is carried out when error between drilling time and rig residence time three is more than 30%.
Case study on implementation
Built in a Ge Mou new districts in road prospecting project, circuit is pulled to about 5 kilometers, has inconvenient traffic along the line, every 500 meters
Arrange a bench drill machine.Such as use traditional approach, circuit is long, it is more difficult to effectively supervision, check and accept in time, using informationization supervision hand
Section is implemented.
Drill design information input
The design to be drilled for the place, including probing type, such as differentiate hole, mark perforation, thief hole, drilling is deeply
Degree, associated specifications, depth, quantity of sampling quantity and depth location are such as tested, creep into design time
Index bed divides
In prospecting place, a general area has similar sequence relation, and the stratigraphic sequence can provide according to prospecting is closed on
Material is reconnoitring initial setting.Strictly monitored preceding two to individual hole, measure sets the time, converted by every meter.
It is about 10min such as to punch the 1m times of banketing, and clay beats about 20min the time required to 1m, and flour sand beats about 30min the time required to 1m, gravel
Stone is 50min the time required to beating 1m,
Information alert
One is drilled, the soil layer information for editing and recording personnel record is the thick 3m that 1. bankets, 2. clay thickness 5m, 3. flour sand thickness 3m,
4. gravel thickness 2m, then beaten this exploratory hole spent time as 320 minutes.If fewer than or it is super go beyond the scope 30%, that
The hole may there is some difference or suspicion of playing tricks, and client can send information alert to mobile phone terminal.Prospecting is single
Position technical staff is verified the hole.
Monitoring device is installed and debugging
After rig is marched into the arena, the installation and debugging of equipment are monitored to it, the rig is numbered in desktop end and
Relevant information typing.Debug it is errorless after, rig is devoted oneself to work.
Check scene
During rig, to prevent worker's work slack, monitoring device is called, field condition is understood, is such as sent out
Now slack phenomenon, carries out live recording, as a kind of evidence.
Scene exchange
When some situations occurs in scene, as barrier is got in probing, design alteration is drilled, probing is unexpected etc., pass through APP ends
Word, speech exchange are carried out, the project participant for being obtains in the very first time, so as to carry out effective decision-making.
Edit and record information
Personnel are edited and recorded according to drilling soil layer information, by soil layer information, such as soil layer numbering, soil layer title, soil depth, soil layer
The typings such as state description, groundwater condition, if any sampling, by soil sample Data Enter, such as soil sample numbering, soil sample depth, test class
Type etc., if any field test, such as mark passes through, moves spy, four-bladed vane, by its Data Enter.As drilling process goes wrong, such as run into
Barrier can not be carried out, and bit freezing burying situation etc., abnormal hole is labeled to the hole.
Information uploads
After information inspection is errorless, is signed, soil sample is taken pictures, experiment is recorded a video.The information is uploaded.When
During no signal, it can temporarily preserve and be uploaded to mobile phone, when having signal, then by information.Information after upload, drilling is set, it is different
Normal hole and the drilling not set have differentiation, and are accordingly counted.Technical staff can be with the progress of very clear scene probing.
Drilling is checked and accepted
The information transfer of personnel's typing is edited and recorded to technical staff APP ends, it is checked, if there is no problem, signature is checked and accepted;
Such as have a question, the very first time verifies.Foundation of the examination drilling as clearing.
Data preparation is into figure
Indoor technical staff carries out real-time calling, using working software is reconnoitred, carries out the volume of achievement to the information of upload
System, such as plan, profile.In this link, while quality management and control can be carried out.When discovery closes on borehole data and other data
Client can send information alert to mobile phone terminal when having larger discrepancy.
Claims (8)
1. one kind prospecting field operation informationization monitoring and managing method, it is characterised in that:Comprise the following steps,
Drilling design information transfer is to mobile phone terminal:The drilling for needing to carry out to prospecting scene carries out parameter designing, and passes through client
Drilling design information is sent to mobile phone terminal by end;
The arrangement of rig:The drilling design information that the technical staff of mobile phone terminal sends over according to client carries out the cloth of rig
Put;
The installation and debugging of on-site monitoring equipment:After rig is marched into the arena, the installation and debugging of equipment are monitored to it, in mobile phone terminal
The rig is numbered and relevant information typing and transmitted to server, after debugging is errorless, rig is devoted oneself to work;
Record drill hole of drilling machine information in real time:Record drill hole of drilling machine information in real time by on-site monitoring equipment;
Exchange in real time:To drilling change, the exchange of field conditions information real-time communication, the very first time grasps scene;
Drill hole information is transferred to server:The drill hole of drilling machine information transfer that on-site monitoring equipment records in real time is deposited to server
Storage;
The processing of information:Drill hole information in the client call service device and information to calling is handled, analyzed, and to different
Normal information is alarmed and warning message is sent into mobile phone terminal;
Warning message feeds back:The technical staff of mobile phone terminal is verified drilling according to the warning message received to scene.
