CN106056347A - Engineering project management cloud platform system based on video monitoring - Google Patents

Engineering project management cloud platform system based on video monitoring Download PDF

Info

Publication number
CN106056347A
CN106056347A CN201610317814.7A CN201610317814A CN106056347A CN 106056347 A CN106056347 A CN 106056347A CN 201610317814 A CN201610317814 A CN 201610317814A CN 106056347 A CN106056347 A CN 106056347A
Authority
CN
China
Prior art keywords
video
video monitoring
module
management
cloud platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610317814.7A
Other languages
Chinese (zh)
Inventor
韩涛
易伟强
黄远征
张湘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing North International Engineering Project Management Co Ltd
Original Assignee
Beijing North International Engineering Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing North International Engineering Project Management Co Ltd filed Critical Beijing North International Engineering Project Management Co Ltd
Priority to CN201610317814.7A priority Critical patent/CN106056347A/en
Publication of CN106056347A publication Critical patent/CN106056347A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Abstract

The invention discloses an engineering project management cloud platform system based on video monitoring. The system can not only realize monitoring and management work standardization, process streamlining, informationization, visualization and intelligentization. The system can also follow up the process of an engineering project, monitor and manage the engineering project so as to realize whole process and comprehensive management of the engineering project and increase management precision and efficiency.

