CN106056268A - Engineering project management cloud platform system based on material tracking - Google Patents

Engineering project management cloud platform system based on material tracking Download PDF

Info

Publication number
CN106056268A
CN106056268A CN201610322652.6A CN201610322652A CN106056268A CN 106056268 A CN106056268 A CN 106056268A CN 201610322652 A CN201610322652 A CN 201610322652A CN 106056268 A CN106056268 A CN 106056268A
Authority
CN
China
Prior art keywords
management
module
supervision
information
cloud platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610322652.6A
Other languages
Chinese (zh)
Inventor
韩涛
易伟强
黄远征
张湘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing North International Engineering Project Management Co Ltd
Original Assignee
Beijing North International Engineering Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing North International Engineering Project Management Co Ltd filed Critical Beijing North International Engineering Project Management Co Ltd
Priority to CN201610322652.6A priority Critical patent/CN106056268A/en
Publication of CN106056268A publication Critical patent/CN106056268A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an engineering project management cloud platform system based on material tracking. The system can not only realize monitoring and management work standardization, process streamlining, informationization, visualization and intelligentization. The system can also follow up the process of an engineering project, monitor and manage the engineering project so as to realize whole process and comprehensive management of the engineering project and increase management precision and efficiency.

Description

Project management cloud platform system based on material tracking
Technical field
The present invention relates to a kind of project supervision and relevant geographic information management system thereof, particularly to based on material tracking Project management cloud platform system.
Background technology
In China, management is from last century since the eighties is introduced, and the development that experienced by more than 20 year defines specially The engineering management service mode of industry, plays the important and pivotal role in the construction of engineering.But management simultaneously is also deposited Uneven at peopleware, management is widely dispersed in each construction project and supervision is inadequate, implementation capacity is poor, part Practitioner's responsibility difference and situation about can not observe professional ethics at work, cause part Quality Assistance Representative unit shape With illusory, the acceptance of work is done as a mere formality often, has had a strong impact on the development of supervision trade.The work note of Current Supervision work tradesman Record is filled in paper Jie's version or electronic edition by supervisor, and the quality filled in depends on supervisor individual's quality and chief supervision engineer Check on, for the solution of Problems and perform also to be the supervision and management dynamics of the responsibility with engineer and chief inspector.With Time supervising engineer's mass and safety check on and be also based on traditional applying for checking and examination, the standardization of data and the acceptance of work, the handle of inspection Pass degree depends entirely on engineer individual, and the supervision of engineering also can only be confined to by Supervision Enterprise aspect and Project Director The paper data selective examination formed.Tour and the time of inspection that management is on-the-spot the most also can only lean on total service, lack effective Measures for the supervision.
Computerized information development in science and technology in recent years is rapid, and especially the Internet is prevailing the most in the ascendant, this become Under gesture, government bodies or each company line number all turn to target with computerization, network.And for many years, engineering management is always The problem that many government bodies and construction project dealer quite have a headache.The most complicated data and phase is often related to due to engineering management The personnel closed, therefore, in time, effective percentage grasp methodically and control the construction of engineering and be often not easy to.
Further, since domestic credit system builds imperfection, in project management is put into practice, there is also material supply In the situation adulterating, give short weight, and present project management also cannot realize to material information automatic How inquiry, comparison, management, therefore, utilize and automatically identify, follow the tracks of, inquire about, manage material, be also in modern project management urgently The problem that need to solve.
Summary of the invention
In order to solve problem present in existing management, the present invention proposes project management cloud based on the Internet and puts down Platform system, while facilitating site supervision personnel to carry out the work, makes the restriction in Supervision Enterprise break through and space to project Management and control in real time, it is achieved relevant industrial department's concern real-time to supervising service and supervision.Solve management records to fill in online And video, photo, audio data can be added, it is possible to clearly reflection job content on the same day, and can be that the data of whole engineering are long-pending Tired data, the big data information collection for whole industry lays the foundation.Chief inspector, Supervision Enterprise can be passed through to look into online in real time simultaneously Read, check working condition and the state of supervising engineer.
Important one of the on-the-spot job content maked an inspection tour as supervisor, supervisor finds quality, safety in tour Problem also is tracked solving to implement, it is possible to quality, the safety of engineering is carried out effectively control.Native system uses the Internet skill Art so that time limit, treatment situation that supervisor pinpoints the problems practicable with problem form well Guan Bi, solve and only find to ask Topic is not tracked the present situation solved.
According to an embodiment of the invention, it is provided that a kind of project management cloud platform system based on material supervision, institute State project management cloud platform system to include: described material monitoring system, for the material in project management is identified, is managed Reason;Wherein, described material monitoring system at least includes such as lower module: material information input module, for being inputted by material information In described material monitoring system;Material information reads and identification module, is used for reading and identifying material information;Material ratio is to mould Block, for after material information is imported into described material monitoring system, the material information obtained by identifying is believed with material Material information in breath data base contrasts, and provides corresponding prompting;Material enquiry module, is used for inquiring about material information; Material information change and management module, for carrying out information change and management to material;Material daily record and reporting modules, for right Material information carries out log management, and forms report;Material information data base, for storing and manage the defeated of above-mentioned modules Enter, export data;And, management system, for the personnel of supervision control engineering project, material, data;Described management system System at least includes such as lower module: supervision module, for by the personnel of mobile terminal records job site, material, construction Scheme implementation status, and form tour record;When there is particular case in work progress, described mobile terminal passes through described prison Reason is maked an inspection tour module and described particular case is sent to problem pending accounts supervisor's system, and tour record is automatically associated to supervision diary In;Sidegating effect module, for being verified preparation of construction situation by mobile terminal, preserving image data, and forms side Stand record;Module is checked and accepted in management, for the completion situation of job site is carried out entity examination, and forms record of acceptance, and will Through files passe examination to data automatic archiving system;Witness sampling and censorship module, be used for making a report on witness sampling record, Witness sampling is carried out and by witness sampling information censorship automatic archiving by the way of shooting image, photo, audiovisual materials; Management logging modle, for forming management record the auto-associating of corresponding types according to management type;Prison Science and engineering makees instruction module, for the particular problem found during site supervision formation management written instructions is sent to work order Position;
According to an embodiment of the invention, described material information input module use with word, numeral, bar code, Material information is input in described material monitoring system by the forms such as Quick Response Code, image, video, RFID.
According to an embodiment of the invention, described material information reads and identification module uses word, numeral, bar shaped The forms such as code, Quick Response Code, image, video, RFID read and identify material information.
According to an embodiment of the invention, described material comparing module have image processing function and image recognition Function, for being identified the material image through image procossing with the image in material information data base and contrasting.
According to an embodiment of the invention, described material enquiry module by the way of word, image at described thing Material information database inquires about material information.
According to an embodiment of the invention, described project management cloud platform system also includes: problem pending accounts supervisor is System, for recording in supervision process the problem on-the-spot maked an inspection tour, check and accept, find during other station, and forms problem rectification notice Single-shot gives problem rectification person liable, and the mobile terminal the supervising engineer of responsible issue track occurs the most pending simultaneously Problem, described pending problem notice can be reminded according to the rectification time limit set;If problem has been rectified and improved, problem rectify and improve Person liable applies for checking and examination to the supervising engineer of responsible tracking, and the supervising engineer being responsible for following the tracks of shows up and checks rectification implementation of conditions, or Follow-up investigations problem rectification situation is actively maked an inspection tour by the supervising engineer of responsible tracking;If it is qualified to check, then carry out at pin item Reason;GPS working trajectory inquiry system, is used for inquiring about supervisor present position, and it is automatic that its working trajectory is uploaded to data Filing system;And performance appraisal system, described performance appraisal system will for supervisor's routine work records appraisal, problem with Track implements completion rate, promptness rate, pinpoint the problems, the solve quality and quantity of problem, performance assessment criteria, according to the timing node set Draw performance appraisal result;Data automatic archiving system, for automatically achieving included in described project management cloud platform system Each system and each module involved by input, output data.