A kind of 2. prospecting field operation informationization monitoring and managing method according to claim 1, it is characterised in that:The drilling design letter
Breath includes bore position, drilling kind, drilling depth, stratum drilling time, experiment and sampling technique requirement.
A kind of 3. prospecting field operation informationization monitoring and managing method according to claim 1, it is characterised in that:The on-site supervision is set
The standby information of record drill hole of drilling machine in real time include drilling time, rig residence time, mobile route, drilling soil layer information, experiment and
Sample intelligence.
A kind of 4. prospecting field operation informationization monitoring and managing method according to claim 3, it is characterised in that:The client according to
The drill hole of drilling machine information that on-site monitoring equipment records in real time calculates, when design drilling time, drilling time and rig residence time
Information alert is carried out when error between three is more than 30%.
5. one kind prospecting field operation informationization supervisory systems, it is characterised in that:Including on-site monitoring equipment, mobile phone terminal, client
And database, the on-site monitoring equipment monitor the live drill hole of drilling machine information of prospecting and arrive drill hole of drilling machine information transfer in real time
Server carries out the storage of information data, and on-site monitoring equipment is connected with mobile phone terminal and client communication, passes through mobile phone terminal
On-site monitoring equipment can be controlled with client, mobile phone terminal and client are connected with server communication, just to service
Information in device is called.
A kind of 6. prospecting field operation informationization supervisory systems stated according to claim 5, it is characterised in that:The on-site monitoring equipment
Including supply unit, supply unit connection cam device, GPS positioning device, radio communication unit, voice call unit and
RAM card is simultaneously powered for it, and the cam device connection radio communication unit and RAM card, cam device is in real time to drilling
Scene is imaged and stores in RAM card and be transferred to by radio communication unit in server, and mobile phone terminal passes through wireless
Communication unit control cam device is adjusted to camera camera site, and the GPS positioning device positions live prison in real time
Control the positional information of equipment and will be transferred in positional information storage to RAM card and by radio communication unit in server, institute
Voice call can also be carried out by voice call unit and mobile phone terminal by stating on-site monitoring equipment, and the radio communication unit is also
Communication is carried out with client to be connected, client controls cam device to carry out camera camera site by radio communication unit
Adjustment.
A kind of 7. prospecting field operation informationization supervisory systems stated according to claim 6, it is characterised in that:The on-site monitoring equipment
Also include information interchange module, described information AC module is by means of power, described information AC module and mobile phone terminal
Communication connection is carried out by radio communication unit, realized to drilling change, the exchange of field conditions information real-time communication.
A kind of 8. prospecting field operation informationization supervisory systems stated according to claim 5, it is characterised in that:The client includes using
In the data call unit of invoking server drill hole information, the drill hole information of calling is sent to data preparation by data call unit
Unit is arranged, and the drill hole information after arrangement is sent to Data Computation Unit, Data Computation Unit pair by data preparation unit
Drill hole information after arrangement is calculated and result of calculation is input into information alert unit, and information alert unit is tied according to calculating
Fruit chooses whether to send warning message to mobile phone terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532027.9A CN107341605A (en) | 2017-07-03 | 2017-07-03 | One kind prospecting field operation informationization monitoring and managing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532027.9A CN107341605A (en) | 2017-07-03 | 2017-07-03 | One kind prospecting field operation informationization monitoring and managing method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107341605A true CN107341605A (en) | 2017-11-10 |
Family
ID=60218932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710532027.9A Pending CN107341605A (en) | 2017-07-03 | 2017-07-03 | One kind prospecting field operation informationization monitoring and managing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107341605A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109947068A (en) * | 2019-04-24 | 2019-06-28 | 广州市城市规划勘测设计研究院 | A kind of field data acquisition system and method |
CN110159252A (en) * | 2019-06-04 | 2019-08-23 | 国网北京市电力公司 | Data collection system and method |
CN112360445A (en) * | 2020-10-28 | 2021-02-12 | 中交第四航务工程局有限公司 | Method for correcting drilling stratum conditions of karst area by using video monitoring |