Description

Project management cloud platform system based on video monitoring
Technical field
The present invention relates to the information management system of a kind of project supervision, particularly to engineering project pipe based on video monitoring Reason system.
Background technology
In China, management is from last century since the eighties is introduced, and the development that experienced by more than 20 year defines specially The engineering management service mode of industry, plays the important and pivotal role in the construction of engineering.But management simultaneously is also deposited Uneven at peopleware, management is widely dispersed in each construction project and supervision is inadequate, implementation capacity is poor, part Practitioner's responsibility difference and situation about can not observe professional ethics at work, cause part Quality Assistance Representative unit shape With illusory, the acceptance of work is done as a mere formality often, has had a strong impact on the development of supervision trade.The work note of Current Supervision work tradesman Record is filled in paper Jie's version or electronic edition by supervisor, and the quality filled in depends on supervisor individual's quality and chief supervision engineer Check on, for the solution of Problems and perform also to be the supervision and management dynamics of the responsibility with engineer and chief inspector.With Time supervising engineer's mass and safety check on and be also based on traditional applying for checking and examination, the standardization of data and the acceptance of work, the handle of inspection Pass degree depends entirely on engineer individual, and the supervision of engineering also can only be confined to by Supervision Enterprise aspect and Project Director The paper data selective examination formed.Tour and the time of inspection that management is on-the-spot the most also can only lean on total service, lack effective Measures for the supervision.
Due to current engineering site usually not video monitoring, even if there being video monitoring, also have no idea to carry out video prison The management of control information, analyze and share, cause also cannot realizing in project management the material to engineering site, equipment, Personnel, building element etc. are inquired about automatically, comparison, management, therefore, how during Project Surveillance, to utilize video monitoring Improve engineering management efficiency, be also the problem needing solution in modern project management badly.
Summary of the invention
In order to solve problem present in existing management, the present invention proposes project management cloud based on video monitoring Plateform system, while facilitating site supervision personnel to carry out the work, makes the restriction in Supervision Enterprise break through and space to item The real-time management and control of mesh, it is achieved relevant industrial department's concern real-time to supervising service and supervision.
According to an embodiment of the invention, it is provided that a kind of project management cloud platform system based on video monitoring, institute State project management cloud platform system to include: video monitoring system, for project scene is monitored;Described video monitoring system At least include such as lower module: video monitoring records module, for the monitor video taken by recorded video CCTV camera;Depending on Frequently monitoring display module, for broadcasting, display monitoring video on the display screen of described entry terminal;Video monitoring images Machine, is used for shooting monitor video.
According to an aspect of the present invention, described video monitoring system also includes: video monitoring camera gesture stability mould Block, for controlling the shooting attitude of video monitoring camera;Described video monitoring camera is the shooting of 3G or 4G video monitoring Machine, is communicated with described entry terminal by 3G or 4G network;Video monitoring camera layout modules, is used for arranging and adjusting Whole video monitoring camera layout in whole engineering project;Video comparison module, for video is compared process, and Display or mark comparative result;
According to an aspect of the present invention, described video monitoring system also includes: query video module, for according to specific Search condition search specific video;Video monitoring daily record and Reports Administration module, for carrying out the content of video monitoring Log management;Video monitoring prompting and alarm module, for sending and specifically point out to specific people, particular telephone or send Warning message;
According to an aspect of the present invention, described video monitoring system also includes: video processing module, described Video processing Video file can be realized compressing, decompress, shear by module, cutting, duplication, setting contrast, brightness adjustment, image procossing, Add word and/or labelling in Audio Processing, video, video preserves, and described video processing module also has and arranges function;Video Information database, the video file recorded for storage and management, and when video is processed by above-mentioned modules Set various data, file.
According to an aspect of the present invention, described management system at least includes such as lower module: supervision module, uses In by the personnel of mobile terminal records job site, material, arrangement and method for construction implementation status, and form tour record;Work as construction During when there is particular case, described particular case is sent to problem by described supervision module by described mobile terminal Pending accounts supervisor's system, and tour record is automatically associated in supervision diary;Sidegating effect module, for by mobile terminal pair Preparation of construction situation carries out verifying, preserving image data, and forms side reporting;Module is checked and accepted in management, for job site Completion situation carry out entity examination, and form record of acceptance, and by the files passe through checking and accepting to data automatic archiving system System;Witness sampling and censorship module, for making a report on witness sampling record, entering by the way of shooting image, photo, audiovisual materials Row witness sampling and by witness sampling information censorship automatic archiving;Management logging modle, for according to management Type forms management record the auto-associating of corresponding types;Management instruction module, for by site supervision process The particular problem of middle discovery forms management written instructions and is sent to unit in charge of construction;Problem pending accounts supervisor's system, is used for recording management During the problem on-the-spot making an inspection tour, check and accept, find during other station, and form problem rectification advice note and be sent to problem rectification Person liable, simultaneously there is corresponding pending problem in the mobile terminal the supervising engineer of responsible issue track, described pending asks Topic notice can be reminded according to the rectification time limit set;If problem has been rectified and improved, by problem rectification person liable to be responsible for The supervising engineer of track applies for checking and examination, and the supervising engineer being responsible for following the tracks of shows up and checks rectification implementation of conditions, or the prison by responsible tracking Reason engineer actively makes an inspection tour follow-up investigations problem rectification situation;If it is qualified to check, then carry out pin item process;GPS working trajectory Inquiry system, is used for inquiring about supervisor present position, and its working trajectory uploads to data automatic archiving system;And performance Checking system, described performance appraisal system will for supervisor's routine work records appraisal, issue track implement completion rate and Time rate, pinpoint the problems, the solve quality and quantity of problem, performance assessment criteria, according to set timing node show that performance appraisal is tied Really;Data automatic archiving system, for automatically achieving each system included in described project management cloud platform system and Ge Mo Input involved by block, output data.
According to an aspect of the present invention, described project management cloud platform system also includes: standard criterion data base and member Work self-service query, help system;Supervising engineer encounters problems in the course of the work, logs in described standard gauge by authorized ports Model data base and employee's self-service query, help system carry out self-service query or seek help, and return the feedback information obtained.
The information such as the personnel of project sites, vehicle, equipment, material can be identified, identify, follow the tracks of by the present invention And management, it is simple to engineering construction personnel, management personnel and site supervision personnel visibility management, thus considerably increase engineering pipe The convenience of reason, also strengthens the efficiency of management.
For further illustrating inventive feature and technology contents, refer to below in connection with detailed description of the invention with attached Figure.
Accompanying drawing explanation
Fig. 1 is the network of relation overall structure schematic diagram of native system;
Fig. 2 is the configuration diagram of native system;
Fig. 3 is the schematic diagram of video monitoring system composition in native system;
Fig. 4 is the workflow schematic diagram of the supervision module of native system;
Fig. 5 is the workflow schematic diagram of the sidegating effect module of native system;
Fig. 6 is the workflow schematic diagram of the management examination module of native system;
Fig. 7 is witness sampling and the workflow schematic diagram of censorship module of native system;
Fig. 8 is the workflow schematic diagram of the management logging modle of native system;
Fig. 9 is the workflow schematic diagram of the management instruction module of native system;
Figure 10 is the workflow schematic diagram of problem pending accounts supervisor's system of native system;
Figure 11 is the workflow schematic diagram of the performance appraisal system of native system;
Figure 12 is standard criterion data base and employee's self-service query system, the workflow signal of help system of native system Figure;
Figure 13 is the workflow schematic diagram of the GPS working trajectory inquiry system of native system;
Figure 14 is the workflow schematic diagram of the data automatic archiving system of native system.
Detailed description of the invention
Fig. 1 is the network of relation overall structure schematic diagram of the present invention, the invention provides a kind of project management cloud platform system System.This project management cloud platform system has server and entry terminal, and server and entry terminal and pass through network Connect.According to a particular embodiment of the invention, each entry terminal and a specific user uniquely bind, and binding later is eventually End can only log in a user.It is of course also possible to carry out, according to actual application scenarios, the number of users that setting item terminal can log in Deng setting.For a person skilled in the art, the corresponding relation between user and entry terminal can set according to demand, This corresponding relation the emphasis of non-invention, above-mentioned specific corresponding relation is not construed as limiting the invention.Additionally, Fig. 1 is only Being only exemplary explanation, those skilled in the art all know, the quantity of server and entry terminal is not limited thereto, Ke Yigen The quantity of server and entry terminal is set according to actual demand.
According to one embodiment of present invention, the hardware required for the present invention needs at least to include: multiple servers (put down by cloud Platform), multiple entry terminal, multiple video monitoring camera.Wherein said entry terminal include mobile entry terminal (include but not Be limited to mobile phone, panel computer, mobile communication equipment), desk computer, work station, notebook etc..Described mobile project The Mobile operating system of terminal includes but not limited to the Mobile operating systems such as Android, iOS, Saipan.According to the present invention one Specific embodiment, also includes in described mobile entry terminal: shooting part, display screen.
Wherein, server, for running each system and the modules of described project management cloud platform system, store institute State the data in project management cloud platform system and file;Entry terminal, for according to authorization privilege, on described entry terminal Run the system in described cloud platform system and particular module.
A specific embodiment according to the present invention, video monitoring camera has radio communication function, is such as that 3G regards Frequently CCTV camera.3G video monitoring camera uses up-to-date 3G mobile communication technology, for family, small business or spy Determine industry user and monitor the demand of application, belong to a kind of install simple, operate mobile video monitor nimble, that cost performance is high and set Standby.3G video monitoring camera accesses 3G network by 3G wireless Internet card, and 3G wireless Internet card is divided into external and built-in two kinds Form, external 3G Modem uses USB port to be connected to video camera, can change flexibly according to local 3G network standard, and built-in 3G Modem is the most reliable and the most stable, and only need to insert SIM on 3G video monitoring camera can use.3G video monitoring is taken the photograph Camera is different from traditional IP video monitoring camera, and it provide not only by the way of internet access, additionally provides 3G The monitor mode of visual telephone passage.Being dialled up on the telephone by 3G, 3G video monitoring camera can access the Internet, passes through DDNS Support long-range web access, carry out the Internet monitoring, and use H.264 Video coding.Certainly, along with the development of 4G network, it is possible to To use 4G video monitoring camera.Additionally, due to video monitoring camera can be equipped with The Cloud Terrace etc. controls photographic head attitude and angle The hardware unit of degree, therefore, according to a specific embodiment of the present invention, the shooting attitude of video monitoring camera is to grasp Indulge.Owing to video monitoring camera belongs to prior art, the present invention is not directed to the hardware device of video monitoring camera and enters The improvement of row, repeats no more.
The system of the present invention may operate on server, entry terminal, and user can use the portion in this system according to authority Point or all subsystem or module.
Fig. 2 is the system architecture schematic diagram of the present invention.As it can be seen, this project management cloud platform system at least includes as follows Subsystem:
Video monitoring system, described video monitoring system at least includes: video monitoring camera layout modules, video monitoring Video camera gesture stability module, video monitoring recording module, video monitoring display module, video processing module, video compares mould Block, query video module, video monitoring daily record and Reports Administration module, video monitoring prompting and alarm module, video information number According to storehouse;Management system;Described management system at least includes: supervision module, sidegating effect module, and management is checked and accepted Module, witness sampling and censorship module, management logging modle, management instruction module, management reporting modules;Problem is hung Account supervisor's system;Performance appraisal system;Standard criterion data base and employee's self-service query system, help system;GPS working trajectory Inquiry system;Data automatic archiving system.Certainly, each system described, module can partially or completely operate in service On device end or entry terminal.
Fig. 3 is the structured flowchart of video monitoring system.Described video monitoring system at least includes:
Video monitoring camera layout modules, for arranging and adjust video monitoring camera in whole engineering project Layout, generates layout designs figure.A specific embodiment according to the present invention, video monitoring camera layout modules is according to engineering Progress, the drawing of engineering design of integration project and the video monitoring camera layout templates pre-set, on computers Automatic imitation generates the layout of video monitoring camera;Supervisor of construction, Project Surveillance personnel etc. have the personnel of authority, can To utilize video monitoring camera layout modules, the layout of the video monitoring camera of simulation adjustment on computers, thus pin Each engineering project is specifically determined final video monitoring camera layout, and according to the video monitoring shooting finally determined Machine placement scheme, prints or exports the video monitoring camera layout drawing of papery or electronics, for finally arranging, installing, Used by debugging video monitoring camera.
A specific embodiment according to the present invention, the layout templates pre-set includes: 1, agent structure stage mould Plate, i.e. if current engineering is in the main structure construction stage, then the anchor point at tower crane and agent structure periphery arranges video CCTV camera;2, decoration stage template, for secondary structure decoration stage, for index bed, different labor service team pioneer work Face arranges video monitoring camera;3, electromechanical installation phase templates, arranges video monitoring camera for pioneer's work surface; 4, furring phase templates, the place typical parts for exterior finish work arranges video monitoring camera;5, municipal administration Gardener Journey template, the place typical parts for gardens arranges video monitoring camera.Certainly, above-mentioned template is merely exemplary, Not being construed as limiting the invention, those skilled in the art are fully able to constantly increase according to engineering project reality, delete, repair Change, change layout templates.
A specific embodiment according to the present invention, this module both can only be run on mobile entry terminal, it is also possible to Only run on other the entry terminal in addition to mobile entry terminal, it is also possible to run on all of entry terminal, It is to say, the operation authority of this module can be configured according to the demand of engineering project.
Video monitoring camera gesture stability module, for controlling the shooting attitude of video monitoring camera.As this A bright detailed description of the invention, entry terminal shows the attitude data that video monitoring camera is current, includes but not limited to, The camera site of video monitoring camera, shooting angle, shooting direction, coverage, shooting time, shooting focal length etc., have The user of corresponding authority, can be by (being included but not limited to mouse, keyboard by user input device, touch on entry terminal Control panel), change or arrange the attitude data that video monitoring camera is current, thus by proprietary communication circuit or wireless Communication line remotely controls the shooting angle of the video monitoring camera at project sites, camera site, shooting direction, bat Take the photograph scope, shooting time, shooting focal length, thus control the shooting attitude of video monitoring camera, obtain and see desired by user Monitor video content.
Certainly, for as the present invention further preferred embodiment, it is also possible to render video prison at entry terminal The three-dimensional rendering graph model of control video camera, then (includes but not limited to mouse, key by user input device on entry terminal Dish, contact panel), control attitude and the focal length of this three-dimensional rendering graph model, thus by proprietary communication circuit or channel radio Letter circuit remotely controls corresponding with this three-dimensional rendering graph model consistent video monitoring shooting arranged at project sites The shooting angle of machine, camera site, shooting direction, coverage, shooting time, shooting focal length, thus control video monitoring and take the photograph The shooting attitude of camera, obtains the monitor video content seen desired by user.According to pre-set model data, at meter Render the threedimensional model of correspondence on the display of calculation machine to belong to the prior art of computer realm and (such as, see Chinese invention Content described by patent application CN 101931790 A), and the emphasis of the present invention do not lie in this, and relevant render reality Existing mode can realize according to prior art, therefore the present invention repeats no more.
A specific embodiment according to the present invention, this module both can only be run on mobile entry terminal, it is also possible to Only run on other the entry terminal in addition to mobile entry terminal, it is also possible to run on all of entry terminal, It is to say, the operation authority of this module can be configured according to the demand of engineering project.
Video monitoring records module, for the monitor video taken by recorded video CCTV camera.User is according to making By authority, it is turned on or off video record function, thus both can pass through video monitoring camera monitoring of a recorded programme video, it is possible to The non-recorded video with viewing monitor video the most in real time.A specific embodiment according to the present invention, this module both can only exist Run on mobile entry terminal, it is also possible to only run on other the entry terminal in addition to mobile entry terminal, also may be used To run on all of entry terminal, say, that the operation authority of this module can be entered according to the demand of engineering project Row is arranged.
Video monitoring display module;For broadcasting, display monitoring video on the display screen.Described video monitoring display mould Block according to the display mode specified by user according to the size of display screen and resolution (can include but not limited to, normally broadcast Put, fast-forward play, slow play, rewinding are play, broadcasting etc. frame by frame), display and play and record module by video monitoring automatically The monitor video recorded;It addition, described video monitoring display module can also be by the resolution of user setup video playback, pressure Contracting ratio etc.;Described video monitoring display module can also be differentiated automatically according to the size of display screen and resolution, video card Rates etc. are adaptively adjusted the broadcast mode of monitor video, are allowed to adapt with display screen, to the more preferable display effect of user. A specific embodiment according to the present invention, this module both can only be run on mobile entry terminal, it is also possible to only except Run on other entry terminal outside mobile entry terminal, it is also possible to run on all of entry terminal, say, that The operation authority of this module can be configured according to the demand of engineering project.
Video processing module, video file can be realized compressing, decompress, shear by described video processing module, cutting, Duplication, setting contrast, brightness adjustment, image procossing, Audio Processing, video add word and/or labelling, video preservation etc. Common video processing function.Additionally, described video processing module also has arranges function, it is possible to arrange recording, play, aobvious Show, process the parameter of video file, consequently facilitating video file itself is operated by the user with corresponding management authority, carry The observing effect of high video and service efficiency;Owing to Video processing itself belongs to prior art, the tool of above-mentioned various vision operations Realizing algorithm and programming details the emphasis of non-invention in detail of body, repeats no more.One according to the present invention is embodied as Example, this module both can only be run on mobile entry terminal, it is also possible to only at other in addition to mobile entry terminal Run on entry terminal, it is also possible to run on all of entry terminal, say, that the operation authority of this module can basis The demand of engineering project and be configured.
Video comparison module, for video is compared process, utilizes Computer Image Processing and identification technology, to regarding Certain objects in Pin, equipment, building, component compare, and show or mark comparative result.For example, according to this One detailed description of the invention of invention, when carrying out video monitoring for main component, in one section of special time, by comparing The difference of the monitor video of the theme component front and back recorded during different time points, it is possible to the construction obtaining main component is entered The relevant informations such as degree, it is simple to management personnel carry out follow-up process.A specific embodiment according to the present invention, this module both may be used Only to run on mobile entry terminal, it is also possible to only transport on other the entry terminal in addition to mobile entry terminal OK, it is also possible to run on all of entry terminal, say, that the operation authority of this module can be according to the need of engineering project Ask and be configured.
Query video module, for according to specific search condition, searches specific video in video information data base. Such as, need, as supervising engineer, No. 20 video monitoring inquiring about at the 2 pm agent structure of-3 on January 22nd, 2016 During the video of shot by camera, there is the user of search access right, can be by entry terminal input inquiry time and to be checked The numbering of video monitoring camera, can fetch the video content of this period from video information data base.Additionally, video is looked into Ask module can also according to complicated query and search formula inquiry, return corresponding Query Result, such as, can be according to video monitoring The multiple queries conditions such as the numbering of video camera, shooting time, camera site inquire about corresponding video in video information data base, Thus improve the convenience of inquiry.A specific embodiment according to the present invention, this module both can be only at mobile entry terminal Upper operation, it is also possible to only run on other the entry terminal in addition to mobile entry terminal, it is also possible at all of item Run in mesh terminal, say, that the operation authority of this module can be configured according to the demand of engineering project.