According to an embodiment of the invention, described project management cloud platform system also includes: standard criterion data base With employee's self-service query, help system;Supervising engineer encounters problems in the course of the work, logs in described mark by authorized ports Quasi-normative database and employee's self-service query, help system carry out self-service query or seek help, and return the feedback information obtained.
The present invention can be to the whole flow processs before the production of material, in production, after production, before use, in use, after use Being identified, follow the tracks of and manage, material also is able to visualized management, thus considerably increases the convenience of engineering management, also adds The strong efficiency of management, overcomes the disadvantageous problem of handling of goods and materials.
For further illustrating inventive feature and technology contents, refer to below in connection with detailed description of the invention with attached Figure.
Accompanying drawing explanation
Fig. 1 is the network of relation overall structure schematic diagram of native system;
Fig. 2 is the configuration diagram of native system;
Fig. 3 is the schematic diagram of material monitoring system composition in native system;
Fig. 4 is the workflow schematic diagram of the supervision module of native system;
Fig. 5 is the workflow schematic diagram of the sidegating effect module of native system;
Fig. 6 is the workflow schematic diagram of the management examination module of native system;
Fig. 7 is witness sampling and the workflow schematic diagram of censorship module of native system;
Fig. 8 is the workflow schematic diagram of the management logging modle of native system;
Fig. 9 is the workflow schematic diagram of the management instruction module of native system;
Figure 10 is the workflow schematic diagram of problem pending accounts supervisor's system of native system;
Figure 11 is the workflow schematic diagram of the performance appraisal system of native system;
Figure 12 is standard criterion data base and employee's self-service query system, the workflow signal of help system of native system Figure;
Figure 13 is the workflow schematic diagram of the GPS working trajectory inquiry system of native system;
Figure 14 is the workflow schematic diagram of the data automatic archiving system of native system.
Figure 15 is the project supervision diary presented example figure at project mobile terminal of native system.
Detailed description of the invention
Fig. 1 is the network of relation overall structure schematic diagram of the present invention, the invention provides a kind of project management cloud platform system System.This project management cloud platform system has server and entry terminal, and server and entry terminal and pass through network Connect.According to a particular embodiment of the invention, each entry terminal and a specific user uniquely bind, and binding later is eventually End can only log in a user.It is of course also possible to carry out, according to actual application scenarios, the number of users that setting item terminal can log in Deng setting.For a person skilled in the art, the corresponding relation between user and entry terminal can set according to demand, This corresponding relation the emphasis of non-invention, above-mentioned specific corresponding relation is not construed as limiting the invention.Additionally, Fig. 1 is only Being only exemplary explanation, those skilled in the art all know, the quantity of server and entry terminal is not limited thereto, Ke Yigen The quantity of server and entry terminal is set according to actual demand.
According to one embodiment of present invention, the hardware required for the present invention needs at least to include: multiple servers (put down by cloud Platform), multiple entry terminal.Wherein said entry terminal include project mobile terminal (include but not limited to mobile phone, panel computer, Mobile communication equipment), desk computer, work station, notebook etc..The Mobile operating system of described project mobile terminal Include but not limited to the Mobile operating systems such as Android, iOS, Saipan.A specific embodiment according to the present invention, described item Mesh mobile terminal includes: shooting part, display screen.According to another specific embodiment of the present invention, described project moves Terminal also includes: Radio Frequency ID element.
Wherein, server, for running each system and the modules of described project management cloud platform system, store institute State the data in project management cloud platform system and file;Entry terminal, for according to authorization privilege, on described entry terminal Run the system in described cloud platform system and particular module.
The system of the present invention may operate on server, entry terminal, and user can use in this system according to authority Some or all of subsystem or module.
Fig. 2 is the system architecture schematic diagram of the present invention.As it can be seen, this project management cloud platform system at least includes as follows Subsystem: material monitoring system;Described material monitoring system at least includes: material information input module, material information read and The change of identification module, material comparing module, material enquiry module, material information and management module, material daily record and reporting modules, Material information data base;Management system;Described management system at least includes: supervision module, sidegating effect mould Block, module, witness sampling and censorship module, management logging modle, management instruction module, management report are checked and accepted in management Module;Problem pending accounts supervisor's system;Performance appraisal system;Standard criterion data base and employee's self-service query system, help system; GPS working trajectory inquiry system;Data automatic archiving system.
Fig. 3 is the structured flowchart of material monitoring system.Described material monitoring system at least includes: material information input mould Block, material information read and identification module, material comparing module, material enquiry module, material information change and management module, thing Material daily record and reporting modules, material information data base.
Material information input module, is input in material monitoring system for material information.Material information can with word, The forms such as numeral, bar code, Quick Response Code, image, video, RFID are input in material monitoring system.Initial material information can To use manually or automatically in the way of input system, the typing form being previously set according to each project or template, adopt Input with words input equipment or image, video, radio frequency identification equipment.RF identification (i.e. Radio Frequency Identification, hereinafter referred to as RFID) technology is one and utilizes radiofrequency signal to realize contactless information by Space Coupling It is passed through transmitted information and reaches the technology of identifying purpose.It is by special information coding write electronic tag, label It is secured in the target needing to identify.It is waterproof antimagnetic, high temperature resistant, without light source, even that RFID has that bar code do not possesses Data can be read through exterior material;Service life is long;Can work in the presence of a harsh environment;Can embed easily or be attached to not Similar shape, type product on;Read apart from farther;Can write and access data, the write time is fewer than bar code;Label interior Appearance can dynamically change;Multiple label can be processed simultaneously;The data access of label has cryptoguard, and safety is higher;Permissible Object accompanying by RFID label tag is tracked the advantages such as location.
According to the present invention it is possible to by the relevant information of the mode record materials such as Quick Response Code, image, RFID, thus by thing Expect in Data Enter material monitoring system and judge whether this material was exchanged.
A specific embodiment according to the present invention, as a example by common coating, coating material production manufacturer or project construction Consistent material information corresponding with coating products (is included but not limited to, manufacturer by side or management side beforehand through entry terminal Title, project name, name of product, production batch, production numbering, sales region, date of manufacture, the date of production, grown place Geographical location information, other predefined information etc.), being input to material supervision with text mode by material input information module is In the material information data base of system.Then, needed for the production firm of coating is according to projects, the coding reserved in advance according to realization Mode, generates the relevant information of coating pattern in 2 D code, is then sprayed by pattern in 2 D code or be printed upon the most waterproof On base material, and paste specific location on the pail pack of coating, then the coating packing bucket posting pattern in 2 D code is carried out Take pictures, then the image taken pictures is input to by material input information module the material information data base of material monitoring system In.So, material information data base had both existed the related text information of material, there is also the image information of material, it is simple to Material is carried out authenticity verification.
As a preferred embodiment of the present invention, in order to realize being fixed on by Quick Response Code in various construction material sample, When following example make construction material sample at the scene, first will post by PET material that (this material is adapted to Building wood Material sample transport, the various environment of maintenance processes) the mobile phone two-dimension code adhesive label that makes is affixed on Quick Response Code band, then The wrapping method different to the sample implementation of different shape: bar samples (reinforcing bar, steel, tubing, electric wire etc.): directly by two dimension Code band binding sample;Pulverized specimen (cement, soil, etc.): directly prick the sealing of sample packaging bag by Quick Response Code band envelope;Block sample Product (drill core sample etc.): undersized sample can be with the Quick Response Code band binding sample of normal size, and large scale sample is permissible Sample is bundled with the Quick Response Code band of long wire;The concrete sample of field fabrication: after the locking circlewise of Quick Response Code band, will It is fabricated to the non-exchange concrete quality tracing system that is available in annulus Transducers Embedded in Concrete and gathers the sample of experimental data. The given information of Quick Response Code includes but not limited to, the Producer of material, seller, user, the place of production, buy place, batch compile Number, purposes, responsible person etc..
When these coating packing buckets are transported to project scene, project Field Force utilizes entry terminal, to Quick Response Code Shoot or scan, read by material information and identification module reads and identifies and calculates representated by Quick Response Code Information, and the information reading, identifying is input in material information data base.Then utilize entry terminal to posting Quick Response Code The coating packing bucket of pattern is taken pictures, and the image after taking pictures is input in material information data base.
After material information is imported into material monitoring system, material comparing module will be obtained by Quick Response Code identification Material information and material production manufacturer in material information data base or the literary composition that prestores of project construction side or management side The material information of font formula contrasts, if the material prestored in the material information inputted and material information data base Information is inconsistent, then judge that current material is not certified products, and the entry terminal or higher used to Field Force, supervisor The entry terminal that the corresponding management personnel of rank are used provides corresponding information, and prompting material itself goes wrong, just Process accordingly in supervisor.
After the image of material is imported into material monitoring system, material comparing module is by the material image inputted and thing It is right that the material image that in material information database, the production firm of material or project construction side or management side prestore is carried out Ratio, if the material image prestored in the material image inputted and material information data base is inconsistent, then judges current Material is not certified products, and to Field Force, the entry terminal of supervisor's use or the corresponding management personnel institute of higher level The entry terminal used provides corresponding information, and prompting material itself goes wrong, it is simple to supervisor is carried out accordingly Process.So, from source, ensure that material enters the safety at scene, concordance, it is therefore prevented that material is played tricks.Described material Comparing module has corresponding image processing function, it is possible to the material image of input is carried out specific image procossing, including But be not limited to amplify, reduce, stretch, rotate, cutting, binaryzation, the common computer image processing technology such as denoising.This Outward, material comparing module also has image identification function, it is possible to by through image procossing material image be stored in advance in Image in material information data base is identified and contrasts, and identification and comparing result are given judged result.Owing to calculating Various computer image processing technologies are the most no longer carried out in detail by machine image processing techniques itself the invention emphasis of non-invention Thin description.If inputted is believed by the material prestored in the obtained material information of Quick Response Code and material information data base Breath is consistent, and the material image inputted is consistent with the material image prestored in material information data base, is then passed through Field test, confirm Quick Response Code, the RFID label tag pasted on material do not tear to pieces, the situation such as replacement, then judge current material It is certified products rather than the product replaced, and is given and is verified information accordingly.
According to another embodiment of the invention, for the component etc. that the volume of steel component etc is bigger, according to realization The coded system reserved in advance, by the relevant information of steel component, (including but not limited to, trade name, project name, production are criticized Secondary, production numbering, sales region, date of manufacture, the date of production, the geographical location information of grown place, other predefined information etc.) Generate RFID label tag and on steel component, paste the RFID label tag of correspondence.Then, the steel component posting RFID label tag is entered Row is taken pictures, and the image taken pictures then is input to the material information data base of material monitoring system by material input information module In.Steel component production firm or project construction side or management side will be with these steel components pair beforehand through entry terminal Material information that should be consistent, is input in the material information data base of material monitoring system by material input information module.? When these steel components are transported to project scene, utilize entry terminal, the RFID label tag of steel component is identified ( Under another embodiment, in addition to identifying RFID label tag, in addition it is also necessary to the steel component posting RFID label tag is shot Or scanning), read and identification module identification calculate the information representated by RFID by material information.
Material information reads and identification module, is used for reading and identifying material information, and its reading manner includes but not limited to Read Quick Response Code, bar code, image, RFID, word etc.;Described recognition method includes but not limited to that Quick Response Code identification, bar code are known Not, image recognition, RFID identification, Text region etc..As a example by reading and identifying Quick Response Code, image, RFID, material information reads Can read and identify the data in Quick Response Code with identification module, it is also possible to read and identify image, additionally it is possible to read and identify Information in RFID label tag, once occurs read error (to include but not limited to, it is impossible to read Quick Response Code, image, RFID or nothing Information etc. included in method identification Quick Response Code, image, RFID), then material information reads and identification module is to currently used Entry terminal and/or specific entry terminal and project management cloud platform system return miscue, thus point out current thing Material goes wrong, and Items in order supervisor or Field Force carry out confirming or checking.Described prompting includes but not limited to, Text prompt, voice message, picture cues, visual prompts, light prompt, vibration prompting and combinations thereof are pointed out.Owing to mistake carries Show the known manner belonging to this area, be not the important inventive point of the present invention, therefore repeat no more various prompting mode.
Certainly, above-mentioned material verification mode is only a kind of embodiment, is not intended that limitation of the present invention.Material is verified Also have other various ways, it is also possible to the simplest or increasingly complex, owing to material checking is the most involved in the present invention one Individual specific aspect, repeats no more other various materials verification modes, the replacement of these obvious verification modes, still falls within Protection scope of the present invention.Additionally, due to construction material form is of a great variety, the present invention cannot enumerate the place to material Reason.
Material enquiry module, for inquiring about material information.According to a specific embodiment of the present invention, material Inquiry mode can be character input modes, is i.e. needed the Word message of the material of inquiry by entry terminal input, at material Information database is inquired about corresponding material.If this material is present in material information data base, then return to entry terminal Corresponding Query Result.If this material does not exists, then point out corresponding error message.The Query Result of described return is the most permissible It is Word message, it is also possible to be the image of material.The most as required, it is also possible to enclose in Query Result and point out letter accordingly Breath.Information includes but not limited to word, voice, image, light etc..According to the another embodiment of the present invention, Material inquiry can also be carried out by input picture.Such as, by entry terminal, material is taken pictures, then the image of material is sent out Deliver in material monitoring system, the thing after material image being identified by material comparing module and in material information data base Material image contrasts, thus inquires about in material information data base, contrasts corresponding material.If this material is present in material In information database, then return corresponding Query Result to entry terminal.If this material does not exists, then point out corresponding mistake Information.The Query Result of described return both can be Word message, it is also possible to be the image of material.The most as required, it is possible to To enclose corresponding information in Query Result.Information includes but not limited to word, voice, image, light etc..When So, it is also possible to material inquiry is arranged authority and scope, sets different authorities and scope for different management personnel, it is ensured that The safety of material information and confidentiality.
Material information change and management module, for project on-the-spot material carry out information change and pipe Reason.The material information of the material that the project that comes into is on-the-spot there may be mistake, the situation such as be left out, therefore material information change and Material information in material information data base can be modified by management module, or directly increases in material information data base Add, delete, revise material information, so that material information can accurately reflect the practical situation that project is on-the-spot, lifting construction Side and the work efficiency of management side.According to one embodiment of present invention, material information change and management module can set more The authority changed and scope.Further, since material belongs to consumable goods, during project construction, its quantity consumed and stockpile number All being continually changing, the quantity consumed of material, occupation mode, stockpile number can be carried out by material information change and management module Manage, add up, check, collect, calculating etc., and can come pre-according to construction speed and condition of construction and construction budget situation Survey following material behaviour in service, thus help construction party and management side preferably material are exercised supervision and manage, improve pipe The efficiency of reason.
Material daily record and reporting modules, for material information being carried out log management, and can be to material information, management Information forms report, is sent to the management personnel of specified permission;But also daily record can be modified and annotate, each time Amendment and annotation all can form a new log content without covering original daily record;Amendment and the annotation of daily record all can be remembered Record detail time, and explain the reason.Therefore, material information daily record can reflect material daily record situation in objective reality ground, it is also possible to Verify when supplying and check.The management personnel of certain authority can inquire about and browse material by material daily record and reporting modules and believe Breath daily record and report, and can utilize material daily record and reporting modules to specific personnel send work order, plan or Backlog, it is simple to related personnel can complete material information daily record in time, accurately, report, is greatly improved work effect Rate, prevents mistakes and omissions.It is of course also possible to material daily record and report are arranged authority and scope, set for different management personnel Different authorities and scope, it is ensured that the safety of material log information and confidentiality.
Material information data base, for storing and manage the input of above-mentioned modules, output data.
According to the present invention, can mutually call between the modules in above-mentioned material monitoring system, it is possible to according to engineering The actual demand of Project Surveillance realizes different regulatory formats to the call relation determining between modules and workflow.Figure 3 and described above content not constitute the restriction to present disclosure, those skilled in the art is according to management demand, completely Being capable of various call relation and Management Process, the content of this on-demand adjustment repeats no more, various obvious changes, Replace, within broadly falling into protection scope of the present invention.
Fig. 4 is the workflow diagram of supervision module.As it can be seen, the flow process at supervision is as follows: site supervision Engineer, during making an inspection tour, is performed by the personnel of mobile terminal real time record job site, machinery, material, arrangement and method for construction Situation and weather affect situation etc. to construct, can include but not limited to the recording modes such as word, voice, video.Patrolling Depending on process if it find that have problems in work progress, then supervising engineer's problem to existing is with " problem rectification advice note " Form notifies unit in charge of construction's rectification, " problem rectification advice note " should can carry out pending accounts supervisor by problem pending accounts supervisor's system, It is tracked after Resolving probiems checking and accepting, after responsibility supervising engineer's acceptance(check), " problem rectification advice note " is done pin item and processes, This Guan Bi is handed over " the problem rectification advice note " of circle to close and is coupled in the middle of original tour record;Make an inspection tour record according to supervising engineer Authority, the information such as ID be automatically associated to the same day of this supervising engineer in supervision diary.Following form includes exemplary Supervision diary recorded content, certainly, only example effect, the present invention is not only restricted to this.
Fig. 5 is the workflow diagram of sidegating effect module.Start as it can be seen, on-site supervision engineer carries mobile terminal Sidegating effect, first verifies preparation of construction situation, will wherein affect the people of the form of quality process, machine, material, method, ring etc. Aspect factor carries out record comprehensively, and this workflow has arranged the other station prison of on-the-spot conventional some importance position, key procedure Reason template, in order to field personnel's standardization, carrying out the work to standardization, following form is with common cast-in-place concrete As a example by operation, arrange the project needing on-site verification.Certainly, this table is only example effect, and the present invention is not only restricted to this.
When site supervision personnel pinpoint the problems during station, side, should point out to unit in charge of construction site administrator in time And require rectification in time, and require to be carried out by " the problem rectification advice note " in sidegating effect module by problem description and rectification Record, and it is practicable to follow the tracks of rectification, sells item after checking.This problem rectification advice note and follow the tracks of implementation of conditions and make a copy for chief inspector's science and engineering simultaneously Cheng Shi.
The significant process of sidegating effect should be used mobile terminal to retain necessary image by sidegating effect personnel as requested Data, the photo such as working performance of concrete test of marching into the arena (includes the single receipt of haulage vehicle licence plate, transport, slump test, winter Season construction concrete opening temperature detection etc.), contrast photo before and after the rectification pinpointed the problems of management witness sampling process, scene Deng.Log in, by mobile terminal, the image data that management clouds terrace system gathers, other station can be uploaded to by mobile network in real time In management record, it is also possible to first preserve in the terminal, centralized office work district to be returned is uploaded by wireless network.
What sidegating effect personnel should complete side reporting after completing sidegating effect work in time fills in work.Sidegating effect is remembered Record can automatically judge according to the sidegating effect end time, when the sidegating effect end time working time day shift (8:30~ Time in the range of 17:00), this part of sidegating effect record can be automatically associated in the supervision diary on this sidegating effect personnel same day;When When the sidegating effect end time is in the range of the night job time (17:00~8:30 next day), this part of sidegating effect record can be certainly In the dynamic night shift record being associated with project management department's same day.Sidegating effect record, after chief inspector's selective examination is checked, will automatically go to data certainly In dynamic filing system.
It addition, according to a specific embodiment of the present invention, the division of aforementioned night job time day shift enumerated is only For example, the distribution of concrete time can be different and arrange according to each project, and above-mentioned day shift, the differentiation of night shift have no effect on this The goal of the invention of invention, does not limits the invention.
Fig. 6 is the workflow diagram that module is checked and accepted in management.As it can be seen, inspection lot is made a report on by authorized ports by unit in charge of construction Check and accept file, then, check and accept file and flow to responsibility supervising engineer according to the working region division of labor delimited in advance, it follows that prison Reason engineer carries out interior industry examination & verification to Inspection lot acceptance file.If examination & verification is passed through, then supervising engineer is according to the time of agreement Entity examination is carried out to scene;If examination & verification is not passed through, the most directly return initiating port and enter according to acceptance criteria and reform advice Row rectification, and continue to be made a report on Inspection lot acceptance file by unit in charge of construction by authorized ports.
Supervising engineer carries out entity examination according to the time of agreement to scene, if by checking and accepting, then and supervising engineer File is checked and accepted in signature, agrees to turn sequence construction;If not by checking and accepting, the most directly returning initiating port according to acceptance criteria and rectification Suggestion is rectified and improved, and continues to be made a report on Inspection lot acceptance file by unit in charge of construction by authorized ports.
When supervising engineer signs examination file, after agreeing to turn sequence construction, then: 1, signed file background uploads to money Material automatic archiving system;2, signed file reverse is fed unit in charge of construction's authorized client;3, signed file auto-associating Supervision diary to responsible engineer.
Fig. 7 is witness sampling and the workflow diagram of censorship module.As it can be seen, unit in charge of construction's testing crew is by authorizing Port makes a report on witness sampling record, and witness record flows to responsibility supervising engineer according to the working region division of labor delimited in advance;Should Supervising engineer carries out witness sampling on the spot according to the time of agreement to scene, enters sampling spot, sampling process, approved sample process Row photo or video data shooting, can upload as the adnexa that this witness records;After completing witness sampling work on the spot, management work Cheng Shi signature witness record;This supervising engineer is by (according to one embodiment of present invention, anti-for the false proof Quick Response Code of tracing to the source bought Puppet Quick Response Code of tracing to the source is easily to tear to pieces type Quick Response Code) with the witness writing scan binding of this part (i.e. scan this Quick Response Code by system, The witness sampling information of this test specimen can be obtained);Supervising engineer this Quick Response Code is fixed on test specimen the most not cracky it Corresponding labelled rule (according to one embodiment of present invention, for different witness sampling test specimens, have been formulated in advance in position Then, as being affixed on outside etc. after steel reinforcing bar specimen bundling);
Being delivered to witness laboratory by witness test specimen by unit in charge of construction, laboratory is received sample personnel and is first confirmd that the witness examination received The integrity of part anti-fake two-dimension code;
Laboratory is received sample personnel and is obtained witness sampling information by authorized ports scanning anti-fake two-dimension code;
Laboratory requires to test according to order ticket, provides laboratory report;
Experimenter passes through authorized ports pump back test result (laboratory report);
Supervising engineer judges whether experimental result meets design and code requirement;
If it is determined that experimental result meets design and code requirement, retrial material may be used for engineering entity, job site Sequence construction can be turned;Then formed and hand over circle data to be included into data automatic archiving system;
If it is determined that experimental result does not meets design and code requirement, retrial material need to be withdrawn from the arena process, and scene takes to add Times retrial, operation are done over again, or structural solid inspection etc. processes, and form written mabage report;Then formed and hand over circle data to be included into Data automatic archiving system.
Fig. 8 is the workflow of management logging modle.First, on-site supervision engineer is respectively according to the management carried out Type of work selects operational module, as performed on-the-spot tour, management examination, sidegating effect, forms corresponding on-the-spot tour respectively Record, management record of acceptance, sidegating effect record and management instruction etc., this type of record will log according to supervising engineer Descriptor clip Text is associated with in the middle of supervising engineer's diary by port automatically, and supervising engineer's diary is not required to repeat to fill in State content.A specific embodiment according to the present invention, supervision diary is complete as supervising engineer's achievement every day Face record, it is necessary to will work every day and carry out itemized record, supervising engineer is logged in by authorized ports and carries out the work, formation Work in every record such as tour, examination, other station etc., be all associated with in the middle of the supervision diary on the same day, formed and only need to be performed one Secondary written typing, it is possible to automatically generate the related content in the middle of supervision diary.
Additionally, on-the-spot record, management record of acceptance and the sidegating effect record maked an inspection tour of night shift will be associated with project night shift note In the middle of record.
And the supervision diary of the supervising engineer of all work on duty on the same day will be associated with in the middle of Project Surveillance daily record.
Chief supervision engineer is responsible for filling in chief supervision engineer's diary, checks Project Surveillance daily record every day, project is supervised safely Manage daily record and project night shift record confirmation of signing.
Certainly, utilize the system of the present invention, other kinds of daily record can be generated according to project demands or particular demands Or record, includes but not limited to that above-mentioned daily record, diary, record, above-mentioned daily record, diary, record are only used as the concrete of the present invention Embodiment, and be not considered as limiting the invention.
Fig. 9 is management instruction module flow chart.If as it can be seen, at the scene supervision process is pinpointed the problems, then Problem is rectified and improved advice note and sends to unit in charge of construction responsible person concerned.Wherein, problem rectification advice note at least include work contact list, Management advice note, engineering moratorium.
After unit in charge of construction rectifies and improves, carry out written reply, application check, then carried out check by supervising engineer and test Card.If supervising engineer to check checking qualified, then when problem rectification advice note, labelling goes wrong and rectifies and improves.
Figure 10 is that problem pending accounts supervise and manage system flow chart.As it can be seen, the problem needing pending accounts to supervise and manage derives from management work The problem found during the tour of Cheng Shi scene, examination, station, side, or the problem of quality, safe joint construction discovery, or meeting proposition need to Rectify and improve the item implemented, or chief inspector arrange to follow the tracks of practicable item, or department at different levels and leader's inspection need to be rectified and improved and implement item, For the above-mentioned various problems occurred in supervision process, the person liable that first implemented by the clear and definite issue track of problem sponsor, ask Topic rectification person liable and rectification time limit requirement, form problem rectification notice single-shot related responsibility unit person liable's problem rectification responsibility People, simultaneously and the terminal of supervising engineer of responsible issue track there will be a pending problem, the notice meeting of this pending problem The rectification time limit according to setting carries out countdown bright light prompting (according to the exemplary embodiment of the present invention, such as the countdown time limit 4 Being green light before hour, bright orange lamp between countdown time limit 4~1 hour, bright orange lamp in 1 hour countdown time limit, during countdown Limit has been crossed and has been sent out a warning).
Problem has been rectified and improved, and by problem, rectification person liable applies for checking and examination to the supervising engineer of responsible tracking, is responsible for the prison followed the tracks of Reason engineer show up check rectification implementation of conditions (or by the supervising engineer of responsible tracking actively make an inspection tour follow-up investigations problem rectify and improve Situation).If it is qualified to check, then carry out pin item process;If checking defective, then repeat the above steps.
Figure 11 is performance appraisal system flow chart.As it can be seen, can by for supervisor's routine work records appraisal, Issue track is implemented completion rate, promptness rate, the quality and quantity of problem of pinpointing the problems, solve, is abided by Zhang Shouji, professional ethics, industry The business performance assessment criteria such as examination, according to the timing node set (as can be quarterly (last moon 25 according to the needs of examination Day), every half a year (last moon 25), or every year (last moon 25), or the most at any time by the end of Point sometime) quantify after data automatically capture input checking system, according to computation model set in advance (the most each quantization Performance assessment criteria gives certain weight, calculates weight score), draw evaluation score and ranking;Company management's layer is with reference to achievement The effect result of appraisal are managed decision-making.
According to a specific embodiment of the present invention, it is provided that following data-measuring mode: supervisor's routine work is remembered First record can circulate to the port of chief supervision engineer after submission every day, chief inspector carry out selective examination and check and provide evaluation, necessary Time concrete modification suggestion is proposed, chief inspector evaluates corresponding to corresponding mark, can collect calculate score by all evaluating;Problem with The completion rate of track and promptness rate can show by mathematical statistics that (situation about such as, sending out a warning without reason will be by certain point of deduction Number);Pinpoint the problems, solve the quantity of problem, quality, just carry out via chief inspector's port in the link making a report on problem rectification advice note Evaluate, and be converted to quantify score value;Remaining abide by chapter keep travel notes be, professional ethics observing situation and business evaluating active situation permissible According to the regulation of company management's system, carry out bonus point, deduction of points or Data Input etc. and process, when event occurs by company management people Member's typing.
Figure 12 is standard criterion data base and employee's self-service query system, help system flow chart.As it can be seen, according to this One specific embodiment of invention, the seek help workflow of inquiry system of employee's self-service query system, employee is as follows:
Supervising engineer encounters problems in the course of the work, and (inquiry mode is logical to log in self-service query by authorized ports Crossing descriptor search, recommend corresponding contents in standard criterion data base, descriptor definition is the most accurate, searches for content recommendation meeting The most targeted);
By the inquiry to standard criterion data base, it is thus achieved that query feedback information;
If problem has been resolved, then return information and the related content of Resolving probiems;
If problem does not has been resolved, then employee is turned to seek help passage;
Sought help inquiry system by employee, expert engineer or Professional team leaders the problem not having been resolved is solved Answer, and return answer information and related content;
If the problem not having been resolved still cannot be answered by expert engineer or Professional team leaders, then by chief inspector's (generation Table) problem not having been resolved is answered, and return answer information and related content;
If the problem not having been resolved still cannot be answered by chief inspector's (representative), then by company project portion to not obtaining The problem solved is answered, and returns answer information and related content;
If the problem not having been resolved still cannot be answered by company project portion, then by expert advisor team to not obtaining Answer to the problem solved, and return answer information and related content.
Figure 13 is GPS working trajectory inquiry system flow chart.In this system self registering working time at the construction field (site) GPS working trajectory, the foundation remotely can registered as on-site supervision engineer, it is also possible to as on-site supervision engineer carry out The foundation of row management responsibility.As it can be seen, according to a specific embodiment of the present invention, when this inquiry system works, GPS work Make track inquiry system workflow as follows:
First, it is responsible for, by job site site plan uploading system, importing by chief supervision engineer after project is marched into the arena Gps data storehouse, and used mobile terminal to carry out straightened up in place by on-site supervision engineer;
Project Surveillance engineer carry out the work to hilllock every day, registry entry management cloud platform;System can check mobile terminal GPS whether open, as do not opened, system can be pointed out to be needed to open GPS;
Supervising engineer carries mobile terminal and carries out the work to scene, and system captured supervising engineer automatically every 5 minutes Present position, and will the temporal information of this some position and geographical location information site plan in systems be marked;
Supervising engineer can check the on-the-spot Real-time and Dynamic point position information on my same day by mobile terminal;Chief inspector and public affairs Department's management level can check arbitrary employee's history dynamic position by PC/ mobile terminal;
Company can be used for fighting line length, the scattered project of personnel using employee scene GPS location information as attendance record Staff's benefits.
Figure 14 is data automatic archiving system flow chart.As it can be seen, according to a specific embodiment of the present invention, this is System workflow is as follows:
Step 1: the money filed through the data examined, each side's contact letters, instruction, other needs that unit in charge of construction reports and submits Material, by scanning, forms electronic document and preserves;And the electronic edition data that Supervision Project portion is formed during implement stakeout It is also carried out preserving;
Step 2: according to set three grades of tree sort coding schemes (table 1 is exemplary sorting code number system, not as Limiting the scope of the invention), according to cryptoprinciple by grouping of data coding the most saved in step 1;
1 three grades of tree sort coding schemes of table
Step 3: after data being carried out sorting code number by full-time documenter, report chief supervision engineer to upload after auditing approval;
Step 4: according to the filing principle automatic archiving set;I.e. as shown in table 1, first five identical data of data coding It is included into identical file folder, and starts flowline numbering, i.e. XX101001 according to the sequencing forming the time from 001;
Step 5: the data in identical file folder can automatically generate (or renewal) respective roll in-list according to data descriptor;
Step 6: generate after list in volume, can carry out according to demand inquiring about, adds up, sorts, associate management report.
Additionally, the letter that described data automatic archiving system can also store every other subsystem, module inputted, exports Breath.
Figure 15 is to be shown supervision diary according to what one specific embodiment of the present invention realized on project mobile terminal Exemplary screen shots.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit protection scope of the present invention.All Within the spirit and principles in the present invention, any amendment, equivalent and the improvement etc. made, should be included in the guarantor of the present invention Within the scope of protecting.

Claims (7)

1. a project management cloud platform system based on material supervision, it is characterised in that described project management cloud platform system Including:
Described material monitoring system, for being identified the material in project management, manage;Wherein,
Described material monitoring system at least includes such as lower module:
Material information input module, for being input to material information in described material monitoring system;
Material information reads and identification module, is used for reading and identifying material information;
Material comparing module, for the thing after material information is imported into described material monitoring system, obtained by identifying Material information contrasts with the material information in material information data base, and provides corresponding prompting;
Material enquiry module, is used for inquiring about material information;
Material information change and management module, for carrying out information change and management to material;
Material daily record and reporting modules, for material information is carried out log management, and form report;
Material information data base, for storing and manage the input of above-mentioned modules, output data;
And,
Described project management cloud platform system also includes: management system, for the personnel of supervision control engineering project, material, number According to;
Described management system at least includes such as lower module:
Supervision module, is used for by the personnel of mobile terminal records job site, material, arrangement and method for construction implementation status, and Formed and make an inspection tour record;When work progress exists particular case, described mobile terminal by described supervision module by institute State particular case and be sent to problem pending accounts supervisor's system, and tour record is automatically associated in supervision diary;
Sidegating effect module, for being verified preparation of construction situation by mobile terminal, preserving image data, and forms side Stand record;
Module is checked and accepted in management, for the completion situation of job site is carried out entity examination, and forms record of acceptance, and will pass through The files passe checked and accepted is to data automatic archiving system;
Witness sampling and censorship module, for making a report on witness sampling record, by the way of shooting image, photo, audiovisual materials Carry out witness sampling and by witness sampling information censorship automatic archiving;
Management logging modle, for forming the management record of corresponding types and automatically closing according to management type Connection;
Management instruction module, for being sent to the particular problem found during site supervision formation management written instructions Unit in charge of construction.
Project management cloud platform system based on material supervision the most according to claim 1, it is characterised in that described material MIM message input module uses and is inputted by material information with forms such as word, numeral, bar code, Quick Response Code, image, video, RFID In described material monitoring system.
Project management cloud platform system based on material supervision the most according to claim 1, it is characterised in that described material Information reads and identification module uses the forms such as word, numeral, bar code, Quick Response Code, image, video, RFID to read and identifies Material information.
Project management cloud platform system based on material supervision the most according to claim 1, it is characterised in that described material Comparing module has image processing function and image identification function, for being believed with material by the material image through image procossing Image in breath data base is identified and contrasts.
Project management cloud platform system based on material supervision the most according to claim 1, it is characterised in that described material Enquiry module inquires about material information by the way of word, image in described material information data base.
Project management cloud platform system based on material supervision the most according to claim 1, it is characterised in that described project Management cloud platform system also includes:
Problem pending accounts supervisor's system, the problem found during recording on-the-spot tour in supervision process, examination, other station, and And formation problem rectification advice note is sent to problem rectification person liable, simultaneously in the movement of supervising engineer of responsible issue track There is corresponding pending problem in terminal, and described pending problem notice can be reminded according to the rectification time limit set;If problem Rectification completes, and by problem, rectification person liable applies for checking and examination to the supervising engineer of responsible tracking, and the supervising engineer being responsible for following the tracks of shows up Check rectification implementation of conditions, or actively maked an inspection tour follow-up investigations problem rectification situation by the supervising engineer of responsible tracking;If it is multiple It is qualified to look into, then carry out pin item process;
GPS working trajectory inquiry system, is used for inquiring about supervisor present position, and it is automatic that its working trajectory is uploaded to data Filing system;With
Performance appraisal system, described performance appraisal system will be implemented for supervisor's routine work records appraisal, issue track Completion rate, promptness rate, pinpoint the problems, the solve quality and quantity of problem, performance assessment criteria, draw achievement according to the timing node set The effect result of appraisal;
Data automatic archiving system, for automatically achieving each system included in described project management cloud platform system and Ge Mo Input involved by block, output data.
7. according to the project management cloud platform system based on material supervision described in claim 1 and 2, it is characterised in that described Project management cloud platform system also includes:
Standard criterion data base and employee's self-service query, help system;
Supervising engineer encounters problems in the course of the work, by authorized ports log in described standard criterion data base and employee from Help inquiry, help system carry out self-service query or seek help, return the feedback information obtained.
CN201610322652.6A 2016-05-17 2016-05-17 Engineering project management cloud platform system based on material tracking Pending CN106056268A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610322652.6A CN106056268A (en) 2016-05-17 2016-05-17 Engineering project management cloud platform system based on material tracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610322652.6A CN106056268A (en) 2016-05-17 2016-05-17 Engineering project management cloud platform system based on material tracking

Publications (1)

Publication Number Publication Date
CN106056268A true CN106056268A (en) 2016-10-26

Family

ID=57177359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610322652.6A Pending CN106056268A (en) 2016-05-17 2016-05-17 Engineering project management cloud platform system based on material tracking

Country Status (1)

Country Link
CN (1) CN106056268A (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN106897642A (en) * 2017-01-25 2017-06-27 上海建工五建集团有限公司 Prefabricated components are received acceptance method and system
CN107016624A (en) * 2017-01-25 2017-08-04 上海建工五建集团有限公司 Prefabricated components install the method and system checked and accepted
CN107016484A (en) * 2017-01-25 2017-08-04 上海建工五建集团有限公司 Prefabricated components produce acceptance method and system
CN107330634A (en) * 2017-07-20 2017-11-07 浙江之江工程项目管理有限公司 A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system
CN107358416A (en) * 2017-09-12 2017-11-17 安徽易商数码科技有限公司 A kind of product quality supervision management system
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN107657421A (en) * 2017-08-04 2018-02-02 鸿鑫互联科技(北京)股份有限公司 Project management file uploads control method, device, system and mobile terminal
CN107917829A (en) * 2017-03-10 2018-04-17 湖南建研信息技术股份有限公司 A kind of anti-exchange method of concrete sample implantation label
CN107957986A (en) * 2017-10-19 2018-04-24 陈伟麟 Original record intelligent editing method and system are calibrated in a kind of measurement verification
CN108492048A (en) * 2018-03-30 2018-09-04 北京半导体专用设备研究所(中国电子科技集团公司第四十五研究所) material tracking method and device
CN108573369A (en) * 2018-03-27 2018-09-25 崔战宾 Construction management system and method with feedback
CN108876395A (en) * 2017-05-15 2018-11-23 广东省有机硅工程技术研究开发中心 A kind of joint trimming agent product serviceization platform business model
CN108898333A (en) * 2018-05-28 2018-11-27 大唐广电科技(武汉)有限公司 A kind of logistics control system and method for view-based access control model identification
CN109472426A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Material cost management method, system, storage medium and the terminal device of live project
CN109583842A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of management monthly magazine generation method, device, electronic equipment and computer storage medium
CN109598442A (en) * 2018-12-04 2019-04-09 北京诺士诚国际工程项目管理有限公司 A kind of methods of marking and device of supervision behavior
CN109685180A (en) * 2019-03-18 2019-04-26 深南电路股份有限公司 Method of calibration, device, computer equipment and the readable storage medium storing program for executing of product material
CN109739185A (en) * 2018-11-16 2019-05-10 成都生活家网络科技有限公司 Long-distance intelligent house ornamentation field management system
CN109829644A (en) * 2019-01-30 2019-05-31 北京金科汇智科技有限公司 A kind of concrete agitation station management system and method
CN109993452A (en) * 2019-04-09 2019-07-09 赣州和永软件开发有限责任公司 Engineering project performance appraisal method and system
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN110942272A (en) * 2019-12-13 2020-03-31 河南城建学院 Engineering project management cloud platform system based on material tracking
CN111340450A (en) * 2020-02-28 2020-06-26 上海必耀科技有限公司 Material information batch new building system and method for batch new building of materials
CN111598199A (en) * 2020-05-26 2020-08-28 成都鹏业软件股份有限公司 Two-dimensional code generation method
CN111598542A (en) * 2020-05-21 2020-08-28 贵州普致丰科技有限公司 Electric power production project archive management system stored according to progress
CN111596634A (en) * 2020-06-17 2020-08-28 中冶京诚工程技术有限公司 Intelligent petroleum oil casing processing production system and production method
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN111985893A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Building engineering project material entry auditing method, intelligent terminal and storage medium
CN112001589A (en) * 2020-07-17 2020-11-27 上海有间建筑科技有限公司 Engineering project potential safety hazard troubleshooting system and troubleshooting method thereof
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN115210746A (en) * 2020-03-03 2022-10-18 大金工业株式会社 Shooting sequence presentation program
CN116166839A (en) * 2023-03-01 2023-05-26 广州广检建设工程检测中心有限公司 Core drilling process supervision system, method, medium and computer
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101873228A (en) * 2010-06-12 2010-10-27 中兴通讯股份有限公司 Management system and method for material information of network equipment
CN101882253A (en) * 2009-05-08 2010-11-10 北京正辰科技发展有限责任公司 Material analysis, prediction and management system
CN102404118A (en) * 2011-10-19 2012-04-04 陈坚 Object certification method based on short-distance communication terminal
CN102915490A (en) * 2011-06-29 2013-02-06 通用电气公司 Automated system for digitized product management
CN103886401A (en) * 2013-09-25 2014-06-25 西安云澜信息科技有限公司 Project management system based on cloud computation
CN104134124A (en) * 2014-07-31 2014-11-05 武钢集团昆明钢铁股份有限公司 Enterprise material management system and method
CN105069603A (en) * 2015-09-09 2015-11-18 三一汽车起重机械有限公司 Freight management handhold terminal, freight management system and method
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882253A (en) * 2009-05-08 2010-11-10 北京正辰科技发展有限责任公司 Material analysis, prediction and management system
CN101873228A (en) * 2010-06-12 2010-10-27 中兴通讯股份有限公司 Management system and method for material information of network equipment
CN102915490A (en) * 2011-06-29 2013-02-06 通用电气公司 Automated system for digitized product management
CN102404118A (en) * 2011-10-19 2012-04-04 陈坚 Object certification method based on short-distance communication terminal
CN103886401A (en) * 2013-09-25 2014-06-25 西安云澜信息科技有限公司 Project management system based on cloud computation
CN104134124A (en) * 2014-07-31 2014-11-05 武钢集团昆明钢铁股份有限公司 Enterprise material management system and method
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system
CN105069603A (en) * 2015-09-09 2015-11-18 三一汽车起重机械有限公司 Freight management handhold terminal, freight management system and method

Cited By (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897642A (en) * 2017-01-25 2017-06-27 上海建工五建集团有限公司 Prefabricated components are received acceptance method and system
CN107016624A (en) * 2017-01-25 2017-08-04 上海建工五建集团有限公司 Prefabricated components install the method and system checked and accepted
CN107016484A (en) * 2017-01-25 2017-08-04 上海建工五建集团有限公司 Prefabricated components produce acceptance method and system
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN107917829A (en) * 2017-03-10 2018-04-17 湖南建研信息技术股份有限公司 A kind of anti-exchange method of concrete sample implantation label
CN107917829B (en) * 2017-03-10 2020-04-17 湖南建研信息技术股份有限公司 Anti-exchange method for concrete test piece implantation label
CN108876395A (en) * 2017-05-15 2018-11-23 广东省有机硅工程技术研究开发中心 A kind of joint trimming agent product serviceization platform business model
CN107330634B (en) * 2017-07-20 2020-10-16 浙江之江工程项目管理有限公司 Engineering construction supervision quality acceptance actual measurement method and system thereof
CN107330634A (en) * 2017-07-20 2017-11-07 浙江之江工程项目管理有限公司 A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN107657421A (en) * 2017-08-04 2018-02-02 鸿鑫互联科技(北京)股份有限公司 Project management file uploads control method, device, system and mobile terminal
CN109472426A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Material cost management method, system, storage medium and the terminal device of live project
CN107358416A (en) * 2017-09-12 2017-11-17 安徽易商数码科技有限公司 A kind of product quality supervision management system
CN107957986A (en) * 2017-10-19 2018-04-24 陈伟麟 Original record intelligent editing method and system are calibrated in a kind of measurement verification
CN107957986B (en) * 2017-10-19 2019-04-16 陈伟麟 A kind of measurement verification calibration original record intelligent editing method and system
CN108573369A (en) * 2018-03-27 2018-09-25 崔战宾 Construction management system and method with feedback
CN108492048A (en) * 2018-03-30 2018-09-04 北京半导体专用设备研究所(中国电子科技集团公司第四十五研究所) material tracking method and device
CN108898333A (en) * 2018-05-28 2018-11-27 大唐广电科技(武汉)有限公司 A kind of logistics control system and method for view-based access control model identification
CN109739185A (en) * 2018-11-16 2019-05-10 成都生活家网络科技有限公司 Long-distance intelligent house ornamentation field management system
CN109598442A (en) * 2018-12-04 2019-04-09 北京诺士诚国际工程项目管理有限公司 A kind of methods of marking and device of supervision behavior
CN109583842A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of management monthly magazine generation method, device, electronic equipment and computer storage medium
CN109829644A (en) * 2019-01-30 2019-05-31 北京金科汇智科技有限公司 A kind of concrete agitation station management system and method
CN109685180A (en) * 2019-03-18 2019-04-26 深南电路股份有限公司 Method of calibration, device, computer equipment and the readable storage medium storing program for executing of product material
CN109993452A (en) * 2019-04-09 2019-07-09 赣州和永软件开发有限责任公司 Engineering project performance appraisal method and system
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN110942272A (en) * 2019-12-13 2020-03-31 河南城建学院 Engineering project management cloud platform system based on material tracking
CN111340450A (en) * 2020-02-28 2020-06-26 上海必耀科技有限公司 Material information batch new building system and method for batch new building of materials
CN115210746A (en) * 2020-03-03 2022-10-18 大金工业株式会社 Shooting sequence presentation program
CN111598542A (en) * 2020-05-21 2020-08-28 贵州普致丰科技有限公司 Electric power production project archive management system stored according to progress
CN111598199A (en) * 2020-05-26 2020-08-28 成都鹏业软件股份有限公司 Two-dimensional code generation method
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN111596634A (en) * 2020-06-17 2020-08-28 中冶京诚工程技术有限公司 Intelligent petroleum oil casing processing production system and production method
CN112001589A (en) * 2020-07-17 2020-11-27 上海有间建筑科技有限公司 Engineering project potential safety hazard troubleshooting system and troubleshooting method thereof
CN111985893A (en) * 2020-08-15 2020-11-24 武汉华胜工程建设科技有限公司 Building engineering project material entry auditing method, intelligent terminal and storage medium
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN116166839A (en) * 2023-03-01 2023-05-26 广州广检建设工程检测中心有限公司 Core drilling process supervision system, method, medium and computer
CN116166839B (en) * 2023-03-01 2023-09-12 广州广检建设工程检测中心有限公司 Core drilling process supervision system, method, medium and computer
CN116501921A (en) * 2023-06-25 2023-07-28 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN116501921B (en) * 2023-06-25 2023-09-15 长沙计支宝信息科技有限公司 Test data processing method and system for press machine for testing performance of building material
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things
CN116644943B (en) * 2023-07-26 2023-09-29 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things

Similar Documents

Publication Publication Date Title
CN106056268A (en) Engineering project management cloud platform system based on material tracking
CN106169131A (en) Project management cloud platform system based on the Internet
CN106056347A (en) Engineering project management cloud platform system based on video monitoring
US7664685B1 (en) Computer-implemented system for recording oil and gas inspection data
CN105761023A (en) Outsourcing team control system
CA2507565A1 (en) System and method for tracking environmental emission reductions
CN107248985A (en) A kind of network security test and appraisal and project quality assessment system
CN105809362A (en) Operating method of outsourcing team management and control system
US20070136082A1 (en) System and method for energy diversion investigation management
CN115375146A (en) Digital construction integrated platform
US11288308B2 (en) System for a verifiable physical object with a digital representation and related applications
CN102968678A (en) Fixed asset project management system based on geographic information system
CN104008450A (en) Testing organization ERP management method
CN110727774A (en) Engineering cost consultation management system
TWM610797U (en) Waste full-resume tracking and processing system
CN207070219U (en) Projects supervision system based on video monitoring
Zahadat Digital forensics, a need for credentials and standards
KR20200048966A (en) System and method for certifying trading related companies
Tyler Asset management the track towards quality documentation
US20230176246A1 (en) System for immutability verifying, recording and storing digital representation of objects and events
US11610202B2 (en) Immutable ledger digital physical asset audit platform
CN205644629U (en) Handheld terminal of management and control system of outsourcing troop
CN113807797A (en) Underground engineering construction management and monitoring system integrated with BIM and intelligent algorithm
CN113011697A (en) Enterprise and institution unit management and supervision standardized assessment platform
US20200082312A1 (en) System and method for preserving forests and certifying the supply chain of lumber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Beijing North International Engineering Project Management Co. Ltd.

Document name: Notification of Decision on Request for Restoration of Right

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: BEIJING NUOSHICHENG INTERNATIONAL ENGINEERING PROJECT MANAGEMENT Co.,Ltd.

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Qiao Ruilin

Document name: Notification of Passing Examination on Formalities

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026