CN112529983A (en) * | 2020-12-22 | 2021-03-19 | 山东省交通规划设计院有限公司 | Internet of things and cloud computing based geological exploration record smart cloud platform and method |
CN112762948A (en) * | 2021-01-09 | 2021-05-07 | 化学工业第一勘察设计院有限公司 | Reconnaissance path generation method and device, server and storage medium |
CN113405844A (en) * | 2021-06-29 | 2021-09-17 | 福建泉成勘察有限公司 | Geotechnical engineering investigation informatization integrated supervision method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864758A (en) * | 2010-02-04 | 2010-10-20 | 上海岩土工程勘察设计研究院有限公司 | Urban exploration geotechnical engineering exploration data processing system and method |
CN102346462A (en) * | 2011-06-09 | 2012-02-08 | 上海市城市建设设计研究院 | In-situ test central control method and system |
CN202150027U (en) * | 2011-06-09 | 2012-02-22 | 上海市城市建设设计研究院 | In-situ test central control system |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105930972A (en) * | 2016-04-22 | 2016-09-07 | 北京航天勘察设计研究院有限公司 | Geotechnical engineering investigation field data acquisition system |
-
2017
- 2017-07-03 CN CN201710532027.9A patent/CN107341605A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864758A (en) * | 2010-02-04 | 2010-10-20 | 上海岩土工程勘察设计研究院有限公司 | Urban exploration geotechnical engineering exploration data processing system and method |
CN102346462A (en) * | 2011-06-09 | 2012-02-08 | 上海市城市建设设计研究院 | In-situ test central control method and system |
CN202150027U (en) * | 2011-06-09 | 2012-02-22 | 上海市城市建设设计研究院 | In-situ test central control system |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105930972A (en) * | 2016-04-22 | 2016-09-07 | 北京航天勘察设计研究院有限公司 | Geotechnical engineering investigation field data acquisition system |
Non-Patent Citations (1)
Title |
---|
刘文彬等: "基于平板电脑的岩土工程勘察外业数据采集系统", 《岩土工程技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109947068A (en) * | 2019-04-24 | 2019-06-28 | 广州市城市规划勘测设计研究院 | A kind of field data acquisition system and method |
CN110159252A (en) * | 2019-06-04 | 2019-08-23 | 国网北京市电力公司 | Data collection system and method |
CN112360445A (en) * | 2020-10-28 | 2021-02-12 | 中交第四航务工程局有限公司 | Method for correcting drilling stratum conditions of karst area by using video monitoring |
CN112529983A (en) * | 2020-12-22 | 2021-03-19 | 山东省交通规划设计院有限公司 | Internet of things and cloud computing based geological exploration record smart cloud platform and method |
CN112762948A (en) * | 2021-01-09 | 2021-05-07 | 化学工业第一勘察设计院有限公司 | Reconnaissance path generation method and device, server and storage medium |
CN113405844A (en) * | 2021-06-29 | 2021-09-17 | 福建泉成勘察有限公司 | Geotechnical engineering investigation informatization integrated supervision method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107341605A (en) | One kind prospecting field operation informationization monitoring and managing method and system | |
CN111254912B (en) | Anchoring and grouting engineering management system based on geological logging big data | |
CN102393711B (en) | Method and system for monitoring grouting process on site | |
CN103942635B (en) | A kind of coal mine gas safe and intelligent cruising inspection system | |
WO2021072921A1 (en) | Disaster occurrence backtracing method based on bim + gis fusion technology | |
CN105631154A (en) | Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform | |
CN101526010A (en) | Mine water bursting disaster monitoring and early-warning system and control method thereof | |
CN105155599A (en) | Remote information monitoring and analyzing device and method for cement soil mixing pile | |
CN110011837A (en) | One kind being based on CBTC grid data intelligent failure analysis methods | |
CN106803149B (en) | Bridge construction information acquisition and management method | |
CN112202242A (en) | Tower comprehensive monitoring and intelligent early warning platform and early warning method | |
CN105894601A (en) | Supervising device and supervising method for maintenance operation on site | |
CN115278543A (en) | Intelligent building site system based on BIM | |
CN102140929A (en) | Mine safety production inspection system | |
CN107146041A (en) | A kind of road network based on 3DGIS+BIM runs long-range disease screening interactive system and method | |
CN107300375A (en) | A kind of high-speed railway subgrade Monitoring method of the subsidence and system | |
CN107833448A (en) | A kind of Geotechnical Engineering rig locating and monitoring system and positioning and monitoring method | |
CN103244186A (en) | Identification, tracking and early-warning system based on coal and gas outburst development process | |
CN104408919B (en) | A kind of road traffic parameter manual research system based on mobile intelligent terminal | |
CN110717736A (en) | Construction progress intelligent tracking method and system for building | |
CN110069552A (en) | A kind of data processing system and method | |
CN208183704U (en) | The safety pre-warning system in tunnel portal slope construction stage | |
CN104832213B (en) | Coal illegal mining monitoring method based on personnel location system | |
CN110020731A (en) | A kind of subway third party monitoring system and method | |
CN109934950A (en) | APP and method are maked an inspection tour in a kind of standardization of transmission line of electricity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171110 |
|
RJ01 | Rejection of invention patent application after publication |