CN207070219U - Projects supervision system based on video monitoring - Google Patents
Projects supervision system based on video monitoring Download PDFInfo
- Publication number
- CN207070219U CN207070219U CN201620436294.7U CN201620436294U CN207070219U CN 207070219 U CN207070219 U CN 207070219U CN 201620436294 U CN201620436294 U CN 201620436294U CN 207070219 U CN207070219 U CN 207070219U
- Authority
- CN
- China
- Prior art keywords
- video
- video monitoring
- server
- item
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of projects supervision system based on video monitoring, pass through the system, standardization, procedure, informationization, visualization and the intellectuality of management can be realized, so as to realize whole, the comprehensive management to engineering project, the fine degree and the efficiency of management of management are lifted.
Description
Technical field
A kind of project supervision system is the utility model is related to, more particularly to based on video monitoring and combining geographic information system
Projects supervision system.
Background technology
For many years, engineering management is always many government bodies and the problem of construction project dealer quite has a headache.Due to
Engineering management is often related to the personnel of a large amount of complicated data and correlation, therefore, timely, effective percentage and grasps and control methodically
The construction of engineering processed is often not easy to.
, often can only be by the way of manual site to make an inspection tour in existing projects management, management result can only pass through
On-the-spot record, the mode that return supervision companies were scanned or digitized again afterwards typing are fed back, and one side efficiency is low
Under, mistakes and omissions are on the other hand easily produced, and management record can not be remained in the form of video, image, also be lacked afterwards
Few efficiently inquiry mode, the adverse consequences for causing management efficiency and quality to be difficult to ensure that.
The logging of Current Supervision work tradesman fills in paper Jie version or electronic edition by supervisor, and the quality filled in depends on
In checking on for supervisor individual's quality and chief supervision engineer, solution for Problems and perform and with engineer
Sense of responsibility and chief inspector supervision and management dynamics.Simultaneously supervising engineer's mass and safety check on be also based on it is traditional apply for checking and examination,
The normalization of data and the acceptance of work, the degree of checking on of inspection depend entirely on engineer individual, Supervision Enterprise aspect and project
Supervision of the chief inspector to engineering can only also be confined to spot-check established paper data.The tour at management scene and the time of inspection
Total service can only be also currently leaned on, lacks effective measures for the supervision.
Utility model content
The utility model provides a kind of projects supervision system based on video monitoring, the projects supervision system
Including:
Video monitoring camera, including:Pick-up lens, the focus adjustable section of the pick-up lens;Communicator is described logical
The signal of the monitor video or data are sent to server, first item terminal by T unit by wired or wireless way
Or second item terminal;
Server, including:Processor-server, server storage device, server communications, the server process
Device is connected with server storage device, server communications respectively;The server is described by network connection entry terminal
The vision signal or data that server is transmitted by wired either wireless mode reception video monitoring camera;It is described
Server is used to storing and managing data, file, runs the subsystems in the projects supervision system;
First item terminal, including:First item terminal handler, display screen, camera, communication interface, GPS location
Chip, internal storage, external memory storage;The first item terminal handler connects with display screen, camera, communication respectively
Mouth, the connection of GPS location chip, internal storage, external memory storage;The first item terminal passes through service described in network connection
Device;The first item terminal wirelessly receives vision signal or the number that the video monitoring camera is transmitted
According to;The first item terminal runs the subsystems in the projects supervision system according to setting authority;
Second item terminal, including:It is second item terminal handler, display screen, communication interface, internal storage, outer
Portion's memory;The second item terminal handler respectively with display screen, communication interface, internal storage, external memory storage
Connection;The second item terminal passes through server described in network connection;The second item terminal passes through wired or wireless
Mode receives the vision signal or data that the video monitoring camera is transmitted;The second item terminal is weighed according to setting
Limit, runs the subsystems in the projects supervision system;
Management system, for the personnel of supervision control engineering project, material, data;
Problem pending accounts supervise and manage system, for recording asking of finding during on-the-spot make an inspection tour in supervision process, examination, other station
Topic, and form problem rectification advice note and be sent to problem rectification person liable, while in the supervising engineer for being responsible for issue track
Entry terminal in show corresponding pending problem, the pending problem notice is reminded according to the rectification time limit of setting;
GPS working trajectory inquiry systems, the GPS letters that the first item terminal according to entrained by supervisor is returned
Breath, inquiry supervisor present position, and its working trajectory is uploaded into data automatic archiving system;
Data automatic archiving system, for achieving automatically involved by each system included in the projects supervision system
And input, output data.
According to one side of the present utility model, the projects supervision system also include shooting attitude-control device and
Video monitoring system, the control instruction that the shooting attitude-control device is sent according to first, second entry terminal control shooting
The shooting posture of camera lens;The video monitoring system is used to carry out video monitoring to project scene, including:
Video monitoring records module, for the monitor video taken by recorded video CCTV camera;
Video monitoring display module, for broadcasting, display monitoring on the display screen of first, second entry terminal
Video;
Video monitoring camera gesture stability module, for controlling the shooting posture of video monitoring camera;
Video processing module, the video processing module can realize compression, decompression to video file, shear, cut, be multiple
Word is added in system, setting contrast, brightness adjustment, image procossing, audio frequency process, video and/or mark, video preserve;
Video information data base, for storing and managing the video file recorded, and above-mentioned modules to regarding
Frequency various data set when being handled, file.
According to one side of the present utility model, the video monitoring system also includes:
Video comparison module, for being compared processing to video, and show or mark comparative result.
Query video module, for searching specific video according to specific search condition;
Video monitoring daily record and Reports Administration module, for carrying out log management to the content of video monitoring;
Video monitoring is prompted and alarm module, specifically prompts or sends for being sent to specific people, particular telephone
Warning message.
According to one side of the present utility model, the management system comprises at least following module:
Supervision module, for being performed by the personnel of first item terminal record job site, material, arrangement and method for construction
Situation, and form tour record;When particular case in work progress be present, the first item terminal passes through the management
Make an inspection tour module and the particular case is sent to problem pending accounts supervisor's system, and supervision diary is automatically associated to by record is maked an inspection tour
In;
Sidegating effect module, for being verified by first item terminal-pair preparation of construction situation, preserving image data,
And form side reporting;
Module is checked and accepted in management, and entity examination is carried out for the completion situation to job site, and forms record of acceptance, and will
File by examination uploads to data automatic archiving system;
Witness sampling and censorship module, for making a report on witness sampling record, by shooting image, photo, audiovisual materials
Mode carries out witness sampling and by the censorship of witness sampling information and automatic archiving;
Management logging modle, for according to management type formed corresponding types management record and it is automatic
Association;
Management instruction module, the particular problem for will be found during site supervision form management written instructions hair
Give unit in charge of construction.
According to one side of the present utility model, the projects supervision system also includes:
Performance appraisal system, for according to supervisor's routine work records appraisal, issue track implement completion rate, in time
Rate, the quality and quantity for problem of pinpointing the problems, solve, performance assessment criteria, performance appraisal result is drawn according to the timing node of setting;
Standard criterion database and employee's self-service query, help system, supervising engineer encounter problems in the course of the work,
The standard criterion database and employee's self-service query, help system progress self-service query are logged in by authorized ports or are sought help,
Return to obtained feedback information.
To further illustrate feature of the present utility model and technology contents, refer to below in connection with of the present utility model detailed
Illustrate and accompanying drawing.
Brief description of the drawings
Fig. 1 is the hardware net structural representation of the system;
Fig. 2 is the system architecture schematic diagram of the system;
Fig. 3 is the structural representation of video monitoring system.
Embodiment
In order to solve problem present in existing management, the utility model proposes the project work based on video monitoring
Journey supervision system, while facilitating site supervision personnel to carry out the work, make the limitation pair in Supervision Enterprise break through and space
The real-time management and control of project, realize relevant industrial department to the real-time concern of supervising service and supervision.Solve to record online in management
Fill in and video, photo, audio data can be added, can clearly reflect same day action, and can be the number of whole engineering
According to stockpile, laid the foundation for the big data data collection of whole industry.Simultaneously chief inspector, Supervision Enterprise can in real time by
Line is consulted, and checks the working condition and state of supervising engineer.
On-the-spot make an inspection tour is important one of the action of supervisor, and supervisor has found quality, safety in tour
Problem can be tracked solution by entry terminal and be implemented, and can carry out effective control to quality, the safety of engineering.The system
With Internet technology, the communication technology and Video Supervision Technique so that supervisor pinpoint the problems with problem implement time limit, place
Reason situation forms good closure, solves the present situation only pinpointed the problems and solved without tracking.
Fig. 1 is network of relation overall structure diagram of the present utility model, and the utility model provides a kind of projects
Supervision system.There is video monitoring camera, server and first, second entry terminal in the projects supervision system, and
And server and first, second entry terminal and pass through network connection.The network includes but is not limited to internet, mobile communication
Network, LAN, wired dedicated network etc..
According to one embodiment of the present utility model, the utility model includes:It is multiple servers, multiple entry terminals, more
Individual video monitoring camera.
Video monitoring camera, including:Pick-up lens, the focus adjustable section of pick-up lens;Communicator, communicator lead to
Crossing wired or wireless way, either data are sent to first, second entry terminal or server by the signal of monitor video.
Server, including:Processor-server, server storage device, server communications, the server process
Device is connected with server storage device, server communications respectively;The server passes through the project of network connection first, second
Terminal, the server by wired or wireless mode receive vision signal that the video monitoring camera transmitted or
Person's data;The server is used to storing and managing data, file, runs each subsystem in the projects supervision system
System.
According to the specific embodiment of the present invention, first item terminal includes but is not limited to mobile phone, tablet personal computer, shifting
Dynamic communication equipment.The Mobile operating system of first item terminal includes but is not limited to the shifting such as Android, iOS, Windows, Saipan
Dynamic operating system.First item terminal includes:First item terminal handler, display screen, camera, communication interface, GPS are fixed
Position chip, internal storage, external memory storage;First item terminal handler connects with display screen, camera, communication respectively
Mouth, the connection of GPS location chip, internal storage, external memory storage;First item terminal passes through network attached server;First
The vision signal or data that entry terminal is transmitted by wired either wireless mode reception video monitoring camera;Section 1
Mesh terminal runs the subsystems in projects supervision system according to setting authority.According to of the present utility model specific real
Example is applied, each first item terminal is uniquely bound with a specific user, and binding the latter terminal can only log in a user.
It is of course also possible to set according to practical application scene to set number of users that first item terminal can log in etc..Fig. 1 is only
Exemplary explanation, the quantity of video monitoring camera, server and first item terminal are not limited thereto, according to actual need
Seek settable corresponding quantity.
According to the specific embodiment of the present invention, second item terminal includes but is not limited to desktop computer, work
Stand.The Mobile operating system of second item terminal include but is not limited to iOS, Windows, etc. operating system.Second item terminal
Including:Second item terminal handler, display screen, communication interface, internal storage, external memory storage;The second item
Terminal handler is connected with display screen, communication interface, internal storage, external memory storage respectively;The second item terminal
Pass through server described in network connection;The second item terminal receives the video monitoring by wired or wireless mode and taken the photograph
The vision signal or data that camera is transmitted;The second item terminal runs the projects prison according to setting authority
Subsystems in reason system.According to specific embodiment of the utility model, each second item terminal is specific with one
User uniquely binds, and binding the latter terminal can only log in a user.It is of course also possible to set according to practical application scene
Number of users that second item terminal can log in etc. is set.
The explanation that Fig. 1 is merely exemplary, the quantity of video monitoring camera, server and first, second entry terminal
It is not limited thereto, corresponding quantity can be set according to the actual requirements.
Also include in video monitoring camera:Video monitoring camera attitude-control device, for example, be electric platform or
Support.According to an embodiment of the present utility model, video monitoring camera has radio communication function, for example is 3G
Or 4G video monitoring cameras.According to an embodiment of the present utility model, video monitoring camera passes through cable
Transmitting video data.
Fig. 2 is system architecture schematic diagram of the present utility model.As illustrated, the projects supervision system comprises at least such as
Lower subsystem:Management system, the management system comprise at least:Supervision module, sidegating effect module, management
Check and accept module, witness sampling and censorship module, management logging modle, management instruction module, management reporting modules;Ask
Inscribe pending accounts supervisor's system;GPS working trajectory inquiry systems;Data automatic archiving system;Video monitoring system;Performance appraisal system
System;Standard criterion database and employee's self-service query system, help system.
It is as follows according to a specific embodiment of the present utility model, the workflow of supervision module:Site supervision work
Cheng Shi records the personnel of job site in real time during tour, by first item terminal, machinery, material, arrangement and method for construction are held
The influence situation of market condition and weather to construction etc., can include but is not limited to the recording modes such as word, voice, video.
Tour process if it find that exist in work progress the problem of problem, then supervising engineer is to existing with《Problem rectifies and improves advice note》
Form notice unit in charge of construction rectification, should《Problem rectifies and improves advice note》System can be supervised and manage by problem pending accounts carry out pending accounts supervisor,
Examination is tracked after Resolving probiems, it is right after responsibility supervising engineer's acceptance(check)《Problem rectifies and improves advice note》Do at pin item
Reason, the closure hand over circle《Problem rectifies and improves advice note》It can associate to original tour record;Record is maked an inspection tour according to management work
The information such as Cheng Shi authority, ID are automatically associated in the same day supervision diary of the supervising engineer.
It is as follows according to a specific embodiment of the present utility model, the workflow of sidegating effect module:Site supervision work
Cheng Shi carries first item terminal and starts sidegating effect, and preparation of construction situation is verified first, will wherein influence quality shape
Recorded comprehensively into the people of process, machine, material, method, ring etc. factor, the workflow has arranged live conventional part weight
Point position, the sidegating effect template of key procedure, so as to field personnel's standardization, normative carry out the work.In addition, table
Lattice can be shown in the display device of entry terminal and/or Platform Server in the form of e-file.Work as site supervision
When personnel pinpoint the problems during being stood on side, it should be pointed out in time to unit in charge of construction site administrator and require to rectify and improve in time, and
Problem is described and rectified and improved and requires to pass through in sidegating effect module《Problem rectifies and improves advice note》Recorded, and track rectification and fall
It is real, sell item after checking.The problem rectifies and improves advice note and tracking implementation of conditions make a copy for chief supervision engineer simultaneously.
Sidegating effect personnel should be retained necessary using first item terminal as requested to the significant process of sidegating effect
Image data, the photo of working performance of concrete of such as marching into the arena test (including survey by haulage vehicle licence plate, the single receipt of transport, the slump
Examination, the detection of winter construction concrete opening temperature etc.), management witness sampling process, the rectification pinpointed the problems of scene is front and rear contrasts
Photo etc..The image data gathered by first item terminal registry entry supervision system, can be in real time by mobile network
Reach in sidegating effect record, can also first be stored in first item terminal, centralized office work area to be returned passes through wireless network
Upload.Side reporting should be completed after sidegating effect personnel completion sidegating effect work in time fills in work.Sidegating effect records
It can be judged automatically according to the sidegating effect end time, when the sidegating effect end time is in the day shift working time (8:30~17:
00) when in the range of, this part of sidegating effect record can be automatically associated in the supervision diary on sidegating effect personnel's same day;When side is stood
The management end time is in the night work time (17:00~next day 8:30) when in the range of, this part of sidegating effect record can close automatically
During night shift on the day of being linked to project management department records.Sidegating effect record will automatically go to data and return automatically after chief inspector's selective examination is checked
In shelves system.
According to another specific embodiment of the present utility model, the workflow that module is checked and accepted in management is as follows:Unit in charge of construction
Inspection lot acceptance file is made a report on by authorized ports, then, checks and accepts file according to the working region division of labor flow direction duty delimited in advance
Appoint supervising engineer, next, supervising engineer audits to industry in the progress of Inspection lot acceptance file.If examination & verification passes through, supervise
Manage engineer and carry out entity examination to scene according to the time of agreement;If examination & verification not by, directly retract initiating port by
Rectified and improved according to acceptance criteria and reform advice, and continue to make a report on Inspection lot acceptance text by authorized ports by unit in charge of construction
Part.
Supervising engineer carries out entity examination according to the time of agreement to scene, if by checking and accepting, supervising engineer
File is checked and accepted in signature, and agreement turns sequence construction;If initiating port is not retracted directly according to acceptance criteria and rectification by checking and accepting
Opinion is rectified and improved, and continues to make a report on Inspection lot acceptance file by authorized ports by unit in charge of construction.
File is checked and accepted when supervising engineer signs, after agreement turns sequence construction, then:1st, signed file background uploads to money
Expect automatic archiving system;2nd, signed file feeds back to unit in charge of construction's authorized client;3rd, signed file auto-associating
To the supervision diary of responsible engineer.
According to another specific embodiment of the present utility model, the workflow of witness sampling and censorship module is as follows:Apply
Work order bit test personnel make a report on witness sampling by authorized ports and recorded, and witness record is divided the work according to the working region delimited in advance
Flow to responsibility supervising engineer;The supervising engineer carries out witness sampling on the spot according to the time of agreement to scene, to sampling ground
Point, sampling process, approved sample process carry out photo or video data shooting, can be uploaded as the annex that the witness records;Complete real
After ground witness sampling work, supervising engineer signs witness record;The supervising engineer is by the false proof Quick Response Code (root of tracing to the source of purchase
According to one embodiment of the present utility model, false proof Quick Response Code of tracing to the source is easily to tear to pieces type Quick Response Code) tied up with this part witness writing scan
Fixed (Quick Response Code being scanned by system, you can obtain the witness sampling information of the test specimen);Supervising engineer is by the Quick Response Code
Being fixed on test specimen, physically the position of cracky (according to one embodiment of the present utility model, is not tried for different witness samplings
Part, the rule of corresponding labelling has been formulated in advance, outside is affixed on after such as steel reinforcing bar specimen bundling);
Test specimen will be witnessed by unit in charge of construction and deliver to witness laboratory, laboratory receives sample personnel and first confirms that the witness examination received
The integrity of part anti-fake two-dimension code;
Receive sample personnel and witness sampling information is obtained by authorized ports scanning anti-fake two-dimension code in laboratory;
Laboratory is tested according to order ticket requirement, provides laboratory report;
Experimenter passes through authorized ports pump back test result (laboratory report);
Supervising engineer judges whether experimental result meets design and code requirement;
If it is determined that experimental result meets design and code requirement, retrial material can be used for engineering entity, job site
Sequence construction can be turned;Then being formed hands over circle data to be included into data automatic archiving system;
If it is determined that experimental result does not meet design and code requirement, retrial material need to be withdrawn from the arena processing, and scene, which is taken, to be added
Times retrial, process are done over again, or structural solid such as examines at the processing, and form written mabage report;Then being formed hands over circle data to be included into
Data automatic archiving system.
It is as follows according to another specific embodiment of the present utility model, the workflow of management logging modle:First,
On-site supervision engineer according to the management type selecting operational module of development, such as performs on-the-spot make an inspection tour, management is tested respectively
Receive, sidegating effect, on-the-spot make an inspection tour record, management record of acceptance, sidegating effect record and management refer to corresponding to formation respectively
Descriptor clip Text is associated with supervising engineer's day by the port logged according to supervising engineer by order etc., such record automatically
Among note, supervising engineer's diary is not required to repeat to fill in the above.According to a specific embodiment of the present utility model, management
Comprehensive record of the diary as a daily achievement of supervising engineer, it is necessary to it will daily work and be recorded in detail, management
Engineer is logged in and carried out the work by authorized ports, the work in every record such as tour of formation, is checked and accepted, other station, can be closed
It is linked among the supervision diary on the same day, formation only need to be performed once written typing, it is possible to automatically generate among supervision diary
Related content.
In addition, the on-the-spot make an inspection tour record of night shift, management record of acceptance and sidegating effect record will be associated with project night shift note
Among record.And the supervision diary of the supervising engineer of the same day all work on duty will be associated among Project Surveillance daily record.Chief inspector
Reason engineer is responsible for filling in chief supervision engineer's diary, checks Project Surveillance daily record, the daily record of project Safety Supervision and project daily
Night shift records and confirmation of signing.
Certainly, using system of the present utility model, can be generated other kinds of according to project demands or particular demands
Daily record or record, including but not limited to above-mentioned daily record, diary, record, above-mentioned daily record, diary, record are only new as this practicality
The embodiment of type, and it is not intended that to limitation of the present utility model.
It is as follows according to another specific embodiment of the present utility model, the workflow of management instruction module:If
Pinpointed the problems at the scene in supervision process, then problem rectification advice note is sent to unit in charge of construction responsible person concerned.Wherein, problem is whole
Change advice note including at least work contact list, management advice note, engineering moratorium.After unit in charge of construction is rectified and improved, enter running hand
Face is replied, and application check, then carries out check checking by supervising engineer.If it is qualified that supervising engineer checks checking,
Mark, which goes wrong, when problem rectifies and improves advice note has rectified and improved.
According to another specific embodiment of the present utility model, problem pending accounts supervisor's system, which is used for processing, needs pending accounts to supervise and manage
The problem of, the problem of these problems are found during supervising engineer's on-the-spot make an inspection tour, examination, other station, or quality, safety
The problem of joint construction is found, or meeting propose that practicable item need to be rectified and improved, or chief inspector arranges that practicable item, or portion at different levels need to be tracked
Door and leader's inspection need to be rectified and improved and implement item, for the above-mentioned various problems occurred in supervision process, first by problem promoter
The practicable person liable of issue track, problem rectification person liable and the requirement of rectification time limit are specified, forms problem rectification notice single-shot phase
Close accountability unit person liable's problem rectification person liable, while and be responsible for the terminal of the supervising engineer of issue track and occur one
Individual pending problem, it is (new according to this practicality that the pending problem notice can carry out the prompting of countdown bright light according to the rectification time limit of setting
The exemplary embodiment of type, as being green light before 4 hours of countdown time limit, bright orange lamp between 4~1 hours countdown time limits, fall
Bright orange lamp in timing deadlines 1 hour, countdown time limit cross and sent out a warning).Problem rectification complete, from problem rectify and improve person liable to
Be responsible for tracking supervising engineer apply for checking and examination, be responsible for tracking supervising engineer show up check rectification implementation of conditions (or by be responsible for
The supervising engineer of track actively makes an inspection tour follow-up investigations problem rectification situation).If check is qualified, enter to be on sale throughout item processing;If
Check unqualified, then repeat the above steps.
According to another specific embodiment of the present utility model, during the self registering work of GPS working trajectory inquiry systems
Interior GPS working trajectories at the construction field (site), it be able to can also be used as existing as the foundation that on-site supervision engineer is remotely registered
Field supervising engineer fulfils the foundation of management responsibility.When the inquiry system works, GPS working trajectory inquiry system workflows
It is as follows:
First, it is responsible for, by job site floor plan uploading system, importing by chief supervision engineer after project is marched into the arena
Gps data storehouse, and carry out straightened up in place using first item terminal by on-site supervision engineer;
Project Surveillance engineer carries out the work to hilllock daily, login system;System can check that the GPS of first item terminal is
No unlatching, do not open such as, system can be prompted to need to open GPS;
Supervising engineer carries first item terminal and carried out the work to scene, system automatic crawl management work every 5 minutes
Cheng Shi present positions, and rower will be entered in the floor plan of the temporal information and geographical location information of the point position in systems
Note;
Supervising engineer can check the real-time dynamic point position information in the scene on my same day by first item terminal;Chief inspector
Any employee's history dynamic position can be checked by PC or first item terminal with company management layer;
Company can be using employee scene GPS location information as attendance record, for the project for fighting line length, personnel disperse
Staff's benefits.
According to another specific embodiment of the present utility model, data automatic archiving system is used to return data automatically
Shelves, its workflow are as follows:
Step 1:The money that the data for the process examination & approval that unit in charge of construction reports and submits, each side's contact letters, instruction, other needs are filed
Material, by scanning, form electronic document and preserved;And the electronic edition data that Supervision Project portion is formed during implement stakeout
Also preserved;
Step 2:, will be saved in step 1 according to cryptoprinciple according to the three-level tree sort coding scheme of setting
Grouping of data encodes;
Step 3:After carrying out sorting code number to data by full-time documenter, chief supervision engineer is reported to be uploaded after auditing approval;
Step 4:According to the filing principle automatic archiving of setting;First five identical data of data coding is included into identical file
Folder, and according to formed the time sequencing since 001 flowline numbering, i.e. XX101001;
Step 5:Data in identical file folder can automatically generate (or renewal) corresponding list in volume according to data descriptor;
Step 6:After generating list in volume, it can according to demand be inquired about, be counted, being sorted, associating management report.
In addition, the data automatic archiving system can also store other subsystems, module inputs, the information that exports.
According to another specific embodiment of the present utility model, performance appraisal system can will be for the daily work of supervisor
Note down evaluation, issue track implement completion rate, promptness rate, problem of pinpointing the problems, solve quality and quantity, abide by Zhang Shouji,
The performance assessment criteria such as professional ethics, business evaluating, (can be quarterly such as according to the needs of examination according to the timing node of setting
(last moon 25), every half a year (last moon 25), either every year (last moon 25) or according to need
Will be at any time by the end of sometime point) quantify after data capture input checking system automatically, according to calculating mould set in advance
Type (i.e. each quantizing examination index assigns certain weight, and weight score is calculated), draws evaluation score and ranking;Company
Management level are managed decision-making with reference to performance appraisal result.According to an embodiment of the present utility model, there is provided as follows
Data quantization mode:It can be circulated first to the port of chief supervision engineer after the daily submission of supervisor's routine work record, by
Chief inspector carries out selective examination and checks and provide evaluation, proposes concrete modification opinion if necessary, and chief inspector's evaluation corresponds to corresponding fraction, can
All evaluations are collected and calculate score;The completion rate and promptness rate of issue track can be drawn by mathematical statistics (such as
Situation about sending out a warning without reason will be deducted certain fraction);Pinpoint the problems, solve quantity, the quality of problem, it is whole in the problem of making a report on
The link for changing advice note is just evaluated via chief inspector port, and is converted to quantization score value;Remaining abide by chapter keep travel notes be, professional road
Moral observing situation and business evaluating active situation can carry out bonus point, deduction of points or achievement record according to the regulation of company management's system
The processing such as enter, when event occurs by corporate operations personnel typing.
According to a specific embodiment of the present utility model, standard criterion database and employee's self-service query system, seek help
The workflow of system is as follows:
Supervising engineer is encountered problems in the course of the work, and logging in first, second entry terminal by authorized ports is carried out
(inquiry mode is searched for by descriptor to self-service query, recommends corresponding contents, descriptor definition in standard criterion database
More accurate, search content recommendation can be more targeted);
By the inquiry to standard criterion database, query feedback information is obtained;
If problem is resolved, the prompt message and related content of Resolving probiems are returned;
If problem is not resolved, turns to employee and seek help passage;
Sought help inquiry system by employee, solved the problem of by expert engineer or Professional team leaders to not being resolved
Answer, and return to answer information and related content;
If the problem of expert engineer or Professional team leaders still can not be to not being resolved is answered, by chief inspector's (generation
Table) to not being resolved the problem of answer, and return to answer information and related content;
If the problem of chief inspector's (representative) still can not be to not being resolved is answered, by company project portion to not obtaining
Solve the problems, such as to be answered, and return to answer information and related content;
If the problem of company project portion still can not be to not being resolved is answered, by expert advisor team to not obtaining
To solving the problems, such as to be answered, and return to answer information and related content.
Fig. 3 is the structured flowchart of video monitoring system.The video monitoring system comprises at least:
Video monitoring camera gesture stability module, for controlling the shooting posture of video monitoring camera.It is used as this reality
With a new embodiment, the current attitude data of video monitoring camera is shown on first, second entry terminal,
Including but not limited to, the camera site of video monitoring camera, shooting angle, shooting direction, coverage, shooting time, bat
Focal length etc. is taken the photograph, the user with corresponding authority can be by passing through user input equipment (bag on first, second entry terminal
Include but be not limited to mouse, keyboard, contact panel), change or the current attitude data of video monitoring camera is set, so as to logical
Cross the shooting angle of proprietary communication circuit or wireless communication line remote control in the video monitoring camera of project sites
Degree, camera site, shooting direction, coverage, shooting time, shooting focal length, so as to control the shooting of video monitoring camera
Posture, obtain the monitor video content seen desired by user.
Certainly, can also be in first, second entry terminal for as the further preferred embodiment of the utility model
The three-dimensional rendering graph model of video monitoring camera is rendered, is then set on first, second entry terminal by user's input
Standby (including but is not limited to mouse, keyboard, contact panel, Touch Screen), the posture and focal length of the three-dimensional rendering graph model are controlled,
So as to by proprietary communication circuit or wireless communication line remote control project sites set with the three-dimensional wash with watercolours
Dye graph model correspond to the shooting angle of consistent video monitoring camera, camera site, shooting direction, coverage, when shooting
Between, shooting focal length, so as to control the shooting posture of video monitoring camera, obtain in the monitor video seen desired by user
Hold.According to pre-set model data, corresponding threedimensional model is rendered on the display of computer and belongs to computer
The prior art in field, and emphasis of the present utility model and this is not lain in, and the related implementation that renders can be according to existing
Technology is realized, therefore the utility model repeats no more.
Video monitoring records module, for the monitor video taken by recorded video CCTV camera.User is according to making
With authority, video record function is turned on or off, so as to both can also may be used by video monitoring camera monitoring of a recorded programme video
Only to watch monitor video in real time without recorded video.According to a specific embodiment of the present utility model, the module both can be with
Only run, only can also be run in second item terminal in first item terminal, can also be at all first, second
Run in mesh terminal, that is to say, that the operation authority of the module can be configured according to the demand of engineering project.
Video monitoring display module;For being played on the display screen of first, second entry terminal, display monitoring regards
Frequently.The video monitoring display module can be according to the size and resolution ratio of display screen, according to the display side specified by user
Formula (include but is not limited to, normal play, fast-forward play, slow play, rewinding are played, played frame by frame etc.), show and broadcast automatically
Put the monitor video recorded module by video monitoring and recorded;In addition, the video monitoring display module can also be by user
Resolution ratio, compression ratio of video playback etc. are set;The video monitoring display module can also be automatically according to the chi of display screen
Very little size and resolution ratio, video card resolution ratio etc. are adaptively adjusted the broadcast mode of monitor video, are allowed to mutually fit with display screen
Should, give user more preferable display effect.According to a specific embodiment of the present utility model, the module both can be only in Section 1
Run, only can also be run in second item terminal in mesh terminal, can also be transported on first, second all entry terminals
OK, that is to say, that the operation authority of the module can be configured according to the demand of engineering project.
Video processing module, the video processing module can to video file realize compression, decompression, shearing, cut,
Word and/or mark, video preservation etc. are added in duplication, setting contrast, brightness adjustment, image procossing, audio frequency process, video
Common video processing function.In addition, the video processing module, which also has, sets function, recording, broadcasting can be set, shown
Show, handle the parameter of video file, consequently facilitating the user with corresponding management authority operates in itself to video file, carry
The observing effect and service efficiency of high video;Because Video processing belongs to prior art, the tool of above-mentioned various vision operations in itself
Body realizes that algorithm and programming details in detail are not emphasis of the present utility model, repeats no more.According to one of the present utility model
Specific embodiment, the module only can both be run in first item terminal, only can also be run in second item terminal, also
It can be run on first, second all entry terminals, that is to say, that the operation authority of the module can be according to engineering project
Demand and be configured.
Video comparison module, for being compared processing to video, using Computer Image Processing and identification technology, to regarding
Certain objects, equipment in frequency, building, component are compared, and show or mark comparative result.For example, according to this
One embodiment of utility model, when carrying out video monitoring for main component, in one section of special time, pass through
Compare the difference of the monitor video for the theme component recorded during front and rear different time points, building for main component can be obtained
If relevant informations such as progresses, it is easy to administrative staff to carry out follow-up processing., should according to a specific embodiment of the present utility model
Module only can both be run in first item terminal, only can also be run in second item terminal, can also be all
Run on first, second entry terminal, that is to say, that the operation authority of the module can be carried out according to the demand of engineering project
Set.
Query video module, for according to specific search condition, specific video to be searched in video information data base.
Such as when supervising engineer needs to inquire about No. 20 video prison at the agent structure of the point of 2 pm -3 on January 22nd, 2016
When controlling the video of shot by camera, there is the user of search access right, when can be by first, second entry terminal input inquiry
Between and video monitoring camera to be checked numbering, you can the video content of this time is fetched from video information data base.
In addition, query video module can also according to the query and search formula inquiry of complexity, return to corresponding Query Result, such as, can be with
Looked into according to the multiple queries condition such as the numbering of video monitoring camera, shooting time, camera site in video information data base
Corresponding video is ask, so as to improve the convenience of inquiry.According to a specific embodiment of the present utility model, the module both can be with
Only run, only can also be run in second item terminal in first item terminal, can also be at all first, second
Run in mesh terminal, that is to say, that the operation authority of the module can be configured according to the demand of engineering project.
Video monitoring daily record and Reports Administration module, for carrying out log management to the content of video monitoring.In addition, video
Monitoring daily record and Reports Administration module can also be collected or illustrated to the situation of video monitoring, so as to form video monitoring
Report, it is sent to the administrative staff of specified permission;And video monitoring daily record can be modified and be annotated, repairing each time
A new log content can all be formed without covering original daily record by changing and annotating;The modification of daily record and annotation can all record
Detail time, and explain the reason.Therefore, video monitoring daily record can objective reality reflecting video monitoring daily record situation, also can
Enough it is easy to be verified at any time.The administrative staff of certain authority can by video monitoring daily record and Reports Administration module polls and
Video monitoring daily record and report are browsed, and video monitoring daily record and Reports Administration module can be utilized to be sent to specific personnel
Work order, plan or backlog, it is easy to related personnel in time, accurately to complete video monitoring daily record and report pipe
Science and engineering is made, and greatly improves operating efficiency, prevents mistakes and omissions.It is of course also possible to authority and model are set to video monitoring daily record and report
Enclose, different authority and scope are set for different administrative staff, it is ensured that the security and secrecy of video monitoring log information
Property.According to a specific embodiment of the present utility model, the module only can both be run in first item terminal, can also be only
Run, can also be run on first, second all entry terminals, that is to say, that the module in second item terminal
Operation authority can be configured according to the demand of engineering project.
Video monitoring is prompted and alarm module, in the case of particular condition occur, by video monitoring prompting and
Alarm module, specific prompting or alert are sent to specific people, particular telephone.It was found that dangerous situation is video
One of main function of monitoring, according to a specific embodiment of the present utility model, when monitor area, monitored object are endangered
Dangerous situation condition, or engineering site occur particular condition (such as equipment it is out of service, have a power failure etc.) when, imaged by video monitoring
The personnel that machine is monitored, prompt message or warning message can manually be sent by video monitoring prompting and alarm module.
Prompt message includes but is not limited to that voice, word, symbol, numeral, image, video, vibrations, light etc. is visible or appreciable letter
Number, it can also include being prompted and be alarmed so as to realize by the order or data of computer system automatic identification and processing
Effect.According to another specific embodiment of the present utility model, video monitoring prompting and alarm module can automatically send and carry
Show or warning message.For example, on the building site of engineering project, agent structure is not before completing, at night and unglazed
It is bright, if there is naked light at night, illustrate that project engineering site goes wrong, now the prison captured by video monitoring camera
Occur in control picture pre- with the visibly different highlight regions of background frame, now video monitoring prompting and alarm module meeting basis
The decision condition of definition is (as certain in illustrative examples, such as video monitoring prompting and alarm module automatic decision monitored picture
The gray value of the pixel in one region is significantly greater than other regions, and the region area of the gray value accounts for the area ratio of monitored picture
Example more than one predefined threshold value), then send prompt message or warning message automatically, without manually send prompting or
Person's warning message.Certainly, the manual prompt described by above-mentioned embodiment or alarm, automatic prompting or alarm, are all exemplary
Explanation, do not form the limitation to scope of protection of the utility model, those skilled in the art can be according to above-mentioned implementation feelings
Condition, without creative efforts, carrying for other forms can be designed according to engineering project actual demand completely
Show or type of alarm, similarly belong to the scope of protection of the utility model.Because the practical application of this area is varied,
In the case of not departing from the utility model core technology scheme, no longer the detailed content of its concrete application is repeated.According to
A specific embodiment of the present utility model, the module only can both be run in first item terminal, can also be only second
Run, can also be run on first, second all entry terminals on entry terminal, that is to say, that the operation power of the module
Limit can be configured according to the demand of engineering project.
Video information data base, for storing and managing the video file recorded, and above-mentioned modules to regarding
Frequency various data set when being handled, file.
To sum up, the utility model provides a kind of projects supervision system, can solve asking for conventional engineering management examination
Topic, to make user in time and efficiently can grasp and control the project progress of each fixed point, and can obtain easily it is each fixed
The related data of the engineering of point.Therefore, the utility model has at a relatively high practical value, and the improvement with using effect.
Preferred embodiment of the present utility model is the foregoing is only, is not intended to limit protection model of the present utility model
Enclose.All any modification, equivalent substitution and improvement within the spirit and principles of the utility model, made etc., all should be included
Within the scope of protection of the utility model.
Claims (3)
- A kind of 1. projects supervision system based on video monitoring, it is characterised in that the projects supervision system bag Include:Multiple video monitoring cameras, each video monitoring camera include:Pick-up lens, the focus adjustable of the pick-up lens Section;The signal of the monitor video or data are sent to by communicator, the communicator by wired or wireless way Server, first item terminal or second item terminal;Multiple servers, every server include:Processor-server, server storage device, server communications, it is described Processor-server is connected with server storage device, server communications respectively;The server passes through network connection item Mesh terminal, the server by wired or wireless mode receive vision signal that the video monitoring camera transmitted or Person's data;The server is used to storing and managing data, file, runs each subsystem in the projects supervision system System;Multiple first item terminals, each first item terminal include:First item terminal handler, display screen, camera, Communication interface, GPS location chip, internal storage, external memory storage;The first item terminal handler respectively with display screen Curtain, camera, communication interface, GPS location chip, internal storage, external memory storage connection;The first item terminal passes through Server described in network connection;The first item terminal wirelessly receives what the video monitoring camera was transmitted Vision signal or data;The first item terminal is run each in the projects supervision system according to setting authority Individual subsystem;Multiple second item terminals, each second item terminal include:Second item terminal handler, display screen, communication connect Mouth, internal storage, external memory storage;The second item terminal handler is deposited with display screen, communication interface, inside respectively Reservoir, external memory storage connection;The second item terminal passes through server described in network connection;The second item terminal is led to Cross wired either wireless mode and receive vision signal or data that the video monitoring camera is transmitted;The second item Terminal runs the subsystems in the projects supervision system according to setting authority.
- 2. the projects supervision system according to claim 1 based on video monitoring, it is characterised in that the project work Journey supervision system also includes shooting attitude-control device and video monitoring system, the shooting attitude-control device according to first, The shooting posture for the control instruction control pick-up lens that second item terminal is sent;The video monitoring system is used to show project Field carries out video monitoring, including:Video monitoring records module, for the monitor video taken by recorded video CCTV camera;Video monitoring display module, for being played on the display screen of first, second entry terminal, display monitoring regards Frequently;Video monitoring camera gesture stability module, for controlling the shooting posture of video monitoring camera;Video processing module, the video processing module can to video file realize compression, decompression, shearing, cut, replicate, Word is added in setting contrast, brightness adjustment, image procossing, audio frequency process, video and/or mark, video preserve;Video information data base, for storing and managing the video file recorded, and above-mentioned modules enter to video Set various data, file during row processing.
- 3. the projects supervision system according to claim 2 based on video monitoring, it is characterised in that the video prison Control system also includes:Video comparison module, for being compared processing to video, and show or mark comparative result;Query video module, for searching specific video according to specific search condition;Video monitoring daily record and Reports Administration module, for carrying out log management to the content of video monitoring;Video monitoring is prompted and alarm module, and specifically alarm is prompted or send for being sent to specific people, particular telephone Information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620436294.7U CN207070219U (en) | 2016-05-16 | 2016-05-16 | Projects supervision system based on video monitoring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620436294.7U CN207070219U (en) | 2016-05-16 | 2016-05-16 | Projects supervision system based on video monitoring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207070219U true CN207070219U (en) | 2018-03-02 |
Family
ID=61500395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620436294.7U Active CN207070219U (en) | 2016-05-16 | 2016-05-16 | Projects supervision system based on video monitoring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207070219U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108460535A (en) * | 2018-03-21 | 2018-08-28 | 浙江省工程咨询有限公司 | A kind of process in project supervision joins Supervision |
CN109583842A (en) * | 2018-12-04 | 2019-04-05 | 北京诺士诚国际工程项目管理有限公司 | A kind of management monthly magazine generation method, device, electronic equipment and computer storage medium |
CN110971878A (en) * | 2019-12-12 | 2020-04-07 | 北京京能清洁能源电力股份有限公司北京分公司 | Engineering field management system |
-
2016
- 2016-05-16 CN CN201620436294.7U patent/CN207070219U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108460535A (en) * | 2018-03-21 | 2018-08-28 | 浙江省工程咨询有限公司 | A kind of process in project supervision joins Supervision |
CN109583842A (en) * | 2018-12-04 | 2019-04-05 | 北京诺士诚国际工程项目管理有限公司 | A kind of management monthly magazine generation method, device, electronic equipment and computer storage medium |
CN110971878A (en) * | 2019-12-12 | 2020-04-07 | 北京京能清洁能源电力股份有限公司北京分公司 | Engineering field management system |
CN110971878B (en) * | 2019-12-12 | 2020-11-06 | 北京京能清洁能源电力股份有限公司北京分公司 | Engineering field management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106056347A (en) | Engineering project management cloud platform system based on video monitoring | |
CN106056268A (en) | Engineering project management cloud platform system based on material tracking | |
CN106910032B (en) | Construction engineering quality detection supervision platform and method | |
US20070136082A1 (en) | System and method for energy diversion investigation management | |
CN105989443A (en) | Intelligent-mobile-terminal-based communication line inspection system | |
CN111768123A (en) | Visual management system for power distribution network construction site | |
CN208888869U (en) | It is a kind of based on internet+external coordination construction team safety control platform | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
CN114140999B (en) | Project supervision system based on communication of Internet of things | |
CN112883310A (en) | Multi-level comprehensive community service platform and equipment based on big data | |
CN107693997B (en) | Fire fighting equipment detection and maintenance management system and management method | |
CN108038674A (en) | A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function | |
CN110727774A (en) | Engineering cost consultation management system | |
CN111861799A (en) | Intelligent construction site management system and method | |
CN114399265A (en) | Electric power engineering construction project overall process management and control system | |
CN112508343A (en) | Implementation method of visual construction management and control system for construction quality management | |
CN113762782A (en) | Construction project supervision site efficiency improving method and device and mobile terminal | |
CN109359831A (en) | A kind of judicial expertise organization information management system | |
CN113808757A (en) | Infectious disease registration traceability system | |
CN109902209B (en) | Special pressure-bearing equipment user three-dimensional visualization method based on space intelligence | |
CN109801416A (en) | A kind of total dimension computer lab management method of building together based on big data analysis | |
CN114091944A (en) | Cloud-end-coordinated distribution network engineering field operation analysis decision system | |
AU2017245284A1 (en) | A Method and System for Generating a Report | |
CN112395476A (en) | Engineering data management method | |
CN112085341A (en) | Master station system suitable for risk management and control of overall process of power production operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING NUOSHICHENG INTERNATIONAL ENGINEERING PROJECT MANAGEMENT Co.,Ltd. Document name: Notification of Passing Examination on Formalities |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING NUOSHICHENG INTERNATIONAL ENGINEERING PROJECT MANAGEMENT CO.,LTD. Person in charge of patentsThe principal of patent Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING NUOSHICHENG INTERNATIONAL ENGINEERING PROJECT MANAGEMENT CO.,LTD. Person in charge of patentsThe principal of patent Document name: payment instructions |
|
DD01 | Delivery of document by public notice |