Video monitoring daily record and Reports Administration module, for carrying out log management to the content of video monitoring.Additionally, video The situation of video monitoring can also be collected or illustrate by monitoring daily record and Reports Administration module, thus forms video monitoring Report, is sent to the management personnel of specified permission;And video monitoring daily record can be modified and annotate, repairing each time Change and annotate and all can form a new log content without covering original daily record;Amendment and the annotation of daily record all can records Detail time, and explain the reason.Therefore, video monitoring daily record can monitor daily record situation by objective reality ground reflecting video, also can Enough it is easy to verify at any time.The management personnel of certain authority can by video monitoring daily record and Reports Administration module polls and Browse video monitoring daily record and report, and video monitoring daily record and Reports Administration module can be utilized to send to specific personnel Work order, plan or backlog, it is simple to related personnel can complete video monitoring daily record and report pipe in time, accurately Science and engineering is made, and is greatly improved work efficiency, prevents mistakes and omissions.It is of course also possible to video monitoring daily record and report are arranged authority and model Enclose, set different authorities and scope for different management personnel, it is ensured that the safety of video monitoring log information and secrecy Property.A specific embodiment according to the present invention, this module both can only be run on mobile entry terminal, it is also possible to is only removing Run on other entry terminal outside mobile entry terminal, it is also possible to run on all of entry terminal, namely Saying, the operation authority of this module can be configured according to the demand of engineering project.
Video monitoring prompting and alarm module, in the case of particular condition occurs, by video monitoring prompting and Alarm module, sends specific prompting or alert to specific people, particular telephone.Find that dangerous situation is video One of Main Function of monitoring, according to a specific embodiment of the present invention, when dangerous feelings occur in monitoring region, monitored object Condition, or when particular condition (such as, equipment is out of service, power failure etc.) occurs in engineering site, entered by video monitoring camera The personnel that row monitors, can be pointed out by video monitoring and alarm module, manually send information or warning message.Prompting Information includes but not limited to the visible or appreciable signal such as voice, word, symbol, numeral, image, video, vibrations, light, Order or the data that can automatically be identified by computer system and process can also be included, thus realize prompting and the work reported to the police With.According to another specific embodiment of the present invention, video monitoring prompting and alarm module can automatically send prompting or report to the police Information.For example, on the building site of engineering project, agent structure, before not completing, there is no light at night, if There is naked light in night, then explanation project engineering site goes wrong, now in the monitored picture captured by video monitoring camera There will be highlight regions visibly different with background frame, now video monitoring prompting and alarm module can be sentenced according to predefined Fixed condition is (as illustrative examples, some region of in such as video monitoring prompting and alarm module automatic decision monitored picture The gray value of pixel is significantly greater than other regions, and the region area of this gray value accounts for the area ratio of monitored picture more than one Individual predefined threshold value), the most automatically send information or warning message, it is not necessary to send prompting or alarm signal manually Breath.Certainly, the manual prompt described by above-mentioned embodiment or warning, automatic prompting or warning, be all exemplary explanation, and Not constituting limiting the scope of the invention, those skilled in the art can not pay wound according to above-mentioned performance In the case of the property made work, prompting or the warning side of other forms according to engineering project actual demand, can be designed completely Formula, belongs to protection scope of the present invention too.Owing to the actual application of this area is varied, without departing from core of the present invention In the case of technical scheme, no longer the detailed content of its concrete application is repeated.One according to the present invention is embodied as Example, this module both can only be run on mobile entry terminal, it is also possible to only at other in addition to mobile entry terminal Run on entry terminal, it is also possible to run on all of entry terminal, say, that the operation authority of this module can basis The demand of engineering project and be configured.
Video information data base, the video file recorded for storage and management, and above-mentioned modules is to regarding The various data set when processing of frequency, file.
According to the present invention, can mutually call between the modules in above-mentioned video monitoring system, it is possible to according to engineering The actual demand of Project Surveillance realizes different regulatory formats to the call relation determining between modules and workflow.Figure 3 and described above content not constitute the restriction to present disclosure, those skilled in the art is according to management demand, completely Being capable of various call relation and Management Process, the content of this on-demand adjustment repeats no more, various obvious changes, Replace, within broadly falling into protection scope of the present invention.
Fig. 4 is the workflow diagram of supervision module.As it can be seen, the flow process at supervision is as follows: site supervision Engineer, during making an inspection tour, is performed by the personnel of mobile terminal real time record job site, machinery, material, arrangement and method for construction Situation and weather affect situation etc. to construct, can include but not limited to the recording modes such as word, voice, video.Patrolling Depending on process if it find that have problems in work progress, then supervising engineer's problem to existing is with " problem rectification advice note " Form notifies unit in charge of construction's rectification, " problem rectification advice note " should can carry out pending accounts supervisor by problem pending accounts supervisor's system, It is tracked after Resolving probiems checking and accepting, after responsibility supervising engineer's acceptance(check), " problem rectification advice note " is done pin item and processes, This Guan Bi is handed over " the problem rectification advice note " of circle to close and is coupled in the middle of original tour record;Make an inspection tour record according to supervising engineer Authority, the information such as ID be automatically associated to the same day of this supervising engineer in supervision diary.Following form includes exemplary Supervision diary recorded content, certainly, only example effect, the present invention is not only restricted to this.
Fig. 5 is the workflow diagram of sidegating effect module.Start as it can be seen, on-site supervision engineer carries mobile terminal Sidegating effect, first verifies preparation of construction situation, will wherein affect the people of the form of quality process, machine, material, method, ring etc. Aspect factor carries out record comprehensively, and this workflow has arranged the other station prison of on-the-spot conventional some importance position, key procedure Reason template, in order to field personnel's standardization, carrying out the work to standardization, following form is with common cast-in-place concrete As a example by operation, arrange the project needing on-site verification.Certainly, this table is only example effect, and the present invention is not only restricted to this.
When site supervision personnel pinpoint the problems during station, side, should point out to unit in charge of construction site administrator in time And require rectification in time, and require to be carried out by " the problem rectification advice note " in sidegating effect module by problem description and rectification Record, and it is practicable to follow the tracks of rectification, sells item after checking.This problem rectification advice note and follow the tracks of implementation of conditions and make a copy for chief inspector's science and engineering simultaneously Cheng Shi.
The significant process of sidegating effect should be used mobile terminal to retain necessary image by sidegating effect personnel as requested Data, the photo such as working performance of concrete test of marching into the arena (includes the single receipt of haulage vehicle licence plate, transport, slump test, winter Season construction concrete opening temperature detection etc.), contrast photo before and after the rectification pinpointed the problems of management witness sampling process, scene Deng.Log in, by mobile terminal, the image data that management clouds terrace system gathers, other station can be uploaded to by mobile network in real time In management record, it is also possible to first preserve in the terminal, centralized office work district to be returned is uploaded by wireless network.
What sidegating effect personnel should complete side reporting after completing sidegating effect work in time fills in work.Sidegating effect is remembered Record can automatically judge according to the sidegating effect end time, when the sidegating effect end time working time day shift (8:30~ Time in the range of 17:00), this part of sidegating effect record can be automatically associated in the supervision diary on this sidegating effect personnel same day;When When the sidegating effect end time is in the range of the night job time (17:00~8:30 next day), this part of sidegating effect record can be certainly In the dynamic night shift record being associated with project management department's same day.Sidegating effect record, after chief inspector's selective examination is checked, will automatically go to data certainly In dynamic filing system.
It addition, according to a specific embodiment of the present invention, the division of aforementioned night job time day shift enumerated is only For example, the distribution of concrete time can be different and arrange according to each project, and above-mentioned day shift, the differentiation of night shift have no effect on this The goal of the invention of invention, does not limits the invention.
Fig. 6 is the workflow diagram that module is checked and accepted in management.As it can be seen, inspection lot is made a report on by authorized ports by unit in charge of construction Check and accept file, then, check and accept file and flow to responsibility supervising engineer according to the working region division of labor delimited in advance, it follows that prison Reason engineer carries out interior industry examination & verification to Inspection lot acceptance file.If examination & verification is passed through, then supervising engineer is according to the time of agreement Entity examination is carried out to scene;If examination & verification is not passed through, the most directly return initiating port and enter according to acceptance criteria and reform advice Row rectification, and continue to be made a report on Inspection lot acceptance file by unit in charge of construction by authorized ports.
Supervising engineer carries out entity examination according to the time of agreement to scene, if by checking and accepting, then and supervising engineer File is checked and accepted in signature, agrees to turn sequence construction;If not by checking and accepting, the most directly returning initiating port according to acceptance criteria and rectification Suggestion is rectified and improved, and continues to be made a report on Inspection lot acceptance file by unit in charge of construction by authorized ports.
When supervising engineer signs examination file, after agreeing to turn sequence construction, then: 1, signed file background uploads to money Material automatic archiving system;2, signed file reverse is fed unit in charge of construction's authorized client;3, signed file auto-associating Supervision diary to responsible engineer.
Fig. 7 is witness sampling and the workflow diagram of censorship module.As it can be seen, unit in charge of construction's testing crew is by authorizing Port makes a report on witness sampling record, and witness record flows to responsibility supervising engineer according to the working region division of labor delimited in advance;Should Supervising engineer carries out witness sampling on the spot according to the time of agreement to scene, enters sampling spot, sampling process, approved sample process Row photo or video data shooting, can upload as the adnexa that this witness records;After completing witness sampling work on the spot, management work Cheng Shi signature witness record;This supervising engineer is by (according to one embodiment of present invention, anti-for the false proof Quick Response Code of tracing to the source bought Puppet Quick Response Code of tracing to the source is easily to tear to pieces type Quick Response Code) (i.e. scan this Quick Response Code by system, i.e. with the witness writing scan binding of this part The witness sampling information of this test specimen can be obtained);This Quick Response Code is fixed on the portion of test specimen the most not cracky by supervising engineer Position (according to one embodiment of present invention, for different witness sampling test specimens, formulate corresponding labelled rule in advance, As being affixed on outside etc. after steel reinforcing bar specimen bundling);
Being delivered to witness laboratory by witness test specimen by unit in charge of construction, laboratory is received sample personnel and is first confirmd that the witness examination received The integrity of part anti-fake two-dimension code;
Laboratory is received sample personnel and is obtained witness sampling information by authorized ports scanning anti-fake two-dimension code;
Laboratory requires to test according to order ticket, provides laboratory report;
Experimenter passes through authorized ports pump back test result (laboratory report);
Supervising engineer judges whether experimental result meets design and code requirement;
If it is determined that experimental result meets design and code requirement, retrial material may be used for engineering entity, job site Sequence construction can be turned;Then formed and hand over circle data to be included into data automatic archiving system;
If it is determined that experimental result does not meets design and code requirement, retrial material need to be withdrawn from the arena process, and scene takes to add Times retrial, operation are done over again, or structural solid inspection etc. processes, and form written mabage report;Then formed and hand over circle data to be included into Data automatic archiving system.
Fig. 8 is the workflow of management logging modle.First, on-site supervision engineer is respectively according to the management carried out Type of work selects operational module, as performed on-the-spot tour, management examination, sidegating effect, forms corresponding on-the-spot tour respectively Record, management record of acceptance, sidegating effect record and management instruction etc., this type of record will log according to supervising engineer Descriptor clip Text is associated with in the middle of supervising engineer's diary by port automatically, and supervising engineer's diary is not required to repeat to fill in State content.A specific embodiment according to the present invention, supervision diary is complete as supervising engineer's achievement every day Face record, it is necessary to will work every day and carry out itemized record, supervising engineer is logged in by authorized ports and carries out the work, formation Work in every record such as tour, examination, other station etc., be all associated with in the middle of the supervision diary on the same day, formed and only need to be performed one Secondary written typing, it is possible to automatically generate the related content in the middle of supervision diary.
Additionally, on-the-spot record, management record of acceptance and the sidegating effect record maked an inspection tour of night shift will be associated with project night shift note In the middle of record.
And the supervision diary of the supervising engineer of all work on duty on the same day will be associated with in the middle of Project Surveillance daily record.
Chief supervision engineer is responsible for filling in chief supervision engineer's diary, checks Project Surveillance daily record every day, project is supervised safely Manage daily record and project night shift record confirmation of signing.
Certainly, utilize the system of the present invention, other kinds of daily record can be generated according to project demands or particular demands Or record, includes but not limited to that above-mentioned daily record, diary, record, above-mentioned daily record, diary, record are only used as the concrete of the present invention Embodiment, and be not considered as limiting the invention.
Fig. 9 is management instruction module flow chart.If as it can be seen, at the scene supervision process is pinpointed the problems, then Problem is rectified and improved advice note and sends to unit in charge of construction responsible person concerned.Wherein, problem rectification advice note at least include work contact list, Management advice note, engineering moratorium.
After unit in charge of construction rectifies and improves, carry out written reply, application check, then carried out check by supervising engineer and test Card.If supervising engineer to check checking qualified, then when problem rectification advice note, labelling goes wrong and rectifies and improves.
Figure 10 is that problem pending accounts supervise and manage system flow chart.As it can be seen, the problem needing pending accounts to supervise and manage derives from management work The problem found during the tour of Cheng Shi scene, examination, station, side, or the problem of quality, safe joint construction discovery, or meeting proposition need to Rectify and improve the item implemented, or chief inspector arrange to follow the tracks of practicable item, or department at different levels and leader's inspection need to be rectified and improved and implement item, For the above-mentioned various problems occurred in supervision process, the person liable that first implemented by the clear and definite issue track of problem sponsor, ask Topic rectification person liable and rectification time limit requirement, form problem rectification notice single-shot related responsibility unit person liable's problem rectification responsibility People, simultaneously and the terminal of supervising engineer of responsible issue track there will be a pending problem, the notice meeting of this pending problem The rectification time limit according to setting carries out countdown bright light prompting (according to the exemplary embodiment of the present invention, such as the countdown time limit 4 Being green light before hour, bright orange lamp between countdown time limit 4~1 hour, bright orange lamp in 1 hour countdown time limit, during countdown Limit has been crossed and has been sent out a warning).
Problem has been rectified and improved, and by problem, rectification person liable applies for checking and examination to the supervising engineer of responsible tracking, is responsible for the prison followed the tracks of Reason engineer show up check rectification implementation of conditions (or by the supervising engineer of responsible tracking actively make an inspection tour follow-up investigations problem rectify and improve Situation).If it is qualified to check, then carry out pin item process;If checking defective, then repeat the above steps.
Figure 11 is performance appraisal system flow chart.As it can be seen, can by for supervisor's routine work records appraisal, Issue track is implemented completion rate, promptness rate, the quality and quantity of problem of pinpointing the problems, solve, is abided by Zhang Shouji, professional ethics, industry The business performance assessment criteria such as examination, according to the timing node set (as can be quarterly (last moon 25 according to the needs of examination Day), every half a year (last moon 25), or every year (last moon 25), or the most at any time by the end of Point sometime) quantify after data automatically capture input checking system, according to computation model set in advance (the most each quantization Performance assessment criteria gives certain weight, calculates weight score), draw evaluation score and ranking;Company management's layer is with reference to achievement The effect result of appraisal are managed decision-making.
According to a specific embodiment of the present invention, it is provided that following data-measuring mode: supervisor's routine work is remembered First record can circulate to the port of chief supervision engineer after submission every day, chief inspector carry out selective examination and check and provide evaluation, necessary Time concrete modification suggestion is proposed, chief inspector evaluates corresponding to corresponding mark, can collect calculate score by all evaluating;Problem with The completion rate of track and promptness rate can show by mathematical statistics that (situation about such as, sending out a warning without reason will be by certain point of deduction Number);Pinpoint the problems, solve the quantity of problem, quality, just carry out via chief inspector's port in the link making a report on problem rectification advice note Evaluate, and be converted to quantify score value;Remaining abide by chapter keep travel notes be, professional ethics observing situation and business evaluating active situation permissible According to the regulation of company management's system, carry out bonus point, deduction of points or Data Input etc. and process, when event occurs by company management people Member's typing.
Figure 12 is standard criterion data base and employee's self-service query system, help system flow chart.As it can be seen, according to this One specific embodiment of invention, the seek help workflow of inquiry system of employee's self-service query system, employee is as follows:
Supervising engineer encounters problems in the course of the work, and (inquiry mode is logical to log in self-service query by authorized ports Crossing descriptor search, recommend corresponding contents in standard criterion data base, descriptor definition is the most accurate, searches for content recommendation meeting The most targeted);
By the inquiry to standard criterion data base, it is thus achieved that query feedback information;
If problem has been resolved, then return information and the related content of Resolving probiems;
If problem does not has been resolved, then employee is turned to seek help passage;
Sought help inquiry system by employee, expert engineer or Professional team leaders the problem not having been resolved is solved Answer, and return answer information and related content;
If the problem not having been resolved still cannot be answered by expert engineer or Professional team leaders, then by chief inspector's (generation Table) problem not having been resolved is answered, and return answer information and related content;
If the problem not having been resolved still cannot be answered by chief inspector's (representative), then by company project portion to not obtaining The problem solved is answered, and returns answer information and related content;
If the problem not having been resolved still cannot be answered by company project portion, then by expert advisor team to not obtaining Answer to the problem solved, and return answer information and related content.
Figure 13 is GPS working trajectory inquiry system flow chart.In this system self registering working time at the construction field (site) GPS working trajectory, the foundation remotely can registered as on-site supervision engineer, it is also possible to as on-site supervision engineer carry out The foundation of row management responsibility.As it can be seen, according to a specific embodiment of the present invention, when this inquiry system works, GPS work Make track inquiry system workflow as follows:
First, it is responsible for, by job site site plan uploading system, importing by chief supervision engineer after project is marched into the arena Gps data storehouse, and used mobile terminal to carry out straightened up in place by on-site supervision engineer;
Project Surveillance engineer carry out the work to hilllock every day, registry entry management cloud platform;System can check mobile terminal GPS whether open, as do not opened, system can be pointed out to be needed to open GPS;
Supervising engineer carries mobile terminal and carries out the work to scene, and system captured supervising engineer automatically every 5 minutes Present position, and will the temporal information of this some position and geographical location information site plan in systems be marked;
Supervising engineer can check the on-the-spot Real-time and Dynamic point position information on my same day by mobile terminal;Chief inspector and public affairs Department's management level can check arbitrary employee's history dynamic position by PC/ mobile terminal;
Company can be used for fighting line length, the scattered project of personnel using employee scene GPS location information as attendance record Staff's benefits.
Figure 14 is data automatic archiving system flow chart.As it can be seen, according to a specific embodiment of the present invention, this is System workflow is as follows:
Step 1: the money filed through the data examined, each side's contact letters, instruction, other needs that unit in charge of construction reports and submits Material, by scanning, forms electronic document and preserves;And the electronic edition data that Supervision Project portion is formed during implement stakeout It is also carried out preserving;
Step 2: according to set three grades of tree sort coding schemes (table 1 is exemplary sorting code number system, not as Limiting the scope of the invention), according to cryptoprinciple by grouping of data coding the most saved in step 1;
1 three grades of tree sort coding schemes of table
Step 3: after data being carried out sorting code number by full-time documenter, report chief supervision engineer to upload after auditing approval;
Step 4: according to the filing principle automatic archiving set;I.e. as shown in table 1, first five identical data of data coding It is included into identical file folder, and starts flowline numbering, i.e. XX101001 according to the sequencing forming the time from 001;
Step 5: the data in identical file folder can automatically generate (or renewal) respective roll in-list according to data descriptor;
Step 6: generate after list in volume, can carry out according to demand inquiring about, adds up, sorts, associate management report.
Additionally, the letter that described data automatic archiving system can also store every other subsystem, module inputted, exports Breath.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit protection scope of the present invention.All Within the spirit and principles in the present invention, any amendment, equivalent and the improvement etc. made, should be included in the guarantor of the present invention Within the scope of protecting.

Claims (7)

1. a project management cloud platform system based on video monitoring, it is characterised in that described project management cloud platform system Including:
Video monitoring system, for being monitored project scene;Described video monitoring system at least includes such as lower module:
Video monitoring camera layout modules, for arranging and adjust video monitoring camera cloth in whole engineering project Office;
Video monitoring records module, for the monitor video taken by recorded video CCTV camera;
Video monitoring display module, for broadcasting, display monitoring video on the display screen of described entry terminal.
Project management cloud platform system based on video monitoring the most according to claim 1, it is characterised in that described video CCTV camera is 3G or 4G video monitoring camera, is communicated with described entry terminal by 3G or 4G network;Its In, described video monitoring system also includes:
Video monitoring camera gesture stability module, for controlling the shooting attitude of video monitoring camera;
Video comparison module, for video compares process, and shows or mark comparative result.
Project management cloud platform system based on video monitoring the most according to claim 1 and 2, it is characterised in that described Video monitoring system also includes:
Query video module, for searching specific video according to specific search condition;
Video monitoring daily record and Reports Administration module, for carrying out log management to the content of video monitoring;
Video monitoring prompting and alarm module, for sending and specifically point out to specific people, particular telephone or send warning Information.
4. according to the project management cloud platform system based on video monitoring described in claim 1-3, it is characterised in that described regard Frequently monitoring system also includes:
Video processing module, video file can be realized compressing, decompress, shear by described video processing module, cutting, duplication, Add word and/or labelling in setting contrast, brightness adjustment, image procossing, Audio Processing, video, video preserves, and described regards Frequently processing module also has and arranges function;
Video is entered by video information data base, the video file recorded for storage and management, and above-mentioned modules Set various data, file when row processes.
5. according to the project management cloud platform system based on video monitoring described in claim 1-4, it is characterised in that described item Mesh management cloud platform system also includes management system;
Described management system at least includes such as lower module:
Supervision module, is used for by the personnel of mobile terminal records job site, material, arrangement and method for construction implementation status, and Formed and make an inspection tour record;When work progress exists particular case, described mobile terminal by described supervision module by institute State particular case and be sent to problem pending accounts supervisor's system, and tour record is automatically associated in supervision diary;
Sidegating effect module, for being verified preparation of construction situation by mobile terminal, preserving image data, and forms side Stand record;
Module is checked and accepted in management, for the completion situation of job site is carried out entity examination, and forms record of acceptance, and will pass through The files passe checked and accepted is to data automatic archiving system;
Witness sampling and censorship module, for making a report on witness sampling record, by the way of shooting image, photo, audiovisual materials Carry out witness sampling and by witness sampling information censorship automatic archiving;
Management logging modle, for forming the management record of corresponding types and automatically closing according to management type Connection;
Management instruction module, for being sent to the particular problem found during site supervision formation management written instructions Unit in charge of construction;
Problem pending accounts supervisor's system, the problem found during recording on-the-spot tour in supervision process, examination, other station, and And formation problem rectification advice note is sent to problem rectification person liable, simultaneously in the movement of supervising engineer of responsible issue track There is corresponding pending problem in terminal, and described pending problem notice can be reminded according to the rectification time limit set;If problem Rectification completes, and by problem, rectification person liable applies for checking and examination to the supervising engineer of responsible tracking, and the supervising engineer being responsible for following the tracks of shows up Check rectification implementation of conditions, or actively maked an inspection tour follow-up investigations problem rectification situation by the supervising engineer of responsible tracking;If it is multiple It is qualified to look into, then carry out pin item process.
6. according to the project management cloud platform system based on video monitoring described in claim 1-5, it is characterised in that described item Mesh management cloud platform system also includes:
GPS working trajectory inquiry system, is used for inquiring about supervisor present position, and it is automatic that its working trajectory is uploaded to data Filing system;With
Performance appraisal system, described performance appraisal system will be implemented for supervisor's routine work records appraisal, issue track Completion rate, promptness rate, pinpoint the problems, the solve quality and quantity of problem, performance assessment criteria, draw achievement according to the timing node set The effect result of appraisal;
Data automatic archiving system, for automatically achieving each system included in described project management cloud platform system and Ge Mo Input involved by block, output data.
7. according to the project management cloud platform system based on video monitoring described in claim 1-6, it is characterised in that described item Mesh management cloud platform system also includes:
Standard criterion data base and employee's self-service query, help system;Supervising engineer encounters problems in the course of the work, passes through Authorized ports logs in described standard criterion data base and employee's self-service query, help system carry out self-service query or seek help, and returns The feedback information obtained.
CN201610317814.7A 2016-05-16 2016-05-16 Engineering project management cloud platform system based on video monitoring Pending CN106056347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610317814.7A CN106056347A (en) 2016-05-16 2016-05-16 Engineering project management cloud platform system based on video monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610317814.7A CN106056347A (en) 2016-05-16 2016-05-16 Engineering project management cloud platform system based on video monitoring

Publications (1)

Publication Number Publication Date
CN106056347A true CN106056347A (en) 2016-10-26

Family

ID=57176316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610317814.7A Pending CN106056347A (en) 2016-05-16 2016-05-16 Engineering project management cloud platform system based on video monitoring

Country Status (1)

Country Link
CN (1) CN106056347A (en)

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106385569A (en) * 2016-10-27 2017-02-08 辽宁公安司法管理干部学院 Video surveillance camera location method
CN106651154A (en) * 2016-12-06 2017-05-10 国家电网公司 Daily precontrol method for infrastructure risk
CN106990762A (en) * 2017-04-01 2017-07-28 江苏艾科瑞思封装自动化设备有限公司 A kind of intelligence manufacture equipment
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107357957A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project
CN107392562A (en) * 2017-06-07 2017-11-24 黄建钊 The interactive supervision method of object-oriented based on network multimedia intelligent terminal system
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN107818402A (en) * 2017-09-30 2018-03-20 中国建筑第七工程局有限公司 A kind of construction quality control system and method
CN107872648A (en) * 2017-10-06 2018-04-03 湖北聚注通用技术研究有限公司 A kind of interior decoration construction scene monitoring system based on three-dimensional modeling
CN108093218A (en) * 2017-12-25 2018-05-29 浙江东南建设管理有限公司 A kind of construction quality video Supervision and system
CN108307150A (en) * 2017-12-29 2018-07-20 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system and method having personnel's management and control function
CN108304995A (en) * 2018-01-10 2018-07-20 四川隧唐科技股份有限公司 Builder's diary management method and system, read/write memory medium
CN108376311A (en) * 2018-02-06 2018-08-07 江苏普信工程项目管理有限公司 The step that leaves a question open in project supervision checks amending method and system
CN108460545A (en) * 2018-04-12 2018-08-28 万翼科技有限公司 Construction quality evaluation method, device and the storage medium of engineering construction person
CN108647929A (en) * 2018-03-26 2018-10-12 崔战宾 Construction Visualized management system with feedback and method
CN108776888A (en) * 2018-05-24 2018-11-09 合肥亿腾工程咨询有限公司 A kind of information management system based on completion information
CN109034754A (en) * 2018-09-29 2018-12-18 重庆盾琪科技有限公司 Major project Dispatch and Command Center
CN109087006A (en) * 2018-08-03 2018-12-25 北京吉北电力工程咨询有限公司 Power equipment supervises the processing method and processing device for making information
CN109146411A (en) * 2018-08-02 2019-01-04 广东展诚工程咨询有限公司 A kind of project supervision, cost, the total management system of bid, consulting
CN109214767A (en) * 2017-07-07 2019-01-15 中联天盛防水科技股份有限公司 A kind of roof waterproof renovation project Quality Process supervising platform
CN109598442A (en) * 2018-12-04 2019-04-09 北京诺士诚国际工程项目管理有限公司 A kind of methods of marking and device of supervision behavior
CN111062686A (en) * 2019-12-10 2020-04-24 广州电力工程监理有限公司 Mobile intelligent supervision and control method and system based on digital model
CN111198854A (en) * 2019-12-27 2020-05-26 南京金绿汇成信息科技有限公司 Data state tracking method of multi-source data acquisition device
CN111399437A (en) * 2020-03-26 2020-07-10 上海蓝彬新材料科技有限公司 Wisdom construction supervision system
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN111931583A (en) * 2020-07-14 2020-11-13 襄阳微时间网络科技有限公司 Method for monitoring and early warning whole process of urban construction project
CN112365122A (en) * 2020-10-10 2021-02-12 长沙格力暖通制冷设备有限公司 Production line quality problem monitoring method and system
CN112381250A (en) * 2020-12-02 2021-02-19 北京数途科技有限公司 Equipment early management system
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN113610487A (en) * 2021-07-06 2021-11-05 江苏金小满信息科技有限公司 Construction process record archiving system and method
CN113780841A (en) * 2021-09-15 2021-12-10 铁科院(北京)工程咨询有限公司 Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set
CN114331190A (en) * 2021-12-31 2022-04-12 惠州市建设集团工程建设监理有限公司 Method and system for checking and actually measuring engineering supervision quality
CN114782028A (en) * 2022-06-20 2022-07-22 广州智建云信息技术有限公司 Intelligent checking method and platform
CN115147021A (en) * 2022-09-02 2022-10-04 深圳市房帮帮互联网科技有限公司 Real estate construction quality control method and system
CN115409488A (en) * 2022-09-15 2022-11-29 盐城工学院 Flow management and control method and system for whole engineering construction process
CN116456061A (en) * 2023-06-15 2023-07-18 四川三思德科技有限公司 Intelligent community monitoring management method, system and medium based on dynamic target detection
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN117408625A (en) * 2023-09-26 2024-01-16 武汉中超电网建设监理有限公司 Supervision method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104935884A (en) * 2015-06-05 2015-09-23 重庆智韬信息技术中心 Method for intelligently monitoring class attendance order of students
CN105117833A (en) * 2015-08-14 2015-12-02 国家电网公司 PDA application system for construction project field management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104935884A (en) * 2015-06-05 2015-09-23 重庆智韬信息技术中心 Method for intelligently monitoring class attendance order of students
CN105117833A (en) * 2015-08-14 2015-12-02 国家电网公司 PDA application system for construction project field management

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
《水利信息化新技术及应用》编委会: "《水利信息化新技术及应用》", 31 July 2013 *
中国建筑业协会工程项目管理委员会: "《2013年度全国建设工程优秀项目管理成果选编(中册)》", 30 September 2014, 中国城市出版社 *
中国建筑监理协会: "《电力工程》", 30 November 2008, 知识产权出版社 *
王卫东 等: "基于移动互联网的铁路监理系统的设计与实现", 《铁道科学与工程学报》 *
苏中强: "引进视频监控,构建监理"数字化"平台", 《福建建设科技》 *

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106385569A (en) * 2016-10-27 2017-02-08 辽宁公安司法管理干部学院 Video surveillance camera location method
CN106651154A (en) * 2016-12-06 2017-05-10 国家电网公司 Daily precontrol method for infrastructure risk
CN106990762A (en) * 2017-04-01 2017-07-28 江苏艾科瑞思封装自动化设备有限公司 A kind of intelligence manufacture equipment
CN107392562A (en) * 2017-06-07 2017-11-24 黄建钊 The interactive supervision method of object-oriented based on network multimedia intelligent terminal system
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107357957A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project
CN109214767A (en) * 2017-07-07 2019-01-15 中联天盛防水科技股份有限公司 A kind of roof waterproof renovation project Quality Process supervising platform
CN109214767B (en) * 2017-07-07 2021-07-06 中联天盛防水科技股份有限公司 Roofing waterproof repair engineering quality process supervision platform
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN107818402A (en) * 2017-09-30 2018-03-20 中国建筑第七工程局有限公司 A kind of construction quality control system and method
CN107872648A (en) * 2017-10-06 2018-04-03 湖北聚注通用技术研究有限公司 A kind of interior decoration construction scene monitoring system based on three-dimensional modeling
CN108093218A (en) * 2017-12-25 2018-05-29 浙江东南建设管理有限公司 A kind of construction quality video Supervision and system
CN108307150A (en) * 2017-12-29 2018-07-20 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system and method having personnel's management and control function
CN108304995A (en) * 2018-01-10 2018-07-20 四川隧唐科技股份有限公司 Builder's diary management method and system, read/write memory medium
CN108376311A (en) * 2018-02-06 2018-08-07 江苏普信工程项目管理有限公司 The step that leaves a question open in project supervision checks amending method and system
CN108647929A (en) * 2018-03-26 2018-10-12 崔战宾 Construction Visualized management system with feedback and method
CN108460545A (en) * 2018-04-12 2018-08-28 万翼科技有限公司 Construction quality evaluation method, device and the storage medium of engineering construction person
CN108776888A (en) * 2018-05-24 2018-11-09 合肥亿腾工程咨询有限公司 A kind of information management system based on completion information
CN109146411A (en) * 2018-08-02 2019-01-04 广东展诚工程咨询有限公司 A kind of project supervision, cost, the total management system of bid, consulting
CN109087006A (en) * 2018-08-03 2018-12-25 北京吉北电力工程咨询有限公司 Power equipment supervises the processing method and processing device for making information
CN109087006B (en) * 2018-08-03 2022-11-18 北京吉北电力工程咨询有限公司 Method and device for processing power equipment monitoring information
CN109034754A (en) * 2018-09-29 2018-12-18 重庆盾琪科技有限公司 Major project Dispatch and Command Center
CN109598442A (en) * 2018-12-04 2019-04-09 北京诺士诚国际工程项目管理有限公司 A kind of methods of marking and device of supervision behavior
CN111062686A (en) * 2019-12-10 2020-04-24 广州电力工程监理有限公司 Mobile intelligent supervision and control method and system based on digital model
CN111198854A (en) * 2019-12-27 2020-05-26 南京金绿汇成信息科技有限公司 Data state tracking method of multi-source data acquisition device
CN111399437A (en) * 2020-03-26 2020-07-10 上海蓝彬新材料科技有限公司 Wisdom construction supervision system
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN111931583A (en) * 2020-07-14 2020-11-13 襄阳微时间网络科技有限公司 Method for monitoring and early warning whole process of urban construction project
CN112365122A (en) * 2020-10-10 2021-02-12 长沙格力暖通制冷设备有限公司 Production line quality problem monitoring method and system
CN112381250A (en) * 2020-12-02 2021-02-19 北京数途科技有限公司 Equipment early management system
CN113128843A (en) * 2021-03-26 2021-07-16 深圳市邦迪工程顾问有限公司 Remote visual supervision system and supervision method for project supervision
CN113610487A (en) * 2021-07-06 2021-11-05 江苏金小满信息科技有限公司 Construction process record archiving system and method
CN113780841A (en) * 2021-09-15 2021-12-10 铁科院(北京)工程咨询有限公司 Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set
CN114331190A (en) * 2021-12-31 2022-04-12 惠州市建设集团工程建设监理有限公司 Method and system for checking and actually measuring engineering supervision quality
CN114782028A (en) * 2022-06-20 2022-07-22 广州智建云信息技术有限公司 Intelligent checking method and platform
CN115147021A (en) * 2022-09-02 2022-10-04 深圳市房帮帮互联网科技有限公司 Real estate construction quality control method and system
CN115147021B (en) * 2022-09-02 2024-03-19 深圳市房帮帮互联网科技有限公司 Real estate construction quality control method and system
CN115409488A (en) * 2022-09-15 2022-11-29 盐城工学院 Flow management and control method and system for whole engineering construction process
CN116456061A (en) * 2023-06-15 2023-07-18 四川三思德科技有限公司 Intelligent community monitoring management method, system and medium based on dynamic target detection
CN116456061B (en) * 2023-06-15 2023-09-08 四川三思德科技有限公司 Intelligent community monitoring management method, system and medium based on dynamic target detection
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN116501921B (en) * 2023-06-25 2023-09-15 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN117408625A (en) * 2023-09-26 2024-01-16 武汉中超电网建设监理有限公司 Supervision method and system

Similar Documents

Publication Publication Date Title
CN106056347A (en) Engineering project management cloud platform system based on video monitoring
CN106169131A (en) Project management cloud platform system based on the Internet
CN106056268A (en) Engineering project management cloud platform system based on material tracking
Dai et al. Utilizing blockchain and smart contracts to enable audit 4.0: From the perspective of accountability audit of air pollution control in China
CN111598379A (en) Project management method, platform, device, computer equipment and storage medium
CN113313387B (en) Intelligent management and control method and system for major security risk classification of enterprise
CN107222523B (en) Terminal data processing method, device and system
CN112308733A (en) City intelligent management system and method
CN111814240A (en) Highway engineering agronomy worker management system based on BIM technique
US20070136082A1 (en) System and method for energy diversion investigation management
CN105719068A (en) Outgoing maintenance management method and system
CN208888869U (en) It is a kind of based on internet+external coordination construction team safety control platform
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
CN113190617B (en) Concealed engineering quality acceptance method and system based on block chain
CN111861799A (en) Intelligent construction site management system and method
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN111062686A (en) Mobile intelligent supervision and control method and system based on digital model
CN112508343A (en) Implementation method of visual construction management and control system for construction quality management
CN112837195A (en) Block chain-based environment monitoring system and method
CN110727774A (en) Engineering cost consultation management system
CN207070219U (en) Projects supervision system based on video monitoring
CN116957341A (en) Intelligent safety risk management and control system based on steel mill
CN110830558A (en) Mobile inspection system for power monitoring equipment
CN109359831A (en) A kind of judicial expertise organization information management system
CN109902209B (en) Special pressure-bearing equipment user three-dimensional visualization method based on space intelligence

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: BEIJING NUOSHICHENG INTERNATIONAL ENGINEERING PROJECT MANAGEMENT Co.,Ltd.

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication