CN105487476B CN201511015601.0A CN201511015601A CN105487476B CN 105487476 B CN105487476 B CN 105487476B CN 201511015601 A CN201511015601 A CN 201511015601A CN 105487476 B CN105487476 B CN 105487476B
Authority
CN
China
Prior art keywords
data
shield
construction
processing device
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511015601.0A
Other languages
Chinese (zh)
Other versions
CN105487476A (en
Inventor
黄德中
朱雁飞
顾嫣
李刚
夏汉庸
王浩
黄�俊
寇晓勇
范杰
李培楠
王旋东
刘喜东
蔡雯俊
王峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO METRO GROUP CO Ltd
Shanghai Tunnel Engineering Co Ltd
Original Assignee
NINGBO METRO GROUP CO Ltd
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO METRO GROUP CO Ltd, Shanghai Tunnel Engineering Co Ltd filed Critical NINGBO METRO GROUP CO Ltd
Priority to CN201511015601.0A priority Critical patent/CN105487476B/en
Publication of CN105487476A publication Critical patent/CN105487476A/en
Application granted granted Critical
Publication of CN105487476B publication Critical patent/CN105487476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/14Plc safety
    • G05B2219/14006Safety, monitoring in general

Abstract

The present invention relates to a kind of managing and control system and method for class rectangle shield-tunneling construction, the system includes:Shield data acquisition equipment in tunnel, for gathering the construction data during shield machine construction;Plug-in subsystem in tunnel, for monitoring the shield-tunneling construction data in tunnel in real time;Data exchange processing device in tunnel, the data exchange processing device connect the data acquisition equipment and the plug-in subsystem by interchanger, for the construction data of the plug-in subsystem monitoring to be transferred into the data acquisition equipment;Control data corporation located at ground, it is connected by the interchanger with the data exchange processing device, for receiving the construction data of the data exchange processing device transmission and being shown;And the shield control PLC in tunnel, for controlling shield machine, the shield control PLC is connected by bus with the data exchange processing device.Effectively ensure that the safety of the original control system of shield machine with it is reliable.

Description

The managing and control system and method for class rectangle shield-tunneling construction
Technical field
The present invention relates to shield-tunneling construction field, refers in particular to a kind of managing and control system and method for class rectangle shield-tunneling construction.
Background technology
With the large-scale exploitation of urban underground space, shield Method is because it is to ground, underground structure, week Surrounding environment influence is small, ensures that traffic is current, reduces the advantages such as road interruption, relocation of services, is applied to city more and more Road, underground common trench, constructing metro tunnel.With the expansion in domestic underground space construction market, more and more different raw factories The shield machine of business is widely used, and the pressure of corresponding various risks management control increases after shield launching, easily causes Risk during shield driving.
Risk management system is each supervision equipment being directly connected in tunnel during existing shield machine construction, directly The construction data in tunnel is gathered, such communication system has larger security risk, influences shield easily by assault Construction safety, and the processing speed of shield machine control PLC can be also influenceed, and then influence shield-tunneling construction.
The content of the invention
The defects of it is an object of the invention to overcome prior art, there is provided a kind of managing and control system of class rectangle shield-tunneling construction and Larger security risk be present, shield easily influenceed by attack in method, the communication modes for solving existing risk management system Construction safety, and risk management system can also influence the processing speed of shield machine control PLC and then influence asking for shield-tunneling construction Topic.
Realizing the technical scheme of above-mentioned purpose is:
A kind of management-control method of class rectangle shield-tunneling construction of the present invention, including:
It is real-time by the plug-in subsystem in setting shield data acquisition equipment and plug-in subsystem in the tunnel of construction Monitor the shield-tunneling construction data in tunnel;
In setting data exchange processing device in tunnel, interchanger is connected for the data exchange processing device;
The data exchange processing device is connected into the data acquisition equipment and the plug-in subsystem by the interchanger System, the construction data that the plug-in subsystem monitors is transferred to by the data acquisition by the data exchange processing device and set It is standby;
By the data exchange processing device by the control data corporation at interchanger connection ground, pass through the number The construction data of the plug-in subsystem monitoring is transferred to the control data corporation according to switching processor;And
The data exchange processing device is connected with the shield control PLC in tunnel by bus, to cause the data Switching processor reads the data of the shield control PLC by bus.
The present invention is additionally arranged data exchange processing device, effectively ensure that the safety of the original control system of shield machine with reliable, Avoid assault.Shield control PLC is isolated with control data corporation and plug-in subsystem by data exchange processing device, There is no any influence to shield control PLC, solve the problems, such as that existing risk management system influences shield control PLC.Data Switching processor realizes that reading to construction data, transmission communication and storage, its processing speed and reliability greatly improve, The security of system of shield control PLC is ensure that, from the attack of outer net.
Class rectangle shield-tunneling construction of the present invention management-control method further improvement is that, in addition to:
The control data corporation is connected into remote terminal by Ethernet, to cause the remote terminal to pass through Ethernet Check the construction data of the control data corporation;
Whether monitoring construction data exceeds threshold value of warning, when construction data exceeds threshold value of warning, sends short message to institute Remote terminal is stated to carry out early warning prompting.
Class rectangle shield-tunneling construction of the present invention management-control method further improvement is that, in setting plug-in son in construction tunnel System, including:
Posture guidance system is set, the posture guiding data of shield machine is read by the posture guidance system;
Gap of the shield tail system is set, the gap of the shield tail data of shield machine are read by the gap of the shield tail system;
The Weighing system that is unearthed is set, the unearthed amount data of shield machine are read by the unearthed Weighing system;
Environmental monitoring system, the construction environment data in tunnel are monitored by the environmental monitoring system.
Class rectangle shield-tunneling construction of the present invention management-control method further improvement is that, the data exchange processing device is led to Cross the interchanger and connect the data acquisition equipment and the plug-in subsystem, including:
The data exchange processing device is connected by udp protocol with the plug-in subsystem communication;
The data exchange processing device is communicated to connect by ICP/IP protocol and the data acquisition equipment.
Class rectangle shield-tunneling construction of the present invention management-control method further improvement is that, in addition to pass through the data exchange Processor is stored the construction data of the plug-in subsystem monitoring.
Present invention also offers a kind of managing and control system of class rectangle shield-tunneling construction, including:
Shield data acquisition equipment in the tunnel of construction, for gathering the construction number during shield machine construction According to;
Plug-in subsystem in the tunnel of construction, for monitoring the shield-tunneling construction data in tunnel in real time;
Data exchange processing device in construction tunnel, the data exchange processing device connect the number by interchanger According to collecting device and the plug-in subsystem, adopted for the construction data of the plug-in subsystem monitoring to be transferred into the data Collect equipment;
Control data corporation located at ground, it is connected by the interchanger with the data exchange processing device, for connecing Receive the construction data of the data exchange processing device transmission and shown;And
Shield control PLC in tunnel, for controlling shield machine, the shield control PLC by bus with it is described Data exchange processing device connects.
Class rectangle shield-tunneling construction of the present invention managing and control system further improvement is that, in addition to remote terminal is described remote Journey terminal is connected by Ethernet with the control data corporation, for checking applying for the control data corporation by Ethernet Number evidence;
The control data corporation is provided with message warning module, and the message warning module is used for whether judging construction data Beyond threshold value of warning, when judging that the construction data exceeds threshold value of warning, by send short message to the remote terminal with Carry out early warning prompting.
Class rectangle shield-tunneling construction of the present invention managing and control system further improvement is that, the plug-in subsystem includes posture Guidance system, gap of the shield tail system, be unearthed Weighing system and environmental monitoring system;
The posture guidance system is used for the posture guiding data for reading shield machine;
The gap of the shield tail system is used for the gap of the shield tail data for reading shield machine;
The unearthed Weighing system is used for the unearthed amount data for reading shield machine;
The environmental monitoring system is used to monitor the construction environment data in tunnel.
Class rectangle shield-tunneling construction of the present invention managing and control system further improvement is that, the data exchange processing device passes through Udp protocol is connected with the plug-in subsystem communication;The data exchange processing device passes through ICP/IP protocol and the shield number Communicated to connect according to collecting device.
Class rectangle shield-tunneling construction of the present invention managing and control system further improvement is that, in addition to at the data exchange The database of device connection is managed, for storing the construction data of the plug-in subsystem monitoring.
Brief description of the drawings
Fig. 1 is the structural representation of the managing and control system of class rectangle shield-tunneling construction of the present invention.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides a kind of managing and control system and method for class rectangle shield-tunneling construction, for solving existing shield-tunneling construction The safety for by the danger of hacker's long-range attack, having a strong impact on shield-tunneling construction be present and influence original shield machine control in risk management system The problem of processing speed of system processed;It is relatively slow, it is necessary to often to solve existing shield-tunneling construction risk management system data query speed The problem of safeguarding;Solve the problems, such as that remote monitoring has the number of visiting people to limit and not to holding open-destination.The class rectangle of the present invention The managing and control system and method for shield-tunneling construction include three-tier architecture, monitoring, ground monitoring and remote monitoring in tunnel, prison in tunnel Control includes the control system of shield machine and the managing and control system of shield machine, and the control system of shield machine is real by shield control PLC Now control, data exchange processing device is additionally arranged in the managing and control system of shield machine, the data exchange processing device leads to shield control PLC Cross bus and carry out communication connection, control system is isolated with managing and control system by data exchange processing device, avoided to control system The influence of operation, the security of shield control system is ensure that, from the attack of outer net.Below in conjunction with the accompanying drawings to class square of the present invention The managing and control system and method for shape shield-tunneling construction illustrate.
Refering to Fig. 1, it is shown that the structural representation of the managing and control system of class rectangle shield-tunneling construction of the present invention.With reference to Fig. 1, The managing and control system of class rectangle shield-tunneling construction of the present invention is illustrated.
As shown in figure 1, the managing and control system of class rectangle shield-tunneling construction of the present invention includes shield data acquisition equipment 11, plug-in son System 12, data exchange processing device 13, interchanger 14, shield control PLC (programmable logic controller (PLC), Programmable Logic Controller) 15, control data corporation 21 and remote terminal 23, shield data acquisition equipment 11 is located at construction Tunnel in, for gathering the construction data during shield machine construction, be responsible for collection and send work, the shield data acquisition Construction data of the collection of equipment 11 comprising shield machine construction and multiple plug-in subsystems is simultaneously carried out real with the man-machine interface of visualization When display, storage.Plug-in subsystem 12 is in the tunnel of construction, for detecting the shield-tunneling construction data in tunnel in real time.Number According to switching processor 13 in the tunnel of construction, connected by interchanger 14 and data acquisition equipment 11 and plug-in subsystem 12 Connect, data exchange processing device 13 is used to the construction data that plug-in subsystem 12 monitors being transferred to data acquisition equipment 11.Data Administrative center 21 is located at ground, is connected by interchanger 14 with data exchange processing device 13, and control data corporation 21 receives data The construction data of the transmission of switching processor 13 is simultaneously shown.Shield control PLC 15 is in tunnel, for controlling shield machine, Shield control PLC 15 is connected by bus with data exchange processing device, and data exchange processing device uses and the phase of shield control PLC 15 With bus communicated with it, data exchange processing device 13 also by interchanger 14 realize shield data acquisition equipment 11, outside The data exchange inside center 21 in subsystem 12 and data pipe is hung, by the shield control PLC 15 of shield machine and data acquisition Center 21 isolates in equipment 11, plug-in subsystem 12 and data pipe, and data exchange processing device 13 only controls from shield The data of shield control system, the no any shadow of operation for shield control system are read in PLC15 using the mode of bus Ring.Remote terminal 23 is connected by Ethernet with control data corporation 21, and remote terminal 23 checks data management by Ethernet The construction data at center 21.
Shield data acquisition equipment 11, plug-in subsystem 12 and data exchange processing device 13 therein belong in tunnel Managing and control system, the control system that shield control PLC 15 belongs in tunnel, the control system in the tunnel includes shield control PLC15, the interchanger 16 being connected with shield control PLC 15 and the touch-screen 17 being connected with interchanger 16.Control data corporation 21 belong to ground monitoring, and control data corporation 21 is connected by technical grade ethernet router 22 with interchanger 14, technical grade with Connected between network router 22 and interchanger 14 by optical fiber very much, spectroscopy equipment is also associated with optical fiber.Remote terminal 23 belongs to In remote monitoring.Shield data acquisition equipment 11 therein is responsible for collecting work, and collection includes shield machine construction and multiple plug-in The construction data of subsystem, real-time display, storage are carried out with the man-machine interface of visualization.Control data corporation 21 is received in tunnel The construction data of transmission, real-time display is carried out by man-machine interface, and connect outer net and provide remote monitoring data for personal terminal Transfer work.
Remote terminal 23 includes terminal computer 231, flat board 232 and mobile phone 233, terminal computer 231, the flat board 232 and mobile phone 233 can by Ethernet connect control data corporation 21, can real time inspection building site monitored picture, carry out Historical data and curve such as transfer at the operation, grasp the construction status in building site whenever and wherever possible.It is provided with and disappears at control data corporation 21 Warning module is ceased, message warning module is used to judge whether construction data exceeds threshold value of warning, judges that construction data exceeds early warning During threshold value, message warning module is by sending short message to remote terminal 23 to carry out early warning prompting.Threshold value of warning choose for The vital parameter of class rectangle shield-tunneling construction, such as eccentric cutter head torque, two screw machine rotating speed deviations, the parameters such as amount of being unearthed, Threshold value of warning is set, message warning module is in real time by the actual parameter of construction compared with threshold value of warning, relatively super When going out threshold value of warning, short message early warning is carried out, it is ensured that the safety for whole process of constructing.It is pre- that the early warning is divided into three ranks progress management and control It is alert, it is divided into general, important, urgent early warning, when in general early warning range, the short message that early warning is reminded is sent to building-site Director is handled, and when in important early warning range, the short message that early warning is reminded is sent to associated department director and carried out Processing, when in urgent early warning range, the short message that early warning is reminded is sent to being in charge of general manager and handled.Accordingly, exist There is the contact method of related personnel in message warning module, the message warning module is preferably short message modem, short message Modem is connected with control data corporation serial ports, when sending alarm, system trigger, generation is sent to short message modem Code, short message modem send short message reminding alarm by code to specific user.
Plug-in subsystem 12 includes posture guidance system 121, gap of the shield tail system 122, be unearthed Weighing system and environment Monitoring system 123;Posture guidance system 121 is used for the posture guiding data for reading shield machine;Gap of the shield tail system 122 is used to read Take the gap of the shield tail data of shield machine;The Weighing system that is unearthed is used for the unearthed amount data for reading shield machine;Environmental monitoring system 123 For monitoring the construction environment data in tunnel.It is preferred that plug-in subsystem 12 include posture guidance system, gap of the shield tail M, Gap of the shield tail L, be unearthed weigh L, being unearthed weighs M, the part such as environmental monitoring system, wherein posture guidance system, gap of the shield tail M, Gap of the shield tail L, being unearthed weighs L, the unearthed M that weighs by data measured write-in data exchange processing device 13, rendezvous protocol UDP.Shield Structure data acquisition equipment 11 again by ICP/IP protocol read the corresponding data address of data exchange processing device 13 read posture be oriented to, The data of gap of the shield tail, and by these data real-time displays in man-machine interface, from the background by these data Cun Chudao historical datas In storehouse.For environmental monitoring system 123 by the data measured in the presence of in the computer where the system, shield data acquisition equipment 11 is logical The data of environmental monitoring system storage are read after the file reading format arranged in advance and include data in man-machine interface.
Data measured is write data exchange processing device 13 by posture guidance system, the systems such as weighing of being unearthed, and rendezvous protocol is UDP.Shield data acquisition equipment 11 and control data corporation 12 read the phase of data exchange processing device 13 by ICP/IP protocol again Data address is answered, dynamic guiding, the data for the external store systems such as weighing of being unearthed are read from this, and these data real-time displays are existed In man-machine interface, from the background by these data Cun Chudao historical data bases.So it can not only collect relatively reliable multi-party The data in face, many manpowers can also be saved (data such as former automatic guide need manual record).In terms of versatility, due to increase Data exchange processing device only need to select corresponding system bus when corresponding to different shield control systems, for each Individual plug-in subsystem, the form of its data exchange once have standard, can saved when Other Engineering is redesigned afterwards The design of docking port pattern is gone, optimization design flow, makes it have versatility, makes the design modularization of whole managing and control system.
It is preferred that data exchange processing device 13 is also connected with database, the construction data that plug-in subsystem 12 is monitored is carried out Storage, with history of forming data.Construction data can also be deposited by shield data acquisition equipment 11 and control data corporation 21 Store up in historical data base.
Shield in one and shield machine control system is individually established in the managing and control system of class rectangle shield-tunneling construction to control PLC15 identical data exchange processings device 13, communicated using with shield control system identical bus with it, while this Data exchange processing device 13 is connected with interchanger 14 (ethernet module), (refers to shield data acquisition equipment 11 for managing and control system With plug-in subsystem 12) internal data exchange, so the control system of shield machine and the data exchange system of managing and control system Isolate, data exchange processing device 13 only reads the shield in shield control PLC 15 from control system using the mode of bus The conduct again of the data of structure control system, the no any influence of operation for shield control system, while data exchange processing device The node opening of data exchange uses to other subsystems (be unearthed weighing, automatic guide etc.).At increased data exchange Manage device be the equipment based on hardware logic computing, and the storage of data and read all handled by data exchange processing device or Externally communication, its processing speed and reliability greatly improve, while also ensure that the security of shield control system, from outer net Attack.
The managing and control system of class rectangle shield-tunneling construction of the present invention has the beneficial effect that:
Increase data exchange processing device, it is ensured that the safety of the original control system of shield machine with it is reliable;
Remote monitoring opens to whole handheld terminals, and the number of visiting people is unrestricted;
There is distant early warning function, early warning short message can be sent to designated person, remind related personnel to pay attention to, it is ensured that full mistake of constructing The safety of journey.
The management-control method of class rectangle shield-tunneling construction of the present invention is illustrated below.
As shown in figure 1, the management-control method of class rectangle shield-tunneling construction of the present invention, including:In setting shield in the tunnel of construction Data acquisition equipment 11 and plug-in subsystem 12, monitor the shield-tunneling construction data in tunnel in real time by plug-in subsystem 12;In Data exchange processing device 13 is set in tunnel, interchanger 14 is connected for data exchange processing device 13;By data exchange processing device 13 Data acquisition equipment 11 and plug-in subsystem 12 are connected by interchanger 14, by data exchange processing device 13 by plug-in subsystem The construction data of monitoring is transferred to data acquisition equipment 11;Data exchange processing device 13 is connected at ground by interchanger 14 Control data corporation 21, the construction data that plug-in subsystem 12 monitors is transferred to by data management by data exchange processing device 13 Center 21;Data exchange processing device 13 is connected with the shield control PLC 15 in tunnel by bus, so as to obtain at data exchange Manage the data that device 13 reads shield control PLC 15 by bus.
The management-control method of the class rectangle shield-tunneling construction of the present invention is divided into monitoring, ground monitoring and remote monitoring in tunnel, Monitoring is controlled by shield data acquisition equipment 11, plug-in subsystem 12, data exchange processing device 13 and shield in tunnel PLC15 realizes, the control system that shield control PLC 15 therein belongs in tunnel, shield data acquisition equipment 11, plug-in son The managing and control system that system 12 and data exchange processing device 13 belong in tunnel, so by data exchange processing device 13 by tunnel Managing and control system in road is isolated with control system, and data exchange processing device 13 is at shield control PLC 15 by way of bus Read the data of shield control system, the no any influence of operation for shield control system, while data exchange processing device The 13 node opening again as data exchange uses to other subsystems, such as plug-in subsystem 12.It is preferred that the data exchange Processor 13 using and the identical structure of shield control PLC 15, be mainly used in data exchange, digital independent, data storage and Externally communication.The processing speed and reliability of data exchange processing device 13 are higher, it is ensured that the security of shield control system, From the attack of outer net.Control data corporation 21 belongs to ground monitoring, and the computer of ground data administrative center 21 receives tunnel The construction data of interior transmission, real-time display is carried out by man-machine interface, and connect outer net and provide remote monitoring number for personal terminal According to transfer work.
The management-control method of class rectangle shield-tunneling construction of the present invention also includes:Control data corporation 21 is connected by Ethernet 24 Remote terminal 23, to cause remote terminal 23 to check by Ethernet 24 construction data of control data corporation 21;Data management Center 21 monitors whether construction data exceed threshold value of warning, and when construction data exceeds threshold value of warning, transmission short message is to long-range Terminal 23 is to carry out early warning prompting.Remote terminal 23 includes terminal computer 231, flat board 232 and mobile phone 233, the terminal meter Calculation machine 231, flat board 232 and mobile phone 233 can connect control data corporation 21 by Ethernet, can real time inspection building site Monitored picture, carry out historical data and curve and the operation such as transfer, grasp the construction status in building site whenever and wherever possible.Control data corporation SMS warning function is provided with 21, is chosen for the vital key parameter of class rectangle shield-tunneling construction (such as eccentric cutterhead Moment of torsion, two screw machine rotating speed deviations, amount etc. of being unearthed) carry out short message warning, it is ensured that the safety of construction overall process.It is divided into 3 ranks Carry out management and control early warning:Typically, important, urgent early warning.The general warning information short message sending of first level to building-site director, The important warning information short message sending of second level is to company associated department director, the urgent warning information short message sending of third level It is in charge of vice general manager to company.Short message sending principle:Ground data management centre computer serial ports connects short message modem, When an alert occurs, system trigger, code is sent to short message modem, if short message modem receives this string code Just short message reminding alarm is sent to specific user to occur.
In setting plug-in subsystem in construction tunnel in the management-control method of class rectangle shield-tunneling construction of the present invention, including:Set Posture guidance system 121, the posture guiding data of shield machine is read by posture guidance system 121;Gap of the shield tail system is set 122, the gap of the shield tail data of shield machine are read by gap of the shield tail system 122;The Weighing system that is unearthed is set, weighed by being unearthed System reads the unearthed amount data of shield machine;Environmental monitoring system 123, applying in tunnel is monitored by environmental monitoring system 123 Work environmental data.Data exchange processing device 13 is communicated to connect by udp protocol and plug-in subsystem 12;By data exchange processing Device 13 is communicated to connect by ICP/IP protocol and shield data acquisition equipment 11.Data exchange processing device 13 is also by plug-in subsystem The construction data of monitoring is stored.
Data measured is write data exchange processing device by automatic guiding system, the systems such as weighing of being unearthed, and rendezvous protocol is UDP.It is corresponding that shield data acquisition equipment and ground data administrative center read data exchange processing device by ICP/IP protocol again Data address, dynamic guiding, the data for the external store systems such as weighing of being unearthed are read from this, and by these data real-time displays in people On machine interface, from the background by these data Cun Chudao historical data bases.It so can not only collect relatively reliable many-side Data, many manpowers can also be saved (data such as former automatic guide need manual record).In terms of versatility, due to increased Data exchange processing device only needs to select corresponding system bus when corresponding to different shield control systems, for each Plug-in subsystem, the form of its data exchange once have standard, can saved when Other Engineering is redesigned afterwards The design of docking port pattern, optimization design flow, makes it have versatility, makes the design modularization of whole managing and control system.
The plug-in subsystem of class rectangle shield have posture guidance system, gap of the shield tail M, gap of the shield tail L, be unearthed weigh L, be unearthed The part such as M, environmental monitoring system is weighed to form.Wherein posture guidance system, gap of the shield tail M, gap of the shield tail L, be unearthed weigh L, It is unearthed and weighs M by data measured write-in relaying PLC, rendezvous protocol UDP.Shield data acquisition equipment and control data corporation are again By ICP/IP protocol read relaying PLC corresponding datas address read posture be oriented to, the data of gap of the shield tail, and by these data Real-time display is in man-machine interface, from the background by these data Cun Chudao historical data bases.The number that environmental monitoring system will measure According in the presence of in the computer where the system, shield data acquisition equipment and control data corporation are read by the file arranged in advance Form is taken to read the data of environmental monitoring system storage and include data in man-machine interface.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright many variations example is made to the present invention.Thus, some details in embodiment should not form limitation of the invention, this Invention will be used as protection scope of the present invention using the scope that appended claims define.

Claims (8)

  1. A kind of 1. management-control method of class rectangle shield-tunneling construction, it is characterised in that including:
    In setting shield data acquisition equipment and plug-in subsystem in the tunnel of construction, monitored in real time by the plug-in subsystem Shield-tunneling construction data in tunnel;In setting plug-in subsystem in construction tunnel, including:Posture guidance system is set, passes through institute State the posture guiding data that posture guidance system reads shield machine;
    Gap of the shield tail system is set, the gap of the shield tail data of shield machine are read by the gap of the shield tail system;
    The Weighing system that is unearthed is set, the unearthed amount data of shield machine are read by the unearthed Weighing system;
    Environmental monitoring system, the construction environment data in tunnel are monitored by the environmental monitoring system;
    In setting data exchange processing device in tunnel, interchanger is connected for the data exchange processing device;
    The data exchange processing device is connected into the data acquisition equipment and the plug-in subsystem by the interchanger, led to Cross the data exchange processing device and the construction data of the plug-in subsystem monitoring is transferred to the data acquisition equipment;
    By the data exchange processing device by the control data corporation at interchanger connection ground, handed over by the data Change processor and the construction data of the plug-in subsystem monitoring is transferred to the control data corporation;And
    The data exchange processing device is connected with the shield control PLC in tunnel by bus, to cause the data exchange Processor reads the data of the shield control PLC by bus.
  2. 2. the management-control method of class rectangle shield-tunneling construction as claimed in claim 1, it is characterised in that also include:
    The control data corporation is connected into remote terminal by Ethernet, to cause the remote terminal to be checked by Ethernet The construction data of the control data corporation;
    Monitoring construction data whether exceed threshold value of warning, when construction data exceed threshold value of warning, transmission short message to it is described far Journey terminal is to carry out early warning prompting.
  3. 3. the management-control method of class rectangle shield-tunneling construction as claimed in claim 1, it is characterised in that by the data exchange processing Device connects the data acquisition equipment and the plug-in subsystem by the interchanger, including:
    The data exchange processing device is connected by udp protocol with the plug-in subsystem communication;
    The data exchange processing device is communicated to connect by ICP/IP protocol and the data acquisition equipment.
  4. 4. the management-control method of class rectangle shield-tunneling construction as claimed in claim 1, it is characterised in that also include passing through the data Switching processor is stored the construction data of the plug-in subsystem monitoring.
  5. A kind of 5. managing and control system of class rectangle shield-tunneling construction, it is characterised in that including:
    Shield data acquisition equipment in the tunnel of construction, for gathering the construction data during shield machine construction;
    Plug-in subsystem in the tunnel of construction, for monitoring the shield-tunneling construction data in tunnel in real time;The plug-in son System includes posture guidance system, gap of the shield tail system, be unearthed Weighing system and environmental monitoring system;
    The posture guidance system is used for the posture guiding data for reading shield machine;
    The gap of the shield tail system is used for the gap of the shield tail data for reading shield machine;
    The unearthed Weighing system is used for the unearthed amount data for reading shield machine;
    The environmental monitoring system is used to monitor the construction environment data in tunnel;
    Data exchange processing device in construction tunnel, the data exchange processing device connect the data by interchanger and adopted Collect equipment and the plug-in subsystem, set for the construction data of the plug-in subsystem monitoring to be transferred into the data acquisition It is standby;
    Control data corporation located at ground, it is connected by the interchanger with the data exchange processing device, for receiving State the construction data of data exchange processing device transmission and shown;And
    Shield control PLC in tunnel, for controlling shield machine, the shield control PLC passes through bus and the data Switching processor connects.
  6. 6. the managing and control system of class rectangle shield-tunneling construction as claimed in claim 5, it is characterised in that also including remote terminal, institute State remote terminal to be connected with the control data corporation by Ethernet, for checking the control data corporation by Ethernet Construction data;
    The control data corporation is provided with message warning module, and the message warning module is used to judge whether construction data exceeds Threshold value of warning, when judging that the construction data exceeds threshold value of warning, by sending short message to the remote terminal to carry out Early warning is reminded.
  7. 7. the managing and control system of class rectangle shield-tunneling construction as claimed in claim 5, it is characterised in that the data exchange processing device It is connected by udp protocol with the plug-in subsystem communication;The data exchange processing device passes through ICP/IP protocol and the shield Structure data acquisition equipment communicates to connect.
  8. 8. the managing and control system of class rectangle shield-tunneling construction as claimed in claim 5, it is characterised in that also include handing over the data The database of processor connection is changed, for storing the construction data of the plug-in subsystem monitoring.
CN201511015601.0A 2015-12-29 2015-12-29 The managing and control system and method for class rectangle shield-tunneling construction Active CN105487476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511015601.0A CN105487476B (en) 2015-12-29 2015-12-29 The managing and control system and method for class rectangle shield-tunneling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511015601.0A CN105487476B (en) 2015-12-29 2015-12-29 The managing and control system and method for class rectangle shield-tunneling construction

Publications (2)

Publication Number Publication Date
CN105487476A CN105487476A (en) 2016-04-13
CN105487476B true CN105487476B (en) 2018-02-23

Family

ID=55674521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511015601.0A Active CN105487476B (en) 2015-12-29 2015-12-29 The managing and control system and method for class rectangle shield-tunneling construction

Country Status (1)

Country Link
CN (1) CN105487476B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106154938A (en) * 2016-09-18 2016-11-23 中铁隧道集团有限公司 A kind of shield-tunneling construction process status data logging plant
CN107315370A (en) * 2017-07-13 2017-11-03 合肥引力波数据科技有限公司 A kind of shield machine construction Schedule monitoring system
CN111290331A (en) * 2020-03-25 2020-06-16 上海隧道工程有限公司 Method and system for acquiring shield construction data
CN112682051A (en) * 2020-12-29 2021-04-20 广州轨道交通建设监理有限公司 Three-dimensional visual risk early warning method based on shield real-time monitoring system
CN112922622B (en) * 2021-02-05 2024-04-16 上海航天卫星应用有限公司 Remote control system of shield tunneling machine
CN114165241A (en) * 2021-12-06 2022-03-11 上海隧道工程有限公司 Tunnel lining soil pressure detection system and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562085A (en) * 2010-12-23 2012-07-11 上海市基础工程有限公司 Shield machine remote data acquisition system based on SCADA (Supervisory Control and Data Acquisition) system
CN102331766B (en) * 2011-08-15 2014-03-19 王茂 Remote control system and method for shield machine
CN203444484U (en) * 2013-06-07 2014-02-19 深圳市恩智浦科技有限公司 USB data transmission device
CN105006131A (en) * 2015-07-30 2015-10-28 中铁工程装备集团有限公司 Shield-tunneling-machine wireless data collecting system based on mobile phone

Also Published As

Publication number Publication date
CN105487476A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN105487476B (en) The managing and control system and method for class rectangle shield-tunneling construction
CN2927206Y (en) Urban security dynamic network video monitor alarming system
CN102436240A (en) Digitized information system and method for remotely and comprehensively monitoring urban inspection wells
CN103034213A (en) Remote monitoring and controlling system
CN104954745A (en) Digital intelligent grain depot total management system
CN103985008A (en) Intelligent monitoring system of city underground pipeline
CN203444595U (en) Gravity detection antitheft system
CN107918366A (en) A kind of method for safety monitoring and system based on Internet of Things
CN105927276A (en) Subway shield segment posture monitoring management system based on mobile terminal
CN105225288A (en) A kind of pipe network cruising inspection system
CN201830299U (en) Wireless indicator data remote transmission system
CN201813483U (en) Mobile safety-production monitor terminal based on wireless sensor network
CN107613246A (en) A kind of office building video anti-theft monitoring system based on face recognition technology
CN107204666A (en) The remote sensing information joint debugging method of transformer station four and system based on mobile message technology
CN103063248A (en) Hydropower station grouting centralized intelligent monitoring system
CN104199407A (en) Intelligent IC (Integrated Circuit) card total pollution discharge amount monitoring and controlling system
CN207817514U (en) The system of long-distance monitor and control PLC terminal devices
CN103634576A (en) Expressway mobile terminal monitoring system and method
CN204178393U (en) A kind of urban pipe network production and operation total management system
CN103078951A (en) Environmental-protection data acquisition device based on mobile application
CN108599370A (en) Power distribution automation main station apparatus and system
CN205123760U (en) Communications management system based on intelligence passes accuse terminal
CN107370762A (en) A kind of network information security supervisory systems based on computer communication
CN106254173A (en) The monitoring system of public transport automatic fare collection terminal and monitoring method
CN207039787U (en) A kind of people's air defense industrial data switch communication storage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant