Method and system for monitoring grouting process on site Download PDF

Info

Publication number
CN102393711B
CN102393711B CN2011103354038A CN201110335403A CN102393711B CN 102393711 B CN102393711 B CN 102393711B CN 2011103354038 A CN2011103354038 A CN 2011103354038A CN 201110335403 A CN201110335403 A CN 201110335403A CN 102393711 B CN102393711 B CN 102393711B
Authority
CN
China
Prior art keywords
grouting
data
site
central server
registering instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011103354038A
Other languages
Chinese (zh)
Other versions
CN102393711A (en
Inventor
樊启祥
周绍武
蒋小春
洪文浩
汪志林
柏龙军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU ZHONGDA HUARUI TECHNOLOGY CO LTD
China Three Gorges Corp
Original Assignee
CHENGDU ZHONGDA HUARUI TECHNOLOGY CO LTD
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU ZHONGDA HUARUI TECHNOLOGY CO LTD, China Three Gorges Corp filed Critical CHENGDU ZHONGDA HUARUI TECHNOLOGY CO LTD
Priority to CN2011103354038A priority Critical patent/CN102393711B/en
Publication of CN102393711A publication Critical patent/CN102393711A/en
Application granted granted Critical
Publication of CN102393711B publication Critical patent/CN102393711B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention discloses a method and a system for monitoring grouting process on site. The method comprises the steps as follows: firstly, a site monitoring center is arranged among a plurality of grouting recorders, a central server is arranged in a digital dam behind, and the three transmit grouting data in a wired or wireless coded way; secondly, a system device is started by codes and a softdog; thirdly, in the measuring, recording and transmitting of the recorders, the monitoring center controls the recorders remotely by a network so as to discover suspicious data, interrupt logging, and require to upload data and process on site, and when a value exceeds a set value, an alarm is used for shutting down automatically and recording data, thereby preventing project quantities from being out of control; fourthly, programs for checking the on-line state of the recorder and the like are arranged in a host machine of the monitoring center, thereby avoiding cheating; fifthly, the monitoring center can fix the position of the recorder, thereby being beneficial to managing equipment on site; and sixthly, after ensuring that the data is reliable, the data can be uploaded on a server to be stored. By the method and the system, the problem of dispersive monitoring due to few supervisors can be solved, and the data safety and project quality are ensured; the 3G (the third generation telecommunication) transportation has a low cost and is reliable; by adopting the wireless network, rewiring is avoided when a construction surface is changed; and a manager can realize the remote control without being on site.

Description

Grouting process on site method for supervising and system
(1) technical field:
The present invention relates to a kind of grouting field monitoring method and system.Be mainly used in the water conservancy and hydropower grouting works being distributed in the monitoring of the various parameter recorders of each construction surface in the grouting scene everywhere.Belong to hydraulic engineering foundation class (E02D) and measurement mechanism class (G01D).
(2) background technology:
The grouting works here refers to the grouting works in the dam construction of power station.Grouting is that the embankment that points to the power station dam, ground etc. pour into the materials such as cement, mortar, to strengthen fastness.Therefore, grouting quality will determine the total quality of power station dam.Setting-out is that embankment, ground are carried out detective test.
Grouting works is concealed work, and there is the supervision difficulty in each construction surface work progress of grouting works, and supervision means is limited.Because it is wide that registering instrument distributes, the number of management is limited, and has inconvenient traffic between each construction surface and caused work progress supervision difficulty.In addition, the supervision means of the other standing posture of traditional management can not 24 hours other stations of every machine, cause in the situation that the someone supervises unit in charge of construction not to be in the milk, the grouting data situation such as do not conform to the actual conditions in the unmanned supervision situation.
The grouting record generally adopts grouting automatic recording instrument to measure at present, can automatically measure, gather, process and print complete process at the registering instrument place, the management personnel are limited because the registering instrument distribution range is large again, cause the difficulty in the supervision, not only data check inconvenience, and the true and reliable property that prints data is limited, causes grouting quality, grouting works amount out of control.Therefore how solving on a large scale, centralization monitoring and the management of dispersed record instrument data become the task of top priority.
(3) summary of the invention:
Grouting process on site method for supervising provided by the invention and system, one of its purpose are that solution existing record instrument distribution range is larger, and the management personnel are limited, supervision difficulty, inquiry inconvenience.Two of its purpose is by to the filling process overall monitor, and the grouting quality that Prevent cheating causes, grouting works amount are out of control, and be true and reliable to guarantee the grouting data that obtain, and effectively guarantees the problem of construction quality and engineering safety.
Technical scheme is as follows: the grouting process on site method for supervising is characterized in that: comprise the steps:
1) supervisory system of following feature is set: 1. in the grouting scene, in each parameter recorder that is in the milk, set up the registering instrument data collector and the encrypting module that are connected with the registering instrument main frame by bus; 2. all set up an on-site supervision center in grouting scene, the every place of grouting works, the on-site supervision center comprises: center host, monitoring printer and alarm are connected Surveillance center's data collector and the encrypting module that is connected with center host by bus; Be provided with in the heart spider lines or wireless network T in every registering instrument and the on-site supervision 12Ciphertext transmission grouting data; 3. in the digital dam at on-the-spot rear is in the milk in the distance many places central server is set, central server comprises: central server main frame, central printer, the central server data collector and the encrypting module that are connected with the central server main frame by bus; Between on-site supervision center, every place and central server with LAN (Local Area Network) or wide area network T 23Wired or wireless ciphertext transmission grouting data; 2) operator can only or hold by password has the hardware encipher of authority setting dog can log in the on-site supervision center, log in central server or directly log in central server by Net-connected computer; 3) measure, record at each registering instrument and transmit in the grouting parametric procedure, the on-site supervision center is monitored with following mode: A. monitor staff or supervisory system are found suspicious data, send instruction Remote registering instrument by network, directly interruption logging instrument work and send registering instrument current data is uploaded to Surveillance center's instruction is for monitor staff's analysis; Notify simultaneously the supervising engineer, site inspection is processed; B. the grouting parameter value surpasses setting value in the Surveillance center, alarm equipment alarm, and the workmen stops construction, records simultaneously the various related datas constantly of reporting to the police, for analyzing and processing; 4) registering instrument record controls program is set in the center host, step is as follows: 1. whether on-site supervision center auto-inspection recorder is under the presence, if carry out step 2., if not registering instrument stops record; 2. registering instrument reports the registering instrument data of last time to the on-site supervision center, and obtains the networking affirmation at on-site supervision center; 3. registering instrument begins this new record; 5) center host is determined each registering instrument position by detecting Surveillance center's data collector network reception and transmission range of networking, and can automatically draw the registering instrument distribution plan; 6) after the on-site supervision center confirmed that data are true and reliable, the data that prints can be uploaded central server after being confirmed by construction party and the signature of management side at least, makes formal data storage.
Be the grouting process on site supervisory system that realizes that above-mentioned grouting process on site method for supervising is required, it is characterized in that: 1. in the grouting scene, in each parameter recorder that is in the milk, set up the registering instrument data collector and the encrypting module that are connected with the registering instrument main frame by bus; 2. all set up an on-site supervision center in grouting scene, the every place of grouting works, the on-site supervision center comprises: center host, monitoring printer and alarm, the Surveillance center's data collector and the encrypting module that are connected with center host by bus; Be provided with in the heart spider lines or wireless network T in every registering instrument and the on-site supervision 12Ciphertext transmission grouting data; 3. in the digital dam at on-the-spot rear is in the milk in the distance many places central server is set, central server comprises: central server main frame, central printer, the central server data collector and the encrypting module that are connected with the central server main frame by bus; Between on-site supervision center, every place and central server with LAN (Local Area Network) or wide area network T 23Wired or wireless ciphertext transmission grouting data.
In the heart cable network or wireless network T in above-mentioned registering instrument and the on-site supervision 12Can adopt such as lower network: wireless network: wireless station, WLAN (wireless local area network) Wifi, general packet radio service technology GPRS or cheap low-power consumption near field communication (NFC) Zigbee; Wired network: power line carrier, 485 communication or field bus techniques.The LAN (Local Area Network) of wired or wireless transmission or wide area network T between above-mentioned on-site supervision center and central server 23Can adopt such as lower network: wired network: optical fiber or netting twine; Wireless network: telecommunications 3G, mobile 3G, the 3G of UNICOM, the 4th generation the communication technology or general packet radio service technology GPRS.
All the other features further specify below in conjunction with accompanying drawing.
Beneficial effect of the present invention:
1) have many places grouting on-the-spot in a grouting works, see Fig. 1, left bank grout curtain is on-the-spot, right bank grout curtain is on-the-spot, the dam consolidation grouting is on-the-spot ... ..; See Fig. 2, have in each grouting scene to be distributed in massif gallery, dam facing, side slope etc. and to locate grouting automatic recorder that each construction surface is measured and recorded.Unified monitoring is carried out to the registering instrument of the dispersion in this grouting on-site supervision net in the on-site supervision center that arranges, and carries out data by Surveillance center and concentrate and print, and it is few to have solved the supervisor, can not monitor simultaneously a difficult problem of disperseing construction surface.2) owing to do not establish printing equipment in the registering instrument, and only allow record view operator's uploading data and carry out instruction, therefore the workmen is not that oneself passes through metering of operation instrument printed information, whole record, transmission, printing, data storage, and the workmen all can't contact and Update Table.3) establish encrypting module, multistage ciphertext transmission and the operator limited, can guarantee the grouting fielded system transmit and monitor in the security of data.The monitor mode of 4) establishing the on-site supervision center and providing, Real Time Monitoring and instant processing of realizing suspicious data; By the network remote control registering instrument, prevented that the grouting works amount is out of control, guaranteed that data reliably reach the grouting works quality.5) establish above the setup parameter automatic alarm at the on-site supervision center, such as: maximum pressure, maximum flow, the maximum value of lifting etc., in case monitoring parameter exceeds setting value, alarm notifies the workmen to stop construction automatically, Accident prevention occurs effectively, lifts the excessive Dam Crack etc. that causes such as grouting; Record simultaneously the various related datas constantly of reporting to the police, for analyzing and processing.6) inspection record instrument presence supervisor is set in the center host, can prevents effectively that unit in charge of construction's escape monitoring from waiting cheating to occur.7) the on-site supervision center has the function according to wireless network positioning recorder position, can automatically draw registering instrument distribution situation figure, makes things convenient for the field apparatus management.8) upload central server behind employing on-site supervision center printed information and the mutual concession, provide standardization and true and reliable data for the later stage data gathers and processes.9) each on-site supervision center transfers data to central server by network, realizes gathering of data, and the various inquiry services that can provide convenience for managerial personnel of central server.10) the wireless 3G signal of the telecommunications of recommendation maturation or more advanced the 4th generation wireless communication technology transmission realize that cost is low, reliable and stable.11) adopt the wireless network transmission, the residing construction surface of registering instrument does not need will re-start wiring as wired when changing, and is convenient and swift, saves the working service cost in later stage.12) on-site supervision center and central server carry out user management based on hardware encipher dog (the U shield of similar bank), can satisfy the needs of safety and management.For example plug the softdog with corresponding authority, just Surveillance center carries out real time data inspecting, the preview of construction note table, report printing at the scene.13) if managerial personnel are not on-the-spot in grouting, also can plug the hardware encipher dog by any Net-connected computer, realize on-site supervision.
(4) description of drawings:
On-the-spot PMS general arrangement synoptic diagram everywhere is in the milk in the grouting works of Fig. 1 power station.
The on-the-spot PMS of each grouting of Fig. 2 is arranged synoptic diagram.
Fig. 3 registering instrument 1 circuit block diagram.
Fig. 4 radio transceiver circuitry block diagram.
Fig. 5 on-site supervision center 2 circuit block diagrams.
Central server 3 circuit block diagrams in Fig. 6 numeral dam.
Fig. 7 hardware encipher dog 4 outside drawings.
(5) embodiment
Present embodiment grouting process on site method for supervising comprises the steps:
1) supervisory system of following feature is set: 2 transmission network T in registering instrument 1 and on-site supervision center in the present embodiment 12With registering instrument 1 and 3 transmission transmission of central server T 13All adopt wireless network.1. see Fig. 1, it is on-the-spot to be distributed with many places grouting by construction surface in a grouting works: left bank grout curtain is on-the-spot, right bank grout curtain is on-the-spot, the dam consolidation grouting is on-the-spot .... etc.In grouting scene, every place, all set up an on-site supervision center 2, be grout curtain on-site supervision center, left bank, right bank grout curtain on-site supervision center, dam consolidation grouting on-site supervision center ... ...See Fig. 2, have in the grouting scene, every place to be distributed in massif gallery, dam facing, side slope etc. and to locate a plurality of grouting automatic recorders 1 that each construction surface is measured and recorded.See Fig. 3, set up the registering instrument data collector and the encrypting module 1.3 that are connected with registering instrument main frame 1.2 interior registering instrument processors by bus in the registering instrument 1.The registering instrument data collector is optional line transceiver and wireless transceiver, and present embodiment is selected registering instrument wireless transceiver 1.1.2. see Fig. 2, in grouting scene, every place, all set up an on-site supervision center 2.See Fig. 5, the on-site supervision center comprises: center host 2.2, monitoring printer 2.4, alarm 2.5, the Surveillance center's data collector that is connected with center host Surveillance center processor by bus and the encrypting module 2.3 in the center host.Surveillance center's data collector is optional line transceiver and wireless transceiver, and present embodiment Surveillance center data collector is selected Surveillance center's wireless transceiver 2.1.Establish in the heart wireless network T in every registering instrument and the on-site supervision 12Ciphertext transmission grouting data.3. see Fig. 2, in the digital dam at on-the-spot rear is in the milk in the distance many places, a central server 3 is set.See Fig. 6, central server comprises: central server main frame 3.2, central printer 3.4, the central server data collector that is connected with central processing unit in the central server main frame by bus and the encrypting module 3.3 in the central server main frame.The central server data collector is optional line transceiver and wireless transceiver, and present embodiment central server data collector is selected central server wireless transceiver 3.1, is provided with LAN (Local Area Network) or wide area network T between on-site supervision center, every place and central server 23Select wireless or cable network ciphertext transmission grouting data.2) see Fig. 2, the operator can only or hold by the user name password any computing machine 5 that has the hardware encipher of authority setting dog 4 can open on-site supervision center 2, central server 3 and network with central server 3.The operator here comprises on-site supervision personnel, owner and is authorized to personnel.Be provided with registering instrument operating right software in on-site supervision center and the central server: the registering instrument operator can only and carry out instruction to on-site supervision center and central server uploading data.3) measure, record at each registering instrument and transmit in the grouting parametric procedure, the on-site supervision center is monitored with following mode: the A. monitor staff finds suspicious data, send instruction Remote registering instrument 1 by network, directly interruption logging instrument work and send registering instrument current data is uploaded to Surveillance center's instruction is for monitor staff's analysis; Notify simultaneously the supervising engineer, site inspection is processed; B. the grouting parameter value surpasses setting value in the on-site supervision center alarm 2.5, and alarm notifies the workmen to stop construction automatically, records simultaneously the various related datas constantly of reporting to the police, for analyzing and processing.4) program that the control registering instrument records is set in the center host, step is as follows: 1. whether on-site supervision center auto-inspection recorder is under the presence, if carry out step 2., if not registering instrument stops record; 2. registering instrument reports the registering instrument data of last time to the on-site supervision center, and obtains the networking affirmation at on-site supervision center; 3. registering instrument begins this new record.5) center host is determined each registering instrument position by detecting Surveillance center's data collector network reception and transmission range, and can automatically draw the registering instrument distribution plan.6) after on-site supervision center 2 confirmed that data are true and reliable, the data that prints can be uploaded central server after being confirmed by construction party and the signature of management side at least, makes formal data storage.
Be the grouting process on site supervisory system that realizes that above-mentioned grouting process on site method for supervising is required, following formation: 1. see Fig. 2, Fig. 3, each grouting automatic recording instrument 1 that in grouting scene, every place, distributes, composed as follows: as to establish registering instrument main frame 1.2, and by the various sensors 1.3 that cable links to each other with the registering instrument main frame, can be flow sensor, pressure transducer, density sensor, displacement transducer etc. and combination thereof.Set up registering instrument wireless transceiver 1.1 and encrypting module 1.3.Registering instrument main frame 1.2 is comprised of data acquisition module, registering instrument processor, keyboard, display and electronic hard disc, data acquisition module, keyboard and display are connected with the registering instrument processor is unidirectional and are connected, and electronic hard disc, registering instrument wireless transceiver 1.1 are connected with encrypting module and are connected with the registering instrument processor is two-way.See Fig. 2, Fig. 3, Fig. 5, registering instrument 1 and on-site supervision center 2 ciphertext transmission grouting data communication device is crossed wireless network T 12See Fig. 4, wireless transceiver 1.1 comprises wireless transceiver circuit, protocol controller and communication protocol software.Protocol controller can adopt single-chip microcomputer.The wireless transceiver circuit interface mode is wireless network T 12Adopt WLAN (wireless local area network) Wifi, general packet radio service technology GPRS and cheap low-power consumption near field communication (NFC) Zigbee.Encrypting module adopts and sets up encryption chip 1.3 or establish encryption software outside the registering instrument processor in the registering instrument processor.If being registering instrument, before on-site supervision center and central server the transmission of data, registering instrument main frame 1.2 raw data are encrypted encryption software: comprise the ciphertext storage and add check code.Raw data and check code are with the storage of ciphertext form, and anyone opens file, and only sees a pile mess code, can't understand.The process ciphertext is carried out the data deciphering after transferring to on-site supervision center and central server.
2. see Fig. 2, Fig. 5, set up on-site supervision center 2 at the grouting scene, comprise: the center host 2.2 that is formed by Surveillance center's processor, keyboard, display and electronic hard disc and monitoring printer 2.4, alarm 2.5, keyboard is connected unidirectional connection of processor with Surveillance center with display, electronic hard disc and Surveillance center's two-way connection of processor.Set up in the center host 2.2 and the two-way encrypting module that is connected 2.3 of Surveillance center's processor; Set up with encrypting module 2.3 is two-way and be connected and by encrypting module and the two-way Surveillance center's wireless transceiver 2.1 that is connected of Surveillance center's processor, on-site supervision center 2 is by Surveillance center's wireless transceiver 2.1, wireless network T 12And 1 of registering instrument carries out ciphertext transmission grouting data.Surveillance center's wireless transceiver 2.1 is identical with registering instrument wireless transceiver 1.1.Be Fig. 4 wireless transceiver.On-site supervision center 2 is also established with encrypting module 2.3 is two-way and is connected and with the two-way wireless transceiver 2.1F of Surveillance center and the Surveillance center that is connected of processor of Surveillance center line transceiver 2.1E is arranged by encrypting module; The on-site supervision center is by wireless transceiver 2.1F, wireless network T 233 wireless ciphertext transmission grouting data of (for example telecommunications 3G) and central server.Also can be by there be line transceiver 2.1E, wired network T in the on-site supervision center 23<telecommunications internet wired network (netting twine or optical fiber) for example〉and 3 wired ciphertexts transmission grouting data of central server.
3. see Fig. 1, Fig. 2 and Fig. 6, in " the digital dam " at the on-the-spot rear of grouting, central server 3 is being set, comprise: the central server main frame 3.2 and the central printer 3.4 that are formed by central processing unit, keyboard, display and electronic hard disc, keyboard is connected with display with central processing unit is unidirectional and is connected, and electronic hard disc is connected with central processing unit is two-way.
Set up in the central server main frame 3.2 and the two-way encrypting module that is connected 3.3 of central processing unit; Set up with encrypting module 3.3 is two-way and be connected and by the two-way central processing unit wireless transceiver 3.1 that is connected of encrypting module and central processing unit, central server 3 is by central processing unit wireless transceiver 3.1, wireless network T 13And 1 of registering instrument carries out ciphertext transmission grouting data.Central processing unit wireless transceiver 3.1 is identical with registering instrument wireless transceiver 1.1.Be Fig. 4 wireless transceiver.Central processing unit 3 is also established with encrypting module 3.3 is two-way and is connected and by the two-way central server wireless transceiver 3.1F that is connected of encrypting module and central processing unit and central server line transceiver 3.1E is arranged; Central server is by central server wireless transceiver 3.1F, and 2 the wireless ciphertexts in telecommunications 3G wireless network and on-site supervision center are transmitted the grouting data.Central server has line transceiver 3.1E by central server, wired network T 23<telecommunications internet wired network (netting twine or optical fiber) for example〉and 2 the wired ciphertexts transmission grouting data in on-site supervision center.See Fig. 2, any one and central server Net-connected computer 5 also can pass through internet wired network or wireless network T at a distance 35Log in central server.
See Fig. 2, Fig. 7 also is provided with hardware encipher dog 4 in the supervisory system, and by security needs, and each related side's of softdog operating right is carried out following setting: the workmen of operation note instrument 1 only allows by wireless network T 12, T 13Respectively to on-site supervision center and central server uploading data; Owner and monitor staff allow to obtain the data of own needs after by system verification.The U shield of the similar bank of hardware encipher dog 4 principles (i.e. " electron key ") has authorization message in the U shield, during bank's operation on the net, only plugs the U shield and could pay the bill, and no longer provides hardware encipher dog chip circuit figure at this.The authorization message that also has encryption in this hardware encipher dog, this hardware encipher dog content can't be modified.Open the on-site supervision center by the site administrator who holds hardware encipher dog 4.Be provided with the software of real time data inspecting, the preview of construction note table, report printing in the on-site supervision main frame 2.2.

Claims (8)

1. the grouting process on site method for supervising is characterized in that: comprise the steps:
1) supervisory system of following feature is set: 1. in the grouting scene, in each parameter recorder that is in the milk, set up the registering instrument data collector and the encrypting module that are connected with the registering instrument main frame by bus; 2. all set up an on-site supervision center in grouting scene, the every place of grouting works, the on-site supervision center comprises: center host, monitoring printer and alarm are connected Surveillance center's data collector and the encrypting module that is connected with center host by bus; Be provided with in the heart spider lines or wireless network T12 ciphertext transmission grouting data in every registering instrument and the on-site supervision; 3. in the digital dam at on-the-spot rear is in the milk in the distance many places central server is set, central server comprises: central server main frame, central printer, the central server data collector and the encrypting module that are connected with the central server main frame by bus; Transmit the grouting data with the wired or wireless ciphertext of LAN (Local Area Network) or wide area network T23 between on-site supervision center, every place and central server;
2) operator can only or hold by password has the hardware encipher of authority setting dog can log in the on-site supervision center, log in central server or directly log in central server by Net-connected computer;
3) measure, record at each registering instrument and transmit in the grouting parametric procedure, the on-site supervision center is monitored with following mode: A. monitor staff or supervisory system are found suspicious data, send instruction Remote registering instrument by network, directly interruption logging instrument work and send registering instrument current data is uploaded to Surveillance center's instruction is for monitor staff's analysis; Notify simultaneously the supervising engineer, site inspection is processed; B. the grouting parameter value surpasses setting value in the Surveillance center, alarm equipment alarm, and the workmen stops construction, records simultaneously the various related datas constantly of reporting to the police, for analyzing and processing;
4) registering instrument record controls program is set in the center host, step is as follows: 1. whether on-site supervision center auto-inspection recorder is under the presence, if carry out step 2., if not registering instrument stops record; 2. registering instrument reports the registering instrument data of last time to the on-site supervision center, and obtains the networking affirmation at on-site supervision center; 3. registering instrument begins this new record;
5) center host is determined each registering instrument position by detecting Surveillance center's data collector network reception and transmission range of networking, and can automatically draw the registering instrument distribution plan;
6) after the on-site supervision center confirmed that data are true and reliable, the data that prints can be uploaded central server after being confirmed by construction party and the signature of management side at least, makes formal data storage.
2. by grouting process on site method for supervising claimed in claim 1, it is characterized in that being provided with in on-site supervision center and the central server registering instrument operating right software: the registering instrument operator can only and carry out instruction to on-site supervision center and central server uploading data.
3. for realizing the required grouting process on site supervisory system of grouting process on site method for supervising claimed in claim 1, it is characterized in that
1. in the grouting scene, in each parameter recorder that is in the milk, set up the registering instrument data collector and the encrypting module that are connected with the registering instrument main frame by bus; 2. all set up an on-site supervision center in grouting scene, the every place of grouting works, the on-site supervision center comprises: center host, monitoring printer and alarm are connected Surveillance center's data collector and the encrypting module that is connected with center host by bus; Be provided with in the heart spider lines or wireless network T12 ciphertext transmission grouting data in every registering instrument and the on-site supervision; 3. in the digital dam at on-the-spot rear is in the milk in the distance many places central server is set, central server comprises: central server main frame, central printer, the central server data collector and the encrypting module that are connected with the central server main frame by bus; Transmit the grouting data with the wired or wireless ciphertext of LAN (Local Area Network) or wide area network T23 between on-site supervision center, every place and central server.
4. by grouting process on site supervisory system claimed in claim 3, it is characterized in that registering instrument data collector, Surveillance center's data collector or central server data collector comprise data transmit-receive circuit, protocol controller and communication protocol software respectively.
5. by grouting process on site supervisory system claimed in claim 4, it is characterized in that the cable network or the wireless network T12 that arrange in the heart in registering instrument and the on-site supervision are as follows: wireless network: wireless station, WLAN (wireless local area network) Wifi, general packet radio service technology GPRS or cheap low-power consumption near field communication (NFC) Zigbee by the transmitting-receiving of data transmit-receive circuit; Wired network: power line carrier, 485 communication or field bus techniques.
6. by grouting process on site supervisory system claimed in claim 3, it is characterized in that described encrypting module adopts processor to set up encryption chip outward or establish encryption software in processor.
7. by grouting process on site supervisory system claimed in claim 3, it is characterized in that the LAN (Local Area Network) of wired or wireless transmission between on-site supervision center and central server or wide area network T23 are as follows: wired network: optical fiber or netting twine; Wireless network: telecommunications 3G, mobile 3G, the 3G of UNICOM, the 4th generation the communication technology or general packet radio service technology GPRS.
8. by grouting process on site supervisory system claimed in claim 3, it is characterized in that registering instrument main frame, center host and central server main frame are comprised of processor, keyboard, display and electronic hard disc respectively, described keyboard, display and electronic hard disc are connected with processor and are connected.
CN2011103354038A 2011-10-28 2011-10-28 Method and system for monitoring grouting process on site Expired - Fee Related CN102393711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103354038A CN102393711B (en) 2011-10-28 2011-10-28 Method and system for monitoring grouting process on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103354038A CN102393711B (en) 2011-10-28 2011-10-28 Method and system for monitoring grouting process on site

Publications (2)

Publication Number Publication Date
CN102393711A CN102393711A (en) 2012-03-28
CN102393711B true CN102393711B (en) 2013-03-13

Family

ID=45861047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103354038A Expired - Fee Related CN102393711B (en) 2011-10-28 2011-10-28 Method and system for monitoring grouting process on site

Country Status (1)

Country Link
CN (1) CN102393711B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102629107B (en) * 2012-04-18 2014-10-22 长沙理工大学 Pressure closed loop control method for large-circulation grouting monitor system
CN103327076B (en) * 2013-05-29 2016-03-30 滁州友林科技发展有限公司 Based on control system for oil-pumping unit and the method for on-the-spot anticipation
CN103345206B (en) * 2013-05-29 2016-09-21 滁州友林科技发展有限公司 Oil pumper remote encryption control method and system
CN103281371A (en) * 2013-05-29 2013-09-04 滁州友林科技发展有限公司 System and method for controlling pumping unit in long distance based on 4G mobile network
CN106292603A (en) * 2016-09-08 2017-01-04 武汉长江仪器自动化研究所有限公司 A kind of grouting information high in the clouds based on Internet of Things record system and method
CN106354070A (en) * 2016-11-04 2017-01-25 华能澜沧江水电股份有限公司 Hydropower engineering grouting construction information real-time acquisition and statistical analysis system
CN106768016B (en) * 2016-11-23 2019-10-18 中铁二院重庆勘察设计研究院有限责任公司 A method of quickly identified using APP, collects, analyzes grouting data
CN106707859A (en) * 2016-12-19 2017-05-24 武汉长江仪器自动化研究所有限公司 Grouting site information processing system and grouting site information processing method based on raspberry Pi
CN108268329B (en) * 2017-12-28 2022-01-28 武汉长江仪器自动化研究所有限公司 Data processing method and device for grouting recorder network terminal
CN108762321B (en) * 2018-05-26 2020-04-24 成都中大华瑞科技有限公司 Intelligent stepless slurry mixing implementation method
CN109491416B (en) * 2018-10-16 2020-05-05 中国三峡建设管理有限公司 Grouting stage boosting control method
CN109819138B (en) * 2019-01-28 2020-11-06 中国环境监测总站 Method and system for monitoring field sampling
CN110399412B (en) * 2019-06-21 2022-05-10 深圳顺络电子股份有限公司 Measurement data system and monitoring method thereof
CN110866016B (en) * 2019-11-26 2022-11-01 青岛华节鼎孚节能科技有限公司 Hydraulic engineering monitoring method and device based on multi-sensor technology and electronic equipment
CN112577546A (en) * 2020-12-11 2021-03-30 杭州长杰科技有限公司 Multifunctional pile machine construction recorder
CN114018333A (en) * 2021-11-09 2022-02-08 武汉长江科创科技发展有限公司 Monitoring system and method of chemical grouting recorder

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3663077B2 (en) * 1999-05-11 2005-06-22 株式会社日東テクノ・グループ Compaction grouting construction management method and system
JP2005133397A (en) * 2003-10-29 2005-05-26 Anderson Technology Kk Device and construction method for injecting grout into cable sheath of pc structure
CN201477628U (en) * 2009-08-11 2010-05-19 蒋小春 Networked grouting information management system
CN201903359U (en) * 2010-10-26 2011-07-20 成都中大华瑞科技有限公司 Grouting automatic recording instrument with function of wireless data transmission

Also Published As

Publication number Publication date
CN102393711A (en) 2012-03-28

Similar Documents

Publication Publication Date Title
CN102393711B (en) Method and system for monitoring grouting process on site
CN104879169B (en) Underground engineering and the unattended real time monitoring early warning system of deep basal pit and its working method
CN109005189B (en) Access transmission platform suitable for dual-network isolation
CN105528841B (en) A kind of anti-external force damage alarm system of power cable
CN105207800B (en) The electric power of multi-communication mode fusion wirelessly communicates private network operation system
CN105043494A (en) Real-time underground water level monitoring device
CN101131787A (en) Real-time hydrology information automatic monitoring and disaster situation alerting system
CN101026661A (en) Pumpingunit long-distance information transmission and control device and control method
CN101325784A (en) Polling mobile communication terminal, system and method
CN101599212B (en) Geotechnical engineering field monitoring high-speed remote wireless transmission device and method thereof
CN105487476B (en) The managing and control system and method for class rectangle shield-tunneling construction
CN201830299U (en) Wireless indicator data remote transmission system
CN109785557B (en) Intelligent power optical cable anti-external loss monitoring and early warning system and monitoring and early warning method thereof
CN202443299U (en) Grouting on-site process monitoring system
CN101373084A (en) System and method for centralized monitoring dispersed boilers
CN111210547A (en) Optical cross-connecting box intelligent lock system and method remotely controlled through NB-IOT technology
CN201742504U (en) 3G network transmission-based fixed monitoring system
CN203742668U (en) Tunnel construction collapse early warning system
CN107026898A (en) Core-wall is mixed gravel earth material backhoe and mixed with long-range action acquisition system and method
CN202886960U (en) Long-distance automated construction monitoring system
CN203154690U (en) Fire-fighting remote control system for intelligent substation
CN102394748A (en) Signal digital transmission method and device of sensors of grouting recorder
KR102082178B1 (en) Dcu for plc-based ami networks, method for managing security and security system thereof
CN103280088A (en) GPRS (general packet radio service) water meter remote monitoring system
CN104269035B (en) A kind of circuit working face based on radio communication monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20151028